HomeMy WebLinkAboutChange Order Nos 4 & 5 - Corby, Ironwood, Rockne Intersection Improvements - Rieth-Riley Construction1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS November 10, 2020 Mr. Joshua McCormick Rieth-Riley Construction Co., Inc. 25200 State Road 23 South Bend, IN 46614 j mcc ormickgrieth-rile, PHoNE 574/235-9251 FAx 574/235-9171 RE: Change Order Nos. 4 & 5 — Corby, Ironwood, Rockne Intersection Improvements Project No. 116-034 Dear Mr. McCormick: The Board of Public Works, at its meeting held on November 10, 2020, approved the Change Order No. 4 for an increase of $1,592.85, bringing that current contract amount to $3,137,321.85. The Board of Public Works also approved the Change Order No. 5 for an increase of $12,327.92, bringing the current contract total amount to $3,148,056.92. Enclosed is a copy of the Change Orders for your records. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, s/Linda M. Martin, Clerk Enclosure GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR CITY OF SOUTH BEND DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Board of Public Works FROM: Leslie Biek, PE SUBJECT: Corby Ironwood and Rockne Change Orders 4 & 5 DATE: 10/15/2020 Attached you will find two change orders for the federally funded Corby Ironwood and Rockne Intersection Improvement project (PN 116-034). Change Order # 4 is for an additional $1,592.85 to change out 8 signal head visors on Rockne after it was installed and to remove the banner arms from the streetlights after instillation. Change Order # 5 is for an additional $12,327.82 to repair irrigation lines that were damaged during construction. Both changes orders 4 and 5 are not federally participating and as a result will be 100% locally funded. It is requested the Board of Public Works approve Change Orders 4 and 5 for the Corby, Ironwood and Rockne project (PN 116-034) for an increase of $13,920.77 bringing the new contract price to $3,176,582.47. Thank you for your consideration of this request. Contract No:R -39540 Change Order No.: 004 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -39540 Letting Date:03,104/2020 District:LAPORTE DISTRICT AE:Patterson, Patrick PE/S:Wills, Dale Status:Pending Change Order Information Change Order No.: 004 EWA: Y or Force Acct: N Date Generated: 09/29/2020 Date Approved: 00i00/0000 Reason Code: ERRORS & OMISSIONS, Spec Related Description: Added Traffic Signal Head & Light Pole Work Original Contract Amount $ 3,135,729.00 Current Change Order Amount $ 1,592.85 Percent: 0.051 % Total Previous Approved Changes $ 0.00 Percent: 0.000 % Total Change To -Date $ 1,592.85 Percent: 0.051 % Modified Contract Amount $ 3,137,321.85 Time Extension Information Date Initiated 00/00/0000 Date Completed 00/00/0000 Original Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) Time Element Description: Current Time Extension SS Days 0 SP Days 0 SP Days Value $ 0.00 Previous Time Approved SS Days by AE:___ DCE: SCE: DDCM: SS Days SP Days Value $ Revised Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SS Date 00/00/0000 or SP Days 0 Contract No:R -39540 INDIANA Department of Transportation Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority ($ per Change Order) (Days per Contract) Verbal Approval Required? Total Change To-Date>5%? Scope/Design Recommendation Required? Change Order No.: 004 Page: 2 AE: DCE: SCE: * DDCM: (-LE$250K-)(-LE$750K-)(--LE$2M--)(--GT$2M--) ( 50 SS days) ( 100 SS days ) ( 200 SS Days } ( GT 200 SS days) Y / N If Y, by Date Issued Y / N If Y, Copy to Program Budget Manager Y / N If Y, Referred to Project Manager(PM) Date to PM Approval Authority Concurs with PM? Y / N If Y, Concurrence by If N,Resolution: Approved LPA Signatures Required? Resolved by Y / N If Y, Date to LPA Date Returned Date Disapproved_ Date Date Retumed FHWA Signatures Required? Y / N If Y, Date to FHWA Date Returned * Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Comments: Date Contract No:R -39540 Change Order No:004 INDIANA Department of Transportation Date:09/29/2020 Contract: R -39540 Project: 1600074 - State:160007400LC4 Change Order Nbr: 004 Change Order Description: Added Traffic Signal Head & Light Pole Work Reason Code: ERRORS & OMISSIONS, Spec Related CLN PCN PLN Item Code Unit Unit Price CO Qty Comment Amount Change Page: 3 0150 1600074 0150 105-06807 LS 1,592.850 1.000 C Amcurt:$ 1,592,85 Item Description: ADDITIONAL Supplemental Descrlption1: Traffic Signal Head Visor and Ught Pole Banner Arm Work Supplemental Description2: Total Value for Change Order 004 = $1,592.85 Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation The City of South Bend requested that the traffic signal head visors be changed for the Rockne Df, eastbound signals. New visors were provided by the City. The cost to do this work was $565.19. The City of South Bend also requested that the light pole banner mounting brackets be removed from the light poles. The cost to do this work was $1,027.66. Change Order Explanation for Specific Line Item 1T1YfftTRY##Y#1rtYf#Y/Yt •f!Y/f a f!Y•fiYYffM f##f f Yf /f ff •!