Opening of Bids - Seitz Park Reconstruction Proj No. 117-093A - Larson-Danielson Construction Co., Inc.
DIVISION A - BASE BID Item No. Line Item Quantity Unit Unit Price Total Amount A-1 Remediation Allowance 1 LSUM $10,000.00 $10,000.00 A-2 Maintenance of Traffic 1 LSUM $6,432.10 $6,432.10 A-3 Permit Compliance Administration 1 LSUM $5,000.00 $5,000.00 A-4 Mobilization and Demobilization 1 LSUM $110,476.93 $110,476.93 A-5 Construction Engineering 1 LSUM $12,590.30 $12,590.30 A-6 Video Record 1 LSUM $459.47 $459.47 A-7 Temporary Erosion and Sediment Control 1 LSUM $2,901.67 $2,901.67 A-8 Temporary Drop Inlet Protection 1 EACH $263.79 $263.79 A-9 Construction Access Drive 1 EACH $2,760.83 $2,760.83 A-10 Clearing, Right of Way 1 LSUM $1,582.73 $1,582.73 A-11 Sidewalk, Concrete, Removal 481 SYS $13.72 $6,599.32 A-12 Wall, Concrete, Removal 65 LFT $633.09 $41,150.85 A-13 Wall, Concrete, Partial Removal 225 LFT $84.41 $18,992.25 A-14 Gabions, Remove and Salvage 190 CYS $52.76 $10,024.40 A-15 Lighting Structure, Removal 4 EACH $390.93 $1,563.72 A-16 Excavation, Common 1630 CYS $52.76 $85,998.80 A-17 Borrow, B 1249 CYS $42.21 $52,720.29 A-18 Geofoam Lightweight Fill 750 CYS $167.13 $125,347.50 A-19 Pipe, Type 4, 6 in 240 LFT $26.38 $6,331.20 A-20 Aggregates for Underdrains 9 CYS $79.14 $712.26 A-21 Salvaged Gabion Material, Install 190 CYS $52.76 $10,024.40 A-22 Concrete, C, Superstructure 185 CYS $391.77 $72,477.45 A-23 Concrete, B, Footings 400 CYS $581.37 $232,548.00 A-24 Concrete, A, Planter Wall 12 CYS $1,582.08 $18,984.96 A-25 Concrete Topping Slab, Integral Color, Finish "A" 237 SYS $186.76 $44,262.12 A-26 Concrete Topping Slab, Integral Color, Finish "B" 231 SYS $70.84 $16,364.04 A-27 Subgrade Treatment, Type III 406 SYS $76.09 $30,892.54 BID PACKAGE NO.1 (Division A through E) BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: Larson-Danielson Construction Co., Inc. Version 4/2/2019 Contractor's Bid for Public Works - 1 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: Larson-Danielson Construction Co., Inc. A-28 Compacted Aggregate, No. 53 90 TON $63.31 $5,697.90 A-29 Sidewalk, 6-in 116 SYS $98.22 $11,393.52 A-30 Straight Curb 84 LFT $41.34 $3,472.56 A-31 Sidewalk, 6-in, Integral Color, Finish "A" 137 SYS $140.26 $19,215.62 A-32 Sidewalk, 6-in, Integral Color, Finish "B" 24 SYS $208.51 $5,004.24 A-33 Concrete Walk False Joints 284 LFT $1.24 $352.16 A-34 Expansion Joint, Concrete Walk 234 LFT $6.48 $1,516.32 A-35 Sidewalk Joint Transitions 104 LFT $1.96 $203.84 A-36 Unit Paver 38 SYS $309.20 $11,749.60 A-37 Litter Receptacle 1 EACH $934.67 $934.67 A-38 Recycling Receptacle 1 EACH $934.67 $934.67 A-39 Bench 6 EACH $1,381.96 $8,291.76 A-40 Tree Grate 1 EACH $3,284.23 $3,284.23 A-41 Type 5 Rail with Custom Infill Panel, 48 inch 156 LFT $894.58 $139,554.48 A-42 Type 5 Rail with Custom Infill Panel, Custom Curved, 48 inch 131 LFT $385.13 $50,452.03 A-43 Lighting, Pole, 12 ft 5 EACH $5,319.88 $26,599.40 A-44 Foundation, Lighting 5 EACH $1,417.70 $7,088.50 A-45 Luminaire, Type