HomeMy WebLinkAbout11242020 Board of Public Works MeetingCITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
MEETING
November 24, 2020 – 9:30 a.m.
Link to Virtual Meeting: https://tinyurl.com/BPW-11242020
GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR
Page 1
1. REVIEW OF MINUTES
A. Regular Meeting of November 10, 2020
2. PUBLIC HEARING
A. New Massage Establishment License
1. Company: Heart to Heart Massage and Wellness
2. Location: 115 N. William St.
3. Favorable Recommendations
3. OPENING OF BIDS
A. One (1) or More, 2020 or Newer, Truck Mounted Street Sweeper – Spec S
1. Funding: PR-00004787
B. Two (2) More or Less, 2020 or Newer, Mid-Size Four Door Hybrid Sedan
Automobiles – Spec F
1. Funding: PR-00004847
C. One (1) or More, 2020 or Newer, Vacuum Air Street Sweeper – Spec R
1. Funding: PR-00004785
D. Seitz Park Reconstruction – Project No. 117-093A
1. Funding: PR-00004857
E. Ductile Iron Pipes, Valves, and Hydrants – Project No. 120-054
1. Funding: PR-00004693
F. Sheridan St. and Sample St. Signal Improvements – Project No. 116-127A
1. Funding: PR-00004690
4. OPENING OF QUOTATIONS
A. Cleveland Well Nos. 2 & 3 Refurbishments – Well Cleaning – Project No. 118-
021E
1. Funding: PR-00005225
B. Edison Well No. 4 Refurbishments – Well Cleaning – Project No. 120-060
1. Funding: PR-00005227
C. North Water Treatment Plant Raw Water Header Improvements – Project No.
119-011A
1. Funding: PR-00005229
D. Curb & Sidewalk Repairs – Project No. 120-001A
1. Funding: PR-00005362
E. East Race Sidewalk Repairs – Project No. 117-130
1. Funding: PR-00005484
F. Pinhook Well No. 4 Refurbishment – Well Cleaning – Project No. 120-061
1. Funding: PR-00005228
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
MEETING
November 24, 2020 – 9:30 a.m.
Link to Virtual Meeting: https://tinyurl.com/BPW-11242020
GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR
Page 2
5. AWARD BIDS AND APPROVE CONTRACTS
A. Two (2), More or Less, 2020 or Newer, Three-Quarter Ton Four Wheel Drive
Pick-Up Trucks – Spec L
1. Company: Jordan Ford
2. Amount:
a) One (1) Base Quote plus Alternates 2, 3, and 4 for $43,918
b) One (1) Base Quote plus Alternate 3 for $32,894
c) One (1) Base Quote plus Alternates 2 and 3 for $39,424
3. Funding: PR-00003993
B. One (1) or More, 2020 or Newer, Full Size Cargo Van – Spec Q
1. Company: Jordan Ford
2. Amount: One (1) at $34,774.49 for Base Quote plus Alternates 1-5 & Dealer
Options 1 & 2; One (1) at $37,492.49 for Base Quote plus Alternates 1-5 &
Dealer Options 1, 2, & 3; Total $72,266.98
3. Funding: PR-00005423
C. Four (4) or More, 2020 or Newer Standard AWD 4-Door Utility Vehicles – Spec
I
1. Company: Jordan Ford
2. Amount: $24,739 each; Total for Five (5) $123,695
3. Funding: PR-00003050
6. CHANGE ORDERS
A. St. Joseph River Backwater Valves – Project No. 119-018
1. Company: Selge Construction Company, Inc.
2. Change Order No.: 1
3. Increase Amount: $10,613
4. Percent of Increase: 11.24%
5. Revised Contract Amount: $105,063
6. Funding: PO-0000303
B. Eagle Way Sewer Extension – Project No. 119-095
1. Company: Indiana Earth, Inc.
2. Change Order No.: 1
3. Increase Amount: $28,737
4. Percent of Increase: 12.00%
5. Revised Contract Amount: $268,181.56
6. Funding: PO-0001014
C. Western Ave. Streetscape, Phase III – Project No. 118-076
1. Company: Indiana Earth, Inc.
2. Change Order No.: 5
3. Increase Amount: $41,135
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
MEETING
November 24, 2020 – 9:30 a.m.
Link to Virtual Meeting: https://tinyurl.com/BPW-11242020
GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR
Page 3
4. Percent of Change: 1.45%
5. Total Percent of Change: 9.53%
6. Revised Contract Amount: $2,885,401.94
7. Funding: PO-0000394
D. River Walk from Beyer Street to Howard Park – Project No. 117-083A
1. Company: Walsh & Kelly, Inc.
2. Change Order No.: 1
3. Increase Amount: $25,880.22; Additional Thirty-Two (32) Days
4. Percent of Increase: 0.81%
5. Revised Contract Amount and Completion Date: $3,224,880.22; January 1,
2021
6. Funding: PO-0001785
7. PROJECT COMPLETION AFFIDAVITS
A. At-Large Council Office Renovations – Project No. 119-105
1. Company: Premier 1 Construction, Inc.
2. Final Contract Amount: $21,500
3. Funding: Council’s Repairs and Maintenance
B. Century Center Elevator Renovation – Project No. 118-104D
1. Company: Gibson-Lewis, LLC
2. Final Contract Amount: $168,700
3. Funding: Hotel/Motel Tax
C. Gemini at Colfax Exterior Renovations, Water Main– Project No. 119-103D
1. Company: Ritschard Brothers, Inc.
2. Final Contract Amount: $65,457
3. Funding: RWDA TIF
D. Miami Basin Valve Replacement – Project No. 116-082D
1. Company: HRP Construction Co., Inc.
2. Final Contract Amount: $175,259.48
3. Funding: LRSA & SSDA TIF (251.0606.431.42.96)
8. REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS
A. Two (2), More or Less, 2020 or Newer, Trailer Mounted Anti-Icing Systems –
Spec U
1. Funding: PR-00005495
9. AGREEMENTS/CONTRACTS/PROPOSALS/ADDENDA
A. Authorization for Entry Agreement – Honeywell International Inc.
1. Description: Drilling and Revocable Permit at 3520 Westmoor St. for
Environmental Remediation
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
MEETING
November 24, 2020 – 9:30 a.m.
Link to Virtual Meeting: https://tinyurl.com/BPW-11242020
GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR
Page 4
B. Professional Services Agreement – Jones Petrie Rafinski
1. Description: Design Services for Streetscape Improvements for the 3400
Block of S. Michigan St.
2. Amount: $8,500
3. Funding: PR-00005242
C. Emergency Sewer Repair Work – HRP Construction
1. Description: Replacement of Deteriorated Sewer Main Line and Manhole due
to discovery of Sink Hole on Corby, Ironwood and Rockne Intersection
Project
2. Amount: $308,124.70
3. Funding: PO-00002249
D. Contribution in Aid of Construction Agreement – Indiana Michigan Power Co.
1. Description: Two (2) Agreements for Installation of Primary Service Feed,
Transformer Relocation & Transformer Removals at Wastewater Treatment
Plant
2. Amount: Re-Use Water Pump Station Building $4,359.28; Compressor
Building $11,173.07; Total $15,532.35
3. Funding: PR-00005428
E. Amendment No. 1 to Owner-Engineer Agreement – Abonmarche Consultants,
Inc.
1. Description: Traffic Analysis and Design Services for Eddy St. and Howard
St. Intersection
2. Amount: $109,430; New Total $129,730
3. Funding: PR-00005408
F. Real Property Transfer Agreement and Quit Claim Deed– Near Northwest
Neighborhood Inc.
1. Description: Transfer Properties for Development of Affordable Housing
2. Locations:
a) 912 N. Sherman Ave.
b) 914 N. Sherman Ave.
c) 918 N. Sherman Ave.
3. Amount: $1.00
G. Amendment to Memorandum of Understanding – Teamsters Local Union No. 364
1. Description: Extend the Current Terms of the Teamster Master Agreement to
December 31, 2021 and Increase Union Employee Base Rate by 1%
H. Sidewalk Utility & Traffic Loop Easement Agreement – Core South Bend, LLC
1. Description: Fifteen (15) Ft. Easement for City at 219 E. Ireland Rd. Property
Frontage for Construction, Repair, Installation, and Maintenance of Public
Sidewalk, certain Utility Structures, and Traffic Loops
I. Professional Services Agreement – Jones Petrie Rafinski Corporation
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
MEETING
November 24, 2020 – 9:30 a.m.
Link to Virtual Meeting: https://tinyurl.com/BPW-11242020
GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR
Page 5
1. Description: Design Services for Drainage Improvements at several Locations
and Randolph Park Improvements
2. Amount: NTE $44,185
3. Funding: PR-00005212
J. Professional Services Agreement – McCormick Engineering, LLC
1. Description: Laurel Woods Drainage Improvements Design
2. Amount: NTE $49,920
3. Funding: PR-00005214
K. Professional Services Agreement – Arcadis U.S., Inc.
1. Description: 2021-2025 Water Capital Improvement Plan Updates and Rate
Case Support
2. Amount: NTE $49,000
3. Funding: PR-00005358
10. LICENSES AND PERMITS
A. Encroachments/Revocable Permits
1. Applicant: PGK Enterprises, LLC
a) Location: 1021 North St. Peter St.
b) Description: Install Hydronic Snowmelt System in Driveway at Public
Right-of-Way
c) Engineering notes City will not be Liable if Private Utility needs to do
Repairs
B. Transient Merchant License Renewal
1. Applicant: JDL Corporation d/b/a/ Shipshewana on the Road
a) Event: Shipshewana on the Road Gift, Food, and Craft Show
b) Location: Convention Hall & Discovery Ball Room, Century Center
c) Description: Gifts, Clothing, Furniture, Food and Craft Show
d) Favorable Recommendations
11. STREET/ALLEY VACATIONS
A. Applicant: Roger Woodard and Mark Hubbard
1. Location: First East/West Alley between St. Vincent St. and Howard St. from
St. Louis Blvd. to First North/South Alley
2. Purpose: Revised due to Information missing from previous Application
3. Engineering and Community Investment state Vacation request violates Three
(3) Criteria of IC 36-7-3-13
12. TRAFFIC CONTROL DEVICES
A. New Installation – Honorary Street Sign
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
MEETING
November 24, 2020 – 9:30 a.m.
Link to Virtual Meeting: https://tinyurl.com/BPW-11242020
GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR
Page 6
1. Description: Placement of Honorary Street Sign for James Charles Trotter, Sr.
(Frankie’s Barbeque Owner)
2. Location: Corner of W. Washington St. and Liston St.
3. All criteria have been met
13. CONSENT TO ANNEXATION AND WAIVER OF RIGHTS TO
REMONSTRATE
A. 51756 Ironwood Rd. – Water/Sewer
B. 53080 Nadine St. – Water/Sewer
C. 53169 Summer Breeze Dr. – Water/Sewer
14. RATIFY BONDS
A. Contractor Bonds
1. Jhonny Pineda, Released effective November 6, 2020
B. Excavation Bonds
1. Elf Excavating LLC, Released effective November 6, 2020
2. Fiber Optic Mgmt. LLC dba Turnkey Network Solutions, Approved effective
November 12, 2020
3. K & S Engineers Inc., Approved effective November 6, 2020
4. Advanced Excavating LLC, Approved effective November 13, 2020
5. Inland Waters Pollution Control, Inc., Approved effective November 13, 2020
C. Occupancy Bonds
1. Custom Awning, Released effective November 6, 2020
2. Davey Tree Expert Company, Released effective November 6, 2020
3. Fiber Optic Mgmt. LLC dba Turnkey Network Solutions, Approved effective
November 12, 2020
4. K & S Engineers Inc., Approved effective November 6, 2020
5. Advanced Excavating LLC, Approved effective November 13, 2020
6. Burkhart Sign Systems, LLC, Approved effective November 12, 2020
7. Inland Waters Pollution Control, Inc., Approved effective November 13, 2020
15. CLAIMS
A. Ratify City of South Bend Claims
1. Claim Nos.: GBN-7663, GBN-7662, GBN-7512/7803
1) Date: 11/10/2020
2) Amount: $1,286,704.38
2. Claim Nos.: GBN-7876, GBN-7937, GBN-7901, GBN-7936
3) Date: 11/17/2020
4) Amount: $1,962,713.60
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
MEETING
November 24, 2020 – 9:30 a.m.
Link to Virtual Meeting: https://tinyurl.com/BPW-11242020
GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR
Page 7
16. PRIVILEGE OF THE FLOOR
17. ADJOURNMENT
NOTICE
FOR HEARING AND SIGHT IMPAIRED PERSONS
Auxiliary Aid or Other Services are Available upon Request at No Charge.
Please Give Reasonable Advance Request when Possible.