HomeMy WebLinkAboutOpening of Bids - North Shore Drive Bank Stabilization Proj No. 118-005A - Northern Indiana Construction Co., Inc.CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name
Project No.
For Bids Due
North Shore Drive Bank Stabilization
118-005A
December 8, 2020
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check
X or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
X executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
X Certification of use of United States Steel Products or Foundry Products.
Proof of MWBE Utilization Plan [MWBE-1.0]. If minimum participation goal is not met, also
provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MWBE Contacted Form
X [MWBE-2.1].
X Acknowledge Receipt of 1 Addendum(s) included with the bid.
X All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
X printed or typed underneath signature.
X This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: Northern Indiana
By Authorized Repres
Signature:
Print Name & Title: Dav
on Companv Inc.
Version 01/29/2020 Contractor's Bid for Public Works - 1
Date: December 8. 2020
;e �
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: North Shore Drive Bank Stabilization
Project Number: 118-005A
For Bids Due: December 8, 2020
Contractor Name: Northern Indiana Construction Company Inc.
BASE BID
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
MOBILIZATION AND DEMOBILIZATION
1
LS
12,150.00
12,150.00
2
MAINTENANCE OF TRAFFIC
1
LS
6,965.00
6,965.00
3
CONSTRUCTION ENGINEERING
1
LS
5,135.00
5,135.00
4
AS -BUILT DRAWING & REPORTING
1
LS
600.00
600.00
5
CLEARING, GRUBBING & OBSTRUCTION
REMOVAL
CLASS I RIPRAP
1
LS
25,816.20
25,816.20
6
800
TON
150.00
120,000.00
7
No. 2 STONE
80
TON
125.00
10,000.00
8
PERMANENT SEEDING
75
SYS
26.30
1,972.50
9
BARE ROOT PLANTINGS
75
EACH
21.36
1,602.00
10
TEMPORARY EROSION AND SEDIMENT
CONTROL
1
LS
9,185.00
9,185.00
11
TOPSOIL
40
TON
175.00
7,000.00
12
NAG C70OBN EROSION CONTROL BLANKET
OR EQUIVALENT
MILLING, UP TO 1.5"
140
650
SYS
SYS
51.55
7,217.00
13
9.00
5,850.00
14
HMA SURFACE, 9.5 MM - TYPE B
55
TON
167.00
9,185.00
15
LINE, THERMOPLASTIC, SOLID, YELLOW 4"
650
LFT
3.00
1,950.00
16
LINE, THERMOPLASTIC, SOLID, WHITE 4"
325
LFT
3.00
975.00
17
CONCRETE CURB, REMOVE
325
LFT
10.00
3,250.00
18
CONCRETE CURB, MODIFIED
325
LFT
25.40
8,255.00
19
GUARDRAIL, MGS W -BEAM, 6 ft, 3 in.
Spacing
240
LFT
45.00
10,800.00
20
GUARDRAIL END TREATMENTS
2
EACH
2,500.00
5,000.00
BASE BID TOTAL $ 252,907.70
Bidder (Firm): Northern Indiana Construction Company Inc.
Address: P. O. Box 1333
City/State/Zip: Mishawaka, IN. 46546 Telephone Number: 574 256.1811
(Signature)
David J. Walorski. President
(Printed Name of Person Signing)
Version 01/29/2020 Contractor's Bid for Public Works - 7
.k
rT, CL
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
See Attached
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid. See Attached
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.) See Attached
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded. See Attached
Version 01/29/2020 Contractor's Bid for Public Works - 3
PART II
(For projects of $150, 000 or more – IC 36-1-12-4)
Governmental Unit: Board of Public Works, City of South Bend, Indiana
Bidder (Firm) Northern Indiana Construction Companv Inc.
Date (month, day, year): December 8, 2020
These statements to be submitted under oath by each bidder with and as a part of his bid
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. What public works projects has your organization completed for the period of one (1) year prior to the
date of the current bid?
Contract Amount Class of Work
Completion
Date
January, 2015
Name and Address of Owner_
INDOT-B-34332-A LaPorte Dist
557 606.86
Bridge Replacement
__2&2,&6.3,50
Bridge Replacement
May, 2017
Starke Coun Bridge No. 78
27 531.20
Bridge Replacement
Au_gust, 2017
Starke Coun Bridge No. 50
414 314.45
Bridge Replacement
I May, 2017
Fulton County Bridge No. 503
2. What public works projects are now in process of construction by your organization?
Expected
Lcontract Amount Class of Work Completion J Name and Address of Owner
_ _} Date
526,525.06 JBriAge Replacement December, 2020 Elkhart County Highway Dept.
493 107.35 (Bridge Deck Overlay September, 20211 Bridge Deck Overlay & Str. Repl
3. Have you ever failed to complete any work awarded to you? No _ If so, where and why?
4. List references from private firms for which you have performed work.
Niblock Excaygting, Inc.,]'. I Box 211 is of ltidiaBA46507
C & E Excavating, Inc. 53767 CR 9 Elkhart Indiana 46514
Ritschard Brothers Inc. 1204 W. Sample Street ,South Bend, Indiana 46619
_ —
John Bae her Sewer & Fycavating Contractor, 3305 N. Home Strcct Mishawaka IN. 46545
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
t . Explain your plan or layout for performing proposed work. (Examples could include a narrative of when
you could begin work, complete the project, number of workers, etc. and any other information which you
believe would enable the governmental unit to consider your bid.)
Work will be performed within the allotted time with N. L C. employees & -equipment
Mplans and s cificati n . ill start within t 10 s of receipt e
notice to proceed and complete project within the allotted time.
2. Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm
who have performed part of the work) that you have used on public works projects during the past five (5)
years along with a brief description of the work done by each subcontractor.
List available upon request._
3 If you intend to sublet any portion of the work, state the name and address of each subcontractor,
equipment to be used by the subcontractor, and whether you will require a bond. However, if you are
unable to currently provide a listing, please understand a listing must be provided prior to contract
approval. Until the completion of the proposed project, you are under a continuing obligation to
immediately notify the governmental unit in the event that you subsequently determine that you will use a
subcontractor on the proposed project.
List will be provided on request.
4. What equipment do you have available to use for the proposed project? Any equipment to be used by
subcontractors may also be required to be listed by the governmental unit.
Excavator Loader and other Miscellaneou Equipment,
_. Miscellaneous E9uipment owned and operated by N. I. C.
Have you entered into contracts or received offers for all materials which substantiate the prices used in
preparing your proposal? If not, please explain the rationale used which would corroborate the prices
listed.