L1A 5 EACH $4,393.03 $21,965.15 A-46 Schedule 80 HDPE, 0.75 inch 75 LFT $6.39 $479.25 A-47 Schedule 80 HDPE, 1.5 inch 275 LFT $10.80 $2,970.00 A-48 Wire, 3#6, No 6 AWG, Stranded Copper 275 LFT $6.94 $1,908.50 A-49 Mobilization and Demobilization for Sodding 2 EACH $422.06 $844.12 A-50 Topsoil 4 CYS $58.03 $232.12 A-51 Sodding, Nursery 33 SYS $10.55 $348.15 A-52 Excelsoir Blanket 357 SYS $2.64 $942.48 A-53 Shredded Hardwood Mulch 21 CYS $79.14 $1,661.94 A-54 Deciduous Tree, 2.5 inch caliper 6 EACH $580.33 $3,481.98 A-55 Coniferous Shrubs, No. 3 Cont 47 EACH $52.76 $2,479.72 A-56 Shrubs, No. 3 Cont.221 EACH $47.48 $10,493.08 A-57 Perennials, No. 1 Cont.243 EACH $13.19 $3,205.17 A-58 Ornamental Grasses, No. 1 Cont. 106 EACH $17.94 $1,901.64 A-59 Planting Mixture 122 CYS $79.14 $9,655.08 Version 4/2/2019 Contractor's Bid for Public Works - 2 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: Larson-Danielson Construction Co., Inc. A-60 Metal Edging 130 LFT $10.55 $1,371.50 A-61 Irrigation System 1 LSUM $34,746.22 $34,746.22 DIVISION A TOTAL $1,321,893.52 DIVISION B - BASE BID Item No. Line Item Quantity Unit Unit Price Total Amount B-1 Remediation Allowance 1 LSUM $10,000.00 $10,000.00 B-2 Maintenance of Traffic 1 LSUM $909.68 $909.68 B-3 Permit Compliance Administration 1 LSUM $5,000.00 $5,000.00 B-4 Mobilization and Demobilization 1 LSUM $137,245.94 $137,245.94 B-5 Construction Engineering 1 LSUM $7,533.80 $7,533.80 B-6 Video Record 1 LSUM $457.80 $457.80 B-7 Temporary Erosion and Sediment Control 1 LSUM $2,891.60 $2,891.60 B-8 Clearing, Right of Way 1 LSUM $5,611.25 $5,611.25 B-9 Sidewalk, Concrete, Removal 58 SYS $13.67 $792.86 B-10 Wall, Concrete, Removal 85 LFT $473.17 $40,219.45 B-11 Gabions, Remove and Salvage 108 CYS $52.57 $5,677.56 B-12 Excavation, Common 806 CYS $52.57 $42,371.42 B-13 Borrow, B 719 CYS $42.06 $30,241.14 B-14 Structural Backfill, Type 4 315 CYS $105.15 $33,122.25 B-15 Geofoam Lightweight Fill 493 CYS $167.46 $82,557.78 B-16 Pipe, Type 4, 6 in 99 LFT $26.29 $2,602.71 B-17 Aggregates for Underdrains 4 CYS $78.86 $315.44 B-18 Manhole, Saddle Structure 1 EACH $6,308.94 $6,308.94 B-19 Casting, Type 4, Adjust to Grade 1 EACH $262.87 $262.87 B-20 Gabions, Metallic Coated 199 CYS $562.55 $111,947.45 B-21 Pneumatically Placed Mortar 1405 SFT $51.81 $72,793.05 B-22 Salvaged Gabion Material, Install 108 CYS $52.57 $5,677.56 B-23 Pile, Steel Pipe, 0.5 inch, 12.75 inch 400 LFT $105.15 $42,060.00 B-24 Dynamic Pile Load Test, 12.75 inch 2 EACH $4,205.96 $8,411.92 B-25 Structural Steel, Galvanized 21,336 LBS $3.81 $81,290.16 B-26 Concrete, C, Superstructure 123 CYS $556.48 $68,447.04 Version 4/2/2019 Contractor's Bid for Public Works - 3 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: Larson-Danielson Construction Co., Inc. B-27 Concrete, B, Footings 179 CYS $611.00 $109,369.00 B-28 Composite Concrete Slab 43 CYS $419.01 $18,017.43 B-29 Concrete Topping Slab, Integral Color, Finish "A" 186 SYS $89.27 $16,604.22 B-30 Concrete Topping Slab, Integral Color, Finish "B" 199 SYS $73.13 $14,552.87 B-31 Sheet Pile NZ14 42 TON $4,641.58 $194,946.36 B-32 Threaded Tie Rod 5 EACH $3,154.47 $15,772.35 B-33 Wales - Double C 130 LFT $215.56 $28,022.80 B-34 Sheet Pile Concrete Cap 65 LFT $142.69 $9,274.85 B-35 Subgrade Treatment, Type III 269 SYS $5.26 $1,414.94 B-36 Compacted Aggregate, No. 53 31 TON $63.09 $1,955.79 B-37 Concrete Walk False Joints 219 LFT $1.30 $284.70 B-38 Expansion Joint, Concrete Walk 67 LFT $6.46 $432.82 B-39 Sidewalk Joint Transitions 262 LFT $1.95 $510.90 B-40 Unit Paver 28 SYS $613.07 $17,165.96 B-41 Type 5 Rail with Custom Infill Panel, 42 inch 40 LFT $456.87 $18,274.80 B-42 Type 5 Rail with Custom Infill Panel, 48 inch 103 LFT $352.25 $36,281.75 B-43 Type 5 Rail with Custom Infill Panel, Custom Curved, 48 inch 77 LFT $337.98 $26,024.46 B-44 Handrail 20 LFT $131.44 $2,628.80 B-45 Lighting, Pole, 12 ft 3 EACH $5,301.27 $15,903.81 B-46 Foundation, Lighting 3 EACH $1,412.85 $4,238.55 B-47 Luminaire, Type L1A 3 EACH $4,377.71 $13,133.13 B-48 Luminaire, Type L13 7 EACH $1,119.84 $7,838.88 B-49 Handhole, Lighting 3 EACH $1,101.61 $3,304.83 B-50 PVC Conduit, 0.75 inch 325 LFT $5.96 $1,937.00 B-51 PVC Conduit, 1.5 inch 225 LFT $6.71 $1,509.75 B-52 PVC Conduit, 2 inch 25 LFT $8.75 $218.75 B-53 Crescent Lights Adjustments 1 LSUM $5,690.67 $5,690.67 B-54 Wire, 3#6, No 6 AWG, Stranded Copper 375 LFT $7.00 $2,625.00 B-55 Wire, 2#12, No 12AWG, Solid Copper 325 LFT $2.26 $734.50 B-56 Excelsoir Blanket 221 SYS $2.63 $581.23 B-57 Shredded Hardwood Mulch 12 CYS $78.86 $946.32 Version 4/2/2019 Contractor's Bid for Public Works - 4 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: Larson-Danielson Construction Co., Inc. B-58 Deciduous Tree, 2.5 inch caliper 6 EACH $578.32 $3,469.92 B-59 Coniferous Shrubs, No. 3 Cont 59 EACH $52.57 $3,101.63 B-60 Shrubs, No. 3 Cont.145 EACH $47.32 $6,861.40 B-61 Perennials, No. 1 Cont.544 EACH $12.88 $7,006.72 B-62 Ornamental Grasses, No. 1 Cont. 78 EACH $17.88 $1,394.64 B-63 Planting Mixture 74 CYS $78.86 $5,835.64 B-64 Irrigation System 1 LSUM $51,755.42 $51,755.42 DIVISION B TOTAL $1,454,372.26 DIVISION C - BASE BID Item No. Line Item Quantity Unit Unit Price Total Amount C-1 Remediation Allowance 1 LSUM $10,000.00 $10,000.00 C-2 Maintenance of Traffic 1 LSUM $5,956.55 $5,956.55 C-3 Permit Compliance Administration 1 LSUM $5,000.00 $5,000.00 C-4 Mobilization and Demobilization 1 LSUM $87,338.16 $87,338.16 C-5 Construction Engineering 1 LSUM $8,391.28 $8,391.28 C-6 Video Record 1 LSUM $621.52 $621.52 C-7 Temporary Erosion and Sediment Control 1 LSUM $2,896.84 $2,896.84 C-8 Temporary Drop Inlet Protection 1 EACH $263.35 $263.35 C-9 Construction Access Drive 1 EACH $2,106.79 $2,106.79 C-10 Clearing, Right of Way 1 LSUM $1,053.39 $1,053.39 C-11 Sidewalk, Concrete, Removal 281 SYS $13.69 $3,846.89 C-12 Wall, Concrete, Removal 90 LFT $121.14 $10,902.60 C-13 Excavation, Common 131 CYS $52.67 $6,899.77 C-14 Borrow, B 200 CYS $42.14 $8,428.00 C-15 Inlet, Type A 2 EACH $1,896.11 $3,792.22 C-16 Catch Basin, Type A 1 EACH $2,106.79 $2,106.79 C-17 Pipe, Type 4, 6 in 325 LFT $26.33 $8,557.25 C-18 Pipe, Type 2, 6 in 190 LFT $26.33 $5,002.70 C-19 Pipe, Type 2, 12 in 22 LFT $35.82 $788.04 C-20 Cleanout, 6 in 1 EACH $421.36 $421.36 C-21 Aggregates for Underdrains 9 CYS $79.00 $711.00 Version 4/2/2019 Contractor's Bid for Public Works - 5 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: Larson-Danielson Construction Co., Inc. C-22 Concrete, C, Superstructure 68 CYS $1,067.55 $72,593.40 C-23 Concrete, A, Planter Wall 144 CYS $1,472.99 $212,110.56 C-24 Concrete Topping Slab, Integral Color, Finish "A" 100 SYS $214.67 $21,467.00 C-25 Concrete Topping Slab, Integral Color, Finish "B" 144 SYS $49.38 $7,110.72 C-26 Subgrade Treatment, Type III 687 SYS $5.27 $3,620.49 C-27 Compacted Aggregate, No. 53 660 TON $63.20 $41,712.00 C-28 Sidewalk, 6-in 224 SYS $92.46 $20,711.04 C-29 Sidewalk, 6-in, Integral Color, Finish "A" 690 SYS $117.02 $80,743.80 C-30 Sidewalk, 6-in, Integral Color, Finish "B" 583 SYS $99.25 $57,862.75 C-31 Sidewalk, 8-in, Integral Color, Finish "A" 269 SYS $123.64 $33,259.16 C-32 Sidewalk, 8-in, Integral Color, Finish "B" 194 SYS $108.92 $21,130.48 C-33 Straight Curb 42 LFT $41.29 $1,734.18 C-34 Concrete Walk False Joints 795 LFT $2.25 $1,788.75 C-35 Expansion Joint, Concrete Walk 203 LFT $6.48 $1,315.44 C-36 Sidewalk Joint Transitions 62 LFT $10.71 $664.02 C-37 Unit Paver 259 SYS $281.45 $72,895.55 C-38 Unit Paver Custom Engraving 403 EACH $47.19 $19,017.57 C-39 Litter Receptacle 2 EACH $1,260.19 $2,520.38 C-40 Recycling Receptacle 2 EACH $1,260.19 $2,520.38 C-41 Type 5 Rail with Custom Infill Panel, 42 inch 368 LFT $331.82 $122,109.76 C-42 Type 5 Rail with Custom Infill Panel, Custom Curved, 42 inch 45 LFT $376.52 $16,943.40 C-43 Type 5 Rail with Custom Infill Panel, 48 inch 408 LFT $352.89 $143,979.12 C-44 Type 5 Rail with Custom Infill Panel, Custom Curved, 48 inch 114 LFT $384.49 $43,831.86 C-45 Type 5 Rail Swing Gate 5 EACH $654.16 $3,270.80 C-46 Handrail 6 LFT $421.36 $2,528.16 C-47 Flagpole 1 EACH $820.17 $820.17 C-48 Memorial, Salvaged, Reinstallation 1 EACH $5,121.11 $5,121.11 C-49 Bollard, Steel, Removable, with Foundation 3 EACH $1,571.46 $4,714.38 C-50 Belt Barrier 1 LSUM $182.36 $182.36 C-51 Lighting, Pole, 12 ft 11 EACH $5,310.74 $58,418.14 Version 4/2/2019 Contractor's Bid for Public Works - 6 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: Larson-Danielson Construction Co., Inc. C-52 Foundation, Lighting 11 EACH $1,415.28 $15,568.08 C-53 Luminaire, Type L1 9 EACH $4,187.95 $37,691.55 C-54 Luminaire, Type L1B 2 EACH $4,240.97 $8,481.94 C-55 Luminaire, Type L5 3 EACH $1,148.20 $3,444.60 C-56 Luminaire, Type L7 3 EACH $995.11 $2,985.33 C-57 Luminaire, Type L11 2 EACH $727.37 $1,454.74 C-58 Handhole, Lighting 9 EACH $1,022.96 $9,206.64 C-59 Schedule 80 HDPE, 0.75 inch 150 LFT $6.11 $916.50 C-60 Schedule 80 HDPE, 1.5 inch 425 LFT $7.19 $3,055.75 C-61 Schedule 80 HDPE, 2 inch 400 LFT $7.89 $3,156.00 C-62 Wire, 3#6, No 6 AWG, Stranded Copper 300 LFT $6.90 $2,070.00 C-63 Wire, 3#8, No 8 AWG, Stranded Copper 825 LFT $5.03 $4,149.75 C-64 Wire, 2#12, No 12AWG, Solid Copper 150 LFT $2.27 $340.50 C-65 Forest Light Reinstallation 1 LSUM $13,633.04 $13,633.04 C-66 Forest Light Donor Recognition Sign 1 LSUM $1,264.07 $1,264.07 C-67 Pedestal Receptacle, Exterio 7 EACH $1,779.18 $12,454.26 C-68 Excelsoir Blanket 45 SYS $26.33 $1,184.85 C-69 Shredded Hardwood Mulch 15 CYS $79.00 $1,185.00 C-70 Deciduous Tree, 2.5 inch Caliper 8 EACH $579.37 $4,634.96 C-71 Shrubs, No. 3 Cont.68 EACH $49.51 $3,366.68 C-72 Perennials, No. 1 Cont.302 EACH $13.17 $3,977.34 C-73 Ornamental Grasses, No. 1 Cont. 39 EACH $18.96 $739.44 C-74 Planting Mixture 80 CYS $79.00 $6,320.00 C-75 Irrigation System 1 LSUM $46,560.06 $46,560.06 DIVISION C TOTAL $1,439,622.51 DIVISION D - BASE BID Item No. Line Item Quantity Unit Unit Price Total Amount D-1 Remediation Allowance 1 LSUM $5,000.00 $5,000.00 D-2 Maintenance of Traffic 1 LSUM $5,465.38 $5,465.38 D-3 Permit Compliance Administration 1 LSUM $2,500.00 $2,500.00 D-4 Mobilization and Demobilization 1 LSUM $126,667.45 $126,667.45 Version 4/2/2019 Contractor's Bid for Public Works - 7 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: Larson-Danielson Construction Co., Inc. D-5 Construction Engineering 1 LSUM $8,989.30 $8,989.30 D-6 Video Record 1 LSUM $456.43 $456.43 D-7 Temporary Erosion and Sediment Control 1 LSUM $2,882.57 $2,882.57 D-8 Clearing, Right of Way 1 LSUM $26,205.21 $26,205.21 D-9 Sidewalk, Concrete, Removal 58 SYS $13.63 $790.54 D-10 Excavation, Common 650 CYS $52.41 $34,066.50 D-11 Borrow, B 100 CYS $41.93 $4,193.00 D-12 Pipe, Type 2, 4 in 8 LFT $26.21 $209.68 D-13 Pipe, Type 2, 6 in 98 LFT $33.54 $3,286.92 D-14 Pipe, Type 2, 12 in 267 LFT $35.64 $9,515.88 D-15 Pipe, Type 4, 6 in 321 LFT $26.21 $8,413.41 D-16 Aggregates for Underdrains 12 CYS $78.62 $943.44 D-17 Inlet, Type A 2 EACH $1,886.78 $3,773.56 D-18 Manhole, Type A 3 EACH $3,144.63 $9,433.89 D-19 Storm Water Quality Unit 1 EACH $15,199.02 $15,199.02 D-20 Storm Outlet, Custom, 12"1 EACH $1,572.31 $1,572.31 D-21 Casting, Type 4, Adjust to Grade 3 EACH $262.05 $786.15 D-22 Water Service, Pavillion 200 LFT $47.17 $9,434.00 D-23 Drinking Fountain Service lead, 1/2" Type K Copper 42 LFT $41.93 $1,761.06 D-24 Gas Service, 3/4"200 LFT $0.00 $0.00 D-25 Concrete, C, Superstructure 10 CYS $771.44 $7,714.40 D-26 Concrete, A, Planter Wall 163 CYS $1,278.25 $208,354.75 D-27 Subgrade Treatment, Type I 220 SYS $9.43 $2,074.60 D-28 Subgrade Treatment, Type III 1757 SYS $5.24 $9,206.68 D-29 Compacted Aggregate, No. 53 527 TON $62.89 $33,143.03 D-30 Sidewalk, 6-in 413 SYS $80.91 $33,415.83 D-31 Straight Curb 188 LFT $41.08 $7,723.04 D-32 Straight Curb, Double Width 178 LFT $45.94 $8,177.32 D-33 Sidewalk, 6-in, Integral Color, Finish "A" 790 SYS $118.26 $93,425.40 D-34 Sidewalk, 6-in, Integral Color, Finish "B" 554 SYS $91.69 $50,796.26 D-35 Concrete Walk False Joints 560 LFT $2.68 $1,500.80 D-36 Expansion Joint, Concrete Walk 135 LFT $6.44 $869.40 Version 4/2/2019 Contractor's Bid for Public Works - 8 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: Larson-Danielson Construction Co., Inc. D-37 Unit Paver 413 SYS $295.73 $122,136.49 D-38 Crushed Stone Surface 87 SYS $146.75 $12,767.25 D-39 Type 5 Rail with Custom Infill Panel, 42 inch 70 LFT $330.19 $23,113.30 D-40 Tree Grate 8 EACH $3,262.61 $26,100.88 D-41 Litter Receptacle 4 EACH $1,253.71 $5,014.84 D-42 Recycling Receptacle 4 EACH $1,253.71 $5,014.84 D-43 Hammock 5 EACH $248.01 $1,240.05 D-44 Drinking Fountain 1 EACH $4,402.48 $4,402.48 D-45 Lighting, Pole, 12 ft 12 EACH $5,284.72 $63,416.64 D-46 Lighting, Pole, Hammock, 12 ft 4 EACH $1,990.55 $7,962.20 D-47 Lighting, Pole, Hammock, 8 ft 2 EACH $1,990.55 $3,981.10 D-48 Foundation, Lighting 18 EACH $1,408.38 $25,350.84 D-49 Luminaire, Type L1 3 EACH $4,049.58 $12,148.74 D-50 Luminaire, Type L4 12 EACH $1,129.27 $13,551.24 D-51 Luminaire, Type L7 3 EACH $990.21 $2,970.63 D-52 Luminaire, Type L9 375 LFT $9.98 $3,742.50 D-53 Luminaire, Type L10 18 EACH $710.57 $12,790.26 D-54 Luminaire, Type L12 2 EACH $723.79 $1,447.58 D-55 Fuses, 250V, 200A, Type RK 3 EACH $106.22 $318.66 D-56 Panelboard, 125A, 208/120V 1 EACH $1,481.12 $1,481.12 D-57 Relay Panel, Dimming Type, 24 Relays 1 EACH $3,626.80 $3,626.80 D-58 Enclosure, Electrical, Stainless Steel 1 EACH $7,689.66 $7,689.66 D-59 Handhole, Lighting 6 EACH $1,221.34 $7,328.04 D-60 Schedule 80 HDPE, 0.75 inch 850 LFT $6.30 $5,355.00 D-61 Schedule 80 HDPE, 1.5 inch 350 LFT $6.94 $2,429.00 D-62 Schedule 80 HDPE, 2 inch 130 LFT $7.98 $1,037.40 D-63 Schedule 80 HDPE, 3 inch 300 LFT $10.52 $3,156.00 D-64 Wire, 4#350kcmil, 1#4 AWG, Stranded Copper 400 LFT $49.67 $19,868.00 D-65 Wire, 3#6, No 6 AWG, Stranded Copper 100 LFT $6.87 $687.00 D-66 Wire, 3#8, No 8 AWG, Stranded Copper 350 LFT $4.99 $1,746.50 D-67 Wire, 2#12, No 12 AWG, Solid Copper 850 LFT $3.00 $2,550.00 D-68 Pedestal Receptacle, Exterior 3 EACH $2,299.42 $6,898.26 Version 4/2/2019 Contractor's Bid for Public Works - 9 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: Larson-Danielson Construction Co., Inc. D-69 Exterior Security/IT System 1 LSUM $17,126.68 $17,126.68 D-70 Shredded Hardwood Mulch 19 CYS $78.62 $1,493.78 D-71 Deciduous Tree, 2.5 inch caliper 17 EACH $610.43 $10,377.31 D-72 Deciduous Tree, 12 feet height, multistem 5 EACH $477.98 $2,389.90 D-73 Coniferous Shrubs, No. 3 Cont 17 EACH $52.41 $890.97 D-74 Shrubs, No. 3 Cont.109 EACH $47.17 $5,141.53 D-75 Perennials, No. 1 Cont.368 EACH $13.10 $4,820.80 D-76 Ornamental Grasses, No. 1 Cont. 72 EACH $17.82 $1,283.04 D-77 Planting Mixture 109 CYS $78.62 $8,569.58 D-78 Irrigation System 1 LSUM $26,205.21 $26,205.21 D-79 Restroom - Substructure 1 LSUM $26,230.94 $26,230.94 D-80 Restroom - Structural Frame 1 LSUM $76,043.69 $76,043.69 D-81 Restroom - Roofing 1 LSUM $102,422.62 $102,422.62 D-82 Restroom - Exterior Walls 1 LSUM $98,032.83 $98,032.83 D-83 Restroom - Interior Subdivision 1 LSUM $15,125.19 $15,125.19 D-84 Restroom - Wall Finishes 1 LSUM $101,786.62 $101,786.62 D-85 Restoorm - Floor Finishes 1 LSUM $4,716.94 $4,716.94 D-86 Restroom - Ceiling Finishes 1 LSUM $39,328.71 $39,328.71 D-87 Restroom - Specialties 1 LSUM $14,499.50 $14,499.50 D-88 Restroom - Casework & Wood Trim 1 LSUM $14,078.15 $14,078.15 D-89 Restroom - Equipment 1 LSUM $4,821.76 $4,821.76 D-90 Restroom - Plumbing 1 LSUM $43,291.01 $43,291.01 D-91 Restroom - HVAC 1 LSUM $30,607.69 $30,607.69 D-92 Restroom - Electrical Systems (Including Technology) 1 LSUM $127,998.83 $127,998.83 D-93 Band Shelter - Substructure 1 LSUM $10,454.28 $10,454.28 D-94 Band Shelter - Structural Frame 1 LSUM $110,509.52 $110,509.52 D-95 Band Shelter - Roofing 1 LSUM $150,880.10 $150,880.10 D-96 Band Shelter - Exterior Walls 1 LSUM $42,047.32 $42,047.32 D-97 Band Shelter - Plumbing 1 LSUM $6,498.89 $6,498.89 D-98 Band Shelter - Electrical Systems (Including Technology) 1 LSUM $57,374.53 $57,374.53 DIVISION D TOTAL $2,304,318.43 Version 4/2/2019 Contractor's Bid for Public Works - 10 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: Larson-Danielson Construction Co., Inc. DIVISION E - BASE BID Item No. Line Item Quantity Unit Unit Price Total Amount E-1 Remediation Allowance 1 LSUM $2,500.00 $2,500.00 E-2 Maintenance of Traffic 1 LSUM $2,233.48 $2,233.48 E-3 Permit Compliance Administration 1 LSUM $1,500.00 $1,500.00 E-4 Mobilization and Demobilization 1 LSUM $62,533.88 $62,533.88 E-5 Construction Engineering 1 LSUM $5,172.57 $5,172.57 E-6 Video Record 1 LSUM $470.98 $470.98 E-7 Temporary Erosion and Sediment Control 1 LSUM $2,973.94 $2,973.94 E-8 Temporary Drop Inlet Protection 1 EACH $270.36 $270.36 E-9 Clearing 1 LSUM $4,325.73 $4,325.73 E-10 Sidewalk, Concrete, Removal 550 SYS $14.06 $7,733.00 E-11 Wall, Concrete, Removal 310 LFT $124.36 $38,551.60 E-12 Excavation, Common 131 CYS $54.07 $7,083.17 E-13 Casting, Type 4, Adjust to Grade 2 EACH $270.36 $540.72 E-14 Concrete, C, Superstructure 75 CYS $811.32 $60,849.00 E-15 Concrete, B, Footings 101 CYS $967.28 $97,695.28 E-16 Subgrade Treatment, Type III 740 SYS $5.41 $4,003.40 E-17 Compacted Aggregate, No. 53 222 TON $64.89 $14,405.58 E-18 Concrete Walk False Joints 422 LFT $1.34 $565.48 E-19 Sidewalk, 6-in, Integral Color, Finish "A" 412 SYS $120.59 $49,683.08 E-20 Sidewalk, 6-in, Integral Color, Finish "B" 328 SYS $108.28 $35,515.84 E-21 Expansion Joint, Concrete Walk 579 LFT $6.65 $3,850.35 E-22 Straight Curb 122 LFT $42.89 $5,232.58 E-23 Type 5 Rail with Custom Infill Panel, 42 inch 112 LFT $340.65 $38,152.80 E-24 Type 5 Rail with Custom Infill Panel, Custom Curved, 42 inch 68 LFT $386.55 $26,285.40 E-25 Handrail 22 LFT $135.18 $2,973.96 E-26 Lighting, Pole, 12 ft 1 EACH $5,452.59 $5,452.59 E-27 Foundation, Lighting 1 EACH $1,453.45 $1,453.45 Version 4/2/2019 Contractor's Bid for Public Works - 11 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: Larson-Danielson Construction Co., Inc. E-28 Luminaire, Type L1 1 EACH $4,178.66 $4,178.66 E-29 Luminaire, Type L8 3 EACH $589.74 $1,769.22 E-30 Handhole, Lighting 1 EACH $465.02 $465.02 E-31 Schedule 80 HDPE, 0.75 inch 125 LFT $6.04 $755.00 E-32 Schedule 80 HDPE, 1.5 inch 145 LFT $6.65 $964.25 E-33 Wire, 3#8, No 8 AWG, Stranded Copper 145 LFT $5.16 $748.20 E-34 Wire, 2#12, No 12AWG, Solid Copper 125 LFT $2.36 $295.00 DIVISION E TOTAL $491,183.57 DIVISION F BASE BID Item No. Line Item Quantity Unit Unit Price Cost F-1 Remediation Allowance 1 LSUM $5,000.00 $5,000.00 F-2 Maintenance of Traffic 1 LSUM $392.93 $392.93 F-3 Permit Compliance Administration 1 LSUM $1,500.00 $1,500.00 F-4 Mobilization and Demobilization 1 LSUM $10,345.45 $10,345.45 F-5 Construction Engineering 1 LSUM $3,884.81 $3,884.81 F-6 Video Record 1 LSUM $283.72 $283.72 F-7 Temporary Erosion and Sediment Control 1 LSUM $2,173.73 $2,173.73 F-8 Floating Dock, Removal 1 LSUM $13,803.19 $13,803.19 F-9 Floating Marina Dock System 1 LSUM $101,129.12 $101,129.12 DIVISION F TOTAL $138,512.95 BID PACKAGE NO.2 (Division F) Version 4/2/2019 Contractor's Bid for Public Works - 12 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: Larson-Danielson Construction Co., Inc. Bid Alternate No. 1 1-1 Railing, Removal 295 LFT $8.88 $2,619.60 1-2 Lighting Structure, Removal 5 EACH $74.05 $370.25 1-3 Type 5 Rail with Custom Infill Panel, 42 inch 295 LFT $337.07 $99,435.65 1-4 Lighting, Pole, 12 ft 5 EACH $5,426.67 $27,133.35 1-5 Foundation, Lighting 5 EACH $1,437.72 $7,188.60 1-6 Luminaire, Type L1 5 EACH $4,134.04 $20,670.20 1-7 PVC Conduit, 1.5 inch 425 LFT $8.50 $3,612.50 1-8 Wire, 3#8, No 8 AWG, Stranded Copper 300 LFT $5.09 $1,527.00 Bid Alternate No. 1 Total $162,557.15 Bid Alternate No. 2 2-1 Adirondack Chair 20 EACH $402.52 $8,050.40 2-2 Bistro Chair 90 EACH $97.39 $8,765.10 2-3 Bistro Table 37 EACH $309.02 $11,433.74 2-4 Umbrella and Stand 6 EACH $1,924.88 $11,549.28 2-5 Bench, Urbastyle Galet II 5 EACH $880.95 $4,404.75 2-6 Bar Height Chair 48 EACH $595.40 $28,579.20 2-7 Bar Height Table 6 EACH $2,577.86 $15,467.16 Bid Alternate No. 2 Total $88,249.63 Bid Alternate No. 3 3-1 DEDUCT - Concrete, A, Planter Wall 83 CYS -$3,497.93 -$290,328.19 3-2 ADD - Precast Concrete Planter Wall 83 CYS $5,549.19 $460,582.77 Bid Alternate No. 3 Total $170,254.58 BID ALTERNATES Version 4/2/2019 Contractor's Bid for Public Works - 13 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Seitz Park Reconstruction Project Number: 117-093A For Bids Due: November 24, 2020 Contractor Name: Larson-Danielson Construction Co., Inc. Item No. Description Item No. Description Item No. Description $2,304,318.43 $1,439,622.51 $1,454,372.26 $1,321,893.52 Total Amount Total Amount Total Bid Package No. 2 $138,512.95 BID PACKAGE NO. 2 ITEM BID PACKAGE NO. 1 ITEMS Division E - Base Bid Division D - Base Bid Division C - Base Bid Division B - Base Bid Division A - Base Bid $491,183.57 BID ALTERNATE ITEMS: Total Amount Division F - Base Bid $138,512.95 Total Bid Package No. 1 $7,011,390.29 TOTAL BID ALTERNATES $421,061.36 Bid Alternate No. 1 $162,557.15 Bid Alternate No. 2 $88,249.63 Bid Alternate No. 3 $170,254.58 Version 4/2/2019 Contractor's Bid for Public Works - 14