HomeMy WebLinkAboutChange Order Nos 2 & 3 - Corby Ironwood Rockne Intersection Improvement Proj No. 116-034 - Rieth Riley Construction Co., Inc.1316 COUNTY -CITY BUILDING
227 W.JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
October 27, 2020
Mr. Joshua McCormick
Rieth-Riley Construction Co., Inc.
25200 State Road 23
South Bend, IN 46614
j mcc ormickgrieth-riley. com
PHoNE 574/235-9251
FAx 574/235-9171
RE: Change Order Nos. 2 & 3 — Corby, Ironwood, Rockne Intersection Improvements
Project No. 116-034
Dear Mr. McCormick:
The Board of Public Works, at its meeting held on October 27, 2020, approved the Change Order
No. 2 for an increase of $20,976.50, bringing that current contract amount to $3,156,705.50.
The Board of Public Works also approved the Change Order No. 3 for an increase of $5,956.20,
bringing the current contract total amount to $3,162,661.70.
Enclosed is a copy of the Change Orders for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-9251.
Sincerely,
s/Linda M. Martin, Clerk
Enclosure
GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR
CITY OF SOUTH BEND
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
TO: Board of Public Works
FROM: Leslie Biek, PE
SUBJECT: Corby Ironwood and Rockne Change Orders 4 & 5
DATE: 10/15/2020
Attached you will find two change orders for the federally funded Corby Ironwood and Rockne
Intersection Improvement project (PN 116-034).
Change order #2 is for the relocation of three (3) water meter vaults, water valves and the addition
of a 2" water service for a total price of $20,976.50.
Change order #3 is for the addition of ten (10) arborvitae around the newly created retention pond
for an additional price of $5,956.20.
Both changes orders 2 and 3 are not federally participating and as a result will be 100% locally
funded.
It is requested the Board of Public Works approve Change Orders 2 and 3 for the Corby,
Ironwood and Rockne project (PN 116-034) for an increase of $26,932.70 bringing the new
contract price to $3,162,661.70.
Thank you for your consideration of this request.
Contract No:R -39540 Change Order No.: 002
INDIANA Department of Transportation Page: 1
Construction Change Order and Time Extension Summary
Contract Information Contract No.: R -39540 Letting Date:03/04/2020
Di strict:LAPORTE DISTRICT AE:Patterson, Patrick PE/S:Wills, Dale Status:Pending
Change Order Information Change Order No.: 002 EWA: Y or Force Acct: N
Date Generated: 07/23/2020 Date Approved: 00/00/0000
Reason Code: ERRORS & OMISSIONS, Design/Plan Related
Description: Water Meter/Valve Relocations
Original Contract Amount $ 3,135,729.00
Current Change Order Amount $ 20,976.50 Percent: 0.669 %
Total Previous Approved Changes $ 0.00 Percent: 0.000 %
Total Change To -Date $ 20,976.50 Percent: 0.669 %
Modified Contract Amount $ 3,156,705.50
Time Extension Information
Date Initiated 00/00/0000 Date Completed 00/00/0000
Original Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SP Date 00/00/0000 or SP Days
(SS = Standard Specification, SP = Special Provision)
Time Element Description:
Current Time Extension
Previous Time Approved
Revised Contract Time
SSDays OSPDays 0
SS Days by AE: DCE
SS Days
SP Days Value $ 0.00
SCE: DDCM:
SP Days Value $
SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SS Date 00/00/0000 or SP Days 0
Contract No:R -39540
INDIANA Department of Transportation
Construction Change Order and Time Extension Summary
Review and Approval Information
Required Approval Authority
($ per Change Order)
(Days per Contract)
Verbal Approval Required?
Total Change To-Date>5%?
Scope/Design Recommendation
Required?
Change Order No.: 002
Page: 2
AE: DCE: SCE: * DDCM:
(-LE$250K-) (-LE$750K-) (--LE$2M--) (--GT$2M--)
( 50 SS days) ( 100 SS days) ( 200 SS Days) ( GT 200 SS days)
Y / N If Y, by Date Issued
Y / N If Y, Copy to Program Budget Manager
Y / N If Y, Referred to Project Manager(PM)
Date to PM
Approval Authority Concurs with PM? Y / N If Y, Concurrence by
If N,Resolution: Approved
LPA Signatures Required?
FHWA Signatures Required?
Resolved by
Y / N If Y, Date to LPA
Y / N If Y, Date to FHWA
Date Returned
Date
Disapproved
Date
* Field Engineer Recommendation (Required for SCE or DDCM Approval)
Field Engineer Date
Comments:
Date Returned
Date Returned
Contractor: Rieth-Riley
Date:10/14/2020
Contract No:R -39540 INDIANA
Change Order No:002 Department of Transportation
Contract: R -39540
Project: 1600074 - State:160007400LC4
Change Order Nbr: 002
Change Order Description: Water Meter/Valve Relocations
Reason Code: ERRORS & OMISSIONS, Design/Plan Related
CLN PCN PLN Item Code Unit Unit Price CO Qty Comment
0148 1600074 0148 105-06807 LS 20,976.500 1.000 C
Item Description: ADDITIONAL
Supplemental Descriptionl : City of South Bend water meter structures and water services
Supplemental Description2:
Date:10/12/2020
Page: 3
Amount Change
Amount:$ 20,976.50
Total Value for Change Order 002 = $ 20,976.50
Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended.
General or Standard Change Order Explanation
Three City of South Bend water meter vaults for sprinkler systems at 808, 811 and 820 Ironwood Drive needed to be moved out of the new
widened roadway. Also three house City of South Bend service water shutoffs at 808, 811 and 822 Ironwood Drive needed to be moved behind
the new curb for the widened roadway. Also a 2" water service to the church at 915 Ironwood Dr. needed to be lowered for the new storm sewer.
Price includes hauling off abandoned water meter vaults that were removed from beneath new roadway location.
Change Order Explanation for Specific Line Item
It is the intent of the parties that this change order is full and complete compensation for the work describe above.
Notification and consent to this change order is hereby acknowledged. Digitally signed by Jamie Plunkett
Jamie Plunkett ON: C=US, E=Cp tr cti ey -So
O=RIeCN_d y i. Pi UGtlon Co..Ga., OU-South
Bend, CN=damie Plunkett
Signed By: oate:2020.10.14 09:28:28-04'00•
NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system.
Contract No:R -39540 INDIANA
Change Order No-002 Department of Transportation
APPROVED FOR LOCAL PUBLIC AGENCY
BOARD OF PUBLIC WORKS
Gary A. Gilot, Presidoni n—. J. Do Member
W
Eli.Mh A. Maradik, Member
Jordan V. Gathers, Member
rYZ
ATTEST:
h'inAa cffmnn
JoseOh R. Molnar, Member
kr.a•a....+..+....:.+a:+..>.a:a..+.r++s.+•.+.+a..••..+...•...+ftf+s
Linda M. Marti., Clerk
1
SUBMITTED FOR CONSIDERATION
PE/S fY
c
Date:10/12/2020
Page: 4
October 27, 2020
(DATE)
APPROVED FOR INDIANA DEPARTMENT OF TRANSPORTATION
Approval Level Name of Approver Date Status
Project Engineer/Supervisor Patterson, Patrick 00/00/0000 Action Pending
IETH `KILEY CONSTRUCTION CO., INc.
100% Quality • 100% Employee Owned • Over 100 Years
June 17, 2020
Mr. Dale Wills
Lochmueller Group
112 W Jefferson Blvd
Suite 500, South Bend, IN 46601
RE: R-39540-A, Water Service Relocates
Dear Mr. Wills
As discussed, the following are the prices for the water service curb stop and meter pit relocations for those
in conflict on the project. Also described is the 2" relocation. The unit measure is on a "per each'.
• Relocate 2" water service to the church
o $4,280.00
o +7% $299.60
Unit Price $4,579.60 1 location Extension $4,579.60
• Relocate Curb Stop
o $2,420.00
o +7% $169.40
Unit Price $2,599.40 3 locations Extension $7,768.20
• Relocate Meter Pit
o $2,470.00
o +7% $172.90
Unit Price $2,642.90 3 locations Extension $7,928.70
• Load up and haul off all existing concrete structures
o $700.00 Lump Sum Extension $700.00
Total value for all items = $20,976.50
Please let us know if you would like to proceed with this work. Thank you.
Respectfully Sub
Jamie Plunkett
Rieth Riley Construction Company
25200 S.R. 23 • South Bend, IN 46614
Phone: (574) 288-8321 • www.rieth-riley.com
CHANGE ORDER REQUEST FORM
CONTRACT R-39540 DATE OF June 17,
NO. SUBMISSION 2020
PROJECT DESCRIPTION IRONWOOD ROAD AND CORBY BLVD
(route / intersection / bridge no(s).)
CHANGE ORDER REQUEST SUMMARY Water service relocates J
DESCRIPTION
PROPOSED SOLUTION SUMMARY Relocate services due to conflicts
NOTE: Upon request from Engineer, enter detailed description on page 2.
ONSET DATE OF CHANGE June 17, 2020 CHANGE ORDER TYPE 104.03 Extra Work
PROPOSED COST AND TIME ADJUSTMENT
COST INCREASE / 20,976.50
COST(DECREASE): $........................................................................................................
The cost adjustment shall include lump sum and estimated totaled unit -priced item costs. Attach a separate sheet of unit price items
including item description, unit of measurement, estimated quantity and unit price.
CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF COST CHANGE:
❑ 109.03 Altered Quantities ® 109.05(a) Agreed Price ❑ 109.05(b) Force Account ❑ 109.05.02 Delay Costs
PROPOSED COST CHANGE INCLUDES: ❑ Labor ❑ Material ❑ Equipment ❑ Lease Agreement
Subcontractor
TIME ADJUSTMENT
INCREASE / (DECREASE):
CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF TIME CHANGE:
(work days) N/A
❑ 108.08(a) Excusable, Non-Compensable ® 108.08(b) Excusable, Compensable
NOTE: If Compensable, attach details based on 109.05.2(a) Allowable Delay Costs.
SUPPLEMENTAL INFORMATION
Additional information may be entered by the contractor.
CHANGE ORDER ORIGINATION_ IK INDOT/ LPA
401610I 40luu. ;l9ft ag
❑ Contract Specifications (ref. doc name/no.)
❑ Contract Plans (ref. doc name/no.)
CHANGE ORDER AFFECTS DBE PARTICIPATION:
Click here to enter text.
Click here to enter text_
❑ yes ® no (if yes, attach details)
❑ Contractor
Ver. 10.23.17
CHANGE ORDER REQUEST FORM
CONTRACT NO. R-39540
UPON WRITTEN REQUEST FROM THE ENGINEER, PROVIDE ADDITIONAL DETAIL
DATE RECEIVED REQUEST FOR SUBMITTAL DATE OF
ADDITIONAL DETAIL [Select Date] ADDITIONAL DETAIL (Select Date]
DETAILED DESCRIPTION / JUSTIFICATION:
(include location(s), actions of contractor, owner, and other stakeholders, key events and related couse(s), discoveries,
discussions, meetings, and effect on the contract if no action is taken. Also include references to key documents attached
or available to support this change order request.)
Click here to enter text.
I
PROPOSED SOLUTION — ADDITIONAL DETAILS:
(include proposed scope of work, means & methods, materials, equipment, utility relocation required, subcontracted
scope and the effect on the contract schedule. Also include references to attached documents including, but not limited
to, sketches, calculations, photos, material information, and submittals and meeting minutes.)
Click here to enter text.
SIGNATURES
Contractor:
Name: (print)
(signature) Date:
Project Engineer/Supervisor: (signature is to acknowledge receipt of the document and does not signify agreement of the change order)
Name: (print)
(signature) Date:
NOTE: The Contractor and PENS should retain a signed copy of this document for record.
P9 ''
CHANGE ORDER REQUEST FORM
CONTRACT NO. R-39540
ATTACHMENT: UNIT PRICE ITEMS DETAIL
Attach or paste a unit price item detail.
pg. 3
Jamie Plunkett
From: John Kramer <johnk@hrpconstruction.com>
Sent: Wednesday, June 17, 2020 2:34 PM
To: Jamie Plunkett
Cc: Jered Baker
Subject: Water Service Relocation Work on Corby & Ironwood
F
ION: Th
notclick lii
Please see below for the requested pricing.
Additional Price for 1 - 1" water service relocation - $2 420
Includes
Excludes
• HRP Labor and equipment
• +/- 15 ft 1" Type K copper
• 2 - 1" couplings
• Utilizing the existing corporation stop and service line
• Installing the curb stop withing 2' of the new curb
• Reconnecting the service within public ROW
• Going onto private property
• Restoration
• Re -tapping of main
• Waiting on the City Water Dept to do any work.
Additional Price for 1 - 1" Meter Pit - $2,470
Includes
Excludes
• HRP Labor and equipment
• 48" MH with Casting
• 2 - 1" Brass Ball Valves
• Going onto private property
• Restoration
• New Water Meter and Meter Yoke
• Haul off of existing concrete structures.
• Waiting on the City Water Dept to do any work.
If HRP would relocate the existing water service and add a meter pit the total price would be $4,890
Additional Price for 2" Water Service Relocation - $4 280
i
Includes
Excludes
• HRP Labor and Equipment
• 2" Copper, 2" Couplings, and 2" 90 degree bends
• Warranty on Water service work
• Curb Box and Curb Stop
• Replacing the existing valve vault.
Let me know if you have any questions,
John Kramer
John Kramer
Estimator / Project Manager
HRP Construction
(574)271-7800 - Office
(574)383-0653 - Mobile
(574)271-0524 - Fax
www.hroconstruction.com
HRP
CONSTRUCTION i
This e-mail and any attachments thereto, are intended only for use by the addressee(s) named herein and may contain
legally privileged and/or confidential information. If you are not the intended recipient of this e-mail (or the person
responsible for delivering this document to the intended recipient), you are hereby notified that any dissemination,
distribution, printing or copying of this e-mail, and any attachment thereto, is strictly prohibited. If you have received this e-
mail in error, please respond to the individual sending the message, and permanently delete the original and any copy of
any e-mail and printout thereof.
SECTION 5 - WATER WORKS
street Sidewalk Light Duty Cast Iron
Frame and Cover
(See Note 3)
4"
Curb Stop Valve and Box
Core Holes
for Piping (Typ•)
(See Note 2)
Direction
of Flow /1
Type "K" Copper Pipe Link seal (Typ.) or J
Approved Equal
Curb Stop Valve and Box
Direction
of Flow
L 24" Min.
ne -
Grade
a °
�n
° G
Precast Conc.
4'-0"
4"
(Square or Circular)
10" Clearance (Typ.)
1", 1', or 2"
c
Meter
°
Inlet Ball Outlet Ball
°
Valve Valve
°
c
�
f
Precast Conc. Base
o
4 ° Min.
— Inlet Ball Valve
Outlet Ball Valve
0 0 0
1", 1 Y, or 2" Meter
G
°
PLAN VIEW
NOTES:
1. Precast Conc. structure shall be manufactured and installed in compliance with
ASTM C-478 (round str.) or ASTM C-913 (rectangular/square str.)
2. The cored opening shall be large enough to allow passage of the pipe flange.
3. Lid shall have the word "WATER" cast into it. If placed in a paved area, casting
shall be heavy duty.
f
Bok
STER<<o FS'
N0. =
• - PE10809510 = •
)3---, STATE OF - Qj
IVQ
%SS/ONAL
///JJlllllllt0�\
Aaj. il F-k' /�`," IPA- ---, 6/26/18
REF STD SPEC SEC Kara M. Boyl , Ph.D.;; P.E. Date
APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS
EFFECTIVE DATE: June 26, 2018 CITY OF SOUTH BEND
Item Revision Approved Date
STANDARDS FOR DESIGN
AND CONSTRUCTION
STANDARD
METER PIT SPECS. FOR 1", 1 1/2", AND 2" METERS 1 5-13
Contract No:R -39540 Change Order No.: 003
INDIANA Department of Transportation Page: 1
Construction Change Order and Time Extension Summary
Contract Information Contract No.: R -39540 Letting Date:03/04/2020
District:LAPORTE DISTRICT AE:Patterson, Patrick PE/S:Wills, Dale Status:Pending
Change Order Information Change Order No.: 003 EWA: Y or Force Acct: N
Date Generated: 00/00/0000 Date Approved: 00/00/0000
Reason Code: SCOPE CHANGES, Added Quantities/Items
Description: Arborvitae Trees by Stormwater Basin
Original Contract Amount $ 3,135,729.00
Current Change Order Amount $ 5,956.20 Percent: 0.190 %
Total Previous Approved Changes $ 0.00 Percent: 0.000 %
Total Change To -Date $ 5,956.20 Percent: 0.190 %
Modified Contract Amount $ 3,141,685.20
Time Extension Information
Date Initiated 00/00/0000 Date Completed 00/00/0000
Original Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SP Date 00/00/0000 or SP Days
(SS = Standard Specification, SP = Special Provision)
Time Element Description:
Current Time Extension
Previous Time Approved
Revised Contract Time
SS Days 0 SP Days 0
SS Days by AE
SS Days
SP Days Value $ 0.00
DCE: SCE: DDCM:
SP Days Value $
SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SS Date 00/00/0000 or SP Days 0
Contract No:R -39540
INDIANA Department of Transportation
Construction Change Order and Time Extension Summary
Review and Approval Information
Required Approval Authority
($ per Change Order)
(Days per Contract)
Verbal Approval Required?
Total Change To-Date>5%?
Scope/Design Recommendation
Required?
Change Order No.: 003
Page: 2
AE: DCE: SCE: * DDCM:
(-LE$250K-)(-LE$750K-)(--LE$2M--)(--GT$2M--)
( 50 SS days) ( 100 SS days) ( 200 SS Days) ( GT 200 SS days)
Y / N If Y, by Date Issued
Y / N If Y, Copy to Program Budget Manager
Y / N If Y, Referred to Project Manager(PM)
Date to PM
Approval Authority Concurs with PM? Y / N If Y, Concurrence by
If N,Resolution: Approved
LPA Signatures Required?
Resolved by
Y / N If Y, Date to LPA
Date Returned
Date
Disapproved
Date
Date Returned
FHWA Signatures Required? Y / N If Y, Date to FHWA Date Returned
* Field Engineer Recommendation (Required for SCE or DDCM Approval)
Field Engineer Date
Comments:
Contract No:R -39540 INDIANA
Change Order No:003 Department of Transportation
Contract: R -39540
Project: 1600074 - State:160007400LC4
Change Order Nbr: 003
Change Order Description: Arborvitae Trees by Stormwater Basin
Reason Code: SCOPE CHANGES, Added Quantities/Items
CLN PCN PLN Item Code Unit Unit Price CO Oty Comment
0149 1600074 0149 622-01937 EACH 595.620 10.000 C
Item Description: PLANT
Supplemental Description-1 - Tree plantings in front of stormwater basin on Corby Blvd.
Supplemental Descriptionl:
Date:10/15/2020
Page: 3
Amount Change
Amount:$ 5,956.20
Total Value for Change Order 003 = $ 5,956.20
Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended.
General or Standard Change Order Explanation
The City of South Bend added arborvitae trees along the fence line of the stormwater basin on Corby Blvd.
Change Order Explanation for Specific Line Item
It is the intent of the parties that this change order is full and complete compensation for the work describe above.
Notification and consent to this change order is hereby acknowledged.
oIpwry signed by Ja- PI-1
❑- -th-R E=jplunMatl@na�h-Al OU=S
Jamie P l u n kett �.+h-R''ujn" "" �. a=5 he�
Rieth—Rile Construction Co.CN�eRun
Contractor: Y Signed By: Date: 2pgg.,o15M,3:56�400•
10/15/2020
NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system.
Contract No:R -39540 INDIANA
Change Order No:003 Department of Transportation
x+rx+rr++rx+rrrxxr:rrr+r++rr+x+xr:+rrr:+rrrrr+rrrrrrrrrrrr+r++r+rtrrrrrrxxxrrrrxrxrrxrr+rrrrrr+r+rrrrrrr+++rrrrrrrr:rrrrrr:+
130ARD GP PUBLIC WORKS APPROVED FOR LOCAL PUBLIC AGENCY
Q'&-CA� 1 0
Gary A. GiM, President Therese J. Doraq Member
Elizabeth A. Maradik, Member Jordan V. Gathers, Membe
ATTEST:
ri�rAa rix
Joseph A Molar, Member
Linda M. Marti., Clerk#r++f+i+rr+irira+rrr++txr+rr#rrr+rirrtt+r#++tat at++ttttt#+######t#
rSUBMITTED FOR CONSIDERATION
PE/S r
Date:10/15/2020
Page: 4
October 27, 2020
(DATE)
APPROVED FOR INDIANA DEPARTMENT OF TRANSPORTATION
Approval Level Name of Approver Date Status
Project Engineer./Supervisor Patterson, Patrick 00/00/0000 Action Pending
July 15, 2020
Mr. Dale Wills
Lochmueller Group
112 W Jefferson Blvd
Suite S00, South Bend, IN 46601
RE: R-39540-A, Arborvitae
Dear Mr. Wills
Please find the following cost per tree for a total of 10 EA Arborvitae trees. The largest trees Slussers
could find are 6'/8' in height. It is possible that in the fall there could be 8'/10' in height available. The
unit price for supplying and planting will be.
10 EA @ $595.62 Extension $5,956.20
Please contact me with any questions you might have. Let me know if you have question. I have
attached back up documents to this letter. Consider this as our formal request to add this work to the
contract. Thank you for your consideration on this topic.
Respectfully Submitted,
Jamie Plunkett
Project Manager
Rieth Riley Construction Company
CHANGE ORDER REQUEST FORM
CONTRACT R-39540
NO.
DATE OF July 15,
SUBMISSION 2020
PROJECT DESCRIPTION IRONWOOD ROAD AND CORBY BLVD
(route / intersection / bridge no(s).)
CHANGE ORDER REQUEST SUMMARY THE CITY REQUESTED THAT TREES BE PLANTED FOR A BARRIER
DESCRIPTION TO THE DRY RETENTION BASIN.
PROPOSED SOLUTION SUMMARY PLAN 10 EA ARBORVITAE TREE AT 6' TO 8' TALL
NOTE: Upon request from Engineer, enter detailed description on page 2.
[ONSET DATE OF CHANGE July 15, 2020 CHANGE ORDER TYPE -- 104.03 Extra Work
PROPOSED COST AND TIME ADJUSTMENT
COST INCREASE / 5,956.21
COST(DECREASE): $..........................................................................................................
The cost adjustment shall include lump sum and estimated totaled unit -priced item costs. Attach a separate sheet of unit price items
including item description, unit of measurement, estimated quantity and unit price.
CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF COST CHANGE:
❑ 109.03 Altered Quantities ® 109.05(a) Agreed Price ❑ 109.05(b) Force Account ❑ 109.05.02 Delay Costs
PROPOSED COST CHANGE INCLUDES: ❑ Labor ❑ Material ❑ Equipment ❑ Lease Agreement Z
Subcontractor
TIME ADJUSTMENT
INCREASE / (DECREASE):
CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF TIME CHANGE:
(work days) N/A ^J
❑ 108.08(a) Excusable, Non-Compensable ❑ 108.08(b) Excusable, Compensable
NOTE: If Compensoble, attach details based on 109.05.2(a) Allowable Delay Costs.
SUPPLEMENTAL INFORMATION
Additional information maybe entered by the contractor.
CHANGE ORDER ORIGINATION:
DOCUMENTS AFFECTED:
❑ Contract Specifications (ref. doc name/no.)
❑ Contract Plans (ref. doc name/no.)
CHANGE ORDER AFFECTS DBE PARTICIPATION:
® INDOT/ LPA
Click here to enter text.
Click here to enter text.
❑ yes ® no (if yes, attach details)
0 Contractor
Ver. 10.23.17
CHANGE ORDER REQUEST FORM
CONTRACT NO. R-39540
UPON WRITTEN REQUEST FROM THE ENGINEER, PROVIDE ADDITIONAL DETAIL
F-- —
DATE RECEIVED REQUEST FOR SUBMITTAL DATE OF
i ADDITIONAL DETAIL [Select Date] ADDITIONAL DETAIL [Select Date]
DETAILED DESCRIPTION / JUSTIFICATION:
(Include location(s), actions of contractor, owner, and other stakeholders, key events and related couse(s), discoveries,
discussions, meetings, and effect on the contract if no action is taken. Also include references to key documents attached
or available to support this change order request.)
Click here to enter text.
PROPOSED SOLUTION — ADDITIONAL DETAILS:
(Include proposed scope of work, means & methods, materials, equipment, utility relocation required, subcontracted
scope and the effect on the contract schedule. Also include references to attached documents including, but not limited
to, sketches, calculations, photos, material information, and submittals and meeting minutes.)
Click here to enter text.
SIGNATURES
Contractor:
Name: (print)
(signature) Date:
Project Engineer/Supervisor: (signature is to acknowledge receipt of the document and does not signify agreement of the change order)
Name: (print)
(signature) Date:
NOTE: The Contractor and PE/s should retain a signed copy of this document for record.
pg. 2
CHANGE ORDER REQUEST FORM
CONTRACT NO. R-39540
ATTACHMENT: UNIT PRICE ITEMS DETAIL
Attach or paste a unit price item detail.
pg. 3
RIETH-RILEY CONSTRUCTION
EXTRA WORK AGREEMENT
DATE: 7115/20 WORK PERFORMED: Arbirvitae Markup
CONTRACT: R-39540 PROJECT: R39540 Ironwood & Corby
FORCE ACCOUNTIEXTRA WORK FOR:
LABOR 109.05 (b)(1)
HOURS
EMPLOYEE
Regular
Overtime
Doubletime
TOTAL
RATE
EXTENSION
ENGINEER
0.00
$35.00
$0.00
FINISHER, CRAFT FOREMAN ELKHART)ST JOE
0.00
$35.15
$0.00
FNISHER, CRAFT FOREMAN LAPORTE
0.00
S36.59
$0.00
FINISHER, JOURNEYMAN ELKHART/ST JOE
0.00
S32.90
$0.00
FINISHER, JOURNEYMAN LAPORTE
0.00
$33.59
$0.00
FOREMAN, LABORER,ELKHART/ ST. JOSEPH
0.00
S43.20
$0.00
FOREMAN. ESOP
0.00
S44.20
$0.00
FOREMAN, FINISHER, ELKHART / ST. JOSEPH
0.00
$35.15
$0.00
FOREMAN, FINISHER, LAPORTE
0.00
$36.59
$0.00
FOREMAN, LABORER, LAPORTE
0.00
$43.20
$0.00
LABORER, ELKHART/ ST. JOSEPH
0.00
$26.10
$0.00
LABORER, LAPORTE
0.00
S31.91
$0.00
MECHANIC
0.00
S42.20
$0.00
OPERATOR,ELKHART
0.00
$31A5
$0.00
OPERATOR, LAPORTE) ST. JOSEPH
0.00
$42.201
$0.00
QA TECH
0.00
$26.10
$0.00
PROJECT SUPERINTENDENT
0.00
550.00
$0.00
TEAMSTER
0.00
S30.91
1 $0.00
FRINGES
TOTAL LABOR $0.00 (2)
FICA 7.50 n x LINE (2) $0.00 (3)
EMPLOYEE
HOURS
RATE
EXTENSION
ENGINEER
0.00
X
$12.79
-
$0.00
FINISHER, CRAFT FOREMAN ELKHART/ST JOE
0.00
X
$15.60
=
$0.00
FINISHER, CRAFT FOREMAN LAPORTE
0.00
x
$23.14
=
$0.00
FINISHER, JOURNEYMAN ELKHART/ST JOE
0.00
X
$15.60
-
$0.00
FINISHER, JOURNEYMAN LAPORTE
0.00
X
$23.14
=
$0.00
FOREMAN, LABORER, ELKHART/ ST. JOSEPH
0.00
X
$36.10
=
$0.00
FOREMAN, ESOP
0.00
X
$36.10
=
$0.00
FOREMAN, FINISHER, ELKHART/ ST. JOSEPH
0.00
X
$15.60
=
$0.00
FOREMAN, FINISHER, LAPORTE
0.00
X
$23.14
=
$0.00
FOREMAN. LABORER LAPORTE
0.00
X
$36.10
=
$0.00
LABORER, ELKHART/ ST. JOSEPH
0.00
X
$16.38
=
$0.00
LABORER, LAPORTE
0.00
x
$20.74
=
$0.00
MECHANIC
0.00
X
$36.10
=
$0.00
OPERATOR, ELKHART
0.00
x
$30.21
=
$0.00
OPERATOR, LAPORTE /ST. JOSEPH
0.00
X
$36.10
=
$0.00
QATECH
0.00
X
$16.38
=
$0.00
PROJECT SUPERINTENDENT
0.00
X
$12.79
=
$0.00
TEAMSTER
0.00
X
$16.54
=
$0.00
TOTAL FRINGES
(4)
WORKERS COMPENSATION 5.72 % X
LINE (2)
$0-00 (5)
BODILY INJURY 1 PROPERTY DAMAGE INSURANCE 5.80 % X
LINE (2)
$0.00 (6)
STATE UNEMPLOYMENT 3.85 % X
LINE (2)
$0.00 (7)
FEDERAL UNEMPLOYMENT 0.40 % X
LINE (2)
$0.00 (8)
TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3)
$0.00 (9)
TOTAL LINES 2, 3, 4, 5, 6, 7, 8 8 9
$0.00 (10)
20 %x LINE (10)
$0.00 (11)
GRAND TOTAL LABOR LINES (10) + (11)
$0.00 (12)
Page 1 of 2
MATERIAL 109.05 (b)(3)
Furcnasecl or
Manufactured
Description
Quantity
Unit
Unit Price
Extenslion
$
5
-
S
S -
$
5
$
5
$
$
MATERIALS PURCHASED
MATERIALS MANUFACTURED
TOTAL: LINE (18)+ (19)
12 % x LINE (20)
GRAND TOTAL FOR MATERIALS: LINE (20)+ (21)
EQUIPMENT 109.05 (b)(4)
SO.00 (18)
S0.00 (19)
S0.00 (20)
S0.00 (21)
$0.00 (22)
Equipment #
CONTRACTOR OWNED EQUIPMENT
FHWA HOURLY RATE
HOURS
EXTENSION
S0.00
$0.00
$0.00
$0.00
S0.00
S0.00
$0.00
S0.00
$0.00
S0.00
$0.00
$0.00
$0.00
S0.00
$0.00
S0.00
Trucking - Striaght Time
$0.00
$0.00
Trucking -Over Time
$0.00
S0.00
Trucking - Double Time
$0.00
$0.00
TOTAL EQUIPMENT
S0.00
(23)
TOTAL TRUCKING
S0.00
(24)
FUEL, LUBRICANTS AND TRANSPORTATION COSTS
S0.00
(25)
TOTAL LINES (23) + (24) + (25)
SO.00
(26)
12 % x LINE (26)
S0.00
(27)
GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27)
S0.00
(28)
SUBCONTRACTORS 109.05 (b)(6)
Slussers Plantina Arborvitae
TOTAL SUBCONTRACT WEEK ENDING
$5,500.00
129)
7 % x LINE (30) OVER $3,000.00
$385.00
(31)
(32)
GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32)
$5,885.00
(33)
TOTAL OF WORK COMPLETED FOR THE WEEK
TOTAL LINES (12), (17), (22), (28) 8 (33)
�.i % OF BOND RATE BASED UPON LINE (34)
$5,885.00
(34)
10 % x LINE (35)
$64.74
(35)
TOTAL EXTRA WORK LINES: (34) + (35) + (36)
S6.47
(36)
$5,956.21
(37)
Page 2 of 2
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 10/15/2020
Name Leslie Biek Department Engineering
BPW Date 10/27/2020 Phone Extension
Review and Approval Required Prior to Submittal to Board
Diversity Compliance ❑
Officer Name
and Inclusion Officer
BPW Attorney ❑ Attorney Name
Dept. Attorney ❑ Attorney Name
Purchasing ® Ron O'Connor
Check the Appropriate Item Type — Re uired or All Submissions
❑ Professional Services Agreement ❑ Contract ❑ Proposal
❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA
❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes
❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA
® Chg. Order, No. 2 & 3 ❑ Traffic Control ❑ Resolution
n Other: n Ease./Encroach
Company or Vendor Name
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
Information
Rieth R
U Yes U If Yes, Approved by Purchasing
® No
E] MBE ❑ WBE Completed E-Verify Form Attached ❑❑ Nos
Corby Ironwood Rockne Intersection Improvement
116-034
LR&S Streets and
442001
$26,932.70
Unit Price
This change order is for the relocation of three (3) water meter vaults, water
valves and the addition of a 2" water service (CO #2 - $20,976.50) and for the
addition of ten (10) arborvitae around the newly created retention pond(CO
#3 - $5,956.20). Both of these change orders will not be federally funded.
They will be 100% locally funded
For Chanize Orders Onl
Amount of ® Increase $ 26,932.70
❑ Decrease ($ )
Previous Amount $ 3,135,729.00
Increase .86%
Current Percent of Change: Decrease ( %)
New Amount $ 3,162,661.70
Increase .86%
Total Percent of Change: Decrease ( %)
Time Extension Amount:
New Completion Date: