Loading...
HomeMy WebLinkAboutChange Order No 1 - Two-Way Conversion of Colfax Ave., Phase II Proj No. 115-053B - Walsh & Kelly, Inc.  GARY A. GILOT ELIZABETH A. MARADIK JORDAN V. GATHERS JOSEPH R. MOLNAR 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS December 8, 2020 Mr. John M. Peisker Walsh & Kelly, Inc. 24358 State Road 23 South Bend, IN 46614 akrueger@walshkelly.com RE: Change Order No. 1 – Two-Way Conversion of Colfax Ave., Phase II Project No. 115-053B Dear Mr. Peisker: The Board of Public Works, at its meeting held on December 8, 2020, approved the above referenced Change Order for an increase of $25,059.38, bringing the current contract amount to $619,959.38. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, s/Linda M. Martin, Clerk Enclosure DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING Project Number: _______________ Project Name: __________________________ Change Order #: ____ DATE INITIATED: BPW DATE: Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). Attachments: (List documents support change – required) Amount of ☐Increase / ☐Decrease: $____________________ Categories (Pick One): ☐ Scope of Work ☐ Differing Site Conditions, Changed Conditions ☐ Conflicted Specifications and Drawings ☐ Failed Materials ☐ Error ☐ Omission ☐ Final Quantity Adjustment ☐ _______________________ Previously approved Change Order(s): $___________________ Current Percent of Change: ____________________ % New Total Amount: $____________________ Total Percent of Change: ____________________ % Funding Secured From: __________________________ (filled out by PM) RECOMMENDED BY: Project Inspector (Print Name) (Signature) (Date) REVIEWED BY: Construction Manager (Print Name) (Signature) (Date) APPROVED BY: Engineering Project Manager (Print Name) (Signature) (Date) APPROVED BY: City Engineer (Print Name) (Signature) (Date) Phone: 574-288-6950 Fax: 574-289-1096 3680 W. Sample St., South Bend, IN 46619 September 21, 2020 Josh, Based on our conversations and our last quote I have revised the scope of work per your request. Now that it’s mid September I would suggest we wait a few weeks for a hard frost. After that, the weeds that are present on site will die. We’ll remove the taller weeds and address areas of other weeds either by removing them, cutting them or tilling them. We’ll then prep the areas for seed and overseed the site. By using this approach we can eliminate the need/cost to spray the weeds to kill them and the need to hydro mulch as long as we work the seed into the soil since there will be more moisture this time of year. I’d suggest we perform this work in mid to late October because once overseeding occurs you’ll not be able to mow this area again until spring. Our total for this work is $2,691 Thank you for allowing us to submit this estimate. Jeff +10% Contractor Mark-Up $2,960.10 December 8, 2020 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 11/16/20 Name Kyle Silveus Department Engineering BPW Date 11/24/20 Phone Extension 9083 Required Prior to Submittal to Board Legal Attorney Name Clara McDaniels Controller Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing Michael Schmidt Check the Appropriate Item Type – Required for All Submissions Agreement Contract Proposal Addendum Professional Services Resolution Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Change Order No. 1 C/O & PCA No. PCA Ease/Encroach. Traffic Control Other: Required Information Company or Vendor Name Walsh and Kelly, Inc. New Vendor Yes No If Yes, Approved by Purchasing MBE/WBE Contractor MBE WBE MBE/WBE Contractor Requested No Yes Name of Company Project Name Two-Way Conversion of Colfax Ave. – Phase II Project Number 115-053B Funding Source River West Development Area TIF Account No. 324-1050-460.42-01 Amount Terms of Contract Final Quantity Adjustment, Additional Seeding Purpose/Description Required Contractor’s Certification Form Attached (Non- Collusion, Non-Discrimination, Non-Debarment, E-Verify, Iran, etc.) Required For Change Orders Only Amount of Increase Decrease $ 25,059.38 $ Previous Amount $ 594,900 Current Percent of Change: 4.21% New Amount $ 619,959.38 Total Percent of Change: 4.21% Dispersal After Approval Copy Original