Loading...
HomeMy WebLinkAbout6C(7)c (l) • r a n • U M ..;in Community & Economic Development 1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 To: South Bend Redevelopment Commission From: Don Inks Subject: Century Center West Entry Improvements Date: November 5, 2012 Attached for your review is a request on the behalf of Century Center for up to $50,000 for improvements to the west entry. These funds will be matched by $150,000 from the Hotel -Motel Tax fund. The improvements include new sliding doors to replace the old doors, along with new concrete paving, canopy and accent lighting. Additional details are included in the attached request. This is being presented to the Redevelopment Commission with a favorable recommendation for your approval in an amount not to exceed $50,000. Century Center West Improvements 11.5.12.doc What We Do Today Makes A Difference! A a / / -11W ARCHITECTURE DESIGN GROUP November 2, 2012 Donald E. Inks Director of Business Assistance City of South Bend Community and Economic Development 227 West Jefferson Boulevard, Suite 1200S South Bend, IN 46601 -1830 RE: CENTURY CENTER WEST ENTRY IMPROVEMENTS FUNDING REQUEST Dear Don: On behalf of the Century Center Board of Managers, ADG, Inc. is submitting this funding request to the South Bend Redevelopment Commission for their review and approval. The Century Center wishes to replace the existing West Pedestrian Entry steel hinged doors and framing with a new automatic sliding door system, similar to the South Entry doors installed in 2010. Shifting and settlement of the existing concrete slab and brick pavers causes the doors to bind, not allowing the doors to operate safely. The deteriorating physical conditions of the steel entry doors, paving, and drive -thru canopy have been documented and included in the Century Center's Capital Plan 2012. The Projected Costs of Construction are estimated at $200,000 and will include the necessary materials and labor to complete the following Work: • Complete removal and disposal of the existing steel structure, doors, and glass • Installation of temporary security and weather protection • Removal of the existing brick pavers • Installation of new colored concrete paving (similar to South Entry) • Installation of new steel tube framing (painted) • Installation of new pre - finished curtainwall frame system • Installation of new pre - finished automatic sliding doors /frame (4) • Installation of new pre - finished manual doors /frame (2) • Prep, patch, paint the existing exterior concrete columns • Prep, patch, paint the existing exterior steel canopy framing • Installation of new LED accent lighting to illuminate the existing exterior steel /glass canopy The St. Joseph County Board of Managers for Hotel -Motel Tax has budgeted $150,000 towards the Project for 2012. The Century Center Board of Managers total funding request is equal to the $50,000 difference. 922 E. Wayne Street South Bend, IN 46617 tel 574.288.6626 fax 574.288.6624 W U c� Su I Q% o U Q U v A a a_ d8 .6 9 ='a z M� C —_] J now •c :a �3 'o :o ;o :Y ;E t d V i 7 V u � a a U h a u O Y O D 'O E 0 0 v o° v 6 d C G G d C 3 z E o p, 0 I N3CWD TWUMIDS VW9S /213lN3DUdfllN9D