Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Opening of Bids - Seitz Park Reconstruction Proj No. 117-093A - Ziolkowski Construction, Inc.
qUi', TII /f. o` FIG CITY OF SOUTH BEND, INDIANA y "� CONTRACTOR'S BID FOR PUBLIC WORK N''`, CHECKLIST FOR BIDDERS Project Name Seitz Park Reconstruction Project No. 117-093A For Bids Due November 24, 2020 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X{ Certification of use of United States Steel Products or Foundry Products. Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted X Form [MWBE-2.1]. X Acknowledge Receipt of 1 Addendum(s) included with the bid. X All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either X printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Ziolkowski Construction, Inc. Date: 11/24/2020 By Authorized Representative: Signature: Print Name & Title: Bill Favors President Version 4/2/2019 Contractor's Bid for Public Works - 1 Document A310 TM -2010 Conforms with The American Institute of Architects AIA Document 310 CONTRACTOR: (Name, legal status and address) Ziolkowski Construction, Inc. 4050 Ralph Jones Drive South Bend, IN 46625 OWNER: (Name, legal status and address) City of South Bend, Indiana, Board of Public Works 227 West Jefferson Boulevard South Bend, IN 46601 SURETY: (Name, legal status and principal place of business) Liberty Mutual Insurance Company 175 Berkeley Street Boston, MA 02116 State of Inc: Massachusetts BOND AMOUNT: Five Percent of Amount Bid (5%) PROJECT: (Name: location or address, and Project number, if airy) Seitz Park Reconstruction; Project No. 117-093A This document has Important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns., jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bondsas may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance,of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond_ sixty (60) days. '>i`; If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in lhis'Sbtld shall be --b' deemed to be Subcontractor and the. term Owner shall be deemed to be Contractor.TT When this Bond has been furnished to comply with a statutory or other legal requirement in the loca3iiart, orf 16lJio c�tL any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleYed�k' efrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated her bjt, g so , furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law botSfh°,�/d 0 tg ed scaled t is /24th day of ove er 2020- /, Ziolkowski Construction, Inc. VVVINNV IY�1/�"1\// (Pn opal (Seal) '(Witness) ristin Kromer (Title)Bill Favors, President � Liberty Mutual Insurance Company (Sur fy , (Seal) (Witnes _ )Maria Concepcion (Itle) Adrienne C. Stevenson, Attorney -in -Fact State of Georgia County of Fulton ss: On November 24, 2020 , before me, a Notary Public in and for said County and State, residing therein, duly commissioned and sworn, personally appeared Adrienne C. Stevenson known to me to be Attorney -in -Fact of Liberty Mutual Insurance Company the corporation described in and that executed the within and foregoing instrument, and known to me to be the person who executed the said instrument in behalf of the said corporation, and he duly acknowledged to me that such corporation executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal, the day and year stated in this certificate above. My Commission Expires February 13, 2022 J Sha# Jean Potts Notary Public =GEORGIA [:Fuhon /2022 t_ 0 0 10�This Power of Attorney limits the acts of those named herein, and they have no authority to Liberty bind the Company except in the manner and to the extent herein stated. Mutual® Liberty Mutual Insurance Company SURETY The Ohio Casualty Insurance Company Certificate No: 8201331 West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized underthe laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized underthe laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Adrienne C. Stevenson all of the city of Atlanta , state of Georgia each individually If there be more than one named, Its true and. lawful attorney -In -tact, with full power and authority hereby conferred to sign, execute and acknowledge the above -referenced surely bond. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 30th day of May, 2019. Liberty Mutual Insurance Company The Ohio Casualty Insurance Company We77ssgYYt ^Ame/r1i can Insu!ranc'n ce-yCompany By:c)(00 David M. Carey, Assistant Secretary STATE OF PENNSYLVANIA ss COUNTY OF MONTGOMERY On this 30th day of May, 2019, before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance Company, The Ohio Casualty Company, and WestAmerlcan Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above written. ''gyp P4Sr COMMONWEALTH OF PENNSYLVANIA �Q.L�MONWFq(� ®® Notarial Seal .rt-A-� 0P Teresa Paslela, Notary Public q, v Upper MenanTyr , Mantgamery County `�✓vP��O My Commission Expires March 29, 2021 By: yOjgHv P Member, Pennsylvania Association of Notaries Teresa Pastella, Notary Public This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casually Insurance Company, Liberty Mutual Insurance. Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: ARTICLE IV - OFFICERS: Section 12. Power of Attorney, Any officer or other official of the Corporation authorized for that purpose In writing by the Chairman or the President, and subject to such limitation as the Chairman or the President may prescribe, shall appoint such atlomeys-In-fact, as may be necessary to act In behalf of the Corporation to make, execute, seal, acknowledge and dellveras surely any and all undertakings, bonds, recegnizances and other surely obligations. Such attorneys -in -fact, subject to the limitations set forth In their respective powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power orauthorily granted to any representative or attomey-in-fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliveras surety any and all undertakings, bonds, recognlzances and other surely obligations. Such attorneys -in -fact, subject to the limitations setforth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto theseal of the Company. When so executed such Instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation -The Presidentof the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretaryto appoint such attorneys - Infect as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization - By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, Renee C. Llewellyn, the undersigned, Assistant Secretary, of Liberty Mutual Insurance Company, The Ohio Casualty Insurance Company, and West American Insurance Company do hereby certify that this powerof attorney executed by said Companies is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 24th day of November . 2020 0(0(9 SY INS � 1Na(/p- d'GaWPORy �R9yC1 V 20°aPoggt'e902c1n�1919 m,s 1991x mos oBy: �'Nnx.Ps`� da YS �ma,AaP ,da$ Renee C, Llewellyn',Assistant Secretary Marsh MSurety POA LMIC OCIC WAIC Multi Co 042019 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name Seitz Park Reconstruction Project No. 117-093A For Bids Due November 24, 2020 PART I (Must be completed for all bids. Please type or print) Date: November 24, 2020 Bidder (Firm): Ziolkowski Construction, Inc. Address: 4050 Ralph Tones Drive City/State/Zip: South Bend, IN 46628 Telephone Number: ( 574 ) 287-1811 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Seitz Park Reconstruction the City of South Bend, Indiana, in accordance with plans and specifications prepared by: SmithGroup, Inc. and dated October 30, 2020 for the sum of (enter the Total Bid as shown on the Proposal) See attached Bid/Proposal form ($ 7,334,832 ) (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional unit of rrr(ai*I0,jhcluded in the contract are needed, the cost of units must be the same as that shown in the ofa2jjnaM€g5t6b�Yf accepted by the City of South Bend. If the bid is to be awarded on a unit gp fit e,t�1 it9 shall be shown basis, the iteiniz `- 1 �_ � B SEAL e R I^ (Signature) ®' Bill Favors, President (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this day of 20 Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member Jordan V. Gathers, Member Therese J. Dorau, Member Joseph R. Molnar, Member Attest: Linda M. Martin, Clerk Version 4/2/2019 Contractor's Bid for Public Works - 2 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. Attached 2. Attach a listing of public works projects currently in process of construction by your organization. Attac}ued 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. None 4. Attach references from private firms for which you have performed work. Attached SECTION 11 PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) To use tyre available manpower and wort: with other trades to ntainlam sctradIde, 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. if contract is awarded, subcontractors will be provided. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. itsubcontrtctors arc used, we will submit the information when contract is awarded. 4. Attach a listing of equipment you have available to use for the proposed project. Whatever equipment is required to complete the project properly and our time. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. Yes. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 4/2/2019 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to cert fy to any of the statements below, it shall attach an explanation to this Affidavit CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana ) ) SS: St. Joseph COUNTY ) The undersigned Contractor; being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor; its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. Version 4/2/2019 Contractor's Bid for Public Works - 4 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E -Verify Program as defined by I.C. 22-5-1,7-3. Contractor's documentation of enrollment and participation in the E -Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E -Verify Program. The Contractor agrees to maintain this certification throughout the term ofthe contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract withrespect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certifiedby the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise (TME") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 4/2/2019 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. T hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 24th day of Nov. 12020 wv - Ziolkowski Construction. Inc. r Contractor/Bidder (Finn) cO SGQ�lag1�°,tY tOLGC tC1 /1D7 Signature of Contractor/Bidder or Its Agent SEAL C) Bill Favors. President a .nq Printed Name and Title Subscribed and sworn to before me this 24th day of November ?020 My Commission Expires January 28. 2023 No ry Public County of Residence JENNIFER WIEST 2L Notary public, State of Indiana St. Jbaaph County $ SEA ;' ` a Cbmmlatllon N 663340. My commlulon Eepiru I..., unlna" ��� January 28. 2023 Version 4/2/2019 Contractor's Bid for Public Works - 6 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: BID PACKAGE NO. 1 (Division A through E) DIVISION A - BASE BID Item No. Line Item Quantity Unit Unit Price Total Amount A-1 Remediation Allowance 1 LSUM 10,000.00 $10,000 A-2 Maintenance of Traffic 1 LSUM 3,661.00 $3,661 A-3 Permit Compliance Administration 1 LSUM 5,000.00 $5,000 A-4 Mobilization and Demobilization 1 LSUM 114,791.00 $114,791 A-5 Construction Engineering 1 LSUM 9,414.00 $9,414 A-6 Video Record 1 LSUM 1,569.00 $1,569 A-7 Temporary Erosion and Sediment Control 1 LSUM 2,877,00 $2,877 A-8 Temporary Drop Inlet Protection 1 EACH 262.00 $262 A-9 Construction Access Drive 1 EACH 2,092.00 $2,092 A-10 Clearing, Right of Way 1 LSUM 1,569.00 $1,569 A-11 Sidewalk, Concrete, Removal 481 SYS 13.60 $6,541 A-12 Wall, Concrete, Removal 65 LFT 627.60 $40,794 A-13 Wall, Concrete, Partial Removal 225 LFT 83.68 $18,828 A-14 Gabions, Remove and Salvage 190 CYS 52.30 $9,937 A-15 Lighting Structure, Removal 4 EACH 387.50 $1,550 A-16 Excavation, Common 1630 CYS 52.30 $85,249 A-17 Borrow, B 1249 CYS 41.85 $52,259 A-18 Geofoam Lightweight Fill 750 CYS 251.04 $188,280 A-19 Pipe, Type 4, 6 in 240 LFT 26.15 $6,276 A-20 Aggregates for Underdrains 9 CYS 78.56 $707 A-21 Salvaged Gabion Material, Install 190 CYS 52.30 $9,937 A-22 Concrete, C, Superstructure 185 CYS 482.28 $89,221 A-23 Concrete, B, Footings 400 CYS 464.44 $185,773 A-24 Concrete, A, Planter Wall 12 CYS 960.59 $11,527 A-25 Concrete Topping Slab, Integral Color, Finish 237 SYS 74.28 $17,602 A-26 Concrete Topping Slab, Integral Color, Finish 231 SYS 74.27 $17,156 A-27 - Subgrade Treatment, Type ill 406 SYS 524 $2,124 Version 4/2/2019 Contractor's Bid for Public Works - 7 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: A-28 I Compacted Aggregate, No. 53 90 TON 62.77 $5,649 A-29 Sidewalk, 6 -in 116 SYS 120.52 $13,980 A-30 Straight Curb 84 LFT 35.93 $3,018 A-31 Sidewalk, 6 -in, Integral Color, Finish "A" 137 SYS 122.76 $16,817 A-32 Sidewalk, 6 -in, Integral Color, Finish "B" 24 SYS 128.59 $3,086 A-33 Concrete Walk False Joints 284 LFT 12.56 $3,565 A-34 Expansion Joint, Concrete Walk 234 LFT 4.45 $1,041 A-35 Sidewalk Joint Transitions 104 LFT 2.52 $262 A-36 Unit Paver 38 SYS 236.43 $8,984 A-37 Litter Receptacle 1 EACH 1,630.00 $1,630 A-38 Recycling Receptacle 1 EACH 1,630.00 $1,630 A-39 Bench 6 EACH 1,733.84 $10,403 A-40 Tree Grate 1 EACH 4,575.00 $4,575 A-41 Type 5 Rail with Custom Infill Panel, 48 inch 156 LFT 387.03 $60,376 A-42 Type 5 Rail with Custom Infill Panel, Custom Curved, 48 inch 131 LFT 418.41 $54,811 A-43 Lighting, Pole, 12 ft 5 EACH 5,273.60 $26,368 A-44 Foundation, Lighting 5 EACH 1,595.80 $7,979 A-45 Luminaire, Type L1A 5 EACH 4,355.00 $21,775 A-46 PVC Conduit, 0.75 inch 75 LFT 6.34 $475 A-47 PVC Conduit, 1.5 inch 275 LFT 10.71 $2,945 A-48 Wire, 3#6, No 6 AWG, Stranded Copper 275 LFT 6.88 $1,892 A-49 Mobilization and Demobilization for Sodding 2 EACH 460.50 $921 A-50 Topsoil 4 CYS 63.50 $254 A-51 Sodding, Nursery 33 SYS 11.52 $380 A-52 Excelsoir Blanket 357 SYS 2.88 $1,027 A-53 Shredded Hardwood Mulch 21 CYS 86.34 $1,813 A-54 Deciduous Tree, 2.5 inch caliper 6 EACH 632.84 $3,797 A-55 Coniferous Shrubs, No. 3 Cont 47 EACH 57.54 $2,704 A-56 Shrubs, No. 3 Cont. 221 EACH 51.78 $11,443 A-57 Perennials, No. 1 Cont. 243 EACH 14.39 $3,495 A-58 Ornamental Grasses, No. 1 Cont. 106 EACH 19.57 $2,074 A-59 Planting Mixture 122 CYS 86.30 $10,528 Version 4/2/2019 Contractor's Bid for Public Works - 8 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: A-60 Metal Edging 130 1 LFT 1 1.16 $150 A-61 Irrigation System 1 LSUM 34,445.00 $34,445 DIVISION A TOTAL DIVISION B - BASE BID $1,219,285 Item No. Line Item Quantity Unit Unit Price Total Amount B-1 Remediation Allowance 1 LSUM 10,000.00 $10,000 B-2 Maintenance of Traffic 1 LSUM 3,138.00 $3,138 B-3 Permit Compliance Administration 1 LSUM 5,000.00 $5,000 B-4 Mobilization and Demobilization 1 LSUM 201,545.00 $201,545 B-5 Construction Engineering 1 LSUM 9,414.00 $9,414 B-6 Video Record 1 LSUM 1,256.00 $1,256 B-7 Temporary Erosion and Sediment Control 1 LSUM 2,877.00 $2,877 B-8 Clearing, Right of Way 1 LSUM 5,230.00 $5,230 B-9 Sidewalk, Concrete, Removal 58 SYS 13.61 $789 B-10 Wall, Concrete, Removal 85 LFT 470.71 $40,010 B-11 Gabions, Remove and Salvage 108 CYS 52.31 $5,649 B-12 Excavation, Common 806 CYS 52.31 $42,154 B-13 Borrow, B 719 CYS 41.85 $30,083 B-14 Structural Backfill, Type 4 315 CYS 104.60 $32,949 B-15 Geofoam Lightweight Fill 493 CYS 251.05 $123,763 B-16 Pipe, Type 4, 6 in 99 LFT 26.16 $2,589 B-17 Aggregates for Underdrains 4 CYS 78,50 $314 B-18 Manhole, Saddle Structure 1 EACH 6,276.00 $6,276 B-19 Casting, Type 4, Adjust to Grade 1 EACH 262.00 $262 B-20 Gabions, Metallic Coated 199 CYS 559.62 $111,363 B-21 Pneumatically Placed Mortar 1405 SFT 33.51 $47,070 B-22 Salvaged Gabion Material, Install 108 CYS 52.31 $5;649 B-23 Pile, Steel Pipe, 0.5 inch, 12.75 inch 400 LFT 104.60 $41,840 B-24 Dynamic Pile Load Test, 12.75 inch 2 EACH 4,184.00 $8,368 B-25 Structural Steel, Galvanized 21,336 LBS 2.79 $59,518 B-26 Concrete, C, Superstructure 123 CYS 670.07 $82,418 Version 4/2/2019 Contractor's Bid for Public Works - 9 Project Name: Seitz Park Project Number: 117-093A BID/PROPOSAL CITY OF SOUTH BEND 0 c, sL For Bids Due: November 24, 2020 Contractor Name: B-27 Concrete, B, Footings 179 CYS 813.95 $145,696 B-28 Composite Concrete Slab 43 CYS 622.14 $26,752 B-29 Concrete Topping Slab, Integral Color, Finish 'A„ 186 SYS 80.91 $15,049 B-30 Concrete Topping Slab, Integral Color, Finish „B„ 199 SYS 86.71 $17,254 B-31 Sheet Pile NZ14 42 TON 4,393.22 $184,515 B-32 Threaded Tie Rod 5 EACH 3,138.00 $15,690 B-33 Wales - Double C 130 LFT 214.44 $27,876 B-34 Sheet Pile Concrete Cap 65 LFT 136.94 $8,901 B-35 Subgrade Treatment, Type III 269 SYS 5.24 $1,407 B-36 Compacted Aggregate, No. 53 31 TON 62.78 $1,946 B-37 Concrete Walk False Joints 219 LFT 4.45 $973 B-38 Expansion Joint, Concrete Walk 67 LFT 4.45 $298 B-39 Sidewalk Joint Transitions 262 LFT 1.31 $343 B-40 Unit Paver 28 SYS 248.97 $6,971 B-41 Type 5 Rail with Custom Will Panel, 42 inch 40 LFT 489.03 $19,561 B-42 Type 5 Rail with Custom Infill Panel, 48 inch 103 LFT 386.22 $39,780 B-43 Type 5 Rail with Custom Infill Panel, Custom Curved, 48 inch 77 LFT 350.49 $26,987 B-44 Handrail 20 LFT 178.90 $3,578 B-45 Lighting, Pole, 12 ft 3 EACH 5,273.67 $15,821 B-46 Foundation, Lighting 3 EACH 1,669.67 $5,009 B-47 Luminaire, Type L1A 3 EACH 4,355.00 $13,065 B-48 Luminaire, Type L13 7 EACH 1,113.86 $7,797 B-49 Handhole, Lighting 3 EACH 1,096.34 $3,289 B-50 Schedule 80 HDPE, 0.75 inch 325 LFT 5.93 $1,926 B-51 Schedule 80 HDPE, 1.5 inch 225 LFT 6.68 $1,502 B-52 Schedule 80 HDPE, 2 inch 25 LFT 8.68 $217 B-53 Crescent Lights Adjustments 1 LSUM 5,661.00 $5,661 B-54 Wire, 3#6, No 6 AWG, Stranded Copper 375 LFT 6.96 $2,610 B-55 Wire, 2#12, No 12AWG, Solid Copper 325 LFT 225 $730 B-56 Excelsoir Blanket 221 SYS 2.88 $636 B-57 Shredded Hardwood Mulch 12 CYS 86.34 $1,036 Version 4/2/2019 Contractor's Bid for Public Works - 10 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: B-58 Deciduous Tree, 2.5 inch caliper 6 EACH 632.84 $3,797 B-59 Coniferous Shrubs, No. 3 Cont 59 EACH 57.55 $3,395 B-50 Shrubs, No. 3 Cont. 145 EACH 51.78 $7;508 B-61 Perennials, No. 1 Cont. 544 EACH 14.10 $7,668 B-62 Ornamental Grasses, No. 1 Cont. 78 EACH 19.57 $1,526 B-63 Planting Mixture 74 CYS 86.30 $6,386 13-64 Irrigation System 1 LSUM 51,485.00 $51,485 DIVISION B TOTAL DIVISION C - BASE BID $1,564,165 Item No. 1 Line Item Quantity Unit Unit Price Total Amount C-1 Remediation Allowance 1 LSUM 10,000.00 $10,000 C-2 Maintenance of Traffic 1 LSUM 3,138.00 $3,138 C-3 Permit Compliance Administration 1 LSUM 5,000.00 $5,000 C-4 Mobilization and Demobilization 1 LSUM 1 110,342.00 $110,342 C-5 Construction Engineering 1 LSUM 11,506.00 $11,506 C-6 Video Record 1 LSUM 2,092.00 $2,092 C-7 Temporary Erosion and Sediment Control 1 LSUM 2,877.00 $2,877 C-8 Temporary Drop Inlet Protection 1 EACH 262.00 $262 C-9 Construction Access Drive 1 EACH 2,092.00 $2,092 C-10 Clearing, Right of Way 1 LSUM 1,046.00 $1,046 C-11 Sidewalk, Concrete, Removal 281 SYS 13.61 $3,822 C-12 Wall, Concrete, Removal 90 LFT 120.30 $10,827 C-13 Excavation, Common 131 CYS 52.31 $6,852 C-14 Borrow, B 200 CYS 41.84 $8,368 C-15 Inlet, Type A 2 EACH 1,883.00 $3,766 C-16 Catch Basin, Type A 1 EACH 2,092.00 $2,092 C-17 Pipe, Type 4, 6 in 325 LFT 26.16 $8,499 C-18 Pipe, Type 2, 6 in 190 LFT 26.16 $4,969 C-19 Pipe, Type 2, 12 in 22 LFT 35.60 $783 C-20 Cleanout, 6 in 1 EACH 419.00 $419 C-21 Aggregates for Underdrains 9 CYS 78,56 $707 Version 4/2/2019 Contractor's Bid for Public Works - 11 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: C-22 Concrete, C, Superstructure 68 CYS 673.55 $45,801 C-23 Concrete, A, Planter Wall 144 CYS 894.74 $128,842 C-24 Concrete Topping Slab, Integral Color, Finish "A„ 100 SYS 80.91 $8,091 C-25 Concrete Topping Slab, Integral Color, Finish „B„ 144 SYS 86.19 $12,410 C-26 Subgrade Treatment, Type III 687 SYS 5.24 $3,594 C-27 Compacted Aggregate, No. 53 660 TON 62.77 $41,422 C-28 Sidewalk, 6 -in 224 SYS 120.53 $26,997 C-29 Sidewalk, 6 -in, Integral Color, Finish "A" 690 SYS 122.75 $84,696 C-30 Sidewalk, 6 -in, Integral Color, Finish "B" 583 SYS 128.55 $74,941 C-31 Sidewalk, 8 -in, Integral Color, Finish "A" 269 SYS 133.21 $35,833 C-32 Sidewalk, 8 -in, Integral Color, Finish "B" 194 SYS 139.01 $26,967 C-33 Straight Curb 42 LFT 35.93 $1,509 C-34 Concrete Walk False Joints 795 LFT 12.56 $9,979 C-35 Expansion Joint, Concrete Walk 203 LFT 4.45 $903 C-36 Sidewalk Joint Transitions 62 LFT 1.33 $82 C-37 Unit Paver 259 SYS 248.95 $64,478 C-38 Unit Paver Custom Engraving 403 EACH 46.03 $18,548 C-39 Litter Receptacle 2 EACH 1,629.50 $3,259 C-40 Recycling Receptacle 2 EACH 1,629.50 $3,259 C-41 Type 5 Rail with Custom Infill Panel, 42 inch 368 LFT 364.60 $134,171 C-42 ype b Nailwim Uustom Imill Flarel, Uustom Curved 42 inch 45 LFT 1 366.12 $16,475 C-43 Type 5 Rail with Custom Infill Panel, 48 inch 408 LFT 383.64 $156,524 C-44 Type 5 Rail with Custom Infill Panel, Custom Curved, 48 inch 114 LFT 417.13 $47,552 C-45 Type 5 Rail Swing Gate 5 EACH 440.40 $2,202 C-46 Handrail 6 LFT 177.84 $1,067 C-47 Flagpole 1 EACH 6,856.00 $6,856 C-48 Memorial, Salvaged, Reinstallation 1 'EACH 18,619.00 $18,619 C-49 Bollard , Removable 3 EACH 1,578.34 $4,735 C-50 Belt Barrier 1 LSUM 0.00 $0 C-51 Lighting, Pole, 12 ft 11 EACH 5,273.55 $58,009 Version 4/2/2019 Contractor's Bid for Public Works - 12 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park. Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: C-52 Foundation, Lighting 11 EACH 1,405.37 $15,459 C-53 Luminaire, Type L1 9 EACH 4,284.23 $38,558 C-54 Luminaire, Type L1B 2 EACH 4,211.00 $8,422 C-55 Luminaire, Type L5 3 EACH 1,140.00 $3,420 C-56 Luminaire, Type L7 3 EACH 988.34 $2,965 C-57 Luminaire, Type L11 2 EACH 722,50 $1,445 C-58 Handhole, Lighting 9 EACH 1,015.89 $9,143 C-59 Schedule 80 HDPE, 0.75 inch 150 LFT 6.06 $909 C-60 Schedule 80 HDPE, 1.5 inch 425 LFT 7,15 $3,036 C-61 Schedule 80 HDPE, 2 inch 400 LFT 7.84 $3,133 C-62 Wire, 3#6, No 6 AWG, Stranded Copper 300 LFT 6.85 $2,055 C-63 Wire, 3#8, No 8 AWG, Stranded Copper 825 LFT 5.00 $4,120 C-64 Wire, 2#12, No 12AWG, Solid Copper 150 LFT 2.26 $338 C-65 Forest Light Reinstallation 1 LSUM 9,205.00 $9,205 C-66 Forest Light Donor Recognition Sign 1 LSUM 16,946.00 $16,946 C-57 Pedestal Receptacle, Exterior 7 EACH 1,766.86 $12,368 C-68 Excelsoir Blanket 45 SYS 28.78 $1,295 C-69 Shredded Hardwood Mulch 15 CYS 86.34 $1,295 C-70 Deciduous Tree, 2.5 inch caliper 8 EACH 632.88 $5,063 C-71 Shrubs, No. 3 Cont. 68 EACH 54.09 $3,678 C-72 Perennials, No. 1 Cont. 302 EACH 14.39 $4,344 C-73 Ornamental Grasses, No. 1 Cont. 39 EACH20.72 $808 C-74 Planting Mixture 80 CYS 86.30 $6,904 C-75 Irrigation System 1 LSUM 46,234.00 $46,234 DIVISION C TOTAL DIVISION D - BASE BID $1,438,423 Item No. Line Item Quantity Unit Unit Price Total Amount D-1 Remediation Allowance 1 LSUM 5,000.00 $5,000 D-2 Maintenance of Traffic 1 LSUM 1,569.00 $1,569 D-3 Permit Compliance Administration 1 LSUM 2,500.00 $2,500 D-4 Mobilization and Demobilization 1 LSUM 164,563.00 $164,563 Version 4/2/2019 Contractor's Bid for Public Works -13 BID/PROPOSAL aYseu rx �., CITY OF SOUTH BEND xS Project Name: Seitz Park Reconstruction Project Number: 117-093A P45For Bids Due: November 24, 2020 Contractor Name: D-5 I Construction Engineering 1 LSUM 11,506.00 $11,506 D-6 Video Record 1 LSUM 1,256.00 $1,256 D-7 Temporary Erosion and Sediment Control 1 LSUM 2,877,00 $2,877 D-8 Clearing, Right of Way 1 LSUM 26,150.00 $26,150 D-9 Sidewalk, Concrete, Removal 58 SYS 13.61 $789 D-10 Excavation, Common 650 CYS 52.30 $33,995 D-11 Borrow, B 100 CYS 41.84 $4,184 D-12 Pipe, Type 2, 4 in 8 LFT 26.25 $210 D-13 Pipe, Type 2, 6 in 98 LFT 33.48 $3,281 D-14 Pipe, Type 2, 12 in 267 LFT 35.57 $9,496 D-15 Pipe, Type 4, 6 in 321 LFT 26.16 $8,395 D-16 Aggregates for Underdrains 12 CYS 78.50 $942 D-17 Inlet, Type A 2 EACH 1,883.00 $3,766 D-18 Manhole, Type A 3 EACH 3,138.00 $9,414 D-19 Storm Water Quality Unit 1 EACH 15,167.00 $15,167 D-20 Storm Outlet, Custom, 12" 1 EACH 1,569.00 $1,569 D-21 Casting, Type 4, Adjust to Grade 3 EACH 261.67 $785 D-22 Water Service, Pavillion 200 LFT 8.79 $1,758 D-23 Drinking Fountain Service lead, 1/2" Type K Copper 42 LFT 41.86 $1,758 D-24 Gas Service, 3/4" 200 LFT 26.15 $5,230 D-25 Concrete, C, Superstructure 10 CYS 496.90 $4,969 D-26 Concrete, A, Planter Wall 163 CYS 909.17 $148,194 D-27 Subgrade Treatment, Type 1 220 SYS 9.42 $2,072 D-28 Subgrade Treatment, Type 111 1757 SYS 5.24 $9190 D-29 Compacted Aggregate, No. 53 527 TON 62.77 $33,075 D-30 Sidewalk, 6 -in 413 SYS 110.06 $45,454 D-31 Straight Curb 188 LFT 35.93 $6,753 D-32 Straight Curb, Double Width 178 LFT 53.02 $9,436 D-33 Sidewalk, 6 -in, Integral Color, Finish "A" 790 SYS 122.75 $96,971 D-34 Sidewalk, 6 -in, Integral Color, Finish "B" 554 SYS 128.55 $71,213 D-35 Concrete Walk False Joints 560 LFT 12.56 $7,030 D-36 Expansion Joint, Concrete Walk 135 UFT 4.46 $601 Version 4/2/2019 Contractor's Bid for Public Works - 14 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: D-37 Unit Paver 413 SYS 248.95 $102,816 D-38 Crushed Stone Surface 87 SYS 161.10 $14,015 D-39 Type 5 Rail with Custom Infill Panel, 42 inch 70 LFT 365.36 $25,575 D-40 Tree Grate 8 EACH 5,146.13 $41,169 D-41 Litter Receptacle 4 EACH 1,629.50 $6,518 D-42 Recycling Receptacle 4 EACH 1,629.50 $6,518 D-43 Hammock 5 EACH 1,724.00 $8,620 D-44 Drinking Fountain 1 EACH 4,394.00 $4,394 D-45 Lighting, Pole, 12 ft 12 EACH 5,273.59 $63,283 D-46 Lighting., Pole, Hammock, 12 ft 4 EACH 1,986.25 $7,945 D-47 Lighting, Pole, Hammock, 8 ft 2 EACH 1,986.50 $3,973 D-48 Foundation, Lighting 18 EACH 1,595.78 $28,724 D-49 Luminaire, Type L1 3 EACH 4,041.00 $12,123 D-50 Luminaire, Type L4 12 EACH 1,126.92 $13,523 D-51 Luminaire, Type L7 3 EACH 988,34 $2,965 D-52 Luminaire, Type L9 375 LFT 9,96 $3,733 D-53 Luminaire, Type 1-10 18 EACH 709.12 $12,764 D-54 Luminaire, Type L11 2 EACH 722.50 $1,445 D-55 Fuses, 250V, 300A, Type RK 3 EACH 106,00 $318 D-56 Panelboard, 125A, 208/120V 1 EACH 1,478.00 $1,478 D-57 Relay Panel, Dimming Type, 24 Relays 1 EACH 3,619.00 $3,619 D-58 Enclosure, Electrical, Stainless Steel 1 EACH 7,673.00 $7,673 D-59 Handhole, Lighting 6 EACH 1,218.67 $7,312 D-60 Schedule 80 HDPE, 0.75 inch 850 LFT 6.29 $5,340 D-61 Schedule 80 HDPE, 1.5 inch 350 LFT 6.93 $2,424 D-62 Schedule 80 HDPE, 2 inch 130 LFT 7.97 $1,036 D-63 Schedule 80 HDPE, 3 inch 300 LFT 10.50 $3,149 D-64 Wire, 4#350kcmil, 1#4 AWG, Stranded Copper 400 LFT 49.57 $19,825 D-65 Wire, 3#6, No 6 AWG, Stranded Copper 100 LFT 6.85 $685 D-66 Wire, 3#8, No 8 AWG, Stranded Copper 350 LFT 4.98 $1,743 D-67 Wire, 3#12, No 12 AWG, Solid Copper 850 LFT 2.99 $2,540 D-68 Pedestal Receptacle, Exterior 3 EACH 2,294.34 $6,883 Version 4/2/2019 Contractor's Bid for Public Works - 15 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: D-69 Exterior Security/IT System 1 LSUM 17,090.00 $17,090 D-70 Shredded Hardwood Mulch 19 CYS 86.32 $1,640 D-71 Deciduous Tree, 2.5 inch caliper 17 EACH 670.06 $11,391 D-72 Deciduous Tree, 12 feet height, multistem 5 EACH 524.80 $2,624 D-73 Coniferous Shrubs, No, 3 Cont 17 EACH 57.59 $979 D-74 Shrubs, No. 3 Cont. 109 EACH 51.78 $5,644 D-75 Perennials, No. 1 Cont. 368 EACH 14.39 $5,293 D-76 Ornamental Grasses, No. 1 Cont. 72 EACH 19.57 $1,409 D-77 Planting Mixture 109 CYS 86.31 $9,407 D-78 Irrigation System 1 LSUM 20,816.00 $20,816 D-79 Restroom — Substructure 1 LSUM 17,309.00 $17,309 D-80 Restroom—Structural Frame 1 LSUM 74,319.00 $74,319 D-81 Restroom — Roofing 1 LSUM 43,096.00 $43,096 D-82 Restroom — Exterior Walls 1 LSUM 195,812.00 $195,812 D-83 Restroom — Interior Subdivision 1 LSUM 108,784.00 $108,784 D-84 Restroom — Wall Finishes 1 LSUM 16,857.00 $16,857 D-85 Restroom — Floor Finishes 1 LSUM 16,569.00 $16,569 D-86 Restroom — Ceiling Finishes 1 LSUM 34,236.00 $34,236 D-87 Restroom -Specialties 1 LSUM 12,919.00 $12,919 D-88 Restroom — Casework &. Wood Trim 1 LSUM 17,469.00 $17,469 D-89 Restroom - Equipment 1 LSUM 5,544.00 $5,544 D-90 Restroom—Plumbing 1 LSUM 43,200.00 $43,200 D-91 Restroom - HVAC 1 LSUM 29,288,00 $29,288 D-92 Restroom — Electrical Systems (including Technology) 1 LSUM 63,865.00 $63,865 D-93 Band Shelter - Substructure 1 LSUM 16,041.00 $16,041 D-94 Band Shelter—Structural Frame 1 LSUM 55,846.00 $55,846 D-95 Band Shelter- Roofing 1 LSUM 71,547.00 $71,547 D-96 Band Shelter— Exterior Walls 1 LSUM 87,341.00 $871341 D-97 Band Shelter- Plumbing 1 LSUM 6,486.00 $6,486 D-98 Band Shelter— Electrical Systems (including Technology) 1 LSUM 28,627.00 $28,627 DIVISION D TOTAL Version 4/2/2019 Contractor's Bid for Public Works - 16 .$2,196,694 BID/PROPOSAL a"riaxtt' CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A 1X45 For Bids Due: November 24, 2020 Contractor Name: DIVISION E - BASE BID Item No. Line Item Quantity Unit Unit Price Total Amount E-1 Remediation Allowance 1 LSUM 2,500.00 $2,500 E-2 Maintenance of Traffic 1 LSUM 1,569.00 $1,569 E-3 Permit Compliance Administration 1 LSUM 1,500.00 $1,500 E-4 Mobilization and Demobilization 1 LSUM 46,246.00 $46,246 E-5 Construction Engineering 1 LSUM 7,113.00 $7,113 E-6 Video Record 1 LSUM 1,256.00 $1,256 E-7 Temporary Erosion and Sediment Control 1 LSUM 2,877,00 $2,877 E-8 Temporary Drop Inlet Protection 1 EACH 262.00 $262 E-9 Clearing 1 LSUM 4,184.00 $4,184 E-10 Sidewalk, Concrete, Removal 550 SYS 13.60 $7;479 E-11 Wall, Concrete, Removal 310 LFT 120.30 $37,290 E-12 Excavation, Common 131 CYS 52.31 $6,852 E-13 Casting, Type 4, Adjust to Grade 2 EACH 261.50 $523 E-14 Concrete, C, Superstructure 75 CYS 498.74 $37,405 E-15 Concrete, B, Footings 101 CYS 766.50 $77,416 E-16 Subgrade Treatment, Type III 740 SYS 5.24 $3,871 E-17 Compacted Aggregate, No. 53 222 TON 62.77 $13,933 E-18 Concrete Walk False Joints 422 LFT 12.56 $5,297 E-19 Sidewalk, 6 -in, Integral Color, Finish 'W' 412 SYS 122.75 $50,571 E-20 Sidewalk, 6 -in, Integral Color, Finish "B" 328 SYS 128.52 $42,152 E-21 Expansion Joint, Concrete Walk 579 LFT 4.45 $2,573 E-22 Straight Curb 122 LFT 35.92 $4,382 E-23 Type 5 Rail with Custom Infill Panel, 42 inch 112 LFT 364.99 $40,878 E-24 Type 5 Rail with Custom Infill Panel, Custom 'Curved, 42 inch 68 LFT 430.87 $29,299 E-25 Handrail 22 LFT 174.05 $3,829 E-26 Lighting, Pole, 12 ft 1 EACH 5,274.00 $5,274 E-27 Foundation, Lighting 1 EACH 1,596.00 $1;596 Version 4/2/2019 Contractor's Bid for Public Works - 17 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A i For Bids Due: November 24, 2020 Contractor Name: E-28 Luminaire, Type 1 1 EACH 4,041.00 $4,041 E-29 Luminaire, Type L8 3 EACH 570.34 $1,711 E-30 Handhole, Lighting 1 EACH 450.00 $450 E-31 Schedule 80 HDPE, 0.75 inch 125 LFT 5.84 $730 E-32 Schedule 80 HDPE, 1.5 inch 145 LFT 6.44 $933 E-33 Wire, 3#8, No. 8 AWG, Stranded Copper 145 LFT 5.00 $724 E-34 Wire, 2#12, No 12AWG, Solid Copper 125 LFT 2.28 $285 DIVISION E TOTAL BID PACKAGE NO. 2 (Division F) DIVISION F BASE BID $447,001 F-1 Remediation Allowance 1 LSUM 5,000.00 $5,000 F-2 Maintenance of Traffic 1 LSUM 1,569.00 $1,569 F-3 Permit Compliance Administration 1 LSUM 1,500.00 $1,500 F-4 Mobilization and Demobilization 1 LSUM 3,138.00 $3,138 F-5 Construction Engineering 1 LSUM 3,661.00 $3,661 F-6 Video Record 1 LSUM 1,046.00 $1,046 F-7 Temporary Erosion and Sediment Control 1 LSUM 2,092.00 $2,092 F-8 Floating Dock, Removal 1 LSUM 13,285.00 $13,285 F-9 Floating Marina Dock System 1 LSUM 89,601.00 $89,601 DIVISION F TOTAL Version 4/2/2019 Contractor's Bid for Public Works - 18 $120,892 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: BID ALTERNATES BID ALTERNATE NO. 1 ri,4 1-1 Railing, Removal 295 LFT 7,43A$26523 $8,415 1-2 Lighting Structure, Removal 5 EACH 72.40 $12,050 1-3 Type 5 Rail with Custom Infill Panel, 42 inch 295 LFT 364.69 $10,682 1-4 Lighting, Pole, 14 It 5 EACH 5,304.601-5 $11,603 2-5 Foundation, Lighting 5 EACH 1,595.801-6 $10,742 2-6 Luminaire, Type L1 5 EACH 405.20 $32,857 1-7 PVC Conduit, 1.5 inch 425 LFT 8.32 $3,533 1-8 Wire, 3#8, No 8 AWG, Stranded Copper 300 LFT q gg $1 qgq BID ALTERNATE NO. 1 TOTAL BID ALTERNATE NO. 2 $151,688 2-1 Adirondack Chair 20 EACH 420.75 $8,415 2-2 Bistro Chair 90 EACH 133.89 $12,050 2-3 Bistro Table 37 EACH 288.71 $10,682 2-4 Umbrella and Stand 6 EACH 1,933.84 $11,603 2-5 Bench, Urbastyle Galet II 5 EACH 2,148.40 $10,742 2-6 Bar Height Chair 48 EACH 684.53 $32,857 2-7 Bar Height Table 6 EACH 3,372.67 $20,236 BID ALTERNATE NO. 2 TOTAL BID ALTERNATE NO. 3 $106,585 3-1 DEDUCT - Concrete, A, Planter Wall 83 CYS (3,476.66) ($288,562) 3-2 ADD - Precast Concrete Planter Wall 83 CYS 4,562.15 $378,658 BID ALTERNATE NO. 1 TOTAL Version 4/2/2019 Contractor's Bid for Public Works - 19 $90,096 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: Run PACKARF NO 7 ITFMS- Item No. Description Total Amount Division A — Base Bid $1,219,288.00 Division B — Base Bid $1,564,165.00 Division C — Base Bid $1,438,423.00 Division D — Base Bid $2,196,694.00 Division E — Base Bid $447,001.00 TOTAL BID PACKAGE NO. 1 RID PACKAr9F NO. 2 ITFMS- $6,865,571.00 Item No. Description Total Amount Division F — Base Bid $120,892.00 TOTAL BID PACKAGE NO. 2 BID ALTERNATE ITEMS: $120,892.00 Item No. Description Total Amount Bid Alternate No. 1 $151,688.00 Bid Alternate No. 2 $106,585.00 Bid Alternate No. 3 $90,096.00 TOTAL BID ALTERNATES Bidder (Firm): Address: $348,369.00 City/State/Zip: OtAt h 907CJ /A/ Telephone Number: 574. ZU-Nil lquo28 /u.r e ee:eoas�ovaavac�er>ause By - A /a n.'�+°. (Signature) (Printed Name of Person Signing) C).SEAL „C) A� % Version 4/2/2019 Contractor's Bid for Public Works - 20 ZIOLKOWSKI Construction, Inc. General Construction & Design/Build Building Strong RelatiOnShipS Since 1974 References Company Name / Address Contact Name Phone No. University of Notre Dame 200 Facilities Building Notre Dame, IN 46556 Tony Polotto LEED, AP 574-631-4200 City of Mishawaka 600 East Third Street Mishawaka, IN Ken Prince 574-258-1625 Fetters Construction, Inc. 5417 County Road 427 Auburn, IN 46706 Steven A. Fetters 260-927-8516 Memorial Hospital & Health System 615 N. Michigan Street South Bend, IN46601 Larry Lies 574-647-1000 ZIOLKOWSK1 Construction, Inc. General construction a Design/Build Building Strong Relationships Since 1974 Completed Projects 2019-2020 Current Projects 2020-2021 Completion Contract Amount Class of Work Date Name and Address of Owner Date Flaherty - Collins Properties $3,654,487 Public Park/City December 2019 311 N. Pennsylvania St. #300, Indianapolis, IN 4620 $1,512,980 School June 2021 South Bend Board of Public Works $3,681,703 Fire Station/City November 2019 227 W. Jefferson Blvd., South Bend, IN 46601 $3,090,507 Library Mqy 2021 Lafayette School Corporation $1,372,611 Sch ove ber 2019 73 - y47904 $1,729,120 School October 2020 Penn -Harris -Madison School Corporation $3,734,923 School December 2019 55900 Bittersweet Rd., Mishawaka, IN 46545 Current Projects 2020-2021 Expected Contract Amount Class of Work Completion Name and Address of Owner Date Kokomo School Corporation $1,512,980 School June 2021 1500 S Washington, Kokomo, IN 46904 St. Joseph County Public Library $3,090,507 Library Mqy 2021 304 S Main St., South Bend, IN 46601 Bremen Public Schools $1,729,120 School October 2020 512 W Grant St. Bremen IN 46506 Goshen Health Systems $4,247,944 HQspital October 2022 200 High Park Ave., Goshen, IN 46526 ZIOLKOWSKI Constnuctlon Inc, GGIMW Constricbm 8, DoWqrJ HuW BLMft9 9ftV iirW&vm m 31we 1474 FINANCIAL STATEMENTS December 31, 2019 and 2018 ZIOLKOWSKI CONSTRUCTION, INC. South Bend, Indiana FINANCIAL STATEMENTS December 31. 2019 and 2018 CONTENTS INDEPENDENT AUDITOR'S REPORT FINANCIAL STATEMENTS BALANCE SHEETS. 1 ................................................................ 3 STATEMENTS OF INCOME AND RETAINED EARNINGS....................................................... 4 STATEMENTS OF CASH FLOWS.. .......................................... 5 NOTES TO FINANCIAL STATEMENTS..................................................................................... 6 Crowe INDEPENDENT AUDITOR'S REPORT Board of Directors and Shareholders Ziolkowski Construction, Inc. South Bend, Indiana Report on the Financial Statements Crowe LLP ,�V rAi nl Cox GIIX W We have audited the accompanying financial statements of Ziolkowski Construction, Inc., which comprise the balance sheets as of December 31, 2019 and 2018, and the related statements of income and retained earnings, and cash flows for the years then ended, and the related notes to the financial statements. Management's Responsibility for the Financial Statements Management is responsible for the preparation and fair presentation of these financial statements in accordance with accounting principles generally accepted in the United States of America; this includes the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement, whether due to fraud or error. Auditor's Responsibility Our responsibility is to express an opinion on these financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free from material misstatement. An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditor's judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity's preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity's internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the financial statements. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion. (Continued) Opinion In our opinion, the financial statements referred to above present fairly, in all material respects, the financial position of Ziolkowski Construction, Inc, as of December 31, 2019 and 2018, and the results of its operations and its cash flows for the years then ended in accordance with accounting principles generally accepted in the United States of America. Crowe LLP Oak Brook, Illinois March 27. 2020 2. CITY OF SOUTH BEND fs°vre\Q ` MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY U o: DEVELOPMENT PROGRAM FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS M This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDOA"). Project Number: 117-093A Date: 11/24/2020 Project Name: Seitz Park Reconstruction Bidder: Ziolkowski Construction, Inc. Contact Person: Telephone: 574-287-1811 Address: 4050 Ralph Jones Dr. City: South Bend State: Indiana zip: 46628 Email: To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies; boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: *Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 4/2/2019 Contractor's Bid for Public Works - 22 EVIDENCE OF GOOD FAITH EFFORTS MBEIWBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.gov/idoa). ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South Bend requires that all perspective bidders complete no less than 2 of the following: 1. Attend all pre-bid meetings scheduled by the City to inform MBE/WBEs of contracting and subcontracting opportunities. Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBE/WBEs reasonable time to respond. 8 3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. 4. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBE/WBE firms. **Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBEANBEs, including providing such MBE/WBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBEM/BEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down contracts into smaller units to facilitate MBEIWBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE/WBE was unqualified to perform the job. *Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 4/2/2019 Contractor's Bid for Public Works - 22 CITY OF SOUTH BEND ;` MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM FORM MWBE-2.1 MBEIWBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE OF Project Number: 117-093A MBE/WBE Participation Goal Project Name: Seitz Park Reconstruction Bidder: Ziolkowslci Construction, Inc. By: Contract Admin 11/24/2020 (Signature) (Title) (Date) MBE/WBE Firm Dudeck Roofing & Sheet Metal Owner or Contact at MBE/WBE Firm Catherine Dudeck Telephone: 574-234-7912 Fax: Email: katy@dudeckroofing.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Roofing RESULTS OF CONTACT WITH THE MBEIWBE FIRM: They did not bid MBE/WBE Firm Ritschard Brothers, Inc. Owner or Contact at MBE/WBE Firm Telephone: 574-288-4777 Fax: Email: ritl204@datacruz.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Earthwork RESULTS OF CONTACT WITH THE MBE/WBE FIRM: They were not low bidder Version 4/2/2019 Contractor's Bid for Public Works - 23 Prescribed by State Board of Accounts Governmental Unit ZIOLKOWSKI CONSTRUCTION, INC. ............................................County, Indiana General Form No. 99P (Rev. 2009A) To..................................................................................... Dr. South Bend Tribune 635 S. Lafayette Blvd., Ste. 138 South Bend, Indiana 46601 Tax ID# #83-2810977 PUBLISHER'S CLAIM LINE COUNT Ad #: 906341 Display Master (Must not exceed two actual lines, neither of which shall total more than four solid lines of type in which the body of the advertisement is set) -- number of equivalent ................................... Head -- Number of lines Body -- Number of lines Body -- Number of lines Total number of lines in notice 14 COMPUTATION OF CHARGES 14 lines, 1 columns wide equals 14 equivalent lines at 1.68 cents per line Additional charges for notices containing rule or tabular work (50 per cent of above amount) Charge for extra proofs of publication ($1.00 for each proof in excess of two) TOTAL AMOUNT OF CLAIM $70.56 DATA FOR COMPUTING COST Width of single column in picas 9.4ems Size of 8 point Number of Insertions ................................... ........... 0.00 ............... Pursuant to the provisions and penalties of IC 5-11-10-1, 1 hereby certify that the foregoing account is just and correct, that the amount claimed is legally due, after allowing all just credits, and that no part of the same has been paid. also certify that the printed matter attached hereto is a true copy, of the same column width and type size, which was duly published in said paper 3 time(-). The dates of publication being as follows: South Bend Tribune: 11/13/20, 11/14/20, 11/15/20. CHERYL JUNE MOREY Notary Public - Seal 5t Joseph County- State of Indiana Commission Number 693302 AV%VApWission Expires Dec 21, 2024 Alan Achkar. Executive Editor South Bend Tribune 635 S. Lafayette Blvd., Ste. 138 South Bend, IN 46601 ON ACCT OF APPROPRIATION FOR $70.56 Appropriation No. Tax ID# 83-2810977 ALLOWED IN THE SUM OF $70.56 Chery! 4une Morey, N Resident of St. Joseph ' u y Commission Number: 69 02 My Commission expires December 21, 2024 That it is duly authenticated as required by law. That it is based upon statutory authority. That it is apparently correct incorrect I certify that the within claim is true and correct; that the services there in itemized and for which charge is made were ordered by me and were necessary to the public business Ad #: 906341 Actively seeking bids from certified MBE/WBE/VBE busi- nesses in several construc- tion trades to participate in the reconstruction of Seitz Park in South Bend, IN. Bid date is November 23, 2020. Plans areavailable at our plan room website (www.zplanroom. com). Questions please contact Kristin at ZIOLKOWSKI CON- STRUCTION, INC, at 574-287- 1811 ext. 271 Hspaxlp 3x 11:13 11:14 11:15 Prescribed by State Board of Accounts Governmental Unit ZIOLKOWSKI CONSTRUCTION, INC. .....County, Indiana General Form No. 99P (Rev. 2009A) To.................................................................................... Dr. South Bend Tribune 635 S. Lafayette Blvd., Ste. 138 South Bend, Indiana 46601 Tax ID# #83-2810977 PUBLISHER'S CLAIM LINE COUNT Ad #: 906341 Display Master (Must not exceed two actual lines, neither of which shall total more than four solid lines of type in which the body of the advertisement is set) -- number of equivalent ................................... Head --Number of lines .............................. Body -- Number of lines ................................... Body -- Number of lines ................................... Total number of lines in notice 14 COMPUTATION OF CHARGES 14 lines, I columns wide equals 14 equivalent lines at 1.68 cents per line Additional charges for notices containing rule or tabular work (50 per cent of above amount) Charge for extra proofs of publication ($1.00 for each proof in excess of two) TOTAL AMOUNT OF CLAIM DATA FOR COMPUTING COST Width of single column in picas 9.4ems Number of Insertions $70.56 Size of 8 point $0.00 ................................... Pursuant to the provisions and penalties of IC 5.11-10-1, 1 hereby certify that the foregoing account is just and correct, that the amount claimed is legally due, after allowing all just credits, and that no part of the same has been paid. I also certify that the printed matter attached hereto is a true copy, of the same column width and type size, which was duly published in said paper 3 time(s). The dates of publication being as follows: South Bend Tribune: 11/13120, 11/14/20, 11/15/20. Alan Achkar, Executive Editor South Bend Tribune 635 S. Lafayette Blvd., Ste. 138 South Bend, IN 46601 ON ACCT OF APPROPRIATION FOR $70.56 Appropriation No. Tax ID# 83-2810977 ALLOWED IN THE SUM OF $70.56 Attest CHERYL AJINE MOREY Notary Public - Scal St Joseph County - State of Indiana Commission Number695102 h pgmmission Expires Dec 2'I, 2024 Resident of St. Joseph Eoun y Commission Number: ii2 My Commission expires December 21, 2024 That it is duly authenticated as required by law. That it is based upon statutory authority. That it is apparently correct incorrect I certify that the within claim is true and correct; that the services there in itemized and for which charge is made were ordered by me and were necessary to the public business Ad #: 906341 Actively seeking bids from certified MBE/WBE/VBE busi- nesses in several construc- tion trades to participate in the reconstruction of Seitz Park in South Bend, IN. Bid date is November 23, 2020, Plans are available at our plan room website (www.zplanroom. com). Questions please contact Kristin at ZIOLKOWSKI CON- STRUCTION, INC. at 574-287- 1811 ext. 271 Hspaxlp 3x 11:13 11:14 11:15 11124/2020 Invitation to Bid Seitz Park (Re -Bid) Completed 11/09/2020 01:39 pm via Email / Fax Filter: rits Name/Company fNo name; Ritschard Brothers, Inc. Fax / Email 574-288-5438 ritl204@datacmz.com Invitation to Bid Phone 574-288-4777 Trades Status Response Fax & Email Sent https://www.zplanroom.com/aec/blast_ recipients_print.php 1/1 11/23/2020 Invitation to Bid Seitz Park (Re -Bid) Completed 11/09/2020 01:39 pm via Email / Fax Filter: dudeck Name/Company Fax / Email INc name] 574-234-2471 Dudeck Roofing & Sheet Metal greg@dudeckroofng.com Invitation to Bid Phone 574-234-7912 Trades Status Response Fax & Email Sent https://w ,zplanroom.com/aec/blast_ recipients_print.php 111 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY__ '. DEVELOPMENT PROGRAM FORM MWBE-1.0 MBEIWBE PARTICIPATION ` This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE/MBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. Project Number: Bidder: 117-093A Project Name: Seitz Park Reconstruction Ziolkowski Construction, Inc. Total Bid Amount: MBE/WBE Goal: Page of Name & Address of MBEIWBE Primary Contact Person (NamefFelephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) DollarAmount of MBEM/BE Component Percentage of Total Bid/Proposal 9A 2 Submitted by: Kristin Kromer November 24, 2020 Print Name ignaltury Date Version 4/2/2019 Contractors Bid for Public Works - 21 1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHoNE 574/235-9251 FAx 574/235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND .Tames Mueller, MAYOR BOARD OF PUBLIC WORKS Date: November 17, 2020 To: All Planholders From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: 1 Project Name: Seitz Park Reconstruction Project Number: 117-093A ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: November 18, 2020 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: SmithGroup, Inc. Authorized Signature: McKinnon, P.E. Date: November 17, 2020 Version 4/2/2015 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Seitz Park Reconstruction Project No. 117-093A For Bids Due November 24, 2020 Contractor Name: Ziolkowsjci Construction, Inc. The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre- qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre- qualified" standing, on a form provided by the City ('Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 315' for the upcoming calendar year, or within twelve (12) months of obtaining pre- qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 5/16/2019 General Conditions - 6 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH -347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 5/16/2019 General Conditions - 7 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) X By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) X Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) X List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) X For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. Version 5/16/2019 General Conditions - 8 IL PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) _ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) _ By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). List identifying all former business names. Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. Evidence that 1 am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 5/16/2019 General Conditions - 9 (ix) _ Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) _ List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: November 24, 2020 t--)kUAAA- Ign Here) Kristin Kromer (Print Name Here) Ziolkowski Construction, Inc. (Name of Company) 4050 Ralph Jones Dr. (Address of Company) South Bend (City) Indiana (State) 574-287-1811 (Telephone Number) Version 5/16/2019 General Conditions - 10 CITY OF SOUTH BEND JAMES MUELLER, MAYOR DEPARTMENT OF PUBLIC WORKS ERIC HORVATH, DIRECTOR November 16, 2020 Ms. Kristin Kromer Ziolkowski Construction, Inc. kkromer@zbuild.com RE: Pre -Qualification Verification — O'Brien Recreation Renovation Project No. 118-091 Dear Ms. Kromer: This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you are required to re -submit a complete application for continuation of pre -qualification status prior to December 31 for the upcoming calendar year. A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist and attachments. If you have any further questions regarding this matter, please call this office at (574) 235-9251 Sincerely, Liz Horvath, Permit Manager BUSINESS INFORMATION CONNIE LAWSON INDIANA SECRETARY OF STATE 11/23/2020 01:01 PM Business Details Business Name: ZIOLKOWSKI CONSTRUCTION, INC. Business ID: 197812-318 Entity Type: Domestic For -Profit Corporation Creation Date: 12/11/1978 Principal Office Address: 4050 RALPH JONES DR, SOUTH BEND, IN, 46628, USA Jurisdiction of Formation: Indiana Business Status: Active Inactive Date: Expiration Date: Perpetual Business Entity Report Due 12/31/2020 Date: Years Due: 2020/2021 Principal Information Title Name Address President Bill Favors 4050 Ralph Jones Dry SOUTH BEND, IN, 46628, USA President Bill Favors 4050 RALPH JONES DR, South Bend, IN, 46628, USA Registered Agent Information Type: Individual Name: BILL FAVORS Address: 4050 RALPH JONES DR, SOUTH BEND, IN, 46628 -1000, USA ZIOLKOWSKI Construction, Inc. General Construction & Design/Build Building Strong Relationships Since 1974 November 24, 2020 City of South Bend, Indiana Department of Public Works Subject: Seitz Park Reconstruction Dear Sirs: Ziolkowski Construction, Inc. has been in business since 1974 and operated during that period of time under that name only. Ziolkowski Construction has not violated any federal, state or local laws, including violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA) laws, federal Davis -Bacon Act laws, within the past five years. Ziolkowski Construction, Inc. is proud to employ the industry's top skilled craftsmen. We have a core group of union craftsmen working on our projects and supplement that group with trained skilled workers from the local union halls. We currently have sufficient workers to perform the work that we are bidding for the above project. All individuals performing work for Ziolkowski Construction, Inc. will be properly classified as employees under the federal Fair Labor Standards Act and in line with all Indiana State and local ordinances. Ziolkowski Construction, Inc. had no federal, state or local tax liens or tax delinquencies in any of the preceding three tax years. Respectfully, ZIOLKOWSKI CONSTRUCTION, INC. Bill Favors President & CFO 4050 Ralph Jones Dr., South Bend IN 46628 Phone (574) 287-1811 Fax (574) 234-0151 Committed to professionalism and excellence for the benefit of our clients, employees, and shareholders. 0 ZIOLKOWSKI Construction, Inc. General Construction & Design/Build Building Strong Relationships Since 1974 Completed Projects 2017-2020 Project Job No. Amount Date Completed Ballard Community Schools 16879 $990,917 Aug -20 Stonewater at Riverwalk 17506 $1,957,854 Jul -20 Mill at Ironworks Plaza 17547 $3,654,487 Aug -20 Central Park Band Shell 17460 $888,525 Jan -20 Erskine Clubhouse Renovations 17668 $1,101,342 Jan -20 Downtown Cross Street, Phase 1 24649 $92,676 Mar -20 Cass County Jail, Phase 1 24675 $127,000 Aug -19 Merrifield Park 24484 $183,267 Aug -18 Battell Center Renovation 16442 $3,126,818 Mar -17 Starke County Courthouse 16774 $1,759,806 Sep -17 August 20, 2020 BAC 4 IN/KY Apprenticeship & Training Program www.bac4trainina.com bac4apprenticeship(ci)gmail.com 219-525-4443 Roger .Jones - ilinnaging Director C/O Ziolkowski Construction, Inc. To Whom It May Concern, This is a letter of recommendation on behalf of Ziolkowski Construction, Inc The BAC 4 IN/KY Apprenticeship & Training Program is a statewide program that was established in I994 and is recognized by the U. S. Department of Labor and is considered in good standing. Ziolkowski Construction, Inc. has been a "signatory union contractor" since 2000 and at the present time employ enrolled apprentices. Ziolkowski Construction, Inc has continued to follow the guidelines set forth in Collective Bargaining Agreement with BAC Local #4 IN/KY meeting the required Journeyman/Apprentice ratio on their jobs. Should you have any further questions please feel free to contact the State office at (2I9) S2S-4443. Sincerely, Roger Jones Managing Director BAC 4 IN/KY Apprenticeship & Training Program Q��itieb �'tat�� �e�artmP�r o��� �ffite of �pprenticPsip certificate of Regi5hation of Apprentito�jip Program BRICKLAYERS AND ALLIED CRAFTWORKERS LOCAL 4 IN/KY APPRENTICE FUND VALPARAISO, INDIANA FOR THE TRADE CLASSIFICATIONS: BRICKLAYER; BRICKLAYER, FIREBRICK & REFRACTORY; TILE SETTER; TUCKPOINTER, CLEANER, CAULKER J'7ey-islereoras parf of fal-e Xafronal�pprenficesa"'-tp 6yslem in accorolance Wlia le OaS C siano(arol of dpprenfices-iip esfaat's eof �y li�e 6ecreiarrJ, of La&r MAY 24, 1996 Revised: February 2, 2007 IN001960012 ./Ze fr islralmt+ '.i�.o. �, cSecrelarr ofG'a6or �...� %i ��/minislralar, �`�ce pprenlices�ip �.ITFi Ohm INDIANA/KENTUCKY/OHIO REGIONAL COUNCIL OF CARPENTERS .POINT APPRENTICESHIP AND TRAINING FUND o ' 1095 MARINERS DRIVE WARSAW, IN 46582 ADMINISTRATION OFFICE 711 Greenwood Springs Drive Greenwood, IN 46143 Phone: 317-807-1112 Fax: 317-807-1115 Ashland Campus 574 Carpenters Way Grayson, KY 41143 Phone: 606-929-1378 Fax: 502-996-8108 Indianapolis Campus 711 Greenwood Springs Drive Greenwood, IN 46143 Phone: 317-807-1116 Fax: 317-807-1131 Lafayette Campus 2953 South Creasy Lane Lafayette, IN 47905 Phone: 765447-5959 Fax: 765-447-7676 Louisville Campus 1245 Durrett Use Louisville, KY 40213 Phone: 502.366-8668 Fax: 502-366-8678 Merrillville Campus 1565 East 7011 Court Merdilville, TN 46410 Phone: 219-947-3348 Fax: 219-947-1889 Muncie Campus 4121 East Centennial Avenue Muncie, IN 47303 Phone: 765-288-9015 Fax: 765-288.9298 Newburgh Campus 5400 Covert Court Newburgh, IN 47630 Phone: 812-853-9312 Fax: 812.853-9316 Terre Haute Campus 3099 South 6th Street Terre Haute, IN 47802 Phone: 812-066-7899 Fax: 812-466-9840 Warsaw Campus 1095 Mariners Drive Warsaw, IN 46582 Phone: 574-267-5264 Pax: 574-269-1464 August 20, 2020 Ziollcowsld Construction, Inc. 4050 Ralph Jones Drive South Bend, IN 46628 To Whom It May Concern: Ziolkowski Construction reguarly employs a number of apprentices affiliated with our apprenticeship program and has done so for many years. We are registered with the United States Department of Labor, Bureau of Apprenticeship and Training and our registration number is 020 0537. Our program also participates in the Building Trades Associate Degree Program with Ivy Tech Community College and has done so since 1996. Ziolkowski Construction is a bona fide contractor in good standing with the Indiana/Kentucky/Ohio Regional Council of Carpenters Joint Apprenticeship and Training Fund and is eligible to employ apprentice carpenters in the future. I have enclosed copies of our certificates from the United States Department of Labor and from the Indiana Department of Veterans Affairs for CI educational benefits. If I can be of further assistance, please do not hesitate to give me a call. ✓tar.�`--�. ad",YAC.-t-� ' Dale Newlin Area Coordinator IKORCCJATF Warsaw Campus Q6�2ttts ID fl �400 449,10pirf graixrin$I wm#�6vrr nub rrrr feriries urwu of� oy unb grattiq &ri tnfr of 990sfrafiun ML4,NA/KENTUCKY REGIONAL COUNCIL OF CARPENTERS J A.T.F. WARSAW, LNDLANA FOR TIM TRADE CLASSITICATTONS: CARMTER, MILLWRIGI3 , FLOOR LAYER, ..`�i�e9isfer'ea�asprtrf o�{'f�ie �¢fio�Qf�pplenfices�ip �r'D91'� in �zccc�'�dnae rr�if.�f�e basic sfanor� o�'apprerifices�iip 4_ esfa6fs�eri� fie c5ecrefrrry of,66,6o OCTOBER 19,1989 Za/. tevue : p IN020890009 `.R<giiirdmn �4 - rj s —�' PFw+��.r6.p ',jv:1einy. Tinp/ayer end�a-wndnu ` '�.. , � # '�` n 'o- TO WHOM IT MAY CONCERN, Plasterers' & Cement Masons' Apprentice Coordinator of Local Union #692 Phone 317-508-1609 FAX 317-972-4907 Email hansen@plcmlocal692.org .42GLW 1099-M THIS LETTER IS TO CERTIFY THAT ZIOLKOWSKI CONSTRUCTION INC.HAS BEEN A SIGNATORY UNION CONTRACTOR WITH THE PLASTERERS' AND CEMENT MASONS' JOINT APPRENTICESHIP TRAINING PROGRAM OF LOCAL 692, FOR AT LEAST THE LAST FIVE YEARS, AND IS IN GOOD STANDING. THEY HAVE A SIGNED CONTRACT WITH LOCAL 692 AND IS ELIGIBLE TO USE UNION PLASTERERS' APPRENTICES AND UNION CEMENT MASONS' APPRENTICES. THROUGH THIS CONTRACT AND OTHERS, THE FINANCIAL OBLIGATIONS OF TRAINING AND SAFETY ISSUES ARE MET. ALL OF THE APPRENTICES ARE REGISTERED WITH THE UNITED STATES DEPARTMENT OF LABOR, BUREAU OF APPRENTICESHIP AND TRAINING, SINCERELY, PAT HANSEN APPRENTICESHIP COORDINATOR FOR LOCAL 692 220 N. Fulton St. Indianapolis, IN 46202 Mureau of Apprentires4ip anb 01raining Tertificate of ±Qegiotration LOCAL #692 PLASTERERS & CEMENT MASONS J. A. T. C. LAFAYETTE, INDIANA FOR THE TRADE CLASSIFICATIONS OF PLASTERER; CEMENT MASON 2eyislereJ as parf of f�e afional %�p�{ enlicesAip J royrafn in accoraTance wA6 lie basic slano(aros \\of apprenlicesi6lp esla6l:r,hed 6y fnse cSecrefary of LaLr J1AY 22, 1995 Dai.-------'-- � yiil�vl�o�v n :K o, n(.ado.. INDIANA LABORERS' TRAINING TR UST FUND David A. Frye Secretary -Treasurer Jerry J.-Bolk Chris L. Guerrero Ricky Henson, Jr. Ramon Mendoza, Jr. Robert S. Wright P.O. Bog 758 - Bedford, Indiana 47421 (812) 279-9751 To Whom It May Concern: Tire Sean Coakley, Director John P. Brown Chairman Kelly Abel Brad Dreibelbis Michael Ferrara Stan Meyer Jim Wiseman FAX: (812) 279-5545 This letter is to confirm that "Ziolkowski Construction, Inc." is a signatory contractor in good standing with the Indiana Laborers' Training Trust Fund. The above mentioned company is a participant in the Joint Apprenticeship and Training Committee through this Union and has been an active participant in good standing for each of the past five plus consecutive years, and is currently eligible to use our apprentices on a project. Further, our organization's program is approved by the U.S. Veterans Administration to participate in the GI educational benefits program., A copy of our approval letters are attached along with the collective bargaining agreement stating the ratios of Journey workers to Apprentices; which is one (1) Apprentice for every five (5) Journey workers and thereafter may not employ, more that (1) Apprentice for every (3) Journey workers. Sincerely, Sean Coakley, Director SC:dc www.indianalaborerstraining.org ,,oatptt 'Bureau of Cnerfifirate of Registration INDIANA LABORER'S TRAINING TRUST FUND BEDFORD, INDIANA for the trade classification of CONSTRUCTION CRAFT LABORER �2�IS 2r2�aS part �1� �2 1Y ai'©ntil 1'WpprenhceS. Y 1 ro�nran7 in accorofance WA4 lie 6asrc slandar ro(s of apprenlreesiip esla6l's ieof 6y ffie c3ecrelary of Sa6or December 14, 1995 mar IN040-0528 -rRF"cfr�un. 94ds S--& y o f ry— r kYc�d R, lr$uuau. of eii�+ecnfice �md � ¢vilr.� ZIOLKOWSKI Construction, Inc. 4050 Ralph Jones Drive South Bend, IN 46628 Re: Proof of Compliance with 30 ILCS 500/30-22(6) Our File No. MI -00321 Dear Sir or Madam: At the request of ZIOLKOWSKI Construction, Inc, I am providing you with evidence of the Company's compliance with the apprenticeship requirements in 30 ILCS 500/30- 22(6) of the Illinois Procurement Code. I am submitting this letter along with apprenticeship certificates (Nos.IL012020003 and IL008780173). As a signatory contractor with the International Union of Operating Engineers„ Local 150, APL -CIO, ZIOLKOWSKI Construction, Inc., is required by Collective Bargaining Agreement to participate in an applicable apprenticeship and training program approved by and registered with the United States Department of Labor's Bureau of Apprenticeship and Training. The attached certificates are evidence of compliance with the U.S. Department of Labor's apprenticeship requirements. Thank you for your cooperation in this matter. If you have any questions or concerns, please do not hesitate to contact me. Very truly yours, IUOE, Local 150, APL -CIO District I dispatch office Caroline Lesniak Enclosures: Certificates ®flirt of Appautitob, Catifiratr of Rpgkstratiou of apprtutimsbip iorvgram Operating Engineers Loca(150,/gppretticeship Fund wrinington, I nois T-ortfie Trade — Operating Engineer (.Meavy Equt 7ment Technician) 5?e91slereo�as parf o,f lZe Xalionaj ,p,prenfices ip c�r�sfem in accorc%ance mAS1' 'e basic slano�arofs ofapprenlicesSip esfa6�'slleor6rf foiecSecrefdrrJ o,fG'a6or Ufa 5, 2002 Revised Yune 21, 2011 R,g-wrom=ge� IL012020003 Operating�EngineersLow[ 150Apprenticeskip Full Wfmington, IMnois 'For the Trade — Operating Engineer cesii e9isfereo'as parf o fL6'e ion�`�pprenfiP c3sfem Y12 ¢ccorolLnce zvsf?�fZe basic sfanoraro(s ,ppjenficeship esfa6fi'sA`eor fSe &erefarrJ oj''¢6or �ecem6er31 178 - 0-1, wised ,dune 23, 2011 X. IL.008780173 LLY SrA� 04 r October 13, 2020 Painters Local Union 1118 1345 Northside Blvd, South Bend, IN 46615 Telephone: 219-246-4235/fax: 317-522-4907 To whom it may concern: Ziolkowski Construction is currently in good standings with IUPAT District Council 91 Local 1118 out of South Bend, Indiana. They are up to date on all of their union contributions to all funds. If you should have any further questions, please feel free to contact my office. Respectfully yours, Lisa Earls Administrative Assistant IUPAT District Council 91/LU 1118 aLk'AOIX IRP-tt aae -ik truining, `�ntylvgrr sub PharSatim �Rurrau of rrn#i> n4* nub graining 1(fafifirufe of Pgisfration Finishing Trades Institute of District Council 91 Evansville, Indiana for the trade classifications of Painter (Construction), Glazier, Drywall Applicator, Hydro BlasterNscuum Technician -We9rsfereoras part ofA6'e xafional✓�pprenficesSip 5�-o9ram in accoroGnce mifSh'2e basic sfano�zrtls of aPprenficesSip March 9, 2009 IN -070 092065 Tey,,/,ah.. Xo. e1V1a6lsSed6y ISe CSecrefary OfJ6aAor secretary oIG'a6or `�de�inislro%r, ✓7pytn/iceySip .%taieie9, Gap/aye! andEa6or cSrrwcw