Quotes received from suppliers, no contract at time of bid.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial
statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to
the governing body awarding the contract must be specific enough in detail so that said governing body can make
a proper determination of the bidder's capability for completing the project if awarded. See Attached
NORTHERN INDIANA CONSTRUCTION CO INC
BALANCE SHEET
{
December 8, 2020
�
(UNAUDITED
CURRENT ASSETS
CASH
$
538,552
MARKETEABLE SECURITITES
$
1,013,986
CONTRACT RECEIVABLES
$
732,344
PREPAID EXPENSES
$
50,942
OTHER RECEIVABLES
_ $
PREPAID EXPENSES
$
44,292
_ _
DEFERRED TAS(
$
-
COSTS AND EARNINGS IN EXCESS
OF RELATED BILLINGS!
�— s
122
TOTAL CURRENT ASSETS
$
2,360,238
PROPERTY AND EQUIPMENT
S
4,812,154
ACCUMULATED DEPRECIATION
$
(4,432,130)
NET PROPERTY AND EQUIPMENT
$
380,024
TOTAL ASSETS 1
$
2,760,262
LIABILITIES AND UddlkHOLDERS EQUITY
CURRENT LIABILITIES
_
CURRENT MATURITIES OT
OF NES PAYABLE
E
ACCOUNTS PAYABLE
$
214,862
ACCRUED EXPENSES T I $
249,660
ACCRUED PROPERTY TAXES
ACCRUED INCOME TAXES
i $
16,300
BILLINGS ON UN_COM_PL_ETE_PROJECTS
`
IN EXCESS OF RELATED COSTS & EARNINGS
j $
116,255
TOTAL CURRENT LIABILITIES
I $
597,097
NON CURRENT LIABILITIES
NOTES PAYABLE, NET OF CURRENT MATURITIES
$
DEFERRED INCOME TAXES
$
108,100
TOTAL NON CURRENT LIABILITIES
$
108,100
TOTAL LIABILITIES
$
705,197
STOCKHOLDERS EQUITY
COMMON STOCK
$
2,134.956
RETAINED EARNINGS
$
(79,892)
TOTAL STOCKHOLDERS EQUITY $ 2,055,064
TOTAL LIABILITIES AND STOCKHOLDERS EQUITY $ 2,760.261
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF Indiana )
)SS.
St. Joseph COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
Version 01/29/2020 Contractors Bid for Public Works - 4
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E -Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E -Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E -Verify Program. The Contractor agrees
to maintain this certification throughout the term,of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee
or applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of employment, or any matter directly or indirectly related to employment because
of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual
orientation or disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions will consider the Contractor's good faith efforts to obtain participation by those
subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to an-MWBE;
however, they may not unlawfully discriminate against said MBE/WBE. A finding of noncompliance or a
discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one
(1) year from the date of such determination, and such determination may also be grounds for terminating
the contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which dues not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
may result in forfeiture of contractual payments.
Version 01/29/2020 Contractor's Bid for Public Works - 5
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this December day of 8 '2020
Northern Indiana Construction C-ompanyjrc.
C ra or/Bid ( irm)
Signature of C Tactor/Bidder or Its Agent
David J. Walorski President
Printed Name and Title
Subscribed and sworn to before me this 8th da'
-of December , 2020
My Commission Expires April 16,_2025
otary Public Danis � L. Marable
County of Residence St. Joseph County, Indiana
Version 01/29/2020 Contractors Bid for Public Works - 6
OHIO FARMERS INSURANCE COMPANY
One Park Circle, P O Box 5001, Westfield Center, Ohio 44251-5001
KNOW ALL MEN BY THESE PRESENTS, that we NORTHERN INDIANA CONSTRUCTION CO., INC.
P.O. Bog 1333. 55803 Dogwood Road. Mishawakp, IN 46545
as Principal, hereinafter called the Principal, and OHIO FARMERS INSURANCE COMPANY, Westfield Center,
Ohio 44251, a corporation duly organized under the laws of the State of Ohio, as Surety, hereinafter called the Surety, are
held and firmly bound unto BOARD OF PUBLIC WORKS, CITY OF SOUTH BEND, INDIANA
County -City Building Room 1316, 227 West Jefferson Street, South Bend, IN 46601
as Obligee, hereinafter called the Obligee, in the sum of FIVE PERCENT OF TOTAL AMOUNT BID
Dollars ($
for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs,
executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has submitted a bid for Project -No: 118-005_A - North Shore Drive Bank Stabilization Project:
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with
the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or
Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt
payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter
such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the
penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith
contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise
to remain in full force and effect.
Signed and sealed this 8th day of DECEMBER 2020
NORTbt6RINDIANA CONST UCTION INC.
4/P�
�) . fSealid J. Walor President (Title)
Ohio Farmers Insurance Company
(Surety) (Seal)
, & C � Y� 4� � t
S. Annette Mullet, 44ttorney in Fac (Title)
1
Printed in cooperation with the American Institute of Architects (AIA) by the Ohio Farmers Insurance Company. The language in this
document conforms exactly to the language used in AIA Document A310, February 1970 edition.
BD5084 OF (11/97)
General POWER NO. 1303532 04
Power Westfield Insurance Co.
of Attorney Westfield National Insurance Co.
CERTIFIED COPY Ohio Farmers Insurance Co.
Westfield Center, Ohio
Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO
FARMERS INSURANCE COMPANY, corporations, hereinafter referred to Individually as a "c;nmpany" and collectively as "Companies," duly
organized and existing under the laws of the State of Ohio, and having its principal office in Weslfield Center, Medina County, Ohio, do by these
presents make, constitute and appoint
S. ANNETTE MULLET
of WESTFIELD and State of IN its true and lawful Attorney(s)-In-Fact, with full power and authority hereby confe.-red in Its name,
place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of
suretyship - - -- -- ------- -- - - -- - -- --
LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE
UOATFANTEE, OR BANK DEPOSITORY BONDS,
and to bind any of the Companies thereby as fully and to the same extent as If suratirch bonds were signed ball y the President, sealed with the corporate
seathe ( of the premises applicable
appointment Is mand deunderand its b authoriityy of the €ollowinnggand resoluttiionl adopted batthethe
Boasaid
rd Alto
of rDirect Directors of each I n- Fact off tiin
the
WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMER INSURANCE COMPANY:
"Be It Resolved, that the President, any Senlor Executive, any Secretary or any Fidelity & Surety Operations Executive or other Executive shall
be and Is hereby vested with full power and authority to appoint any one or more suitable persons as Altorney(s)-in-Fact to represent and act for
and on behalf of the Company subject to the following provisions:
The Atrorneyin•Fact. may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements of Indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such Instruments so executed by any such
Attorney -in -Fact shall be as binding upon the Company as If signed by the President and sealed and attested by the Corporate Secretary."
'Be I Furfher Resoived, that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any
power of attorneyor any certificate relating thereto by facsimile, and any power of attorney or certificate nearing facsimile signatures or facsimile
seal shall be vad and binding upon the Company with respect to any bond or undertaking to which it Is attached." (Each adopted at a meeting
held on February 8, 2000).
In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE
COMPANY have caused these presents to be signed by their National Surety Leader and Senior Executive and their corporate seals to be hereto
affixed this 02nd day of JANUARY A.D., 2020 .
Corporate _1" ,
Seals ......
��..•.._.......,,,
.•WESTFIELD
���I,y''•
'
INSURANCE
WESTFIELD NATIONAL INSURANCE COMPANY
..••.
Affixed r{�v9 .w p
�,•`�s+kS.��A�'�5'•.
�o:' ''•'-p';
=f ''•�`'?
OHIO FARMERS INSURANCE COMPANY
1.`r
, •-1 =
eK��r o
SES
SEAL
i C:=
4..
1848
State of Ohio
"""
By
ss.:
Gary W. tumper, NafforSuretyy Leader and
Sr
Senior Executive
On this 02nd day of JANUARY A.D., 2020 , before me personally came Gary W. Stumper to me known, who, being by me duly sworn,
did depose and say, that he resides in Hartford, CT; that he is National Surety Leader and Senior Executive of WESTFIELD INSURANCE
COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which
executed the above Instrument; that he knows the seals of said Companies; that the seals affixed to said Instrument are such corporate seals; that
they were so affixed by order of the Boards of Directors of said Companies; and that he signed his name thereto by like order.
Notarial �•„n•K+N,Myr, /�
Seal � R1 A L S, !V/■i///
Affixed
State of Ohio }_ �, 11111111 o David A. Kotnik, Attorney at Law, Notary Public
County of Medina ss.: �' .• My Commission Does Not Expire (Sec. 147.03 Ohio Revised Code)
of o
I, Frank A. Carrino, Secretary of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS
INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said
Companies, which is still In full force and effect; and furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are
in full force and effect.
In Witness Whereof, I have hereunto set my hand and affixed the seals of said Companies at Westfield Center, Ohio, this 8th day of
A.D„ 2020
December•,,,,..,","; ,,,, c, ,
Raju..Map
[y�z y,��nts„u 1115�! yry
SEALti o ,: 'sig = �t •• '� e
SE.�L ��, SEAL =ne ;e..• G�+ � �F�: � ��-o-,,�
�r r-= : m : / 1 Sacrctay
NV %'�•.•' ' a' 8,"4.1®.; Frank A. Carrino, Secretary
BPOAC2 (combined) (06-02)
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name
Project No.
For Bids Due
North Shore Drive Bank Stabilization
118-005A
December 8, 2020
PART I
(Must be completed for all bids. Please type or print)
Date: December 8. 2020 Bidder (Firm): Northern Indiana Construction Company Inc.
Address: P. O. Box 1333
City/State/Zip: Mishawaka, IN. 46546 Telephone Number: ( 574 ) 256-1811
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
North Shore Drive Stabilization, Protect No. 118-005A
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
J. D. Cardno
and dated November 2, 2020 for the sum of (enter the Total Bid as shown on the Proposal)
Two Hundred Fifty -Two Thousand Nine HuncJred_S_even Dollars and Seventy Cents ($ 252.907.70 )
(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by th i of South Bend. If the id is to be Z
n a unit
basis, the itemization of the units shall be $
n o a sep r9t tach n
(Signature)
David J. Walo i President
(Printed Name of Person Signing)
The above bid is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
Elizabeth A. Maradik, Member
Jordan V. Gathers, Member
ACCEPTANCE
day of 20
Joseph R. Molnar, Member
Therese J. Dorau, Member
Attest: Linda M. Martin, Clerk
Version 01/29/2020 Contractor's Bid for Public Works - 2
12/03/2020 THU 13:04 FAX
*********************
*** FAX TX REPORT ***
*********************
TRANSMISSION OK
JOB NO.
1128
DESTINATION ADDRESS
2359171
SUBADDRESS
Linda M. Martin, Clot
DESTINATION ID
Addendum Number:
ST. TIME
12/03 13:04
TX/RX TIME
00'42
PGS.
1
RESULT
OK
r cK
1316 COUNTY-0'rY1311II,DINl1 ,. ; r� I'I[ON P. 574/235-9251
227 W. J14TERSON BOULEVARD irNr VAX 57/t/ 235-9 17 1
SOUI,IIBEND, INDIANn46601-1830 TDI) 574/235-5567
CI'T'Y 01' SOUT1I MND, JAMBS MUV1,1,F-R, MAYOR
BOARD OF PUBLIC" WORKS
Date:
_December 2, 2020
To:
All Planholders
From
Linda M. Martin, Clot
Subject
Addendum Number:
Project Name:
Project Number:
118-005A
I
Board of Public Works
North Shore Drive Bank Staabiiiution
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received: December 3, 2020
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
10001
IT
U
Vt..c,e ?.
1316 COUNTY -CITY BUILDING �. —1 •r.�� PHONE 574/235-9251
227 W. JEFFERSON BOULEVARD fNfi3 FAX 574/ 235-9171
SOUTH BEND, INDIANA 46601-1830 TDD 574/ 235-5567
CITY OF SOUTH BEND, JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
Date: December 2 2020
To: All Planholders
From Linda M. Martin, Clerk, Board of Public Works
Subject Addendum Number: 1
Project Name: 118-005A
Project Number: North Shore Drive Bank Stabilization
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received: December 3, 2020
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company: Northern Indiana Construction CbmWy Inc.
Authorized Signature::'.
'Da—vid J. W rs i. , President—
Date:
December 3, 2020
Version 4/2/2015
,you TII y�
G
u r2
yz MucF. y
yst a
y I N'S
NORTH SHORE DRIVE BANK STABILIZATION
118-005A
ADDENDUM NO. 1
Date: December 2, 2020
To: All Plan Holders
From: Linda M. Martin, Clerk of the Board of Public Works
The following information is to be changed/added to the contract documents:
XIII. PROSECt1TiON AND PROGRESS
B. Additions:
1. The project will have a completion date of 45 calendar days for all work. The contract time will start
when the Notice to Proceed is delivered and signed.
a. The project shall have a Notice to Proceed date of May 10, 2020, to avoid salmonid spawning
period and allow for all work to be completed with one mobilization.
Attachments:
Pre -Bid Conference Agenda (2 pages)
Pre -Bid Conference Attendance Sheet (1 page)
Response to Contractor Questions (2 pages)
You must acknowledge receipt of this addendum by signing the first page,
returning it via facsimile to (574) 235-9171, and a copy of the first page must be
included with your bid.
— This addendum consists of a total of 7 pages inclusive of "Acknowledgement
of Receipt of Addendum" sheet —
Version 4/2/2019
North Shore Drive Bank Stabilization
Addendum #1 Contractor Questions
1. Can you provide an attendance list to the pre-bid meeting?
A: See attendance list and agenda from pre-bid conference attached to this addendum.
2. With the anticipated start and completion date, we have been unable to locate an asphalt
contractor to perform asphalt work due to plant shut down and time of year. May road and
concrete curb repair work wait until spring once the asphalt plants open back up?
A: DNR has indicated a willingness to issue a temporary waiver for work to be completed
starting May 10, 2021. This will allow all in -stream, asphalt and curb repair work to take place in
the same mobilization.
3. It looks like this project could potentially start in January and is scheduled to be complete with
in 45 calendar days for all work. Our concern is what happens if we have a hard winter this year
and the ground freezes up really bad. Will the awarded contractor be able to finish this project
in April?
A: Refer to Question and Answer #2 for details on timeframe of completed work.
4. Do you have the AEP contact for the relocation work?
A: Please see Sheet 2 of the plans. Relocation will be coordinated by the City prior to contractor
work commencing.
5. The pay item for class 1 rip rap shows a quantity of 800 tons. The 800 tons seems very high. Can
the engineer please confirm this quantity or explain his calculation?
A: This quantity is based off an estimated 325 LF of rock placement at 2' thick with an average
slope length of 12-14'. Some excess riprap assumed to fill void near exposed utility.
6. Is there a link to MBE/WBE approved contractors on the City website or elsewhere?
A: The City does not have such a list.
7. What is the Participation Goal for MBE/WBE?
A: There is no participation goal for this project.
8. May we use Bio -D Blocks for the soil lifts with equivalent coir mat instead of using soil forms?
A: Yes.
9. The drawings show planting the bottom row of shrubs between the lift and stone without
adding soil. Without soil survivability would be very low. Should soil be added?
A: Yes, a thin layer of soil (3" minimum) should be incorporated between lifts.
10. Is all silt fence to be installed with steel posts or may wooden posts be used?
A: Metal or wood posts are acceptable.
11. There is a large tree that has fallen into the water on the site. The root ball is still partially in the
riverbank. Is the tree and root ball to be removed and if so, will it need to be replaced?
A: An approximately 18" DBH Sycamore tree has fallen into the river since the issuance of these
bid documents. The entirety of the tree, including rootball, will be removed from the site and
this additional work should be included in the unit price for Clearing, Grubbing, and Obstruction
Removal. The void left by the tree should be backfilled with INDOT Class I Riprap. The current
quantity of INDOT Class I Riprap included on the bid sheet should be considered sufficient to fill
this void and still complete all other designated bank stabilization work.
12. May we substitute live stakes in lieu of bare root shrubs because planting time is out of season.
We recommend doubling live stake quantity as survival rate is not as great.
A: Should installation of plantings take place prior to spring availability of bare roots or as
approved by the Owner, native species live stakes installed at a 3:1 ratio may substitute bare
root plantings.
13. Will the overhead utility line be relocated before construction begins? Or will line protection be
required?
A: The overhead utility line will be relocated to the north side of North Shore Drive prior to
construction.
PRE. -BID CONFERENCE AGGIEZNDA
Project: 118-005A North Shore Drive Bank Stabilization
November 30, 2020
3:00 P.M (Local Time)
Welcome and Introductions
Direct all questions, in writing, during bidding:
Alicia Pellegrino, Project Engineer for South Bend Public Works,
anelleg(a)southbendin. ciov
Questions due by 5:00 p.m. (Local Time) Thursday, December V, 2020
Final Addendum will be issued on Friday, December 4'h, 2020
"IMPORTANT: Electronic bids need to be submitted to bpwbids@south ben din.gov
by 9:OOam, Local Time, on December 8th 2020.
Instructions and information about electronic bid submittals can be found at:
http://southbend in. pov/bids
Project Overview
A. Work includes furnishing all labor, services, materials, insurance and equipment to
provide and install bank stabilization improvements to include a rock toe, vegetated
soil lifts, seeding, planting, and other final stabilization according to the intent of the
plans and specifications along the east side of the St. Joseph River between
Parkovash Avenue and Iroquois Street in South Bend, Indiana.
III. Schedule
A. The project will have a completion date of 45 calendar days for all work. The contract
time will start when the Notice to Proceed is delivered and signed.
B. Liquidated Damages - $500/ calendar day — Special Provisions Section XVI.B.2
C. The owner must be notified 10 business days prior for any deviations in the agreed
upon schedule or methods.
IV. Bidding Overview
A. Plans and Specifications
A. The Contract Documents are on file and available for public inspection or
purchase commencing on the first advertise date during regular working hours at
American Reprographics Company ("ARC", located at 1303 Northside Blvd.,
South Bend, Indiana, 46615), www.e-arc.com/location/south. bend/ (574) 287-
2944, toll free at (800) 783-7231. There will be a non-refundable charge for
reproduction as set by ARC for every set of documents for all bidders.
Additionally, the Contract Documents will be available that same day for
inspection at MACIAF, 212 W. Colfax Ave. South Bend, IN 46601.
B. Bid Requirements
1. Bids must be on the City of South Bend Contractor's Bid for Public Work Form,
accompanied by a Certified Check or Bid Bond in the amount of not less than five
percent (5%) of the bid total.
2. Acknowledgement of receipt of any Addendum must be included in bid
submission.
a. Addenda will be published on the ARC website.
3 MWBE Forms must be completed, signed, and handed in with the bid
submission. These forms are shown in the bid proposal, Contractor's Bid for
Public Works, sheets 4 — 6.
4. A checklist for bidders is included in the Contractor's Bid for Public Works, sheet
1. The Responsible Bidder checklist is located in General Conditions, sheets 6-
10, and will need to be completed in its entirety for the contractor to be eligible for
award.
5. Board of Public Works will receive sealed electronic bids at
hpwbids@south bend in.gov until 9:00 a.m., Local Time, on
December 811, 2020.
C. Award of Bid
1. The anticipated bid award date is December 17'h, 2020. Bids remain subject to
acceptance for sixty calendar days after bid opening.
2. Upon award, the successful Bid provider shall supply the following bonds
a. Payment Bond within seven (7) days of the Notification of Award for an
amount equal to one hundred percent (100%) of the contract amount.
b Performance Bond within seven (7) days of the Notification of Award for an
amount equal to one hundred twenty-five percent (125%) of the contract
amount.
c. Maintenance bond within ten (10) days of acceptance of the project by the
City of South Bend, for an amount equal to ten percent (10%) of the final
contract price, guaranteeing for a period of three (3) years after the date of
acceptance of the project by the City of South Bend.
3. Payments for work completed during this project will be made every thirty (30)
calendar days. Consistent with provisions of IC 36-1-12-14, the Board of Public
Works shall retain a percentage of payments throughout the duration of the
project.
4. Materials and properties purchased under contract with the Owner that becomes
a permanent part of the structure or facilities constructed are not subject to the
Indiana Gross Retail Tax (Sales Tax). The exemption number will be furnished
to the Contractor upon award.
V. Comments by Department of Public Works
A. Regulatory Permits have been secured from IDEM, US Army Corps of
Engineers, and IDNR — contractor responsible for abiding by all permit
requirements and conditions throughout construction
B. Communication for project will be in coordinating with the City of South Bend
Public Works Department including letters to residents communicating traffic
rpstrictinn% and parking restrictions, and any other impacts,
VI. Contractor Questions
Pre -Bid Conference Attendance
North Shore Drive Bank Stabilization
118-005A
November 30, 2020
3:OOPM
NAME
Company
E - MAIL
Alicia Pellegrino
City of South Bend - Public Works
apelle asouthbendin.gov
Larry King
City of South Bend - Contract Compliance Administrator
Iking(u1southbend in.gov
Ross St. Clair
Cardno
ross,st.clair cardno.com
Cullen Stanger
The Stanger Group, Inc.
csstan er slenviro rou .com
Colby Stanger
The Stanger Group, Inc.
cstanger(d_)sIenvirogroujp.com
Dan Younggreen
G.E. Marshall, Inc.
dan. youn reenggemarshall.com
Ethan Knepp
HRP Construction Inc.
ethank hr construction.com
Chris Schaurrberg
Williams Creek Management
cschaumber wiliiamscreekm t.net
David Walorski
Northern Indiana Construction Co., Inc.
davidwaIorski(aD- northern in. com
Jimmy Kabel
Indiana Earth, Inc.
limmyindianaearthCcr7yahoo.com
iii rs y
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY w
DEVELOPMENT PROGRAM
FORM MWBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBEIWBE participation. It is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration ("IDOA").
Project Number:
Project Name:
Bidder:
Contact Person:
Address:
118-005A
North Shore Drive Bank Stabilization
Date: December 8, 2020
Northern Indiana Construction Company Inc.
David J. Walorski Telephone 574-256-1811
P. O. Box 1333
City: Mishawaka State: Indiana Zip- 46546
Email: —davidwalorski@northernin.com
To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
*Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 01/29/2020 Contractor's Bid for Public Works - 9
EVIDENCE OF GOOD FAITH EFFORTS
MBEIWBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
Owned Business as found on their website (hftp://www.in.gov/idoa).
ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South
Bend requires that all perspective bidders complete no less than 2 of the following:
1. Attend all pre-bid meetings scheduled by the City to inform MBE/WBEs of contracting and
subcontracting opportunities
2. Advertise in general circulation and/or trade association publications concerning subcontracting
opportunities, and allow MBE/WBEs reasonable time to respond.
3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated
to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to
participate effectively.
4. Utilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in the recruitment
and placement of MBE/WBE firms.
**Bidder must circle or otherwise notate which of the two (2) required actions were performed.
GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs,
including providing such MBE/WBE's with adequate information about the plans, specifications and other
requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business
reasons based on a thorough investigation of their capabilities.
SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by
MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down
contracts into smaller units to facilitate MBE/WBE participation)
CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has
bid on the subcontracting opportunity:
1 Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBEANBE was unqualified to perform the job.
*Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 01/29/2020 Contractor's Bid for Public Works - 9
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
PAGE 1 OF-2-
Project
F2Project Number: 118-OOSA MBE/WBE Participation Goal
Project N North Shore Drive Bank Stabilization
Bid o i Co ruction CompanV Inc.
By: President December 8, 2020
(Signature) (Title) (Date)
MBE/WBE Firm State Barricading. Inc.
Owner or Contact at MBE/WBE Firm James Michalski
Telephone: 574-287-2078 Fax: 574-287-1744 Email: statebarricade1 @aol.com
TYPE OF WORK SOLICITED FOR THIS PROJECT: Maintenance of Traffic & Pavement Markinqs
RESULTS OF CONTACT WITH THE MBE/WBE FIRM
Utilized in Bid as a Subcontractor
MBE/WBE Firm Slusser's Green Thumb Inc.
Owner or Contact at MBE/WBE Firm John Williamson
Telephone: 574-722-3102 Fax: 574-722-2993 Email: JDWP_Slussers.com
TYPE OF WORK SOLICITED FOR THIS PROJECT: Landscaping & Seeding Items
RESULTS OF CONTACT WITH THE MBE/WBE FIRM: Utilized in Bid as a Subcontractor.
Version 01/29/2020 Contractor's Bid for Public Works - 10
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
Project Number:
Project Nam
Bidder:
By: .sC
5�gnature)
118-OOSA
North Shore Drive Bank
PAGE _2
MBE/WBE Participation Goal
lization
President
(Title)
OF 2
December 8, 2020
(Date)
MBE/WBE Firm Victory Trucking & Supply Inc.
Owner or Contact at MBE/WBE Firm Becki Fredrick
Telephone: 260-357-3911 Fax: 260-357-6883 Email: Beckif@victorytrucking.com
TYPE OF WORK SOLICITED FOR THIS PROJECT: Materials & Hauling Services
RESULTS OF CONTACT WITH THE MBE/WBE FIRM: Did not Receive a Quote so they were not Utilized in bid.
MBE/WBE Firm C Tech Corporation
Owner or Contact at MBE/WBE Firm Dave Carew
Telephone: 317-835-2745 Fax: 317-835-2781 Email: dcarew@c-techinc.net
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE/WBE FIRM: Utilized in Bid as a Subcontractor.
Version 01/29/2020 Contractor's Bid for Public Works - 10
David Walorski
From: David Walorski
Sent: Tuesday, December 1, 2020 11:28 AM
To: tannerfortune@sbcglobal.net
Subject: North Shore Drive Bank Stabilization
Tanner;
We are bidding the referenced project and need a quote to mobilize and mill 1.5" deep for 650 sys.
This work is spring work early to mid-April. I need your quote by Monday December 7"
Let me know if you have any questions. The project is located just north of South Bend Indiana on North Shore Drive
1000' west of SR 933.
Please note my new email address davidwalorski@northernin.com.
David J. Walorski
Northern Indiana Construction Co., Inc.
55803 Dogwood Road
P. 0. Box 1333
Mishawaka, Indiana 46546
(574) 256-1811 Phone
(574) 256-1879 Fax
David Walorski
From: David Walorski
Sent: Tuesday, December 1, 2020 11:32 AM
To: (caroline@hughesmiIIing.com)
Subject: North Shore Drive Bank Stabilization
Caroline;
I am bidding the referenced project and need your quote for one mobilization and for milling 1.5" deep for 650 sys.
This will be early to mid April work. I need your quote on December 7th
Please note my new email address davidwalorski@)northernin.com.
Thank you;
David J. Walorski
<R>
Northern Indiana Construction Co., Inc.
55803 Dogwood Road
P. O. Box 1333
Mishawaka, Indiana 46546
(574) 256-1811 Phone
(574) 256-1879 Fax
David Walorski
From: David Walorski
Sent: Monday, November 30, 2020 10:07 AM
To: (dcarew@c-techinc.net)
Subject: North Shore Drive Bank Stabilization
Attachments: 118-005A North Shore Drive Bid Specifications.pdf; 118-005A North Shore Drive Bid
Plans.pdf
Dave;
We are bidding the referenced project on December 8th. I have attached the plans and specs. Sheets 7, 9, 10, 11 refer
to the guard rail work. Please quote the guard rail and end treatments.
Let me know if you have any questions.
Please note my new email address davidwalorski@northernin.com.
David J. Walorski
OED
Northern Indiana Construction Co., Inc.
55803 Dogwood Road
P. 0. Box 1333
Mishawaka, Indiana 46546
(574) 256-1811 Phone
(574) 256-1879 Fax
1
David Walorski
From:
Sent:
To:
Subject:
Good Morning Becki;
David Walorski
Monday, November 30, 2020 9:07 AM
beckifredrick
North Shore Drive Erosion Repairs
I am bidding this project on December 8th and would like you to quote the material below delivered
January weather permitting and I have room to stockpile.
• Rip -Rap Class 1 720 Ton
• Revet. Rip -Rap 80 Ton
• #2 Aggregate 80 Ton
This will help me with the cities MWBE goal. Let me know if you have any questions.
Please note my new email address davidwalorsid
David J. Walorski
Northern Indiana Construction Co., Inc.
55803 Dogwood Road
P. O. Box 1333
Mishawaka, Indiana 46546
(574) 256-1811 Phone
(574) 256-1879 Fax
1
northernin.com.
This will go in
CITY OF SOUTH BEND o�tiuuTrr BfyG
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM
FORM MWBE-1.0 J .
MBE/WBE PARTICIPATION
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE/MBE participation.
It is the bidder's sole responsibility to verify whether any listed minority orwoman business meets the qualifications of a Minority or Women's
owned business.
Project Number:
Bidder:
118-005A Project Name: North Shore Drive Bank Stabilization
Northern Indiana Construction Company Inc.Total Bid Amount:
Name & Address of MBENVBE
State Barricading, Inc.
P. O. Box 3751
South Bend, IN, 46619
Primary Contact Person
(Name/Telephone)
James Michalski
574-287-2078
Scope of Work to be Performed
(Attach scope/schedule if you need additional space)
Maintenance of Traffic & Pavement Markings
MBE/WBE Goal:
Page 1 of 1
Dollar Amount of Percentage
MBENVBE Component of Total
p
$3,725.00 1 1.472%
Slusser's Green Thumb Inc. John Williamson Landscaping & Seeding Items
P. O. Box 33 574-722-3102 ` $14,480.00 5.725%
Logansport, IN. 46947
C Tech Corporation Dave Carew Guardrail Items
5300 W. 100 North 317-835-2745 $15,800.00 6.247o
/o
Boggstown, IN. 46110
Submitted by: David J. Walorski, President 4
Print Name Signature
Version 01/29/2020 Contractors Bid for Public Works - 8
December 8, 2020
Date
(6rrtifunte of Quatwumfion
�ln�imw �rparYiurntD BY
of Qreu�spnxfatimt
INDIANAPOLIS, IN
TO
NORTHERN INDIANA CONSTRUCTION CO INC
January 30, 2020
MISHAWAKA, IN
who has filed with the Department a Contractor's Statement of Experience and Financial Condition as
required under Indiana Code 8-23-10, is hereby qualified to bid at any Department of Transportation
letting in Classes of Work and within the amount and other limitation of each classification as listed
below, for such period as the uncompleted work on hand from all sources does not exceed the Aggregate
amount. Classification references by name or symbol are in accordance with the definitions in the
Contractor's Statement of Experience and Financial Condition. This certificate supersedes any certificate
previously issued, but is subject to revision or revocation according to the law, if and when changes
in the financial condition of the contracting firm or other facts justify such revision or revocation.
Valid February 1, 2020 Thru January 31, 2021
AGGREGATE.................... ......... ...................... ......... ......... ».............................................. ...................... $32,116,000
0272 POLYMERIC CONCRETE BRIDGE DECK OVERLAY ................... -- .... ......... ,........................... .._........ $500,000
A(B) CONCRETE PAVEMENT: LIMITED ... .............................................................................. :....................... $2,000,000
C(B) LIGHT GRADING..... .. - - -.... •................................:..............
D(A) HIGHWAY OR RAILROAD BRIDGE OVER WATER --i .....
D(B) HIGHWAY OR RAILROAD BRIDGE OVER HIGHWAY ........
D(C) HWY/RR BRIDGE REQ RR TRACK PROTECTION ...............
E(E) SMALL STRUCTURES AND DRAINAGE ITEMS ...................
E(F) SURFACE MASONRY AND MISC CONCRETE ...... ........ :......
E(I) PERMANENT SEEDING, SODDING, AND TOP SOIL ............
E(Q) CONCRETE PAVEMENT: REPAIRS ........................................
E(T) DEMOLITION__.........................................._....._.........................
PREQUALIFICATION ENGINEER
State I'm 20508 (R3 15-05)
I .......... ............ : $2,000,000
....... ............. ...... ....... .... - .......... ............. $26,816,000
.............................................................. $26,816,000
........................................................ $26,816,000
........................................................ $2,000,000
......... ;...:................ :.....:.....a...:............... $2,000,000
.. . .......................................................... $1,000,000
.............................................................. $1,000,000
.............................................................. $2,000,000
�0
OMIIAISSIONER
CITY OF SOUTH BEND, INDIANA
ONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name North Shore Drive Bank Stabilization
Project No.
For Bids Due
118-005A
December 8, 2020
Contractor Name: Northern Indiana Construction Company Inc.
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre-
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre-
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 315' for the upcoming calendar year, or within twelve (12) months of obtaining pre-
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of
the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application
for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal
of the designation, effective January 1 of the following year, or immediately following the twelve (12) months
of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 01/29/2020 General Conditions - 6
POST BID SUBMISSIONS:
Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty
thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder and all subcontractors on a public works project are required to submit
certified payroll utilizing the federal form known as WH -347 or a similar form on a bi-weekly basis,
submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall
identify the job title and craft for each employee. Certified payrolls shall be submitted
electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to
utilize all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
Version 01/29/2020 General Conditions - 7
PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements:
(i) _ By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements within
the last twelve (12) months. A copy of my Pre -Qualification verification letter
is attached.
_ By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(b) Attachments
(i) _ Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
(iv) For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
Version 01/29/2020 General Conditions - 8
PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(i) X By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) X By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) X By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) X By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(b) Attachments.
(i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) N/A List identifying all former business names. None.
(iii) N/A Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years. None.
(iv) X Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v) X Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
(vi) X For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
(vii) X Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(viii) X Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
Version 01/29/2020 General Conditions - 9
(ix) N/A Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(i) X List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
Date: December 8 202
(Sign ere) Y !�
David J. Walorski, President
(Print Name Here)
Northern Indiana Construction Company Inc.
(Name of Company)
P. O. Box 1333
(Address of Company)
Mishawaka
(City)
Indiana
(State)
574-256-1811
(Telephone Number)
Version 01/29/2020 General Conditions - 10
BUSINESS INFORMATION
CONNIE LAWSON
INDIANA SECRETARY OF STATE
12/03/2020 01:11 PM
t
Business Details
t.
Business Name: NORTHERN INDIANA CONSTRUCTION Business ID: 198611-033
COMPANY INC
Entity Type: Domestic For -Profit Corporation
Creation Date: 11/03/1986
Principal Office Address: PO BOX 1333, MISHAWAKA, IN, 46546 -
1333, USA
Jurisdiction of Formation: Indiana
Business Status: Active
Inactive Date:
Expiration Date: Perpetual
Business Entity Report Due 11/30/2022
Date:
Years Due:
Principal Information
Title
Name
Address
Secretary
Scott Fredrick
428 CHESTNUT FOREST COVE, FT. WAYNE, IN, 46814, USA
President
WALORSKI.DAVID. J.
51566 BRIDGEWATER CT, SOUTH BEND, 1N, 46637, USA
Registered Agcut Information
Type: Individual
Name: David J. Walorski
Address: 55803 Dogwood Road, Mishawaka, IN, 46545, USA
APPROVED AND FILED
CONNIE LAWSON
INDIANA SECRETARY OF STATE
09/11/2020 03:16 PM
BUSINESS ENTITY REPORT
I►AME 1+�►ID PRINCIPAL OM,CE ADDRESS
BUSINESS ID 198611-033
BUSINESS TYPE Domestic For -Profit Corporation
BUSINESS NAME NORTFIERN INDIANA CONSTRUCTION COMPANY INC
ENTITY CREATION DATE 11/03/1986
JURISDICTION OF FORMATION Indiana
PRINCIPAL OFFICE ADDRESS PO BOX 1333, MISHAWAKA, IN, 46546 - 1333, USA
1'F7A FILED
YEARS
EFFEI' p
EFFECTIVE DATE
EFFECTIVE TIME
REGISTERED OFFICE .WD ADDRESS
2020/2021
09/11/2020
3:16 PM
REGISTERED AGENT TYPE Individual
NAME David J. Walorski
ADDRESS 55803 Dogwood Road, Mishawaka, IN, 46545, USA
PRINCI PALS) - -
TITLE Secretary
NAME Scott Fredrick
ADDRESS 428 CHESTNUT FOREST COVE, FT. WAYNE, IN, 46814, USA
TITLE President
NAME WALORSKI.DAVID. J.
ADDRESS 51566 BRIDGEWATER CT, SOUTH BEND, IN, 46637, USA
- Page 1 of 2 -
APPROVED AND FILED
CONNIE LAWSON
INDIANA SECRETARY OF STATE
f 09/11/2020 03:16 PM
,SIGNATURE
IN WITNESS WHEREOF, THE UNDERSIGNED HEREBY VERIFIES, SUBJECT TO THE PENALTIES OF PERJURY, THAT THE
STATEMENTS CONTAINED HEREIN ARE TRUE, THIS DAY September 11, 2020.
SIGNATURE David J. Walorski
TITLE President
Business ID : 198611-033
Filing No.: 8719441
-Page2of2-
Ilortnern Indiana Construction
December 8, 2020
TO: Board of Public Works of the City of South Bend, Indiana
RE: Northern Indiana Construction Company's Staffing Capabilities
Since its incorporation on November 3, 1986, Northern Indiana Construction Company Inc. has
always maintained accurate staffing to initiate, and complete, all the projects we bid and are
awarded. As of the date of this letter, Northern Indiana Construction Company has an extensive
list of employees who are adequately trained to complete the work and projects we bid. As apart
of our Good Faith Efforts with the Indiana Department of Transportation, Northern Indiana
Construction Company, solicits candidates for hire, several times every year, from numerous
recruitment agencies, social organizations, local colleges & training facilities, and Workforce
Development Services of Northern Indiana.
V- K ndly,
David J. orski
President
Northern Indiana Construction Company Inc.
55803 DOGWOOD RD. P.O. BOX 1333 MISHAWAKA, IN. 46546.1333 PH: 574-256-181 1 FAX: 574-256-1879
" An Equal Opportunity Employer"
Ilorthern Indiana Construction
December 8, 2020
City of South Bend
Board of Public Works
County -City Building, Room 1316
227 West Jefferson Street
South Bend, Indiana 46601
RE: Northern Indiana Construction Company Inc., Statement of Compliance regarding
personnel who will perform work on any of our public works projects.
Ladies/Gentlemen of the Board,
Please accept this letter as a statement of compliance that all individuals who will
perform work on any public works project that Northern Indiana Construction Company
Inc. has been contracted to work on, will be properly classified as either an employee or
as an independent contractor, under all applicable state and federal laws and local
ordinances.
Res ectfully Submitted,
Danisha L. Marable, EEO Officer
Northern Indiana Construction Co., Inc.
55803 DOGWOOD RD. P.O. BOX 1333 MISHAWAKA, IN. 46546-1333 PH: 574-256-181 1 FAX: 574-256-1879
" An Equal Opportunity Employer"
dib
Mortnern Indiana Construction
December 8, 2020
TO: Board of Public Works, City of South Bend, Indiana
RE: Northern Indiana Construction Company Evidence of Participation in Apprenticeship and
Training Programs
Northern Indiana Construction Company is a member of the Associated Builder & Contractors
of Indiana / Kentucky Inc. The Associated Builder & Contractors of Indiana / Kentucky provides
formal apprenticeship and craft training that are registered with the United States Department of
Labor Office of Apprenticeship. We also participate in the Indiana Department of Transportation
— OJT Training Program for minorities and women. The stated programs meet all federal and
state requirements for a formal apprenticeship program and prevailing wage work including
employer sponsored classroom instructions, along with on the job training (OJT). The classroom
instructions are available in Elkhart Indiana and other locations, and follow the National Center
for Construction Education and Research (NCCER) curriculum, "Wheels of Learning."
Northern Indiana Construction Company also has trained and certified all of our crane operators.
They have classroom training and have successfully passed all exams, and each is certified by
the National Commission for the Certification of Crane Operators (NCCCO).
Currently we have one full time employee participating in one of the above referenced training
programs. The current employee is a trainee in the labor crafts. We have one trainee participating
in the OJT training (to obtain skills) and participant in the Associated Builders & Contractors
Inc. classroom instruction 2020.
Should you need any additional information, please do not hesitate to contact me.
Vid
K' dly,
D
J. Wal - ki
President
Northern Indiana Construction Company Inc.
55803 DOGWOOD RD. P.D. BOX 1333 MISHAWAKA, IN. 46546.1333 PH: 574-256-181 1 FAX: 574-256.1879
" An Equal Opportunity Employer"
JULY 31, 2007
NORTHERN INDIANA CONSTRUCTION CO., INC.
EMPLOYEE DRUG TESTING PLAN
It is the policy of Northern Indiana Construction co., Inc. to maintain a drug-free
workplace and to conduct testing as required by Indiana law (IC -4-13-18) to discourage
use of prohibited substances by our employees. Our drug -testing program consists of the
following steps:
1) All truck drivers who are subject to the drug and alcohol -testing requirements
of 49CFR Parts 40 and 382 will continue to be tested subject to those
requirements rather than according to this policy.
2) All field employees, both management and trade, who work on state public
works contracts are subject to testing by random selection. All field employees
will be subject to a drug test at least one (1) time each year.
3) The names of all field employees has been submitted to Beacon Occupational
Health, 4630 Vistula Road, Mishawka, Indiana 46544 our drug -testing agency,
they have entered the names into their database for random selection. The list of
employees will be updated as needed to reflect the change in status of any
employees as well as to add any new employees.
4) At least two percent (2%) of the subject employees will randomly be selected
for testing each month. If two percent (2%) of the subject employees is less than
one (1), at least one name will be randomly selected.
5) Within 72 hours of being selected or prior to the employee's next scheduled
day of work, whichever is later, the employee selected for testing will be notified
that he/she has been randomly selected.
6) Once an employee has been notified of his/her selection for testing, the
employee will be directed to Beacon Occupational Health, 4630 Vistula Road,
Mishawka, Indiana 46544, our current testing facility for Northern Indiana
Construction Co., Inc. The employee will have 48 hours from the time of
notification to provide a specimen at the designated facility. Proof that the
specimen was collected, within the allotted time must be provided by the
employee to Northern Indiana Construction Co., Inc.
7) Specimens will be tested for amphetamines, cocaine, opiates (2000ng/ml),
PCP, and THC.
8) All drug tests will be conducted as follows: by a laboratory certified by the
United States Department of Health and Human Services under the National
Laboratory Certification Program.
9) All test results shall be: sent by the laboratory to the Medical Review Officer
(MRO) designated by Northern Indiana Construction Co., Inc.
10) The concentration thresholds established by (under) 49 CFR Part 40.87, will
determine whether a drug -test is positive or negative.
11) If the MRO notifies Northern Indiana Construction Co., Inc. that an employee
has tested positive, the following disciplinary progression will be followed, unless
Northern Indiana Construction Co., Inc. determines that it is in the company's
best interest to terminate the employee:
(A) After the first positive test, an employee must be:
(i)
Suspended from work for thirty (30) days;
(ii)
Directed to a program of treatment or rehabilitation; and
(iii)
Subject to unannounced drug testing for one (1) year, beginning
the day the employee returns to work.
(B) After the
second positive test, an employee must be:
(i)
Suspended from work for ninety (90) days;
(ii)
Directed to a program of treatment or rehabilitation; and
(iii)
Subject to unannounced drug testing for one (1) year, beginning
the day the employee returns to work.
(C) After the
third or subsequent positive test, an employee must be:
(i)
Suspended from work for one (1) year;
(ii)
Directed to a program of treatment or rehabilitation; and
(iii)
Subject to unannounced drug testing for one (1) year, beginning
the day the employee returns to work.
12) All subcontracts for work to be performed on state public works contracts will
include a provision requiring the subcontractor to have a drug testing plan
(program) that complies with IC 4-13-18 and to provide information regarding
implementation of its drug testing plan (program) upon request of the owner
agency.
Revised on 7/18/2019
DEPARTMENT OF THE TREASURY
BUREAU OF THE FISCAL SERVICE
WASHINGTON, DC 20227
Edward J. Largent III, President
Ohio Farmers Insurance Company
P. O. Box 5001
Westfield Center, OH 44251 - 5001
Dear Edward J. Largent III:
Your Company's Certificate of Authority to qualify as an acceptable surety and/or reinsurer on Federal
bonds is hereby renewed and will remain in effect until June 30, 2021, unless revoked prior to that date.
On the basis of our review of the Company's Annual Financial Statement as of the close of the last calendar
year, the following underwriting limitation has been established, effective July 1, 2020, under the renewed
Certificate:
POLICYHOLDERS' SURPLUS at December 31, 2019 $2,516,176,672
UNDERWRITING LIMITATION $251,618,000
We are following the practice of making no deductions from policyholders' surplus reported where the
amount of adjustment (e.g., for unauthorized reinsurance, inadequate loss reserves, etc.) would have a
nominal effect on the surplus and where it has been determined that the Company is solvent per Treasury's
guidelines. This practice facilitates the review work and should not be interpreted as changing or nullifying
applicable Treasury requirements.
The list of approved sureties (Circular 570) is available on our website at
littps://www.fiscal.trsasu[y.goy/surety-bonds/list-certified-compltiies.html. Please disseminate this
information to your associates, agents, reinsurers and even Government agencies whenever possible.
If you wish to comment on the underwriting limitation established, please contact Linda Gobble at (304)
480-5629, immediately.
Sincerely,
Digitally signed by Melvin H.
Melvin H. Saunders Saunders
Date: 2020.07.02 08:47:13 -04'00'
Melvin Saunders
Manager
Surety Bond Branch
SURETY BOND BRANCH
200 THIRD STREET — RM. 1010
PARKERSBURG, WV 26101
hs.�as;l! v,utiv fisc! tre�s��rrx:gn�lsurcty-hands)
northern Indiana Construction
Previous Projects of Similar Size
and Scope of Nature within Three (3)Years Prior
Proj ect Proj ect Project Proj ect
Name Type Amount Owner
Historic Leeper
Park Improvements
Bid Amount -
City of South Bend,
Park Improvements
(this project had
$813,360.05
IN.
BID Package 2,
Bank Stabilization
Project No. 118-
added via Change
01013
Order
S-56-20 Ash Road
Ditch Repair &
Project Amount -
St. Joseph County,
over Grimes Ditch
Bank Stabilization
$124,330.50
IN.
Performed work on River Walk Projects, more than 3 years ago, in South Bend,
Mishawaka & Elkhart.
558133 DOGWOOD RD. P.O. BOX 1333 MISHAWAKA, IN. 46546.1333 PH: 574-256-181 1 FAX: 574-256.1879
" An Equal Opportunity Employer"