#/Rf iff f-fY##Y##ftiNYNYHitx#t11 k#Y#f Yi#Rf ffR#MY#f### #HY###Ytt Y#tvY It is the intent of the parties that this change order is full and complete compensation for the work describe above. Notification and consent to this change order is hereby acknowledged. / Contractor: 1 Cr Signed By: )C Date: 36 - Zo NOTE: Other required State and FH WA signatures will be obtained electronicaily through the SkeManager system. Contract No:R -39540 INDIANA Date:09/29/2020 Change Order No:004 Department of Transportation Page: 4 tHflHlM!!H!fltHYHr!!flrtf!};*rfr'Iff11fAtrNY+'+rHfHtHHtH+HRrHr+rN#rrr+6+rk+++fAxHtx++irH11aH H+r+H+H rH+iH e BOARD OF PUBLIC WORKS APPROVED FOR LOCAL PUBLIC AGENCY C Gary A. Giloy Preaidem -&;A ,:Wk Blizabelh A. M—dik, Member ,-- 7'rZ_ JosephR. Mdh Member Therese J. JNrcao, Member Jordan V. Gathers, Member ATTEST: Z"& Cw.vx Linda M. Martiq Clerk SUBMITTED FOR CONSIDERATION HfHH rr+rrrw HHHrHHHrrr+r+++rfH rrr• Hrr*f arfrrw •wHff+rt HHw+frrH.+twrf++rrw r++:+++++Y+• w H k++f a Y rrw+rw++l+++Y+ff t November 10, 2020 (DATE) (DATE) APPROVED FOR fNDIANA DEPARTMENT OF TRANSPORTATION Approval Level Name of Approver Date Status Project Engineer/Supervisor Patterson, Patrick 00/00/0000 Action Pending 1ETHj ILEY CONSTRUCTION CO., INC. 1000/o Quality • 100% Employee Owned • Over 100 Years September 21, 2020 Mr. Dale Wills Lochmueller Group 112 W Jefferson Blvd Suite S00, South Bend, IN 46601 RE: R-39540-A, Remove Banner Arms Dear Mr. Wills The total cost for the work associated with removing the banner arms off the light poles was as follows. Total amount requested = $1,027.66 Please consider this as our formal request for a Change Order to add this work to the contract. Please let me know if you have any questions. Thank you for your consideration on this matter. Respectfully Submitted, Jamie Plunkett Project Manager Rieth Riley Construction Company 25200 S.R. 23 • South Bend, IN 46614 Phone: (574) 288-8321 • www.neth-riley.com CHANGE ORDER REQUEST FORM CONTRACT R-38540 DATE OF :3eptellnber'' NO. SUBMISSION 21, NOTE: Upon request from Engineer, enter detailed description on page 2. ONSET DATE OF CHANGE AmOuSt 2020 CHANGE ORDER TYPE %104:03 ExtraWork:.; PROPOSED COST AND TIME ADJUSTMENT COST COST INCREASE / (DECREASE): $ 1,.027.66'. The cost adjustment shall include lump sum and estimated totaled unit -priced item costs. Attach a separate sheet of unit price Items including item description, unit of measurement, estimated quantity and unit price. CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF COST CHANGE: D 109.03 Altered Qyantitles 13-109.05(a} Agreed price ®109.05(b) Force Account D 109.05.OZ.DelayGosts.. PROPOSED COST CHANGE INCLUDES: 0.1abor 0.0aterial 0 quipmerit . Q Lease Agreement Subcontractor TIME ADJUSTMENT INCREASE/(DECREASE): (work days)N/A CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF TIME CHANGE: i].108.OS(aj Excusable, ln-Cornpensable.'_ .08(b) Excusable, Compensable NOTE: if Compensabk, attach details based on 109.m.2(a) Allowable Delay Costs. SUPPLEMENTAL INFORMATION Additinnal Informatinn may ha s+nfamd by tha rnntr�.tn� CHANGE ORDER ORIGINATION: t INDOT-/ LPA .:: 0 Contractor '--_ DOCUMENTS AFFECTED: ❑ Contract Specifications (ref. doc name/no.) Clic .here to enter text ❑ Contract Plans (ref. doc name/no.) Clli here to enter text- . CHANGE ORDER AFFECTS DBE PARTICIPATION: ❑ yes ® no (if yes, attach details) Ver. 10.23.17 CHANGE ORDER REQUEST FORM CONTRACT NO. R:39540 UPON WRITTEN REQUEST FROM THE ENGINEER, PROVIDE ADDITIONAL DETAIL DATE RECEIVED REQUEST FOR [Select Date] SUBMITTAL DATE OF [Select Date] ADDITIONAL DETAIL ADDITIONAL DETAIL DETAILED DESCRIPTION / JUSTIFICATION: (include location(s), actions of contractor, owner, and other stakeholders, key events and related cause(s), discoveries, discussions, meetings, and effect on the contract if no action is taken. Also include references to key documents attached or available to support this change order request.) Click hereto 9nter.text. PROPOSED SOLUTION — ADDITIONAL DETAILS: (include proposed scope of work, means & methods, materials, equipment, utility relocation required, subcontracted scope and the effect on the contract schedule. Also include references to attached documents including, but not limited to, sketches, calculations, photos, material information, and submittals and meeting minutes.) Click herd to entertext SIGNATURES Contractor: _yy Name: (print) J (signature) Date: 6t ^ 2 1 - zo 20 Project Engineer/Supervisor: (signature is to acknowledge receipt of the document and does not signify agreement of the change order) Name: (print) (signature) NOTE. The Contractor and PENS should retain a signed copy of this document for record. Date: pg. 2 CHANGE ORDER REQUEST FORM CONTRACT NO. R=39540 :. ATTACHMENT; UNIT PRICE ITEMS DETAIL Attach or paste a unit price item detail. pg. 3 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 9/22/20 WORK PERFORMED: Hawk, Removed flag banners CONTRACT: 39540 PROJECT: 39540 FORCE ACCOUNT/EXTRA WORK FOR: Ironwood and Corby Hawk removed flag banners off of each light pole. LABOR 109.05 (b)(11 Hnl IRS EMPLOYEE Regular Overtime Doublebme TOTAL RATE EXTENSION ENGINEER 0.00 $35.00 $0.00 FINISHER, CRAFT FOREMAN ELKHART/ST JOE 0.00 $35.15 $0.00 FINISHER, CRAFT FOREMAN LAPORTE 0.00 $36.59 $0.00 FINISHER, JOURNEYMAN ELKHART/ST JOE 0.00 $32.90 $0.00 FINISHER, JOURNEYMAN LAPORTE 0.00 S33.59 $0.00 FOREMAN, LABORER,ELKHART/ ST. JOSEPH 0.00 0.00 S43.20 $0.00 FOREMAN, ESOP 0.00 S44.20 $0.00 FOREMAN, FINISHER. ELKHART / ST. JOSEPH 0.00 S35.15 $0.00 FOREMAN, FINISHER, LAPORTE 0.00 $36.59 $0.00 FOREMAN, LABORER, LAPORTE 0.00 $43.20 $0.00 LABORER, ELKHART/ ST. JOSEPH 0.00 0.00 $26.10 $0.00 LABORER, LAPORTE 1 0.00 $31.91 $0.00 MECHANIC 0.00 $42.20 $0.00 OPERATOR, ELKHART 0.00 $31.15 $0.00 OPERATOR, LAPORTE / ST. JOSEPH 1 0.00 S42-20i 0.00 QA TECH 0.00 $26.10 $0.00 PROJECT SUPERINTENDENT 0.00 S50.00 $0.00 TEAMSTER 0.00 $30.91 $0.00 FRINGES TOTAL LABOR $0.00 (2) FICA 7.50 % x LINE (2j $0.00 (3) EMPLOYEE HOURS RATE EXTENSION ENGINEER 0.00 x $12.79 = $0.00 FINISHER, CRAFT FOREMAN ELKHART/ST JOE 0.00 X $15.60 = $0.00 FINISHER, CRAFT FOREMAN LAPORTE 0.00 X $23.14 = $0.00 FINISHER, JOURNEYMAN ELKHART/ST JOE 0.00 X $15.60 - $0.00 FINISHER, JOURNEYMAN LAPORTE 0.00 x $23.14 = $0.00 FOREMAN, LABORER,ELKHART/ ST. JOSEPH 0.00 x $36.10 = $0.00 FOREMAN, ESOP 0.00 X $36.10 = $0.00 FOREMAN, FINISHER, ELKHART/ ST. JOSEPH 0.00 X $15.60 = $0.00 FOREMAN, FINISHER, LAPORTE 0.00 x $23.14 = $0.00 FOREMAN, LABORER, LAPORTE 0.00 x $36.10 = $0.00 LABORER, ELKHART/ ST. JOSEPH 0.00 x $16.38 = $0.00 LABORER. LAPORTE 0.00 x $20.74 - $0.00 MECHANIC 0.00 X $36.101 CM OPERATOR, ELKHART 0-00 X $30.21 = $0.00 OPERATOR, LAPORTE / ST. JOSEPH 0.00 x $36.10 = $0.00 QA TECH 0.00 x $16.38 = $0,00 PROJECT SUPERINTENDENT 0.00 x $12.79 = $0.00 TEAMSTER 0.00 x $16.54 = $0.00 TOTAL FRINGES $0,00 (4) WORKERS COMPENSATION 5.72 % X LINE (2) $0.00 (5) BODILY INJURY/ PROPERTY DAMAGE INSURANCE 5.80 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT 3.85 % X LINE (2) $0.00 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $0.00 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5. 6, 7, 8 & 9 $0.00 (10) 20 % x LINE (10) $0.00 (11) GRAND TOTAL LABOR LINES (10), (11) $0.00 (12) Page 1 of 2 MATERIAL 109.05 (b)(3) Purchased or Manufactured Description Quantity Unit Unit Price Extenstion $ 240.00 $ $ $ $ $ $ s $ $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18) + (19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) S0.00 (21) $0.00 (22) Equipment N CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION $0.00 $0.00 0.00 $0.00 $o.00 $0.00 $0.00 $0.00 $0.00 SO.00 $0.00 S0.00 $0.00 S0.00 $0.00 S0.00 $0.00 S0.00 Trucking - Striaght Time $0.00 S0.00 Trucking -Over Time $0.00 $0.00 Trucking - Double Time $0.00 0. 00 TOTAL EQUIPMENT S0.00 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $0.00 (26) 12 % x LINE (26) S0.00 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $0.00 (28) SUBCONTRACTORS 109.05 (b)(6) Removed TOTAL SUBCONTRACT WEEK ENDING 7 % x LINE (30) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) TOTAL OF WORK COMPLETED FOR THE WEEK $948.95 (29) $66.43 (31) $0.00 (32) $1,015.38 (33) TOTAL LINES (12). (17), (22), (28) 8 (33) $1 ,015.38 (34) 1.1 % OF BOND RATE BASED UPON LINE (34) $11.17 (35) 10 % x LINE (35) S1.12 (36) TOTAL EXTRA WORK LINES: (34)+ (35)+ (36) $1,027.66 (37) Page 2 of 2 ` Remove banner arms off of light poles. Rates Updated: LaborOZ. Hours Rate Burdens Total General Foreman $57.47 $33.66 $91.13 Foreman 4 $50.38 $30.35 $80.73 Lineman $45.98 $28.29 $74.27 Equipment Operator $45.98 $28.29 $74.27 Groundman Equip.Operator 4 $44.53 $27.61 $72.14 Senior Groundman Truck Driver $31.88 $21.70 $53.68 Groundman $26.56 $19.21 $45.77 E_Quipment Rates Updated: 1/2119 Labor Total Description Hours Rate On -Highway Light Duty Truck $21.88 On -Highway Flatbed Truck $34.10 On -Highway Rear Dump $40,18 Wheel Mtd. Hyd. Excavator $95.45 Truck w/ Articulating Lift 4 $48.03 Truck w/ Teleoscopic Lift $58.58 Trailer $11.16 Skid Steer Loader $32.91 Generator $5.40 Cut-off Saw $2.64 Conduit Bender $8.01 Air Compressor $17.36 Walk -Behind Saw $22.31 Crack Filler (Loop ) $10.27 Directional Boring Machine $93.43 Boring Truck $47,57 INNO 1ZR fusion splice kit $10,22 EXFO Fiber inspection pro $5.78 EXFO 720C $8.04 INTECH 8x12 TA2 $15.28 Material 1 2. 3. 4. 5. 6. Description Sub Totals Labor Total $611.48 Equipment Total $192.12 Material Total $0.00 Equipment Total Quantity Cost Material Total + mark-up $122.30 $23.05 $0.00 Total: 1/1/2020 Subtotal $0.00 $322.92 $0.00 $0.00 $288.56 $0.00 $0.00 $611.48 Extension $0.00 $0.00 $0.00 $0.00 $192.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $192.12 Extension $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $733.78 $215.17 $0.00 $948.95 Amho EquipmentlNatch- www.equlpm entwalch.00m All prices shown in US dollars ($) Adjustments for 4M9-B in All Saved Models September21 2020 Miscellaneous 68150 Articulating Boom Aerial Lifts For Truck Mounting g y Size Class: 41-Nft Weigh: NIA Configuration for Ba150 Boom Conflguratlon Overcenter Material Handling No Maximum Platform Height 41.0. 50.0 ft Blue Book Rates FHWA Rate Is equal to the monthly ownership coat d vided by 176 plus the heady esdmated operating cost. Ownership Cost$ Estimated FHWA Rate - Operating Costs Monthly Weekly Daily Hourly Hourly Hourly Published stales USD $1,995.00 U57 $500.00 USD $140.00 USD $21.00 USD $3.94 USD $15.28 Adjustments Region (Indlana: 99%) (USD $19.96) (USD $5.60) (USD $1.40) (USD $0.21) Model Yea (USD $142.91) (USD $40.12) (USD $10.03) (USD $1.H0) (2009: 92.76%) Adjusted Hourly - - - - Owneaship Cost (100%) Hourly Op9miling Cost (1001%) Total: USD $1,832.14 USD $614.28 USD $128.57 USD $19.29 USD $3.94 USD $14.35 Nan -Active Use Rates Hourly Standby Rate USD $5.20 Idling Rate USD $10.41 Rate Element Allocation Element Dep eclation (ownership) Overhaul (ownemhfp) CFO (ownership) Indirect (ownership) Revised Date: 2nd half 2020 Percentage 56% 22% 4% 131% Fuel cost data Is not available for these rates. value USO $1,318.70/mo USD S438.90/mo USD $79.80/mo USD $159.60Im0 These are the most accurate rates for the selected Revision Date(s). However, due to more frequent online updates, these rates may nut match Rental Rate Bkre Book Print. Visit the Coat Recovery Product Guide on our Help page for more information. The equipment represented in this report has been exclusively prepared for MARY MASTRANTONIQ (mary@hawk-inc.com) All material herein 02003-2020 Informa All rights reserved. IETH! IL E Y CONSTRUCTION CO., INc. 100% Quality • 100% Employee Owned • Over 100 Years September 22, 2020 Mr. Dale Wills Lochmueller Group 112 W Jefferson Blvd Suite S00, South Bend, IN 46601 RE: R-39540-A, Install Tunnel Visors Dear Mr. Wills The total cost for the work associated with installing tunnel visors was as follows. Total amount requested = $565.19 Please consider this as our formal request for a Change Order to add this work to the contract. Please let me know if you have any questions. Thank you for your consideration on this matter. Respectfully Submitted, Jamie Plunkett Project Manager Rieth Riley Construction Company 25200 S.R. 23 • South Bend. IN 46614 Phone: (574) 288-8321 • www.rieth-ritey.com CHANGE ORDER REQUEST FORM CONTRACT 0 DATE OF September NO. SUBMISSION 22,2020 NOTE: Upon request from Engineer, enter detailed description on page 2. ONSET DATE OF CHANGE September_.1, 2020 CHANGE ORDER TYPE F 104.03 Extra Work PROPOSED COST AND TIME ADJUSTMENT COST COST INCREASE / (DECREASE): $ 565.19: The cost adjustment shall include lump sum and estimated totaled unit -priced item costs. Attach a separate sheet of unit price items including item description, unit of measurement, estimated quantity and unit price. CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF COST CHANGE: D 109.03 altered Quantities Q t.09 05(a) Agreed Pnce Z 109.05(b) Force Account {] 109.05.02 Delay Costs. PROPOSED COST CHANGE INCLUDES: Cl Latior Material ; Equipment . ❑Leas*' Agreement Subcontractor TIME ADJUSTMENT INCREASE / (DECREASE): (work days) N/A CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF TIME CHANGE: 0 108.08(a) Excusable Non-CAmpensable-0108.08(b) Excusable, Corn erasable NOTE: if Compensable, attach details based on 109.05.2(a) Allowable Delay Costs. SUPPLEMENTAL INFORMATION Additinnal lnfnrmatinn may hn entered by the nnntrartnr CHANGE ORDER ORIGINATION: ,® .INDOT/-LPA ❑ Contractor . DOCUMENTS AFFECTED: ❑ Contract Sped icatlons (ref. doc name/no.) Caick here to enter ❑ Contract Plans (ref. doc name/no.) Click here W enter text CHANGE ORDER AFFECTS DBE PARTICIPATION: ❑.yes ® no..(Ifyes, attach details) ' Ver. 10.23.17 CHANGE ORDER REQUEST FORM CONTRACT NO. R�3S540. UPON WRITTEN REQUEST FROM THE ENGINEER, PROVIDE ADDITIONAL DETAIL DATE RECEIVED REQUEST FOR " SUBMITTAL DATE OF [$elect Date] [Select Date] ADDITIONAL DETAIL ADDITIONAL DETAIL .. DETAILED DESCRIPTION / JUSTIFICATION: (Include location(s), actions of contractor, owner, and other stakeholders, key events and related cause(s), discoveries, discussions, meetings, and effect on the contract if no action is taken. Also include references to key documents attached or available to support this change order request.) Click here to enter text. PROPOSED SOLUTION — ADDITIONAL DETAILS: (include proposed scope of work, means & methods, materials, equipment, utility relocation required, subcontracted scope and the effect on the contract schedule. Also Include references to attached documents including, but not limited to, sketches, calculations, photos, material information, and submittals and meeting minutes.) click"hefe to: enter text. SIGNATURES Contractor: Name: (pi (signature Date: ' -22 - 2020 Project Engineer/Supervisor: (signature is to acknowledge receipt of the document and does not signify agreement of the change order) Name: (print) (signature) Date: NOTE: The Contractor and PE/5 should retain a signed copy of this document for record. pg. 2 CHANGE ORDER REQUEST FORM CONTRACT NO. R-39540 ATTACHMENT: UNIT PRICE ITEMS DETAIL Attach or paste a unit price item detail. pg. 3 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 9/22/20 WORK PERFORMED Hawk Install Tunnel Visors CONTRACT: 39540 PROJECT: 39540 FORCE ACCOUNT/EXTRA WORK FOR: Ironwood and Corby install tunnel visors provided bV city of south bend. LABOR 109.05 (b)(1) EMPLOYEE Regular Overtime Doublefime TOTAL RATE EXTENSION ENGINEER 0.00 $35.00 $0.00 FINISHER, CRAFT FOREMAN ELKHART/ST JOE 0.00 $35.15 $0.00 FINISHER, CRAFT FOREMAN LAPORTE 0.00 $36.59 $0.00 FINISHER, JOURNEYMAN ELKHART/ST JOE 0.00 S32.90 $0.00 FINISHER, JOURNEYMAN LAPORTE 0.00 $33.59 $0.00 FOREMAN, LABORER,ELKHART/ ST. JOSEPH 0.00 0.00 S43.20 $0.00 FOREMAN, ESOP 0.00 $44.20 $0.00 FOREMAN, FINISHER. ELKHART I ST. JOSEPH 0.00 $35.15 $0.00 FOREMAN, FINISHER, LAPORTE 0.00 $36.59 $0.00 FOREMAN, LABORER, LAPORTE 0.00 $43.20 $0.00 LABORER, ELKHART/ ST JOSEPH 0.00 0.00 S26A0 $0.00 LABORER, LAPORTE 0.00 S31.91 $0.00 MECHANIC 0.00 $42.20 $0.00 OPERATOR, ELKHART 0.00 $31.15 $0.00 OPERATOR, LAPORTE / ST. JOSEPH 0.00 S42.20 $0.00 DATECH 0.00 $26,10 $0.00 PROJECT SUPERINTENDENT 1 0.00 I S50.001 $0.00 TEAMSTER 1 0.00 1 $30-911 $0.00 FRINGES TOTALLABOR FICA 7.50 g; x LINE (2) $0.00 (2) $0.00 (3) EMPLOYEE HOURS RATE EXTENSION ENGINEER 0.00 x $12.79 = $0.00 FINISHER. CRAFT FOREMAN ELKHART/ST JOE 0.00 X $15.60 = $0.00 FINISHER, CRAFT FOREMAN LAPORTE 0.00 X $23.14 = $0.00 FINISHER, JOURNEYMAN ELKHART/ST JOE 0-00 X $15.60 - $0.00 FINISHER, JOURNEYMAN LAPORTE 0.00 X $23.14 = $0.00 FOREMAN, LABORER.ELKHART/ ST. JOSEPH 0.00 X $36.10 = $0.00 FOREMAN, ESOP 0.00 X $36.10 = $0.00 FOREMAN, FINISHER, ELKHART/ ST. JOSEPH 0.00 X $15.60 = $0.00 FOREMAN, FINISHER, LAPORTE 0.00 x $23.14 = $0.00 FOREMAN, LABORER, LAPORTE 0.00 X $36.10 = $0.00 LABORER, ELKHART/ ST. JOSEPH 0.00 X $16.38 - $0.00 LABORER, LAPORTE 0.00 X $20,74 = $0.00 MECHANIC 0.00 X $36.10 = $0.00 OPERATOR, ELKHART 0.00 X $30.21 = $0.00 OPERATOR, LAPORTE / ST. JOSEPH 0.00 X $36.10 = $0.00 CA TECH 0.00 x $16.38 = $0.00 PROJECT SUPERINTENDENT 0.00 x $12.79 = $0.00 TEAMSTERI 0.00 X $16.54 = $0.00 TOTAL FRINGES $0.00 (4) WORKERS COMPENSATION 5.72 % X LINE (2) $0.00 (5) BODILY INJURY PROPERTY DAMAGE INSURANCE 5.80 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT 3.85 % X LINE (2) $0.00 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $0.00 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5. 6, 7, 8 & 9 $0.00 (10) 20 %x LINE (10) $0.00 (11) GRAND TOTAL LABOR LINES (10) + (11) $0.00 (12) Page 1 of 2 MATERIAL 109.05 (b)(3) Purchased or Manufactured Descnption Quantity Unit Unit Price Extenslion $ 240.00 S $ $ $ $ $ s $ s MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18) + (19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment k CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION $0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Trucking - Striaght Time $0.00 S 0.00 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0,00 50.00 SUBCONTRACTORS 109.05 (b)(6) Install Tunnel Visors TOTAL EQUIPMENT $0.00 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $0.00 (26) 12 % x LINE (26) $0.00 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $0.00 (28) TOTAL SUBCONTRACT WEEK ENDING $521.90 (29) 7 % x LINE (30) $36.53 (31) $0.00 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $558.43 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22). (28) & (33) $558.43 (34) 1.i % OF BOND RATE BASED UPON LINE (341 $6.14 (35) 10 % x LINE (35) $0.61 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $565.19 (37) Page 2 of 2 I Route: Section: County. St. Joseph District: q Force Account bill for: Went to LaPorte to get tunnel visors, installed them on NE and EB signals on mast arm Cn b CrJ O r�. Contract 39450 Project: Corbe, Ironwood, & Rockne Payroll Amount Eligible for Mon Tue Wed Thu Fri Total Hours Payroll Earnings Unemployment Tax (D _ September 2020 7 8 9 '10 11 S.T. O.T. Rate Amount To Date F.U.T. S.U.T. Gen_ Foreman 0.0 0.0 $ 57.47 $ $ _ $ O Foreman Jack May 3.5 2.5 1.0 $ 50,38 $ 201 52 $ 82,667.OD $ - $ Foreman 0.0 0.0 $ 50.38 $ g _ $ ►r�1 Journeyman 0.0 0.0 $ 45.98 $ $ _ $ �t Equip Oper 4 0,0 .0 0.0 $ 45.98 $ - $ _ $ • Equip Oper 3 0.0 0.0 $ 44.53 $ F Grm-Skilled 0.0 0.0 $ 36.78 $ - Z Sr Gm Tk Dry 0.0 0.0 $ 31.88 $ - $ $ Subtotals: Labor $ 201.52 $ $ CA Gen. Foreman Pension & Welfare Funds: hours @ 23.46 $ - O Foreman Pension & Welfare Funds: 3.5 hours @ 21,40 $ 74.90 Journeyman Pension & Welfare Funds: hours @ 20.12 $ _ "C Groundman Pension & Welfare Funds: hours @ 17.46 $ _ Trainee Pension & Welfare Funds: hours @ 12.43 $ - 0 Subtotals: Labor $ 276.42 M Plus 20% of $ 276.42 $ 55.28 N �+ Subtotals: Labor $$ 331.70 zo Plus Workman's Comp. Insurance 2.649% of $ 176.33 $4.67 Public Liability and Property Damage tv Insurance, excluding payroll of 0 Truck Drivers O Federal Unemployment Tax 0.60% of $ - $0.00 State Unemployment Tax 7.400% of $ - $0.00 Federal Social Security Tax 7.65% of $ 201.52 $15,42 Total Payroll Additives $26.09 Fes-+ Plus 10% of $ 20.09 $2.01 cr $22.10 $22.10 Total Labor $3.53.80 N I hereby certify that the above statement is a copy of that portion of the payroll which applies to the above state work, and that the rates shown C for taxes and insurance are actual costs. to (Signed) (Signed) .14 (Res. Engineer) V (Contractor) X I '0 a -I (61 Tota I Equipment Expense 7 8 9 10 11 Hours Rate Amount Bucket Truck 3.5 3.5 $ 33.68 S 117.88 Articulating Boom 3.5 3.5 $ 14,35 $ 50.23 0 $ 0 $ - 0 $ 0 $ _ 0 $ 0 $ - 0 $ 0 $ _ 0 g _ 0 $ 0 $ C $ _ 0 $ _ 0 $ _ 0 $ _ Total Equipment Expense $ 168.11 Subcontractor Expense S - Subtotal, Subcontractor $ - Plus 12% of $ _ $ - Total Subcontractor $ This is to certify that the material entered on this force account bill which was taken from stock Is shown at our cost. Hawk Enterprises, Inc. (Company) By: Total Labor: $ 353.80 Total Equipment Expense: $ 168.11 Total Subcontractor: $ _ Total: S 521.90 Bond: 0.75% Plus 10% of: $ Total Bill: $ 521.90 Resident SNi'ERPAtFliS lIJ�. 1850 E. North Street Crown Point, IN 46507 Q I I " Q2aIr j , Contractor Report No. Dlwc 11 ^Z.3 Authorization No. Extra Work Da 'Reliort County S-T 311-�=' 0 Route -�. �J� L,->Ocr� Disvl,t 3959 o Convact No. Job No. Project - EQUIP ENT USED MATERIAL USED Description: Number of List MBrtufacturar Model Date_ Capacity Hours _ Description Quantrry REMARKS: APPROVE �/� APPROVED: ontractvr's Represent"' i State's Represenrative 3 C 535 t Rev 6-77) L 494- 0426 Original: Constractur M. Distrct He CC: District no mAgr-All,j i Contract No:R -39540 Change Order No.: 005 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -39540 Letting Date:03/04/2020 District:LAPORTE DISTRICT AE:Patterson, Patrick PE/S:Wills, Dale Status:Pending Change Order Information Change Order No.: 005 EWA: Y or Force Acct: N Date Generated: 09/29/2020 Date Approved: 00/00/0000 Reason Code: ERRORS & OMISSIONS, Special Prov Related Description: Lawn Irrigation Repair Work Original Contract Amount $ 3,135,729.00 Current Change Order Amount $ 12,327.92 Percent: 0.393 % Total Previous Approved Changes $ 0.00 Percent: 0.000 % Total Change To -Date $ 12,327.92 Percent: 0.393 % Modified Contract Amount $ 3,148,056.92 Time Extension Information Date Initiated 00/00/0000 Date Completed 00/00/0000 Original Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) Time Element Description: Current Time Extension Previous Time Approved Revised Contract Time SS Days 0 SP Days 0 SS Days by AE: DCE SS Days SP Days Value $ 0.00 SCE: DDCM: SP Days Value $ SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SS Date 00/00/0000 or SP Days 0 Contract No:R -39540 INDIANA Department of Transportation Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority ($ per Change Order) (Days per Contract) Verbal Approval Required? Total Change To-Date>5%? Scope/Design Recommendation Required? Change Order No.: 005 Page: 2 AE: DCE: SCE: * DDCM: (-LE$250K-)(-LE$750K-)(--LE$2M--)(--GT$2M--) ( 50 SS days) ( 100 SS days) ( 200 SS Days) ( GT 200 SS days) Y / N If Y, by Date Issued Y / N If Y , Copy to Program Budget Manager Y / N If Y, Referred to Project Manager(PM) Date to PM Approval Authority Concurs with PM? Y / N If Y, Concurrence by If N,Resolution: Approved LPA Signatures Required? Resolved by Y / N If Y, Date to LPA Date Returned Date FHWA Signatures Required? Y / N If Y, Date to FHWA * Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: Disapproved Date Date Returned Date Returned Contract No:R -39540 INDIANA Date:09/29/2020 Change Order No:005 Contract: R -39540 Department of Transportation Project: 1600074 - State:160007400LC4 Change Order Nbr: 005 Change Order Description: Lawn Irrigation Repair Work Reason Code: ERRORS & OMISSIONS, Special Prov Related Page: 3 CLN PCN PLN Item Code Unit Unit Price CO oty Comment Amount Change 0151 1600074 0151 105-06807 LS 12,327.920 1.000 C Amount:$ 12,a27.92 Item Description: ADDITIONAL Supplemental Descriptionl: Lawn Irrigation Repairs Supplemental Descriptlon2: Total Value for Change Order 005 = $ 12,327.92 Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation Lawn Irrigation repairs were needed due to several homeowner and church private irrigation systems being damaged because of excavation and new construction of sidewalks and drives for the project. There was no allowance in the contract for this work and nothing was covered in the Special Provisions. Property owners were also not compensated to repair their sprinkler lines in the property agreements for temporary right-of-way areas. Change Order Explanation for Specific Line Item •f#M!i!r*iHY*#*#Y*tt**i*tf#**f!f*!1*re**t�iiiiti 4t##iY#lt+i kiff iMl+PYft+ktt#i*t*flit*fitHttfiitiHt+*itf H*t*tt*Hlttff Mi*f It is the intent of the parties that this change order is full and complete compensation for the work describe above. Notiflcatlon and consent to this change order is hereby acknowledged. Contractor:� �t �C— Signed By: ! �� Date:_ 7 - 2 r - W20 lftf►Htf 11H*lfifftHt Hf+Hl+ xf+f+t#!1rf■YHttt1H#f itittitlH#Yi!!i—*fittl.t*#A Ht1H#1ti-!+f t4i....t'iHtfif►tHt —*.— NOTE: Other requxed State and FHWA signatures will be obtained electronically through the SiteManager system. Contract No:R -39540 INDIANA Change Order No:005 Department of Transportation wwrwwwwwrwwwwwwrwrwrwrrwrwwrrwrwrwwwwwwwwrrrwwwrwrwrwrwwrwrrwrwrrwrrwrwwrwrwrr«wrwwwwwwww««rrwwrrrw«wrrrrrrrrrrrrrrrwrrrrr«w BOARD oePUBLIC WORKS APPROVpn Fnp I Or.A1 Pl IRI I('. ArFNrY Gary A. Glot, Presidem Therese J. D.., Member E i -bath A. Mecedik, MG.bu Jordee V. Gathers, Member ATTEST: 01 (1 11, Joseph A Mol—o M—be N Linda M. Martin, Clerk PErs -0 0 SUBMITTED FOR CONSIDERATION Date:09/29/2020 Page: 4 November 10, 2020 (DATE) (DATE) APPROVED FOR INDIANA DEPARTMENT OF TRANSPORTATION Approval Level,. pp Name of Approver Date Status Project Engineer/Supervisor Patterson, Patrick 00/00/0000 Action Pending 1ETHj IL E Y CONSTRUCTION CO., INc. 100% Quality • 100% Employee Owned • Over 100 Years September 18, 2020 Mr. Dale Wills Lochmueller Group 112 W Jefferson Blvd Suite S00, South Bend, IN 46601 RE: R-39S40-A, Irrigation Work Dear Mr. Wills The following is the cost for the done in repairing the irrigation systems as needed on the project. Cost include all of WISSCO's work and Rieth Riley installing Sleeves under the walk that WISSCO provided the material for. Included with this letter is a break down of charges per property address. Total amount requested = $12,327.92 Please let me know if you have any questions. Thank you for your consideration on this matter. Respectfully Submitted, 11L4A&- Jamie Plunkett Project Manager Rieth Riley Construction Company 25200 S. R. 23 • South Bend. IN 46614 Phone: (574) 288-8321 • www.neth-riley.com CHANGE ORDER REQUEST FORM ONSET DATE OF CHANGE June 95, 2020 CHANGE ORDER TYPE :104,Oi IF16a Work PROPOSED COST AND TIME ADJUSTMENT COST COST INCREASE / (DECREASE): $ :.22,327.92. The cost adjustment shall include lump sum and estimated totaled unit -priced item costs. Attach a separate sheet of unit price items Including item description, unit of measurement, estimated quantity and unit price. CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF COST CHANGE: ❑ 109.03Altered C�uantitles ❑ ib9 05(a) Agreed Price ® 109 05(b) Force Account. .❑ 109.05.02 Delay Costs.:_: PROPOSED COST CHANGE INCLUDES: ❑Labor ❑ MaCeria! fO Equipment p Lease Agreement Subcontractor: TIME ADJUSTMENT INCREASE / (DECREASE): (work days) N/A CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF TIME CHANGE: ❑ 108 08(a} Excusable;Ncn-Compensable 11.109.08(b) Excusable, Compensable. NOTE: If Compensable, attach details based on .109.05.2(a) Allowable Delay Costs. SUPPLEMENTAL INFORMATION Additional information may be entered by the contractor. CHANGE ORDER ORIGINATION: ® IND07/ LPA CI Contractor DOCUMENTS AFFECTED: ❑ Contract Specifications (ref. doc name/no.) CIldc.here to entertexL ❑ Contract Plans (ref. doc name/no.) CHANGE ORDER AFFECTS DBE PARTICIPATION: Click here to enter text. - ❑ yes N no (if yes, attach details) Ver. 10.23.17 CHANGE ORDER REQUEST FORM CONTRACT NO. R-39540 . . UPON WRITTEN REQUEST FROM THE ENGINEER, PROVIDE ADDITIONAL DETAIL DATE RECEIVED REQUEST FOR [Select Date] :. SUBMITTAL DATE OF [Select Date] ADDITIONAL DETAIL ADDITIONAL DETAIL DETAILED DESCRIPTION / JUSTIFICATION: (include location(s), actions of contractor, owner, and other stakeholders, key events and related cause(s), discoveries, discussions, meetings, and effect on the contract if no action is taken. Also include references to key documents attached or available to support this change order request.) CIPA here tgenter text. - PROPOSED SOLUTION — ADDITIONAL DETAILS: (include proposed scope of work, means & methods, materials, equipment, utility relocation required, subcontracted scope and the effect on the contract schedule. Also include references to attached documents including, but not limited to, sketches, calculations, photos, material information, and submittals and meeting minutes.) Cl" here to enter.text: SIGNATURES Contractor: Name: (print) Avw1 (signature) Date: Project Engineer/Supervisor: (signature is to acknowledge receipt of the document and does not signify agreement of the change order) Name: (print) (signature) Date: NOTE. The Contractor and PE/S should retain a signed copy of this document for record. pg- 2 CHANGE ORDER REQUEST FORM CONTRACT NO. R 39540 ATTACHMENT: UNIT PRICE ITEMS DETAIL Attach or paste a unit price item detail. peg. 3 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 9/18120 WORK PERFORMED: various irrigation repairs within RAN CONTRACT: 39540 PROJECT: 39540 FORCE ACCOUNT/EXTRA WORK FOR City of South Bend various dates an locations. WISSCO reparied irrigation lines that were inside the R/W. Rieth Riley placed PVC Sleeves under walks accordingly. LABOR 109.05 (b)(1) HOURS EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION ENGINEER 0.00 $35.00 $0.00 FINISHER, CRAFT FOREMAN ELKHART/ST JOE 0.00 $35.15 $0.00 FINISHER, CRAFT FOREMAN LAPORTE 0.00 S36.59 $0.00 FINISHER, JOURNEYMAN ELKHART/8T JOE 0.00 S32.90 $0.00 FINISHER, JOURNEYMAN LAPORTE 0.00 S33.59 $0.00 FOREMAN, LABORER,ELKHART/ ST. JOSEPH 1.00 1.00 $43.20 $43.20 FOREMAN, ESOP 0.00 S44.20 $0.00 FOREMAN, FINISHER, ELKHARTIST. JOSEPH 0.00 $35.15 $0.00 FOREMAN, FINISHER, LAPORTE 0.00 $36.59 $0.00 FOREMAN, LABORER, LAPORTE 0.00 S43.20 $0.00 LABORER, ELKHART/ ST. JOSEPH 1.00 1.00 $26.10 $26.10 LABORER, LAPORTE 0.00 $31.91 $0.00 MECHANIC 0.00 $42.20 $0.00 OPERATOR, ELKHART 0.00 $31.15 $0.00 OPERATOR, LAPORTE / ST. JOSEPH 1,00 1.00 $42.20 $42.20 QA TECH 0.00 $26.10 $0.00 PROJECT SUPERINTENDENT 0.00 S50.0ol $0.00 TEAMSTER 0.00 1 SM911 $0.00 FRINGES TOTAL LABOR $111 .50 (2) FICA 7.50 % x LINE (2) $8.36 (3) EMPLOYEE HOURS RATE EXTENSION ENGINEER 0.00 X $12.79 = $0.00 FINISHER, CRAFT FOREMAN ELKHART/ST JOE 0.00 X $15.60 = $0.00 FINISHER, CRAFT FOREMAN LAPORTE 0.00 X $23.14 = $0.00 FINISHER. JOURNEYMAN ELKHARTIST JOE 0,00 X $15.60 - $0.00 FINISHER, JOURNEYMAN LAPORTE 0,00 X $23.14 = $0.00 FOREMAN, LABORER,ELKHART/ ST. JOSEPH 1.00 X 36.101 $36.10 FOREMAN, ESOP 0.00 X $36.10 = $0.00 FOREMAN, FINISHER, ELKHART/ ST JOSEPH 0.00 X $15.60 = $0.00 FOREMAN, FINISHER, LAPORTE 0.00 X $23.14 = $0.00 FOREMAN, LABORER, LAPORTE 0.00 X $36.10 = $0.00 LABORER, ELKHART/ ST. JOSEPH 1.00 X $16.38 - $16.38 LABORER, LAPORTE 0.00 X $20.74 = $0.00 MECHANIC 0.00 X $36.10 = $0.00 OPERATOR, ELKHART 0-00 X $30.21 = $0-00 OPERATOR, LAPORTE/ST, JOSEPH 1.00 X $36.101 $36.10 OA TECH 0.00 X $1&381 $0.00 PROJECT SUPERINTENDENT 0.00 X $12.791 $0.00 TEAMSTER 0.00 X $16,541 $0.00 TOTAL FRINGES $88.58 (4) WORKERS COMPENSATION 5.72 % X LINE (2) $6.38 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE 5.80 % X LINE (2) $6.47 (6) STATE UNEMPLOYMENT 3.85 % X LINE (2) $4.29 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $0.45 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 8 9 $226.03 (10) 20 %x LINE (10) $45.21 (11) GRAND TOTAL LABOR LINES (10) + (11) $271 .23 (12) Page 1 of 2 MATERIAL 109.05 (b)(3) Purchased or Manufactured Description Quantity Unit Unit Price Extenstion $ 240.00 $ S $ S $ $ $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18) + (19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20)+ (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) SO.00 (21) $0.00 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION $0.00 pick up truck foreman $25.00 1.00 $25.00 Excavator Caterpillar 308 Sw 00 1.00 $80.00 SO.00 $0.00 WOO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SO.00 Trucking - Striaght Time $0.00 $0.00 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 .0 TOTAL EQUIPMENT $105.00 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $105.00 (26) 12 % x LINE (26) $12.60 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $117.60 (28) SUBCONTRACTORS 109.05 (b)(6) DESCRIPTION AMOUNT WISSCO Irrigation , Inc. $11,020.28 TOTAL SUBCONTRACT WEEK ENDING $11,020.28 (29) 7% $771.42 (31) (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $11 ,791.70 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) $12,180.53 (34) 1.1 % OF BOND RATE BASED UPON LINE (34) $133.99 (35) 10 % x LINE (35) $13.40 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $12,327.92 (37) Page 2 of 2 WISSCO Irrigation, In:C. Invisible Fence of South Bend 1820 South Bend Ave. South Bend, IN 46637 USA Voice: 574-277-9861 Fax: 574-277-9860 ArrA11�v��, BiII TO.' Rieth Riley 25200 State Rd. 23 South Band, IN 46614 INVOICE Invoice Number: GS-IRONWOODCORBY I nvo ice Date: 8121120 Page: 1 Duplicate 0`{ 1 o Customer ID: IRONWOODDRCOR :: , Customer PO', Payment teffhs . bales i#ep m tJue > .ate ` Net 10 Days 8/31120 Description Amount 300 ft - 4" PVP Pipe for sleeves - dropped off for contractor 771.00 Er1. nwoo - Material 1,703.55 Labor 3,076.50 81"t^ .. nwood Material 622.75 Labor 446.00 VK,9 , rol , W, 1W'S Material 557.08 Labor 1,293.00 , � C66 Material 1,319.25 Labor 987.00 --- -- ----- --- I -------------- ------ Check/CradIt Memo Nt i • I� ti i Subtotal Sales Tax Total Invoice Amount PaymentlCred it Appiled TOTAL Overdue invoices are subject to late charges. 10,678.13 341.15 11,020.26 •11,t)20:28 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 10/15/2020 Name Leslie Biek Department PW BPW Date 10/27/2020 Phone Extension Review and Approval Required Prior to Submittal to Board Diversity Compliance ❑ Officer Name and Inclusion Officer BPW Attorney ❑ Attorney Name Dept. Attorney ❑ Attorney Name Purchasing ® Ron O'Connor Check the ADDronriate Item Tvne — Professional Services Agreement ❑ Open Market Contract ❑ Bid Opening ❑ Quote Opening ❑ Proposal Opening ® Chg. Order, No. 4 & 5 n Other: Company or Vendor Name New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract All Submissions U Contract U Proposal ❑ Amendment/Addendum ❑ Special Purchase, QPA ❑ Bid Award ❑ Req. to Advertise ❑ Quote Award ❑ Reject Bids/Quotes ❑ C/O & PCA No. ❑ PCA ❑ Traffic Control ❑ Resolution n Ease./Encroach Information INDOT- (Rieth Rilev Contractor ❑ Title Sheet U Yes U If Yes, Approved by Purchasing ® No MBE ❑ WBE Completed E-Verify Form Attached ❑ Yes No Corby Ironwood Rockne Intersection Improvement 116-034 LR&S Streets and Alleys 442001 $13,920.77 Unit Price Purpose/Description CO #4 is for an additional $1,592.85 to change the signal head visor on Rockne after it was installed and to remove the banner arms from the streetlights after instillation. CO#5 is for an additional $12,327.92 to repair irrigation lines that were dama ed during construction. For Change Orders Only Amount of ® Increase $ 13,920.77 ❑ Decrease ($ ) Previous Amount $ 3,162,661.70 Increase 0.44% Current Percent of Change: Decrease ( %) New Amount $ 3,176,582.47 Increase 1.30% Total Percent of Change: Decrease ( %) Time Extension Amount: New Completion Date: