HomeMy WebLinkAbout11102020 Board of Public Works MeetingCITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
MEETING
November 10, 2020 – 9:30 a.m.
Link to Virtual Meeting: https://tinyurl.com/BPW-11102020
GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR
Page 1
1. REVIEW OF MINUTES
A. Regular Meeting of October 27, 2020
2. OPENING OF BIDS
A. One (1) or More, 2020 or Newer, 60’ Aerial Two Wheel Drive Tower Truck – Spec
J
1. Funding: PR-00003964
B. Two (2) More or Less, 2020 or Newer, Three-Quarter Ton Extended Cab Four
Wheel Drive Pick-Up Trucks – Spec K
1. Funding: PR-00003968
C. Two (2) More or Less, 2020 or Newer, 18,000 Lb. Four Wheel Drive Chassis with
Dump Bed - Spec O
1. Funding: PR-00004026
D. One (1) or More, 2020 or Newer, Emergency Medical Vehicle – Spec P
1. Funding: PR-00004000
3. AWARD BIDS AND APPROVE CONTRACTS
A. Wastewater Treatment Plant Masonry Improvements Gallery Buildings 1-4 – Project
No. 120-036
1. Company: Slatile Roofing and Sheet Metal Co., Inc.
2. Amount: $420,218
3. Funding: PR-00003823
4. RATIFY AWARD OF PROPOSAL
A. Pinhook Water Treatment Plant Guaranteed Energy Savings Contract – Project No.
119-003
1. Company: Bowen Engineering Corporation
2. Description: Ratify Award recommendation of Selection Review Committee to
the Highest Scoring Vendor for RFQ
5. REJECT QUOTATIONS
A. Former Salvation Army Building Roof Repairs – Project No. 119-084B
1. Description: Quotes exceed Legal Quote Threshold of $150,000
6. CHANGE ORDERS
A. Main & Colfax Parking Structure Repairs – Project No. 115-143BR
1. Company: D.C. Byers Co./Detroit Inc.
2. Change Order No.: 1
3. Increase Amount: $16,570; Forty-Five (45) Days
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
MEETING
November 10, 2020 – 9:30 a.m.
Link to Virtual Meeting: https://tinyurl.com/BPW-11102020
GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR
Page 2
4. Percent of Increase: 6.17%
5. Revised Contract Amount/Completion Date: $284,950; September 23, 2020
6. Funding: PO-0002743
B. Corby, Ironwood, Rockne Intersection Improvements – Project No. 116-034
1. Company: INDOT (Contractor Rieth-Riley Construction Co., Inc.)
a) Change Order No.: 4
(1) Increase Amount: $1,592.85
(2) Percent of Increase: 0.051%
(3) Revised Contract Amount: $3,137,321.85
b) Change Order No.: 5
(1) Increase Amount: $12,327.92
(2) Percent of Increase: 0.393%
(3) Revised Contract Amount: $3,148,056.92
2. Funding: PR-00004428
C. Gemini at Colfax Exterior Renovations, Division D – Project No. 119-103
1. Company: Ritschard Bros., Inc.
2. Change Order No.: 1
3. Decrease Amount: ($2,000)
4. Percent of Decrease: (2.96%)
5. Revised Contract Amount: $65,457
6. Funding: PO-0000713
D. Gemini at Colfax Exterior Renovations, Division E - Window Replacement – Project
No. 119-103
1. Company: Vic Butcher Construction
2. Change Order No.: 1
3. Increase Amount: $38,888.28; Two Hundred, Forty-Two (242) Days
4. Percent of Increase: 18.71%
5. Revised Contract Amount/Completion Date: $246,739.28; April 30, 2021
6. Funding: PO-00002678
E. Bendix Dr., Lathrop to Indiana Toll Road – Project No. 114-065
1. Company: INDOT (Contractor Rieth-Riley Construction Co., Inc.
a) Change Order No.: 3
(1) Increase Amount: $4,166.80 (City Pays 20% or $833.36); Five (5) Days
(2) Percent of Increase: 0.102%
(3) Total Percent of Change: 0.174%
(4) Revised Contract Amount/Completion Date: $4,096,097.03; September
23, 2020
b) Change Order No.: 4
(1) Increase Amount: Four (4) Days
(2) Revised Completion Date: September 27, 2020
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
MEETING
November 10, 2020 – 9:30 a.m.
Link to Virtual Meeting: https://tinyurl.com/BPW-11102020
GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR
Page 3
2. Funding: PO-00004854
F. East Bank Trail Storm Repairs – Project No. 118-306
1. Company: Walsh & Kelly, Inc.
2. Change Order No.: 1
3. Decrease Amount: ($500)
4. Percent of Decrease: (0.24%)
5. Revised Contract Amount: $211,300
6. Funding: PO-0000248
7. CHANGE ORDERS AND PROJECT COMPLETION AFFIDAVITS
A. Miami Basin Control Valve Replacement – Project No. 116-082D
1. Company: HRP Construction, Inc.
2. Change Order No.: 1 (Final)
3. Decrease Amount: ($740.52)
4. Percent of Decrease: (0.42%)
5. Final Contract Amount: $175,259.48
6. Funding: PO-0000306
8. PROJECT COMPLETION AFFIDAVITS
A. Speed Hump Installation – Project No. 120-043
1. Company: Premium Concrete Services, Inc.
2. Final Contract Amount: $210,400
3. Funding: LRSA
9. REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND APPLICATIONS
A. Beck’s Lake Site – Project No. 120-053
1. Title Sheet
2. Funding: PR-00005004
B. Guardrail Replacement and Installation – Project No. 118-084
1. Title Sheet
2. Funding: PR-00004815
C. North Shore Drive Bank Stabilization – Project No. 118-005A
1. Title Sheet
2. Funding: PR-00005053
D. Water Works Utility Service Line Repair Program
1. Description: Request for Applications from Qualified Vendors for addition to
Preferred Vendors List for repair of Water Service Line Leaks between
Residence and Water Main Line
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
MEETING
November 10, 2020 – 9:30 a.m.
Link to Virtual Meeting: https://tinyurl.com/BPW-11102020
GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR
Page 4
10. AGREEMENTS/CONTRACTS/PROPOSALS/ADDENDA
A. Partial Easement Agreement – Five Corners, LLC
1. Description: Release of Northern 10’ of Existing Utility Easement on Vacated
Corby Blvd. for Development at Southeast Corner of Corby Blvd. and South
Bend Ave.
B. Professional Services Agreement – Jones, Petrie, Rafinski Corp.
1. Description: Temporary Easement Acquisition for Riverside Drive Bank
Stabilization Project
2. Amount: NTE $31,105
3. Funding: PR-00005094
C. Amendment No. 3 to Professional Services Agreement – Cardno, Inc.
1. Description: Temporary Easement Acquisition for Riverside Drive Bank
Stabilization Project
2. Amount: $2,000; New Total $106,600
3. Funding: PR-0000108
D. Professional Services Agreement – Arcadis U.S. Inc.
1. Description: RICE NESHAP Update Assistance for Electrical Upgrades at
Wastewater Treatment Plant
2. Amount: $4,400
3. Funding: PO-0005381
E. Amendment to Software Agreement – Systems & Software
1. Description: Extend Go-Live Date Seven (7) Weeks, from October 26 to
December 15, 2020, for enQuestra Implementation
2. Funding: PO-0000071
F. Second Amendment to Consulting Agreement – Veritas, LLC
1. Description: Extend Current Agreement through December 31, 2021, for
Managing Remedial Work at Beck’s Lake Site to assist with EPA Deliverables
2. Amount: $200,000
3. Funding: Professional Services EPA
11. LICENSES AND PERMITS
A. Encroachments/Revocable Permits
1. Applicant: KRG Eddy Street Land II, LLC
a) Location: Various Locations on Eddy Street and Howard Street
b) Description: Private Storm Sewer from West Side of Eddy St. to Detention
System East of Eddy St.
c) Favorable Recommendations
2. Applicant: Bald Mountain, LLC
a) Location: 201 S. Main Street
b) Description: Vertical Blade Sign on North/East Corner Facade
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
MEETING
November 10, 2020 – 9:30 a.m.
Link to Virtual Meeting: https://tinyurl.com/BPW-11102020
GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR
Page 5
c) Favorable Recommendations
12. STREET/ALLEY VACATIONS
A. Applicant: Roger Woodard and Mark Hubbard
1. Location: First East/West Alley between St. Vincent St. and Howard St. from St.
Louis Blvd. to First North/South Alley
2. Purpose: Regularly Flooding unused Alley; Abutting Property Owners to
Landscape and Beautify
3. Community Investment and Engineering recommend denial per Indiana Code
Criteria
13. CONSENT TO ANNEXATION AND WAIVER OF RIGHTS TO REMONSTRATE
A. 18295 Forest Glade Dr. – Water/Sewer
B. 53201 Summer Breeze Dr. – Water/Sewer
14. RATIFY BONDS
A. Occupancy Bonds
1. Anastos Brothers Custom Concrete Inc., Approved effective October 28, 2020
15. CLAIMS
A. Ratify City of South Bend Claims
1. Claim Nos.: GBN-7002, GBN-7135, GBN-6817, GBN-7132/7169
1) Date: 10/27/2020
2) Amount: $3,373,242.06
2. Claim Nos.: GBN-7399, GBN- 7327/7328/7354/7443, GBN-7398
1) Date: 11/03/2020
2) Amount: $3,757,928.15
16. PRIVILEGE OF THE FLOOR
17. ADJOURNMENT
NOTICE
FOR HEARING AND SIGHT IMPAIRED PERSONS
Auxiliary Aid or Other Services are Available upon Request at No Charge.
Please Give Reasonable Advance Request when Possible.