Loading...
HomeMy WebLinkAbout6F(2)Community & Economic Development 1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 To: Redevelopment Commission; Board of Public Works From: Jitin Kain it—/— Subject: Change in Scope of Fellows St. Corridor Improvement Phase II work Date: November 5, 2012 Attached to this memorandum is a proposal from Christopher B. Burke Engineering Ltd. for additional professional services work done as part of the Fellows St. Corridor Improvement — Phase II design. An amendment to the addendum to the Master Agency agreement for Fellows St. Improvement — Supplement #2 was approved by the Redevelopment Commission on May 31, 2012 in the amount of $127,458. This covered design services for the redesign of Fellows St. based on an eastern alignment as well as drainage design plans. Upon completion of the services outlined in Supplement #2, Christopher B. Burke Engineering further completed several tasks including public presentations and created additional design alternatives at the request of the Commission. Staff requests approval of the attached proposal and an amount not to exceed $68,108 from the SSDA TIF. What We Do Today Makes A Difference! B I - CHRISTOPHER B. BURKE ENGINEERING, LLC PNC Center Suite 1368 South 115 W. Washington St. Indianapolis, Indiana 46204 TEI October 22, 2012 Jitin Kain City of South Bend 227 W. Jefferson Blvd. 12th Floor County -City Building South Bend, IN 46601 Subject: Amendment of Agreement - Fellows Street Corric (CBBEL Project No. 110093.00001) Dear Mr. Kain: In accordance with our contract, we are notifying you of a change in the scope of our project which has resulted in additional work that was not included in the original contract Scope of Services. The City requested that we expand our scope to provide additional services with the agreement that our contract would be amended to formally include the additional work. In the interest of keeping the project moving forward and focused on responding to the various issues of the project, we were requested to complete the additional work based on a verbal agreement, and to follow up with this formal written amendment. In response to the City's request (as discussed at our October 15th and 17th, 2012 meetings), the contract Scope of Work is expanded to include the following tasks: Additional Task 1 - Create Project Presentations for Public Hearings/Meetings: • July 12, 2012 - Presentation to Redevelopment Commission CBBEL staff prepared and gave a detailed presentation on the design process that was used for the recommended alternative. The presentation included visual aids showing each design option that was considered along with the restrictions and warrants associated with each. The Commission asked for more information and the analysis of additional alternatives. • August 28, 2012 Redevelopment Commission Public Hearing CBBEL staff prepared and gave a detailed presentation comparing the original design (alternative A) with several new alternatives as requested by the Commission. The new alternatives were labeled B -1, B -2, B -3, C -1, C -2, and D. The Commission selected Alternatives A, C -1, and C -2 for additional analysis and consideration. 3 Christopher B. Burke Engineering, LLC City of South Bend Fellows St. Corridor Improvement Phase II 19.13 110093.00001 Page 1 Additional Task 2 - Preliminary Design and Exhibits: CBBEL completed analysis and preliminary design for each of the six alternatives requested by the City. This included exhibits for each of the alternative routes that were presented at the public hearing on August 28, 2012. Additional Task 3 - Modify Preliminary Designs: CBBEL modified the preliminary designs for the three preferred alternatives as requested at the public hearing. This included modification of the original design (Alternative A) to allow five properties originally scheduled for vacation to remain. This modification was named Alternative A -1. The Commission then selected Alternatives A -1 and C -1 for additional study and consideration. Additional Task 4 - Survey and Hearing Notifications: CBBEL delivered two separate surveys and one public hearing notification to the Fellows Street neighborhood residents. The first survey was delivered on September 12, 2012, and the second survey was delivered on October 4, 2012. The public hearing notification was delivered on August 23, 2012. Additional Task 5 - Project Coordination: CBBEL corresponded and conducted several meetings with the City and with the affected property owners. This included several planning and design meetings with City staff during the alternative selection process as well as meeting and corresponding with individual property owners to discuss the project alternatives and answer questions. The fee for this additional work that has been completed is $68,108. We also anticipate needing up to an additional $10,000 to coordinate and resolve issues that may arise with this phase of the project. In the event the additional fee for this phase is not fully needed, the remainder will be applied towards the design services for the recommended alternative. Total Additional Estimated Fee: $78,108 If additional design services are required to complete plans and construction documents for the final alternative, a separate amendment will be prepared. This amendment is subject to the General Terms and Conditions included in the original contract. If the information provided above meets with your approval, please sign this amendment and send a copy back to us as notice to proceed with the additional work. If you have any questions regarding this amendment, please contact me or Jason Durr, P.E. at 574- 282 -8001. Sincerely, Jon D. Stolz, P.E. Manager, Indiana Christopher B. Burke Engineering, LLC City of South Bend Fellows St. Corridor Improvement Phase II 19.R110093.00001 Page 2 THIS AMENDMENT PROPOSAL FOR THE FELLOWS STREET CORRIDOR IMPROVEMENTS PHASE II IS ACCEPTED BY THE CITY OF SOUTH BEND, INDIANA - DEPARTMENT OF PUBLIC WORKS. ACCEPTANCE The above contract is accepted this day of Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot - President Member Member Member Member ATTEST: Linda M. Martin - Clerk JDS /In CITY OF SOUTH BEND-FELLOWS STREET AMENDMENT 2 2012 13 Christopher B. Burke Engineering, LLC City of South Bend Fellows St. Corridor Improvement Phase 11 19.R110093.00001 Page 3