Redevelopment Commission Agenda Item
DATE: October 22, 2020
FROM: Kyle Silveus, Assistant City Engineer
SUBJECT: Budget Request – Eagle Way Sewer Extension
Which TIF? (circle one) River West; River East; South Side; Douglas Road; West Washington
PURPOSE OF REQUEST: Funding for improvements in the amount of $22,000.
Specifics: After the initial design it was discovered that the existing pipe to be used for the
switch over to gravity stopped just short of the manhole. The sewer was thought
to be connected to the manhole with a concrete plug (as shown on available
plans). Crews will need to cut the roadway to install a short section of pipe and
connect to the manhole to completely switch over to the gravity line and retire
the temporary lift station. Construction is ongoing, with the project expected to
wrap up by the end of fall, 2020.
Further background on the project: $300,000 was requested in October, 2019
from RWDA to cover design and construction fees.
In 2000, a temporary lift station was constructed to facilitate development along
Enterprise Dr./Eagle Way/Lone Wolf Drive to take sanitary flow. A sanitary stub
was also constructed and plugged at the end of Eagle Way, with the intent to bring
the flow south to Nimtz Pkwy by gravity in the future. The temporary lift station
has limited flow, causing maintenance issues such as freezing pipes in the wet well
in the winter and forcing our sewer department needs to pump it out regularly.
By bringing the sanitary flow by gravity to Nimtz Pkwy, we are able to eliminate
the temporary lift station. This project was in coordination with the current
development of the property to the south with the 80/90 Distribution Center, took
off from the stub at Eagle Way, and extended south through an easement to the
existing sanitary sewer in Nimtz Pkwy.
Page | 2
INTERNAL USE ONLY: Project Code: _______________________________________________;
Total Amount new/change (inc/dec) in budget: _$22,000_________; Break down:
Costs: Engineering Amt: ______________________; Other Prof Serv Amt_________________;
Acquisition of Land/Bldg (circle one) Amt: ___________; Street Const Amt ________________;
Building Imp Amt_________; Sewers Amt_________; Other (specify) Amt: ________________
___________________________________________. Going to BPW for Contracting? Y/N
Is this item ready to encumber now? ____ Existing PO#________ Inc/Dec $_____________