Loading...
HomeMy WebLinkAbout5B1 Budget Request (Eddy St. and Howard St. Intersection Improvements) Redevelopment Commission Agenda Item DATE: November 10, 2020 FROM: Kyle Silveus, Assistant City Engineer SUBJECT: Budget Request –Eddy St./Howard St. Funding Source* (circle one) River West; River East; South Side; Douglas Road; West Washington; RDC General *Funds are subject to the City Controller's determination of availability; if funds are unavailable, as solely determined by the City Controller, then the authorization of the expenditure of such funds shall be void and of no effect. Purpose of Request: In order to support the recent development at Eddy St. Commons and the surrounding area, a traffic study and conceptual design was recently performed to determine upcoming traffic needs and support circulation in and around the Howard St./Eddy Intersection. This request is for the full design and preparation of bid documents for improvements in these areas to support growth. The intersections include: Howard St./Eddy St., Howard St./SR23, Corby Blvd./South Bend Ave., and Notre Dame Ave/South Bend Ave. This request would also support a preliminary design for a realignment and connections along South Bend Ave at Francis St. Campeau St. INTERNAL USE ONLY: Project ID: 120-024 ; Total Amount – New Project Budget Appropriation $109,430___; Total Amount – Existing Project Budget Change (increase or decrease) $_______________; Funding Limits: Engineering: $_____________________; Other Prof Serv Amt $_______________; Acquisition of Land/Bldg (circle one) Amt: $___________; Street Const Amt $________________; Building Imp Amt $_________; Sewers Amt $_________; Other (specify) Amt $ ________________ _________________________Pres/V-Pres ATTEST: __________________Secretary Date: ____________________ APPROVED Not Approved SOUTH BEND REDEVELOPMENT COMMISSION