Loading...
HomeMy WebLinkAboutOpening of Quotes - North WTP Raw Water Header Improvements Proj No. 119-011A - D.A. Dodd, LLCBOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 11/4/2020 Name Becca Plantz Department Public Works BPW Date 11/24/2020 Phone Extension 5998 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name Michael Patton BPW Attorney Attorney Name Clara McDaniels Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name North Water Treatment Plant Raw Water Header Improvements Project Number 119-011A Funding Source River West TIF Account No. PR-00005229 Amount Terms of Contract Lump Sum Purpose/Description Replace existing stainless steel raw water header near Vessel 2. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: Version 2/14/2020 Page - 1 Public Works Quote SCOPE OF WORK CITY OF SOUTH BEND PROJECT NAME: North Water Treatment Plant Raw Water Header Improvements PROJECT NO. 119-011A QUOTES DUE November 24, 2020 I. PROJECT DESCRIPTION A. The project includes the furnishing of all equipment, material, insurance, and labor to remove and replace existing stainless steel raw water pipe, fittings, supports, and butterfly valve connected to Vessel 2 within the North Station Water Treatment Plant located at 830 North Michigan Street within the City of South Bend, IN. II. PREVAILING SPECIFCIATIONS AND CONSTRUCTION STANDARDS AND SPECIFICATIONS A. The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and CONSTRUCTION STANDARDS AND SPECIFICATIONS, most recent version, are to be used on this project. B. Each Quote provider is specifically instructed to become completely familiar with the most recent version of the PREVAILING SPECIFICATIONS and the CONSTRUCTION STANDARDS AND SPECIFICATIONS prior to submitting a quote. C. Wherever the PREVAILING SPECIFICATIONS refer to “State Specifications,” it shall mean the 2020 INDOT Standard Specifications for the letting effective after September 1, 2019. D. These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING SPECIFICATIONS and are to be used only in conjunction with the PREVAILING SPECIFICATIONS. E. In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING SPECIFICATIONS, the SPECIAL PROVISIONS will govern. III. TERM “OR EQUAL” A. Prevailing Specifications: None B. Additions 1. Where the term "or equal" is used in these specifications, the Quote provider deviating from specified item shall file with his/her/its Quote a letter fully explaining and justifying his/her/its proposed article or equal. The City of South Bend shall be the sole judge in determining if the “or equal” offered meets the specification. IV. TAX EXEMPT A. Prevailing Specifications: None B. Additions 1. Materials and properties purchased under contract with the Owner that becomes a permanent part of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax). The exemption number will be furnished to the Contractor upon award. V. INDEMNIFICATION A. Prevailing Specifications: None B. Additions 1. Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its agents, officers and employees, from all costs, losses, claims and suits, including court costs, attorney fees, and other expenses, arising from or out of the negligent performance of this Contract by Contractor, Version 2/14/2020 Page - 2 Public Works Quote or because of arising out of any defect in the goods, materials or equipment supplied by the Quote provider. VI. INSURANCE A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 103 B. Additions: 1. All Contractors and subcontractors doing business with the City of South Bend shall present a Certificate of Insurance showing coverage in the following minimum amount: a. General Liability: Premises-Completed Operations or Products, Bodily Injury and Property Damage Combined Single Limit - $5,000,000. b. There shall be no exclusion for explosion, collapse or underground hazard. c. Workmen’s Compensation: Statutory State of Indiana Employer's Liability - $100,000. d. Auto Liability: Bodily Injury and Property Damage Combined Single limit - $1,000,000. e. The City of South Bend shall be named as additional insured on the Certificate of Insurance. VII. CONTROL OF WORK A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 105 B. Additions: 1. The complete responsibility for this project lies with the Director of Public Works of the City of South Bend, Indiana acting through his authorized representatives. 2. Construction Engineering - The Contractor shall provide all the necessary, qualified personnel, equipment and supplies to perform all work required under this item. There will be no direct payment for this item. 3. The contractor is responsible to maintain the site which includes but is not limited to; dust control, site security, erosion control, and protecting adjacent properties. 4. Work hours for the Project shall be from 7:00 a.m. through 6:00 p.m., Monday through Friday. No work shall be permitted on weekends, Holidays, or after hours unless approved by the City of South Bend Department of Public Works. 5. Contractor shall coordinate access to the facility, all temporary outages, and work schedule with City of South Bend’s Manager of Operations, Bradley VanOosterum, contacted at (574)235-5670. VIII. LEGAL RELATIONS A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 107 B. Additions: 1. The Owner, where mentioned in these documents, is the City of South Bend. The Engineer, where mentioned in these documents, is the City of South Bend Department of Public Works, Division of Engineering. 2. The Contractor shall apply for and obtain any and all required permits for the work from local, state, and federal agencies and shall comply with permit requirements, including the St. Joseph County / City of South Bend Building Department. 3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the Contractor shall provide the Owner with proof that the Contractor is duly licensed, qualified and registered with the Secretary of State of Indiana to engage in business within the State of Indiana. 4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The Owner reserves the right to immediately terminate the public work project awarded should the Contractor be found to be in violation of any provision of Indiana Code 5-16-13 and such violation shall result in the forfeiture of Contractor’s performance bond to the Owner. IX. PROSECUTION AND PROGRESS A. Prevailing Specifications: 2020, INDOT Standard Specifications Sec. 108 B. Additions: Version 2/14/2020 Page - 3 Public Works Quote 1. The project will have a completion schedule of forty-five days (45) calendar days. The contract time will start when the Notice to Proceed is delivered and signed. 2. The City, Engineer, and Contractor will hold a pre-construction meeting following award of the contract. The date of the Notice to Proceed will be agreed at that meeting. 3. Contractor shall provide a schedule to the Owner prior to beginning any work on the site. X. CHANGE OF CONTRACT TIME A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 108 B. Additions 1. The Contract Time may only be changed by Change Order. Any Claim for an extension in the Contract Time shall be based on written notice delivered to the Department of Public Works within seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent of the claim with supporting data shall be delivered within fourteen (14) calendar days after such occurrence unless an official of the Public Works Department allows an additional period of time to ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost to delays beyond the control of the Contractor if a claim is made in accordance with this provision. Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God. 2. Unless otherwise provided, the Contract time is based upon normal weather conditions. An extension is granted for weather conditions significantly more severe than normal if the Contractor demonstrates to the satisfaction of the City that the delay in the progress of the work was due to such weather. The basis to define normal weather with be the data compiled by the United States Department of Commerce, National Oceanic and Atmospheric Administration (NOAA). 3. No extension of time will be granted if the Contractor, by his/her/its own action or inaction, including fault or negligence of Contractor’s subcontractors, caused the delay, or for which any remedies are provided under any other provision of this agreement. 4. The grant of an extension of time under this Section in no way constitutes a waiver by the City of any rights or remedies existing under this contract at law or in equity. XI. DEFAULT AND TERMINATION A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 108 B. Additions: 1. Events of Default shall include Contractor’s failure to perform any of its obligations under this contract including failure to commence work at the time specified, failure to perform the work in accordance with these specifications, unauthorized discontinuation of the work, failure to carry out the work in a manner acceptable to the City, failure to observe Federal, State, or local laws or regulations, and failure to comply with any other term of this contract. 2. If an Event of Default occurs, the City shall provide Contractor written notice and may permit Contractor ten (10) calendar days after the date of the notice to cure the default. If the default is not cured within the ten (10) day cure period, the City may at any time thereafter terminate this contract in which case the termination shall be final and effective. 3. Upon an Event of Default, the City may invoke the following remedies in addition to those remedies provided under separate provisions of this contract, the right of set-off against any payments due or to become due to the Contractor against the retainage, the right to take over and complete the Work. If the City notifies Contractor that City is invoking its right to complete the Work, all rights that the Contractor has in order under Contractor’s subcontracts are assigned to the City, subject to the City’s right to take assignment of all or only selected subcontracts at the City’s discretion. The sole obligation accepted by the City under such subcontracts is to pay for Work satisfactorily performed after the date of the assignment. In the event a conditional assignment has not been executed, the Contractor shall execute or cause to be executed any assignment, agreement, or other document that may be necessary in the sole opinion of legal counsel to the City’s Board of Public Works to evidence compliance with this provision. The Contractor shall promptly deliver such documents upon the City’s request. In the case of such assignment, unless otherwise agreed in writing, The Contractor remains liability to subcontractors for any payment already involved, and for any claim, Version 2/14/2020 Page - 4 Public Works Quote suit or cause of action based upon or resulting from any error, omission, negligence or other breach of contract by the Contractor, its officers, employees, or agents arising prior to the date of assignment to the City. XII. LIQUIDATED DAMAGES A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 108 B. Additions: 1. The contractor shall proceed with the work at such rate of progress to insure full completion within the Contract Time. It is expressly understood and agreed, by and between the Contractor and the Owner, that the Contract Time for completion of the work described herein is a reasonable time, taking into consideration the average climatic and economic conditions and other factors prevailing in the locality of the work, and excludes the time for unavoidable delays which were beyond the control and without the fault of the Contractor. 2. If the Contractor shall fail to complete the work within the Contract Time, or extension of time granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages a sum of five hundred dollars ($500.00) for each calendar day that the Contractor shall remain in default after the time of completion stipulated in the Contract Documents. 3. The Contractor shall not be charged with liquidated damages or any excess cost when the delay in completion of the work is due to the following and the Contractor has promptly given written notice of such delay to the Owner and Engineer/Architect. a. To any preference, priority, or allocation order duly issued by the Owner. b. To unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to acts of God, acts of public enemy, acts of the Owner, acts of another Contractor in the performance of a Contract with the Owner, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and unforeseeable weather. XIII. RETAINAGE AND FINAL PAYMENT A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 109 B. Additions: 1. Payments will be made every thirty (30) calendar days 2. Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a percentage of payments throughout the duration of the project. 3. Before final payment and retainage are released the Contractor must satisfy the following: a. All parts and labor meet requirements stated in the specifications. b. Provide copies of test reports or cut sheets on all materials supplied. c. Provide As-Built drawings in accordance with the City of South Bend Prevailing Specifications for Public Works. d. One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final Waiver of Lien. XIV. WARRANTY A. Prevailing Specifications: None B. Additions 1. All Parts shall include the following: a. Performance specifications b. Bill of Materials c. Warranties on all parts d. Installation and safety requirements Version 2/14/2020 Page - 5 Public Works Quote XV. DESCRIPTION OF WORK A. Prevailing Specifications: None B. Additions 1. Work to be performed shall include furnishing all labor, services, materials, insurance and equipment to remove and replace existing stainless steel raw water pipe, fittings, supports, and butterfly valve connected to Vessel 2 within the North Station Water Treatment Plant located at 830 North Michigan Street within the City of South Bend. 2. Prior to submittal of the quote proposal, the bidder shall visit North Station to see the raw water header and conduct any necessary measurements. Visits shall be coordinated with Becca Plantz contacted at (574) 235-5998 during business hours Monday through Friday between 8:00 am to 4:00 pm. 3. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors, and their property from damage caused by the Contractor’s operations. 4. The work to be completed shall include: a. Dimension existing piping for prefabrication. b. Install 12” blind flange in 12” flanges or propose an equivalent means and methods to obstruct flow for construction. c. Demolish 12” stainless steel pipe and fittings. d. Remove and salvage 12” stainless steel butterfly valve. e. Fabricate and install new valve supports for new 12” valve location. f. Install 12” SCH 80 PVC pipe, fittings, and flanges in place of existing, reusing hangers. g. Install saddle clamp for ¾” port and stainless steel ball valve. h. Reroute electrical services to new valve location. i. Prior to final acceptance, the Contractor shall cleanup the construction area. The site shall be left neat and clean in condition acceptable to the Owner. XVI. PIPING REMOVAL AND INSTALLATION A. Prevailing Specifications: None B. Additions: 1. Reference Standards: Comply with the latest editions of the following: a. ASTM D 1784, Rigid Poly (Vinyl Chloride) PVC Compounds and Chlorinated Poly/Vinyl Chloride) CPVC Compounds. a. ASTM D 1785, Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80. b. ASTM D 2564, Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Pipe and Fittings. c. ASTM D 2467, Poly (Vinyl Chloride) (PVC) Plastic Pipe and Fittings. d. ASTM D 2464, Threaded Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80. e. ASTM D 1599, Test for Resistance to Short-Time Hydraulic Pressure of Plastic Pipe, Tubing, and Fittings. f. ASTM D 2122, Test for Determining Dimensions of Thermoplastic Pipe and Fittings. g. ASTM D 1598, Test for Time-to-Failure of Plastic Pipe Under Constant Pressure. h. ANSI B2.1, Pipe Threads. 2. Submittals a. Shop Drawings and Product Data: Manufacturer’s data showing material composition of pipe and fittings, pressure ratings, pipe layout, and verification as to compatibility with respective fluids being conveyed. 3. Piping Materials a. Polyvinyl Chloride (PVC) Pipe: (i) Pipe and Fitting Material: (i) Standard: ASTM D 1784 (ii) Type: Type I, Grade I, rigid 912454-B) (ii) Pipe: (i) Standard: ASTM 1785 (ii) Designation: PVC 1120 (iii) Schedule: Schedule 80 unless otherwise specified. (iii) Joints: (i) General: Connect pipe by solvent cementing except where flanged or threaded fitting and required at expansion joints, valves, equipment connections or otherwise shown or directed. Version 2/14/2020 Page - 6 Public Works Quote (ii) Flanged Joints: 1. Use flanges joined to pipe by solvent cementing 2. Flange Drilling and Dimensions: Comply with ANSI B16.1 3. Flange Gaskets: Viton full face 4. Bolts and Nuts: Type 304 stainless steel (iii) Threaded Joints: 1. Taper Pipe Threads: ANSI B2.1 2. Join Preparation: Teflon Tape. 3. Use PVC dies for taper pipe threads. (iv) Primer and Solvent Cement: 1. Standard: ASTM D 2564 2. Products: Weld - On 724 CPVC Cement in Gray and Weld - On Plumbing Primer in Clear or approved equal. (iv) Fittings: (i) Socket-Type: 1. Standard: ASTM D 2467 2. Designation: PVC I. (ii) Threaded Type: 1. Standard: ASTM D 2464 2. Designation: PVC I. 4. Piping Installation: a. Install piping as shown, specified, and recommended by the manufacturer. b. If there is a conflict between manufacturer’s recommendations and the Specifications request instructions from the Owner before proceeding. c. Install straight runs true to line and elevation. d. Install vertical pipe truly plumb in all directions. e. Install piping parallel or perpendicular to building walls. f. Install piping so as to leave all corridors, walkways, work areas, and like spaces unobstructed. g. Protect and keep clean water pipe interiors, fittings, and valves. h. Provide temporary caps or plugs over all pipe openings at the end of each day’s work, and when otherwise required or directed by Owner. i. Cutting: Cut pipe from measurements taken at site, not from Drawings. j. Provide screwed or flanged unions at each piece of equipment and where necessary to install or dismantle piping. k. Support all valves independently of the piping system. l. When anchors are required at locations other than equipment, they shall be placed at elbows, valve locations, and at bends in the pipeline. m. Spacing of supports shall be in accordance with the manufacturer’s published recommendations at the maximum design operating temperature of the pipe. n. Use “U” clamps with wide band circumferential contact with cushion spacer or low friction rubber pads. o. Use guides on long runs of piping to maintain alignment and reduce chance of elastic failure of the pipe. Space guides as recommended by manufacturer. p. Do not install pipe when temperature is less than 60 F. q. Contractor shall verify that each component of the plumbing system is compatible with all other parts of the system; that all piping, fixtures, and appurtenances are appropriate; and that all devices necessary for a properly functioning system have been provided. r. Install markers and arrows at the following locations: (i) At intervals not exceeding 50 feet along continuous runs of pipe. (ii) Wherever pipes pass through walls, floors, or panels. (iii) At each valve or equipment connection. (iv) At each branch where it connects to a main line. s. Joints: (i) Make joints in accordance with the pipe manufacturer’s recommendations. (ii) Cut piping accurately and squarely and install without forcing or springing. (iii) Ream out all pipes and tubing to full inside diameter after cutting. Remove all sharp edges on cuts. Version 2/14/2020 Page - 7 Public Works Quote (iv) Remove all cuttings and foreign matter from the inside of pipe and tubing before installation. Thoroughly clean all pipe, fittings, valves, specials, and accessories before installing. (v) Observe safety precautions with the use of joint primers and solvent cements. Allow air to circulate freely through pipelines to permit solvent vapors to escape. Slowly admit water when flushing or filling pipelines to prevent compression of gases within pipes. (vi) Protect threaded joints at the point of grip by inserting a rubber sheet or other material between pipe and vise. Thread pipe in accordance with the pipe manufacturer’s recommendations. Brush threads clean of chips and ribbons. Then starting with the second full thread and continuing over the thread length, wrap Teflon (PTFE) thread tape in the direction of the threads. Overlap each wrap by one half the width of the tape. Screw the fitting or coupling onto the pipe and tighten by hand. Using a strap wrench only, further tighten the connection an additional one to two threads past tightness. t. Testing of Piping (i) Test all piping except as may be exempted in the Schedule. (ii) Conduct all tests in the presence of the Owner. (iii) Remove or protect any pipeline-mounted devices that may be damaged by the test pressure. (iv) Provide all apparatus and services required for testing, including but not limited to, the following: (i) Test pumps, bypass pumps, hoses, calibrated gauges, test containers, valves, and fittings. (ii) Temporary bulkheads, bracing, blocking and thrust restraints. (v) Unless otherwise specified, Owner will provide water required for testing. (vi) Repair observed leaks and any pipeline failing to meet acceptance criteria. Retest after repair. (vii) Test Procedure: (i) Fill pipeline slowly to minimize air entrapment and surge pressures. Fill rate should not exceed one foot per second in the pipe being tested. (ii) Examine exposed joints and valves, and correct visible leakage. (iii) After the wetting period prescribed above, add fluid to pressurize line to the required test pressure. Maintain test pressure for a stabilization period of 10 minutes before beginning test. (iv) After the stabilization period, maintain test pressure for a two-hour period. Add fluid to restore test pressure if pressure drops 5 psi below test pressure at any time during the test period. (v) Pump from a test container to maintain test pressure. Measure the volume of fluid pumped from the container and record on the test report. Record pressure at the test pump at 15-minute intervals for the duration of the test. (viii) Allowable Leakage Rates: Leakage is defined as the quantity of fluid that must be supplied to the pipeline or any section thereof to maintain pressure within 5 psi of the test pressure during a two-hour period. The two-hour test period shall not begin until after the pipe has been filled, exposed to the required wetting period, air has been expelled and pressure has been stabilized. Allowable leakage rates for piping system are listed below: A. No Leakage: Pipe with flanged, welded, fused, screwed, or soldered joints. (ix) Cleaning and Disinfection (i) All dirt, debris, standing water and any other material shall be removed from the pipes, to satisfaction of the Owner. (ii) All water, dirt, or foreign material accumulated in this operation shall be removed from the pipes, to the satisfaction of the Owner. XVII. VALVES A. Prevailing Specifications: None B. Additions: 1. Remove and salvage existing Pratt stainless steel 12” butterfly valve for new location. 2. Modify cradle to accommodate valve weight 3. Installation: a. Install valves plumb and level unless otherwise approved. Version 2/14/2020 Page - 8 Public Works Quote b. Install valves free from distortion and strain caused by misaligned piping, equipment, or other causes. c. Valves shall be installed with sufficient clearance for proper operation of any external mechanisms, and with sufficient clearance to dismantle the valve for in-place maintenance. d. Installation shall be in accordance with the valve manufacturer’s recommendations. e. Butterfly valves shall be installed with the shaft horizontal unless otherwise necessary for proper operation or as acceptable to the Owner. f. Valve actuators and accessories shall be factory mounted on the valve, calibrated, and tested. 4. Field quality control: a. Field test and calibrate equipment to demonstrate to the Owner's representative that all equipment will satisfactorily perform the functions and criteria per manufacturer. b. Provide all test apparatus required at no extra cost to Owner. c. Follow testing procedures recommended by the manufacturer and approved by the Owner. d. All valves shall be free from leaks. Each leak that is discovered within testing shall be repaired by and at the expense of the Contractor. XVIII. ELECTRICAL A. Prevailing Specifications: None B. Additions: 1. Remove and salvage existing EIM electrical actuator for new location of valve. 2. Power Supply and Communication: a. Power to the existing valve is 120 V. b. Signal to the existing valve is 4-20 mA. 3. All work shall be performed and materials shall be furnished in accordance with the NEC – National Electrical Code, the NESC – National Electrical Safety Code, and the following standards where applicable: AEIC The Association of Edison Illuminating Companies ANSI American National Standards Institute ASTM American Society for Testing and Materials AWG American Wire Gauge Fed Spec Federal Specification ICEA Insulated Cable Engineers Association IEEE Institute of Electrical and Electronics Engineers IESNA Illuminating Engineering Society of North America NEIS National Electrical Installation Standards NEMA National Electrical Manufacturers Association NFPA National Fire Protection Association UL Underwriters' Laboratories 4. All boxes, fittings, condulets, mounting hardware, and accessories shall be rigid PVC or PVC- coated. 5. Conduit: a. Conduit in junction boxes shall be provided with identification tags. b. PVC conduit shall be heavy wall, Schedule 40 and 80, UL labeled for aboveground and underground uses, and shall conform to NEMA TC-2 and UL 651. c. Rigid Schedule 40 and 80 PVC conduit shall have supports and provisions for expansion as required by NEC Article 352. d. Conduits shall be capped during construction to prevent entrance of dirt, trash, and water. e. All conduits that enter enclosures shall be terminated with acceptable fittings that will not affect the NEMA rating of the enclosure. f. Existing conduits may be reused subject to the concurrence of Owner and compliance with the following requirements: (i) A wire brush shall be pulled through the conduit to remove any loose debris. (ii) A mandrel shall be pull through the conduit to remove sharp edges or burrs. g. Exposed conduit shall be installed either parallel or perpendicular to structural members and surfaces. 6. Installation: a. All material, equipment, and components specified to be installed according to this section shall be installed, tested, and commissioned for operation in compliance with NECA 1000 – NEIS Version 2/14/2020 Page - 9 Public Works Quote Specification System. Where required in NECA 1000, testing and commissioning procedures shall be followed prior to energizing equipment. b.The actuator must be promptly installed after removal and shall be inspected and readjusted according to the manufacturer’s recommendations. c.As modified, the actuator shall conform to the applicable requirements of ANSI/AWWA C507. d.Actuator mounting arrangements and positions shall facilitate operation and maintenance and shall be confirmed by the Owner. e.Splices may be made only at readily accessible locations. f.Cable terminations and splices shall be made as recommended by the cable manufacturer for the particular cable and service conditions. g.Two or more conduits in the same general routing shall be parallel, with symmetrical bends. h.Contractor shall use flexible electrical conduit to connect to the valve. i.The power and communication shall be in separate conduit. 7.The electrical system and equipment shall be grounded in compliance with the National Electrical Code. 8.Temporary power or relocation of existing power and control wiring, equipment, and devices shall be provided as required during construction. Coordination and timing of outages shall be specified with the owner 24 hours in advance and scheduling at times of low demand may be required. 9.Repairs shall be refinished to match the existing surrounding surfaces. 10.All deposits of oil, grease, mud, dirt, or debris shall be cleaned from the electrical equipment following installation and field wiring. A detergent water based solution, or other liquid cleaners not harmful to material or equipment finishes, shall be used as recommended by the manufacturer. XIX.PLANS A. Prevailing Specifications: City of South Bend CONSTRUCTION STANDARDS AND SPECIFICATIONS B. Additions: 1.Attachments: a.Exhibit 1, Main Floor Plan & Construction Limits b.Exhibit 2, North Station As Builds for Filter Process Piping 2.The drawings are schematic in nature. 3. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. 4.In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. Version 2/14/2020 Page - 10 Public Works Quote CITY OF SOUTH BEND, INDIANA CONTRACTOR’S QUOTE FOR PUBLIC WORK PROJECT NAME: North Water Treatment Plant Raw Water Header Improvements PROJECT NO. 119-011A QUOTES DUE November 24, 2020 (Must be completed for all quotes. Please type or print) Date: Firm: Address: City/State/Zip: Telephone Number: ( ) Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: the City of South Bend, Indiana, in accordance with plans and specifications prepared by: The City of South Bend, Department of Public Works and dated for the sum of (enter the Total Quote as shown on the Proposal) ($ ) (Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. ACCEPTANCE The above quote is accepted this day of 20 Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Therese J. Dorau, Member Elizabeth A. Maradik, Member Jordan V. Gathers, Member Joseph R. Molnar, Member Attest: Linda M. Martin, Clerk By (Signature) (Printed Name of Person Signing) Version 2/14/2020 Page - 11 Public Works Quote When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR’S NON-COLLUSION AND NON-DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF ___________ ) ) SS: COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have, or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, “Iran” means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time-to-time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time-to-time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor, or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized Version 2/14/2020 Page - 12 Public Works Quote alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor’s newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor’s documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor’s good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business (“MBE”) or as a Women’s Business Enterprise (“WBE”) as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16- 8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel Version 2/14/2020 Page - 13 Public Works Quote products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. *** I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this day of , 20__ Contractor/Bidder (Firm) Signature of Contractor/Bidder or Its Agent Printed Name and Title Subscribed and sworn to before me this day of , 20 My Commission Expires Notary Public County of Residence Version 2/14/2020 Page - 14 Public Works Quote QUOTE/PROPOSAL CITY OF SOUTH BEND PROJECT NAME North Water Treatment Plant Raw Water Header Improvements PROJECT NO. 119-011A QUOTES DUE November 24, 2020 Item No. Description Quantity Unit Total Amount 1 Material & Equipment to replace Raw Water Headers and relocate valve. 1 LS $ 2 Electrical reroute to relocated valve 1 LS $ 3 Labor to replace Raw Water Headers and relocate valve. 1 LS $ Total Amount of Quote Firm: Address: City/State/Zip: Telephone Number: ( ) Fax Number: ( ) By (Signature) (Printed Name of Person Signing) Version 2/14/2020 Page - 16 Public Works Quote Exhibit 1 Main Floor Plan & Construction Limits Version 2/14/2020 Page - 17 Public Works Quote Version 2/14/2020 Page - 18 Public Works Quote Exhibit 2 North Station As Builds for Filter Process Piping