Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Amendment to Owner-Engineer Agreement - Traffic Analysis and Design Services for Eddy St. & Howard St. Inter – Abonmarche Consultants
1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS November 24, 2020 Mr. Daryl Knip Abonmarche Consultants, Inc. 750 Lincoln Way East South Bend, IN 46601 dknip(kabonmarche. com RE: Amendment No. 1 to Owner -Engineer Agreement Dear Mr. Knip: PHoNE 574/235-9251 FAx 574/235-9171 The Board of Public Works, at its meeting held on November 24, 2020, approved the above referenced amendment for traffic analysis and design services for the Eddy St. and Howard St. intersection in the amount of $109,430 with a new total amount of $129,730. Enclosed please find a copy of the amendment for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Enclosure Sincerely, s/Linda M. Martin, Clerk November 24, 2020 GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR This is EXHIBIT K, consisting of 3 pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated April 14, 2020,. AMENDMENT TO OWNER -ENGINEER AGREEMENT Amendment No. 1 1. Background Data: a. Effective Date of Owner -Engineer Agreement: April 14, 2020 b. Owner: Board of Public Works, Citv of South Bend C. Engineer: Abonmarche Consultants, Inc. d. Project: Howard Street Conceptual Design 2. Description of Modifications: a. The Scope of Services currently authorized to be performed by Engineer in accordance with the Agreement and previous amendments, if any, is modified as follows: Task Order # 1: Traffic Analysis i. Traffic Analysis shall include a capacity analysis of the intersection of Howard Street and Eddy Street and of Howard Street and SR 23 as requested during the development of the conceptual alternatives. ii. Review updated traffic count data provided by the City. Update the traffic analysis of these two intersection. The updated report will include an analysis of the current condition, the projected condition in 2022 following planned development, and 2040 condition including planned development and projected growth rate. Task Order # 2: Phase 1 Design i. Survey, design, special provisions and bid documents, easement or property acquisition, permitting, and bid period services of the following intersection: a. Howard Street and Eddy Street b. Howard Street and SR 23 c. Corby Boulevard and South Bend Avenue d. Notre Dame Avenue and South Bend Avenue (Topographical survey to be provided by the City) ii. Construction Administration services including review of shop drawings, attend progress meetings as requested, respond to questions as requested. Construction Administration will be performed at an hourly rate, not to exceed, as requested by the City. Task Order # 3: Project Coordination Page 1 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. i. The City will coordinate the proposed design with Ian Lockwood at various stages as necessary. ii. Abonmarche will schedule and conduct meetings with the City, University of Notre Dame, the developer, and other interested stakeholders as necessary. iii. Project coordination will be performed at an hourly rate, not to exceed, based a projected three video conference meetings, and 8 hours of correspondence and meeting preparation. Task Order # 4: Phase 2 Design i. Survey, 30% design, and traffic analysis of the intersections and connections along South Bend Avenue from Notre Dame Avenue to Corby Boulevard and the intersection of Frances Street with Campeau Street and connection to South Bend Avenue. 30% Design will include the geometric layout and intersection details with conceptual storm sewer routing. Grading and maintenance of traffic are not included in the 30% conceptual design. b. For the Additional Services or the modifications to services set forth above, Owner shall pay Engineer the following additional or modified compensation: Task Order #1: Traffic Analysis i. Traffic Analysis of Conceptual Alternatives (Hourly, NTE) $5,430 ii. Updated Traffic Analysis (Lump Sum) $6,200 Task Order # 2: Phase 1 Design i. Howard Street and Eddy Street Intersection (Lump Sum) $16,000 ii. Howard Street and SR 23 Intersection (Lump Sum) $15,800 iii. Corby Boulevard and South Bend Ave Intersection (Lump Sum) $15,900 iv. Notre Dame Avenue and South Bend Ave Intersection (Lump Sum) $17,300 v. Easement Acquisition $1,800 per parcel (Lump Sum) $5,400 vi. Construction Administration (Hourly, NTE) $3,500 Task Order #3: Project Coordination (Hourly, NTE) Task Order #4: Phase 2 Design (Lump Sum) c. The schedule for rendering services is modified as follows: Page 2 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. $3,500 $20,400 Task Order # 1 and #2 will commence the date of this approved amendment. Take Oder #3 will be performed as requested. Task Order #4 will not commence until authorization is received to proceed with the task. Task Order #1 45 Days Task Order #2 a. Topographic Survey 21 Days b. Preliminary Design 40 Days c. Final Design and Bid Documents 30 Days Task Order #4 a. Topographic Survey 21 Days b. Conceptual Design 45 Days c. Traffic Design 45 Days 5. Agreement Summary (Reference only) a. Original Agreement amount: $ 20,300 b. Net change for prior amendments: $ 0.00 c. This amendment amount: $ 109,430 d. Adjusted Agreement amount: $ 129,730 The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in Exhibit C. Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is November 24, 2020 le ivam BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member Jordan V. Gathers, Member Joseph R. Molnar, Member ATTEST: dZn'& owViN Linda M. Martin, Clerk ENGINEER: By: Daryl S. Knip, P.E. Title: CEO Date Signed: November 16, 2020 Page 3 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. Abonmarche Consultants, Inc. 305 W. Jefferson Blvd. South Bend, IN 46601 APPENDIX "A-1" Phase 2i - Howard Street and Eddy Street Intersection Survey Staff hour Justifcation CLIENT: City of South Bend PROJECT: Howard Street Conceptual Design SHEET 1 of 8 October 27, 2020 DESCRIPTION No. Shts. STAFFHOURS BY CLASSIFICATION Total Hours Total Cost Senior PM Survey Manager Project Surveyor Crew Chief Survey Tech CAD Tech Research Records for Plats & Deeds 2 2 4 Obtain Existing Utility Information 1 2 2 5 Establish Existing R/W's 1 1 1 2 2 2 9 Alignment and Centerline Contol 1 2 2 5 Obtain Topographic Data 1 1 1 4 4 11 Establish Vertical Control Benchmarks 1 2 2 5 Locate Existing Manholes, Inlets and Water Valves 1 1 2 Obtain Invert Elevations, Pipe Sizes and Directions 1 1 2 Locate existing Utilities in the R/W's 1 1 1 3 Drafting Utilities, Property Owners, Existing R/W 1 1 4 6 Total Hours 2 4 10 13 13 10 52 Cost per Hour $160.00 $120.00 $120.00 $75.00 $65.00 $85.00 Total Cost by Classification $320.00 $480.00 $1,200.00 $975.00 $845.00 $850.00 Survey Total $4,670.00 Budget $4,700.00 Abonmarche Consultants, Inc. 305 W. Jefferson Blvd. South Bend, IN 46601 APPENDIX "A-1" Phase 2i - Howard Street and Eddy Street intersection Design Staffhour Justifcation CLIENT: City of South Bend PROJECT: Howard Street Conceptual Design SHEET 2 of 8 October 27, 2020 DESCRIPTION No. Shts. STAFFHOURS BY CLASSIFICATION Total Hours Total Cost Principal PM -PE Pro'. En r-PE Staff En r CAD Tech Land. Arch. Setup Base Drawing 2 2 Cover Sheet 1 1 2 Preliminary Geometric Layout 1 1 2 2 6 Preliminary Intersection Details 2 2 4 Preliminary Curb Ramp Details 1 2 2 5 Preliminary Grading Details 1 4 4 9 Storm Sewer Design 2 4 6 Preliminary Maintenance of Traffic 1 2 4 7 Preliminary Quality Control 1 1 1 3 50% Cost Estimate 1 2 4 7 50% Design Review Meeting with City 1 1 2 Field Check 1 1 2 Utility Coordination 1 1 Final Geometric Layout 1 1 2 Final Intersection Details 1 1 2 Final Curb Ram Details 1 2 3 Final Grading Details 1 2 3 Final Maintenance of Traffic 1 1 2 4 Bid Documents and Special Provisions 1 4 6 11 Quality Control 1 1 2 4 Final Cost Estimate 1 2 4 7 Final Design Review Meeting with City 1 1 2 Bid Process 1 1 1 1 4 Total Hours 3 10 27 41 17 0 98 Cost per Hour $215.00 $160.00 $130.00 $100.00 $80.00 $110.00 Total Cost by Classification $645.00 $1,600.00 $3,510.00 $4,100.00 $1,360.00 $0.00 Design Total $11,215.00 Budget $11,300.00 Abonmarche Consultants, Inc. 305 W. Jefferson Blvd. South Bend, IN 46601 APPENDIX "A-1" Phase 2ii - Howard Street and SR 23 Intersection Survey Staff hour Justifcation CLIENT: City of South Bend PROJECT: Howard Street Conceptual Design SHEET 3 of 8 October 27, 2020 DESCRIPTION No. Shts. STAFFHOURS BY CLASSIFICATION Total Hours Total Cost Senior PM Survey Manager Project Surveyor Crew Chief Survey Tech CAD Tech Research Records for Plats & Deeds 1 1 2 Obtain Existing Utility Information 1 2 2 5 Establish Existing R/W's 1 1 1 2 2 2 9 Alignment and Centerline Contol 1 2 2 5 Obtain Topographic Data 1 1 1 4 4 11 Establish Vertical Control Benchmarks 1 2 2 5 Locate Existing Manholes, Inlets and Water Valves 1 1 2 Obtain Invert Elevations, Pipe Sizes and Directions 1 1 2 Locate existing Utilities in the R/W's 1 1 2 Drafting Utilities, Property Owners, Existing R/W 1 1 4 6 Total Hours 2 4 8 13 13 9 49 Cost per Hour $160.00 $120.00 $120.00 $75.00 $65.00 $85.00 Total Cost by Classification $320.00 $480.00 $960.00 $975.00 $845.00 $765.00 Survey Total $4,345.00 Budget $4,400.00 APPENDIX "A-V Phase 2i - Howard Street and SR 23 Intersection Design Staffhour Justifcation Abonmarche Consultants, Inc. CLIENT: City of South Bend 305 W. Jefferson Blvd. PROJECT: Howard Street Conceptual Design South Bend, IN 46601 SHEET 4 of 8 October 27, 2020 DESCRIPTION No. Shts. STAFFHOURS BY CLASSIFICATION Total Hours Total Cost Principal PM - PE Pro'. En r-PE Staff En r CAD Tech Land. Arch. Setup Base Drawing 2 2 Cover Sheet 1 1 2 Preliminary Geometric Layout 1 1 2 1 5 Preliminary Intersection Details 2 1 3 Preliminary Curb Ramp Details 2 2 4 Preliminary Grading Details 1 2 2 5 Storm Sewer Design 1 4 5 Preliminary Traffic Signal 2 4 Preliminary Maintenance of Traffic 1 2 4 7 Preliminary Quality Control 1 1 2 50% Cost Estimate 1 4 5 50% Design Review Meeting with City 1 1 2 Field Check 1 1 2 Utility Coordination 2 2 Final Geometric Layout 1 2 3 Final Intersection Details 2 2 Final Curb Ramp Details 1 2 3 Final Grading Details 1 2 3 Final Traffic Signal 2 2 4 Final Maintenance of Traffic 1 2 3 Bid Documents and Special Provisions 2 4 6 12 Quality Control 1 2 3 Final Cost Estimate 1 2 4 7 Final Design Review Meeting with City 1 1 2 Bid Process 1 1 1 3 INDOT Permit 1 4 Total Hours 0 9 28 52 13 0 102 Cost per Hour $215.00 $160.00 $130.00 $100.00 $80.00 $110.00 Total Cost by Classification $0.00 $1,440.00 $3,640.00 $5,200.00 $1,040.00 $0.00 Design Total $11,320.00 Budget $11,400.00 Abonmarche Consultants, Inc. 305 W. Jefferson Blvd. South Bend, IN 46601 APPENDIX "A-1" Phase 2iii - Corby Boulevard and South Bend Avenue Intersection Survey Staff hour Justifcation CLIENT: City of South Bend PROJECT: Howard Street Conceptual Design SHEET 5 of 8 October 27, 2020 DESCRIPTION No. Shts. STAFFHOURS BY CLASSIFICATION Total Hours Total Cost Senior PM Survey Manager Project Surveyor Crew Chief Survey Tech CAD Tech Research Records for Plats & Deeds 2 2 4 Obtain Existing Utility Information 1 2 2 5 Establish Existing R/W's 1 1 1 2 2 2 9 Alignment and Centerline Contol 1 2 2 5 Obtain Topographic Data 1 1 1 4 4 11 Establish Vertical Control Benchmarks 1 2 2 5 Locate Existing Manholes, Inlets and Water Valves 1 1 2 Obtain Invert Elevations, Pipe Sizes and Directions 1 1 2 Locate existing Utilities in the R/W's 1 1 1 3 Drafting Utilities, Property Owners, Existing R/W 1 1 4 6 Total Hours 2 4 10 13 13 10 52 Cost per Hour $160.00 $120.00 $120.00 $75.00 $65.00 $85.00 Total Cost by Classification $320.00 $480.00 $1,200.00 $975.00 $845.00 $850.00 Survey Total $4,670.00 Budget $4,700.00 Abonmarche Consultants, Inc. 305 W. Jefferson Blvd. South Bend, IN 46601 APPENDIX "A-1" Phase 2iii - Corby Boulevard and South Bend Avenue Intersection Design Staffhour Justifcation CLIENT: City of South Bend PROJECT: Howard Street Conceptual Design SHEET 6 of 8 October 27, 2020 DESCRIPTION No. Shts. STAFFHOURS BY CLASSIFICATION Total Hours Total Cost Principal PM - PE Pro'. En r-PE Staff Engr CAD Tech Land. Arch. Setup Base Drawing 2 2 Cover Sheet 1 1 2 Preliminary Geometric Layout 1 1 2 2 6 Preliminary Intersection Details 2 2 4 Preliminary Curb Ramp Details 1 2 2 5 Preliminary Grading Details 1 4 4 9 Storm Sewer Design 2 4 6 Preliminary Maintenance of Traffic 1 2 4 7 Preliminary Quality Control 1 1 1 3 50% Cost Estimate 1 1 4 6 50% Design Review Meeting with City 1 1 2 Field Check 1 1 2 Utility Coordination 1 1 Final Geometric Layout 1 2 3 Final Intersection Details 2 2 Final Curb Ramp Details 1 2 3 Final Grading Details 1 2 3 Final Maintenance of Traffic 1 4 5 Bid Documents and Special Provisions 1 4 6 11 Quality Control 1 1 2 4 Final Cost Estimate 1 2 4 7 Final Design Review Meeting with City 1 1 2 Bid Process 1 1 1 1 4 Total Hours 3 9 25 45 17 0 99 Cost per Hour $215.00 $160.00 $130.00 $100.00 $80.00 $110.00 Total Cost by Classification $645.00 $1,440.00 $3,250.00 $4,500.00 $1,360.00 $0.00 Design Total $11,195.00 Budget $11,200.00 Abonmarche Consultants, Inc. 305 W. Jefferson Blvd. South Bend, IN 46601 APPENDIX "A-1" Phase 2iv - South Bend Avenue and Frances Street Survey Staff hour Justifcation CLIENT: City of South Bend PROJECT: Howard Street Conceptual Design SHEET 7 of 8 October 27, 2020 DESCRIPTION No. Shts. STAFFHOURS BY CLASSIFICATION