October 13, 2020
Ms. Xuqing Xiong
Keramida Inc.
401 North College Ave.
Indianapolis, IN 46202
RE: Proposal
Dear Ms. Xiong:
PHONE 574/235-9251
FAx 574/ 235-9171
The Board of Public Works, at its meeting held on October 13, 2020, approved the above
referenced proposal for investigation and sampling for the nitrate source at the closed biosolids
Lagoon No. 4 in the amount of $19,125.
Enclosed please find a copy of the proposal for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
s/Linda M. Martin, Clerk
Enclosure
GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR
INTER -OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENVIRONMENTAL SERVICES
TO: Linda Martin
FROM: Andrea Alexander
SUBJECT: Keramida, Inc— Proposal
DATE: October 6, 2020
Due to the Agreed Order Case Nos. B-1645 and SW-237 a Closure/Post Closure Plan
for Biosolids Lagoon No. 4 located at the Organic Resource Facility was submitted and
approved by IDEM. This plan includes requirements for groundwater monitoring. As
part of required monitoring, exceedances of the Groundwater Protection Standard for
nitrate have been found. Recent geological work at the facility resulted in a re-
interpretation of groundwater flow for the facility. We are continuing to work with IDEM
to determine both the source and extent of nitrate.
401 North College Avenue
Indianapolis, Indiana 46202
(317) 685.6600 - Fax (317) GB5.6610
11-800-508-8034
info#keramida.com - www.keramida.com
September 24, 2020
Andrea Alexander
Manager of Environmental Compliance
Division of Utilities I Wastewater
City of South Bend
3113 Riverside Drive
South Bend, IN 46628
aalexandn,southbendin.gov
Re: Proposal for Nitrate Source Investigation
Organic Resources Facility — Closed Biosolids Landfill
4340 Trade Drive, South Bend, Indiana
KERAMIDA Proposal No. P2408OR
Dear Ms. Alexander:
In accordance with your request, KERAMIDA Inc. (KERAMIDA) has prepared this proposal and cost
estimate to perform a groundwater investigation to assess the source of the nitrate Groundwater Protection
Standard (GWPS) exceedances in MW-13 and MW-14 at the Organic Resources Facility's closed biosolids
landfill, located at 4340 Trade Drive in South Bend, Indiana. Details of the work to be performed are presented
in the following sections.
BACKGROUND
There is an ongoing groundwater monitoring and statistical analyses program at the Organic Resources
Facility's closed biosolids landfill at 4340 Trade Drive in South Bend, Indiana. Monitoring Well (MW) MW-
13, reported nitrate levels exceeding the site -specific GWPS. In an effort to establish the nature and extent of
the nitrate exceedance, a hydrogeologic investigation was performed in June 2020. The results of the June 2020
investigation indicated MW-13 and newly installed MW-14 to the north are monitoring the St. Joseph Aquifer.
Based on this interpretation and the placement of MW-13 and MW-14 in the St. Joseph Aquifer, the source of
the nitrate detected in MW-13 and MW-14 would be to the west.
In correspondence dated September 3, 2020, the Indiana Department of Environmental Management (IDEM)
requested that the Biosolids facility be evaluated as the source of the nitrate exceedances occurring in MW-13
and MW-14. IDEM also requested an evaluation of monitoring the past exceedances that occurred in MW-
5R.
The second semiannual 2020 groundwater sampling event is scheduled in October and will be performed
by the City of South Bend. The proposed scope of work outlined in the following sections is designed to
address the IDEM comments and resolve the issue regarding the source of the nitrate exceedances occurring
in MW-13 and MW-14.
SCOPE OF WORK
The proposed scope of work is designed to maximize the collection of groundwater quality data to resolve
concerns expressed by IDEM and minimize any subsequent monitoring well installations.
INCREASING OUR CLIENTS' PROFITABILITY THROUGH SMART CONSULTING'
ENGINEERS - GEOLOGISTS - SCIENTVSTS - SAFETY PROFESSIONALS • INDUSTRBAL. HYGIENISTS • TOXICOLOGISTS . MODELING EXPERTS
INDIANAPOLIS, IN • GRANGER„ �N « CHVCAGO, IIL . PITTSBURGH, PA • NEW YORK. NY » LOS ANGELES, CA • SACRAMENTO, CA
Ms. Andrea Alexander
September 24, 2020
KERAMIDA Proposal No. P240SOR
Task 1: Prenaration of InvestiLyation Work Plan
KERAMIDA will prepare an Investigation Work Plan (IWP) outlining the proposed investigation methodology
and sampling and analytical protocols to assess the source(s) of nitrate occurring at MW-13 and MW-14 at the
Organic Resources Facility. The IWP will include a preliminary Site Map identifying proposed investigation
sampling locations. A draft of the IWP and proposed sample locations will be provided to City of South Bend
— Environmental Services for review prior to submittal.
KERAMIDA will contract with Jones Petrie Rafinski QPR) to survey in the coordinates (eastings, northings
and ground elevations) of the proposed investigation sampling locations. The eastings and northings will be
utilized to plot the investigation sampling locations on a Site map, the ground surface elevation will be used to
calculate the depth to the water table for groundwater sample collection. In addition, I�ERAMIDA will have
JPR establish elevation benchmarks on the adjacent County property if investigation sample locations require
additional "stepping out" to complete the delineation of nitrate impacts.
Task 2: Field Activities
Boring Location Survey
I�ERAMIDA will coordinate boring staking and survey prior to soil boring activities. KERAMIDA will
subcontract the boring survey with JPR to determine the State Plane coordinates and ground surface elevations
of each of the initial boring locations prior to drilling.
Utility Clearance
Prior to initiating the subsurface groundwater investigation scope of work, IsERAMIDA will call in a public
utility locate through the Indiana 811 program. A geophysical survey will also be performed in the work areas
using electromagnetic (EM) and ground -penetrating radar (GPR) sensors to identify/clear subgrade utilities or
structures. KERAMIDA will retain a qualified subcontractor to perform the geophysical survey and will
provide oversight and guidance during the performance of the survey.
Groundwater Sample Collection
IsERAMIDA will advance a groundwater sampling probe to the water table based on the surveyed ground
surface elevation and the groundwater elevation based on depth to water measurements from the St. Joseph
Aquifer monitoring wells. The sampling probe will be advanced using a Geoprobe® 7822 DT tracked direct
push rig. The groundwater sample probe consists of a 3-foot long steel screen housed within a steel casing.
The probe is advanced by driving steel rods to the target depth, then pulling up on the rods exposing the screen.
The probe will be driven to a depth approximately 5 feet below the water table and the screen deployed. Then
water level within the screen will then be measured with an electronic water level meter and the probe pulled
up until the top of the screen is at the water table. The probe screen will be developed using a check valve and
dedicated tubing to reduce the turbidity to the extent practicable. Once purging is complete, a sample will be
drawn for an in -field nitrate test using a HachTM kit and a split sample provided to the City of South Bend to
perform a laboratory nitrate analysis. Additional sampling will be performed based on the results of the field
test. The laboratory analysis will be used as an independent confirmation of results.
The initial investigation is scoped for 2 days and 5 sample locations. "Real time" analytical data will be obtained
utilizing a field HachTM nitrate test kit. Field data could indicate that additional sampling is required down -
gradient (east) of the proposed investigation locations to delineate the extent of nitrate impact.
Task 3: Investigation Report
IsERAMIDA will prepare a brief report detailing the results of the investigation and recommendations for the
installation of additional monitoring wells, if warranted. This report will include probe logs, a search of Indiana
Department of Natural resources on-line well log databases, and narrative discussion of procedures and results.
Ms. Andrea Alexander
September 24, 2020
KERA 111DA Proposal No. P240SOR
A draft of the Investigation Report will be provided to City of South Bend — Environmental Services for review
prior to submittal.
COST ESTIMATE
The estimated cost to complete the initial scope of work (2 day s/5 sample locations) detailed in this proposal
is $12,525 as detailed in Table 1 below. Costs are based on IDEM not requiring soil sampling concurrent with
advancement of the groundwater sampling probe. If required by IDEM, soil sampling utilizing Dual Tube®
protocols will likely require an additional day of field work. Costs will be invoiced on a time and materials not
to exceed basis, with billing concurrent with completion of each item. Other terms and conditions will be in
accordance with the attached KERAMIDA Standard Terms and Conditions.
If field nitrate sample results indicate additional sampling is required towards the eastern boundary of the
adjacent County property, up to 2 additional boring/sample locations can be completed at a rate of $3,300 per
day, which is the basis of the maximum $19,125 not to exceed cost. Costs assume no permits for borings or
Right -of -Way permits/Encroachment Licenses are required if drilling along Foundation Drive east of the Site.
Table 1
Item
Cost
Task 1: Investigation Work Plan Preparation & Submittal
$1,000
Task 2: Field Activities (survey, utility locate, soil borings)
$9,185
Task 3: Investigation Report Preparation & Submittal
$2,340
PROJECT TOTAL
$12,525
Additional: Maximum of 2 additional days of sampling at $3,300/da r
$6,600
TOTAL NOT TO EXCEED
$19,125
SCHEDULE
IDEM agreed to confirm the exceedance of nitrates in MW-14 during the next groundwater sampling event
prior to any investigation work. After the confirmation of nitrates exceedance in MW-14 during the October
2020 semiannual groundwater sampling event, KERAMIDA can initiate work on this project immediately upon
issuance of a Purchase Order (P.O.) from the City of South Bend.
We look forward to the opportunity to continue to assist you with this project. If you have any questions, please
call me at (317) 685-6616.
Sincerely,
KERAMIDA Inc.
Xuging Xiong, M.S.
Project Engineer
Bruce R. Winning , L.P.G.
Senior Geologist
Ms. Andrea Alexander
September 24, 2020
KEKAMIDA Proposal No. P240SOK
44k,ati,L.P.G.
Senior Project Manager
401 North College Avenue
Indlanapolls, Indiana 46202
(317) 685.6600 - Fax (317) GB5.6610
11-800-508-8034
info#keramida.com - www.keramida.com
AUTHORIZATION SHEET
Project Name: City of South Bend — Foi mer• Biosolids Landfill
Description of Services: Nitrate Source Investigation
Project Location: 4340 Trade Drive, South Bend, Indiana 46628
Proposal No. and Date: P24080R, September• 24, 2020
FOR APPROVAL AND PAYMENT OF CHARGES: If approval and payment are not handled by the same
individual, please indicate the appropriate name(s).
Firm/Company: City of South Bend
Address: 3113 Riverside Drzve
City/State: South Bend, Indiana Zip: 46628
Attention: Ms. Susan Zeeb Phone: (574) 27I -42I2
Email: szeeb(ct�,southbendin.gov
PAYMENT TERMS:
Project Cost: $19,125 not to exceed
Task I Investigation fFoik Plan Prowation: $1,000
Task 2 Field 1Vork: $9, I85
Task 3: Investigation R porgy• $2,340
Additional: Day rate of $3,300 for additional investigations (2 maximum)for not to exceed cost
Invoicing: All costs will be invoiced on a time & materials not to exceed basis, with billing concurrent with
completion of each item.
PROJECT ACCEPTANCE: The Terms and Conditions of this Proposal, including the Terms on this page and
the attached General Terms and Conditions are:
Accepted this 13th. day of October, , 2020.
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
Elizabeth A. Maradik, Member
Joseph R. Molnar, Member
Therese J. Dorau, Member
Jordan V. Gathers, Member
ATTEST:
�trlda GP�fialPrr
Linda M. Martin, Clerk
INCREASING OUR CLIENTS' PROFITABULITY THROUGH SMART CONSULTING —
ENGINEERS - GEOLOGISTS - SCIENTVSTS - SAFETY PROFESSIONALS • INDUSTRIAL. HYGIENISTS - TOXICOLOGISTS - MODEIUNG EXPERTS
INDIANAPOLIS, IN • GRANGER, IN • CHIICAGO, IIL . PITTSBURGHI, PA • NEW YORK, NY . LOS ANGELES, CA • SACRAMENTO, CA
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date October 6, 2020
Department Utilities —
Organic Resource
Name Andrea Alexander Facility
BPW Date October 13, 2020 Phone Extension 5813
Review and Approval Required Prior to Submittal to Board
Diversity Compliance ❑
Officer Name
and Inclusion Officer
BPW Attorney ® Attorney Name Clara McDaniels
Dept. Attorney ❑ Attorney Name
Purchasing ❑
Check the Appropriate Item Type — Re uired or All Submissions
❑ Professional Services Agreement ❑ Contract ® Proposal
❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA
❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes
❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA
❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution
I-1 Other: I -I Ease./Encroach
Information
Company or Vendor Name
Keramida Inc.
❑ Yes ❑ If Yes, Approved by Purchasing
New Vendor
® No
MBYes
MBE/WBE Contractor
E Completed E-Verify Form Attached
❑ ❑ No
Project Name
Nitrate Source Investigation
Project Number
Funding Source
Closed Landfill Monitoring
Account No.
641-06-605-515-439013
Amount
$19,125
Terms of Contract
Purpose/Description
Follow Groundwater Monitoring Plan required by Post -Closure Plan of
Biosolids Lagoon 44
For Change Orders Only
Amount of ❑
Increase $
❑
Decrease ($ )
Previous Amount
$
Increase %
Current Percent of Change:
Decrease ( %)
New Amount
$
Increase %
Total Percent of Change:
Decrease ( %)