Loading...
HomeMy WebLinkAbout6.B.(1)I� /�(1) Community & Economic Development 1200 County -City Building. 227 West Jefferson. South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 To: Redevelopment Commission From: David Relos, Economic Development Planner' Subject: Professional Services Agreement Addendum— The Troyer Group Memorial Hospital Area Fagade Improvements Date: October 25, 2012 On December 13, 2011, the Commission approved a Professional Services Agreement with the Troyer Group. This agreement was undertaken as part of the improvements in and around the Memorial Hospital campus, and to specifically create a unified look of the buildings on the east side of Michigan St., including the Skywalk over this main thoroughfare leading into downtown South Bend. The December 2011 agreement with Troyer was to have them finalize facade designs, prepare construction bid specs, project bidding evaluation, and construction oversight. We are currently in the construction oversight phase of these fagade improvements. As the project progressed, it was discovered there were undocumented underground utilities where the foundation of the west tower supports were to be placed. This discovery required a redesign of the tower, which has led to additional work outside the scope of the original agreement. Cost for these additional services is $3,500. Staff requests approval of this Professional Services Agreement Addendum in an amount of $3,500. What We Do Today Makes A Difference! TBE rf ROYER GROUP 550 Union St. Mishawaka, IN 46544 or_-= (574) 259 -9976 wwwAroyergroupxom r� ", OWNER. / ARCHITECT AGREEMENT CHANGE NOTICE Change No,: 001 Project Name: City of South Bend Memorial Hosoital Facades Proiect City Proleet No 112 -018 Date: October 16 ,1012 Client, City of South Fiend Conunouity & Economic Development Project No.: i 1136.00 1. CLASSIFICATION X A. Pmject Scope Change X B. Revisions to Approved Arrangements C. Alterations in Design Concept D. Other (describe) IV. V Vl. DESCRIPTION Redesign of the tower element on the project due to in place utilities /as -built conditions. The design work included developing three options, pr renting them to the Owner /Contractor Team, revising the existing documents issuing them in the form of a Proposal request for pricing and construction and review of new shop drawings and submittals related to the changes. There are no additional eests for Construction Administration Services related to this work. Reimbursables for this work will be covered via the original agreement. RFASONS FOR CHANGE Existing utilitiesrabuih conditions encountered which were not documented. ESTIMATED IMPACT ON CONSTRUCTION COSTS - (Actual) (Minimum) (Maximum) It is estimated that these changes will reduce construction costs. Increase (Decrease) CONTRACT MODIFICATIONS The original Services Fee was The Services Fee prior h) this Change Order was The Services Fee will beg� (decreased) (unchanged) by this Change Order The new Services Fee including this Change Order will be S S f 19,250.00 S 119,250.01) 5 3.500.00 S 122.750. W ESTIMATED IMPACT ON DESIGN &DOCUMENTATION TIME (9 (Subtract) (Design was completed and issued September 27, 2012) Not Valid until signed by both Owner and Architect. Authorized: The Troyer Group, hic. Architect By: Andrew S. Roche, AIA Date: October 16.2012 Authorized: Rwner/CHent 9y: _ Date: G: J'rojeras'JlCMemorie! Hwpuel �.1! 136- IX)'proJert- inlh�34- ehmrge'charcge -1X11 _16oarl2.dor ^THE §TROYER Work Changes Proposal GRO _D,a based on: AIA Document G709 -2001 Plaunlop . Design . Construction PROJECT (Nameand address): PROPOSAL REQUEST NUMBER NO: 001 City of South Bend OWNER ❑x Memorial Hospital ARCHITECT ❑ Facades Project CONSULTANT ❑ City Project No. 112 -418 CONTRACTOR South Bend, IN 46601 FIELD O OTHER ❑ OWNER (Name and address): DATE OF ISSUANCE: September 27, ^_012 City of South Bend Community & Economic CONTRACT FOR: General Construction Development 227 W. Jefferson Blvd, Ste. 1200S South Bend, IN 46601 FROM ARCHITECT (Name and CONTRACT DATE: November 11, 2411 address): The TToyer Group, Inc 550 Union St. Mishawaka, IN 46544 TO CONTRACTOR (Name and ARCHITECT'S PROJECT NUMBER: address): 11136.00 Holladay Construction Group 227 South Main St. Suite 200 South Bend, W 46601 Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein. Within seven (7) days, the Contractor must submit this proposal or notify the Architect, in writing, of the date on which proposal submission is anticipated. THIS WORK IS NOT A CHANGE ORDER, A CONSTRUCTION CHANGE DIRECTIVE OR A DIRECTION TO PROCEED WITH WORK DESCRIBED, UNLESS NOTED OTHERWISE: DESCRIPTION: Architectural and Coordinated Work 1. Fumish and install all materials, labor, etc. to revise the project to eliminate the two (2) decorative columns and supporting elements and revise the work as shown in the attached plans, sections and details ATTACHMENTS: (Here insert listing of documents that support description.) Six (b) 30" x 42" sheets as referenced above. ISSUED BY THE ARCHITECT: ( gnatureJ Andrew S. Roche, AIA (Printed Name and firleo) lie f °� 1 all y1 affd� a � c 6,' � j Y i i ii _ y €� a¢..0�.� a�pe9 �� !! 0gi F i 5g gg ji 3= 144 i� E . j f k lie f °� 1 all y1 affd� a � c 6,' � j Y i i ii _ If as �� O i 1A r II' .Yan. ■ I a .Y■ ■u■ •w. .u• ■a■ ■Yu■ ■■ Moo ■ ■M■ mul.Y.K-.f M IT gili ll �4E ii II�L� Iii i li I r {I e Bg3li e #1���1�9 € 6 di 9 l AO" l ol f 1 mom r {I e Bg3li e #1���1�9 € 6 0 e Bg3li atide o�iii�-i��1� #1���1�9 di 9 l ll�� l ol 0 BFI ��9 �R I Y �PIiE 3A14'/ eE\\e all sip 11 1 P; °i€ 3 e m `§ ill oil ! ig i'r qq m `§ ill oil 4 ;i _ GACAOE IMGROVEMENTS FAR: CITY OF SOUTH BEND 1 CRY PROJECT NO. �Raln sov S£NO. IN Ae i L. i a 3 p 1� RICA HIM �tj IN IN rima� a3j�pl+ x� a e Y• '-- k,RR�� tl4r� c I � ?V rima� ) � | , || � | |§ ! | | !� � | ,■ !� | � I � / % \ alit § ----- . { ¥ |H § ! . -. , \ | | 0 ��— c\ n o , §f d� \� Ti -!a! > ( I o;I I � k H •�,n�lais #� |�! )kB |�� |4 |� §q•' | #k §�� |•§� |� /� � . , !$; . |f « ,! !q � §!§ � ! 7 j §m §m qm q !� � | ,■ !� | � I � / % \ alit § ----- . { ¥ |H § ! . -. , \ | | 0 ��— c\ n o , §f d� \� Ti -!a! > ( I o;I I � k H •�,n�lais #� |�! )kB |�� |4 |� §q•' | #k §�� |•§� |� /� � . , !$; . |f « ,! !q � MWI THE TROYER GROUP,,, A I Planning a Design Construction* LETTER OF PROPOSAL November 11. 2011 Mr. David Relos Economic Development Planner City of South Bend Community & Economic Development 227 W. Jefferson Blvd. Ste. 1200 S South Bend, (N 46601 Re: Facade Studies — Phase 11 Dear Mr. Relos W c are pleased a) offer to yuu our Architectural Services to complete the construction documentation, bidding, and construction administration phases for the new facades of the Skyway Office Building and associated fencing. the Skyway Bridge, the E. Blair Warner office building, the hank. and MarMain pharmacy. We have not included the N1PSC'O Building as Memorial Hospital of South Bend has yet to finalize requirements for the property at this time. We have listed the components of each building and broken the 2012 versus the 2015 phases out separately in this proposal. Thank you for your continued confidence in our design team. Sk*1xa_QMce Building and Sktwat Bridee -2012 chase We understand that budgets of S1,000,000 for the Skyway Office Building and 51,100.000 for the Skyway Bridge have been approved for expenditures in 2012. We also understand these amounts will need to raver construction and design fees. The design for the Skyway Office Building will need to be altered. 7'hc current design's probable cost is 52.625.000 without design fees. The design team has included in our proposed services working with Gibson -Lewis for consiruciinn cost estimation to determine the scope of the fagade treatments. We have allowed a maximum of two design review meetings /presentations; additional review meetingvpresentations will be done at time and expense. The Troyer Group has copies of the original Construction Documentation for both the Skyway Office Building and the Skyway Bridge. This will aid us in verifying existing conditions 1'or both of these facades. We have included field measuring of both in our senices to confirm existing as -built condition. We have also included additional fagade treatments on the Skyway Office Building and the fencing for both the north and south properly (as shown in the renderings) in the bid package. The fencing has probably construction cost of $100.000 (North) and S( 85,000 (South). This will allow us to have 550 *Union Streel, Mishawaka, IN 46544 P 574.259.9976 F 574.259.9982 www.troyer9roup.com 0 alternatives should the pricing come in lower than the expected construction cost. The Skywa) Bridge, the Skyway Offiicc Building and the alternates noted above will comprise the first bid package. We have not included an) coordination that might be required with the Indiana State Dcpanmcnt of Transportation ( INI)OT) Por an% of the Skywa) Bridge treatments. We believe that everything proposed should not encroach on the current clearance alread) in place. We do not expect an) additional INDOT meetings. if there arc INDOT or other governments approvals, the design team will perform the work required on a time and expense basis. We anticipate being able to start the field verification and design probable cost determination to narrow down the design once this contract is approved. We anticipate completing the first bidding package in the first quarter of 21112 so that construction bidding can occur in approximately early March of 2012. Construction would then he able to start when the x inter weather clears iputentialh April). E. Blair Warner Met Buildine.IheHattk.& MarMlnin —2015 Phase The Estimated Construction Pricing for the E. Blair Warner Building and the Bank Building is 5575,000. MarMain is 5390,0(1(). The proposed decorative column at The MRI screen wall will also need to be evaluated: a revised probable cost has not yet been determined. In addition, the Skyway Fencing will be included in this bid package if it is not completed in phase one. This is considered to he bid package two. Please note that these constriction costs have not been adjusted for inflation. The design team will request copies of the original documentation to assist in verify the existing field conditions of each of the buildings from Memorial Hospital of South Bend. Once we have these. we will reproduce these drawings and return the originals. Completing this set of documentation will be second priority but will be conducted in earl) 2012. The anticipated bid time will be roughly March of 2015 with construction staring in April of 2015. We can move forward with this schedule if funding allows. For ibis reason, we will break the bidding and construction administration fee out from the bid documentation preparation fee. What if willcostt Bid Package One For the services listed above under 2012 Phase, we offer a fee of One Hundred Nineteen Thousand. Two Hundred and Fift) Dollars ISI 19,250-00) not including reimbursable expenses. Reimbursable expenses are composed of copies. facsimile. velum prints, and postage i deliver service costs. Expenses Hill be billed at their cost times 1.1 (one point one) Bid Package Two For the preparation of the construction documents listed abo%c for the second bid package, we ofFera fee of Forty -Five Thousand. Six Hundred Dollars ($45.600.00) not including reimbursable expenses. Reimbursable expenses are composed of copies, facsimile, velum prints, and postage : delivery service costs. Expenses will be billed at their cost times 1,1 (one point one). For the bidding and construction administration phases of bid package two, which will occur in 2015, we offer a fee of Ten Thousand. One Ifundred and Fifty Dollars {510,150) not including reimbursable 0 expenses. Reimbursable expenses arc composed of copies, facsimile. velum prints, and postage dcliarry service costs. Expenses will be billed at their cost limes 1.1 lone point one). The Troyer Group hills monthly. Consequently, at the beginning of each month you will receive a statement covering the time and expenses expended during the previous month. Pa }'ment is due within thirty 1301 days after statement dale. Thank you fin your confidence in Thu Troyer Group. Please call with am questions. if the terms are acceptable, please print and sign two copies. keeping one fnr your records and returning one to us. Sincerely, Gary A. Hall, AIA. LEED AP Project Manager Ronald I Troyer. PE. LEED AP Vice President On behalf of The City of South Bend Date APPROVED W D RED JAI C T - r a