Total Hours Total Cost Senior PM Survey Manager Project Surveyor Crew Chief Survey Tech CAD Tech Research Records for Plats & Deeds 2 2 4 Obtain Existing Utility Information 1 2 2 5 Establish Existing R/W's 1 1 2 2 2 2 10 Alignment and Centerline Contol 1 2 2 5 Obtain Topographic Data 0 Establish Vertical Control Benchmarks 0 Locate Existing Manholes, Inlets and Water Valves 0 Obtain Invert Elevations, Pipe Sizes and Directions 0 Locate existing Utilities in the R/W's 0 Convert provided survey to Abonmarche layer standards 4 4 Review provided survey 1 2 Total Hours 2 4 7 4 4 10 31 Cost per Hour $160.00 $120.00 $120.00 $75.00 $65.00 $85.00 Total Cost by Classification $320.00 $480.00 $840.00 $300.00 $260.00 $850.00 Survey Total $3,050.00 Budget $3,100.00 Abonmarche Consultants, Inc. 305 W. Jefferson Blvd. South Bend, IN 46601 APPENDIX "A-1" Phase 4 - South Bend Avenue and Frances Street Design Staffhour Justifcation CLIENT: City of South Bend PROJECT: Howard Street Conceptual Design SHEET 8 of 8 October 27. 2020 DESCRIPTION No. Shts. STAFFHOURS BY CLASSIFICATION Total Hours Total Cost Principal PM - PE Pro'. En r-PE Staff En r CAD Tech Land. Arch. Setup Base Drawing 4 4 Cover Sheet 1 1 2 Preliminary Geometric Layout 4 12 16 16 48 Preliminary Intersection Details 4 8 8 20 Storm Sewer Design 2 4 6 Preliminary Quality Control 1 1 1 3 50% Cost Estimate 1 2 4 7 50% Design Review Meeting with City 1 1 1 3 Field Check 1 4 5 Utility Coordination 1 2 3 Traffic Analysis 8 16 Total Hours 1 15 41 39 29 0 125 Cost per Hour $215.00 $160.00 $130.00 $100.00 $80.00 $110.00 Total Cost by Classification $215.00 $2,400.00 $5,330.00 $3,900.00 $2,320.00 $0.00 Design Total $14,165.00 Budget $14,200.00 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 11/10/2020 Department Engineering Name Kvle Silveus Phone Extension BPW Date l l /24/2020 Phone Extension - Review and Approval Required Prior to Submittal to Board Diversity Compliance ❑ Officer Name and Inclusion Officer BPW Attorney ❑ Attorney Name Dept. Attorney ❑ Attorney Name Purchasing ❑ Check the Appropriate Item I Professional Services Agreement ❑ Contract ❑ Open Market Contract ❑ Bid Opening ❑ Quote Opening ❑ Proposal Opening ❑ Chg. Order, No. n Other: Company or Vendor Name New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract Clara McDaniels ® Amendment/Addendum ❑ Bid Award ❑ Quote Award ❑ C/O & PCA No. ❑ Traffic Control Information Abonmarche Consultants, Inc. All Submissions U Proposal ❑ Special Purchase, QPA ❑ Req. to Advertise ❑ Reject Bids/Quotes ❑ Resolution ❑ Ease./Encroach Ease./Encroach ❑ Title Sheet ❑ Yes ❑ If Yes, Approved by Purchasing i ® No ❑ WBE Completed E-Verify Form Attached ❑❑ Yes No Eddy St. and Howard St. Intersection Improvements 120-024 REDA TIF 429.1050.460.42.02 $109,430 LumD Sum. HNTE Purpose/Description Full Intersection Design Does for: Howard St./Eddy St., Howard St./SR23, Corby Ave./SB Ave., and ND Ave/SB Ave. and 30% Design for the Realignment/Connections along SB Ave. at Frances St. and Campeau St. This analysis is needed due to significant traffic changes as a result of and to accommodate the Edd Street develo ment. For Change Orders Only Amount of ❑ Increase $ ❑ Decrease ($ ) Previous Amount $ Increase % Current Percent of Change: Decrease ( %) New Amount $ Increase % Total Percent of Change: Decrease ( %) Time Extension Amount: