September 22, 2020
Mr. Greg Quartucci
Cardno Inc.
708 Roosevelt Rd.
Walkerton, IN 46574
i ss.st:.clait-((�),cat-dti .c �-yI
RE: Amendment No. 2 to Owner -Engineer Agreement
Dear Mr. Quartucci:
PHONE 574/235-9251
FAx 574/ 235-9171
The Board of Public Works, at its meeting held on September 22, 2020, approved the above
referenced amendment for engineering design services for the guardrail installation along the
North Shore drive riverbank stabilization project in an amount, not to exceed $5,000 bringing
the new total amount to $104,600.
Enclosed please find a copy of the amendment for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
s/Linda M. Martin, Clerk
Enclosure
GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR
This is EXHIBIT K, consisting of 9 pages, referred to in
and part of the Agreement between Owner and Engineer
for Professional Services dated November 12, 2018.
AMENDMENT TO OWNER -ENGINEER AGREEMENT
Amendment No. 2
1. Background Data:
a. Effective Date of Owner -Engineer Agreement: November 12, 2018
b. Owner: Board of Public Works, City of South Bend, Indiana
C. Engineer: Cardno, Inc.
d. Project: St. Joseph River Bank Stabilization LARE Feasibility: Riverside Drive at
Yukon
2. Description ofModications:
[NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to
this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity
with respect to the modifications to be made. Use paragraph numbers in this document for ease of
reference herein and in future correspondence or amendments.]
a. Engineer shall perform or furnish the following Additional Services: Cardno Inc. will
complete design, plan development and specification development for guardrail up to
700 feet (685' anticipated to be required) along North Shore Drive in conjunction with
the current St. Joseph River Bank Stabilization engineering design study. The necessary
plan information and standard details along with construction specifications will be
added to the previously mentioned St. Joseph River Bank Stabilization design plans and
specifications.
Deliverables:
1. Preliminary submittal of plan view, standard detail and construction specifications
related to guardrail installation. Submittal to be reviewed by City of South Bend.
2. Final 100% plans for the North Shore Bank Stabilization to include plan view and
typical detail for guardrail installation.
3. Final 100% specifications for the North Shore Bank Stabilization project to include
construction guidance for guardrail installation.
b. The Scope of Services currently authorized to be performed by Engineer in accordance
with the Agreement and previous amendments, if any, is modified as follows:
See Attachment for additional scope detail.
Page 1
(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1)
EJCDC E-500 Agreement Between Owner and Engineer for Professional Services.
Copyright �) 2008 National Society of Professional Engineers for EJCDC. All rights reserved.
c. The responsibilities of Owner are modified as follows: See Attachment A.
d. For the Additional Services or the modifications to services set forth above, Owner
shall pay Engineer the following additional or modified compensation: $5,000.00
e. The schedule for rendering services is modified as follows:
f. Other portions of the Agreement (including previous amendments, if any) are modified
as follows:
[List other Attachments, if any]
5. Agreement Summary (Reference only)
a. Original Agreement amount:
$40,000.00
b. Net change for prior amendments:
$59,600.00
c. This amendment amount:
$5,000.00
d. Adjusted Agreement amount:
$104,600.00
The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement,
including those set forth in Exhibit C.
Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this
Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in
effect. The Effective Date of this Amendment is July 8, 2020.
OWNER: ENGINEER:
BOARD OF'PUBLIC WORKS (J
Gary A. Gilot, President
Lli,Aeth A Maradik, Member
Joseph R Molnar, Member
Therese J. Doom, Member By: Greg Quartucci
Title: Senior Consultant I Office Manager
Jordan V. Gathers, Member
ATUsT, Date Signed: July 8, 2020
Linda M. Martin. Clerk
Page 2
(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1)
EJCDC E-500 Agreement Between Owner and Engineer for Professional Services.
Copyright �) 2008 National Society of Professional Engineers for EJCDC. All rights reserved.
Project Name: St. Joseph River Bank Stabilization
Project Number/ Phase: J18X465600
Date: July 1, 2020 Change Order Number: 02
Prepared By: Lisa Setnor Project Manager: Ross St. Clair
John Richardson
Change Requested:
Cardno Inc. will complete design, plan development and specification development for guardrail up to 700
feet (685' anticipated to be required) along North Shore Drive in conjunction with the current St. Joseph
River Bank Stabilization engineering design study. The necessary plan information and standard details
along with construction specifications will be added to the previously mentioned St. Joseph River Bank
Stabilization design plans and specifications. Work related to guardrail design will be completed at the
fixed fee price stated below.
Design and Bid Documents
1.Cardno will complete design of up to 700 feet of INDOT guardrail along North Shore Drive to
encompass the entirety of the North Shore Bank Stabilization project (325') currently being developed by
Cardno and the previously installed 100' of rock bank stabilization immediately adjacent to the east. With
the two previous bank stabilization areas identified as area of concern (hazard) measuring 425', a total
length of approximately 685' of guardrail is anticipated with a 130' runout length required on either end of
the hazard. Based on utility locates and existing site survey, Cardno assumes that the guardrail will
terminate prior to the gas line indicated east of the project areas and no utility relocation will be required.
It is also assumed that relocation of the overhead power and associated light poles will be performed by
others prior to any construction of guardrail. Based on existing site survey, Cardno also assumes that the
minimum 2'6" embankment width behind the post is available and therefore would not require INDOT
review and approval which comes with detail modification.
Slope
Break.
faro x S" x 11_21",_.
Timber a:r
Composite
Blockout.
FGuarFace of MGS �
W Beam -ci
Srk-�eal
drail
Slope 20:1 De5kable--- 1
Sloping clurta rci
uar Flaltcrc Shoulder Slope—
.�MWT
1" — 4 (max°)
,lf
�a) steel l��a w 6 x � ..m„ ..� � n .
6r flra ber post 6"x S'° ..__� .
� III
Furze of curb
TYPICAL MGS W-BEAM INSTALLATION AT CURB
2. Cardno will amend the North Shore Bank Stabilization design plans and specifications with the addition
of the INDOT guardrail. Cardno will review the INDOT standard drawings (Drawing Series E 601),
previously approved and stamped by INDOT engineers, to confirm existing conditions along North Shore
Drive support minimum requirements of INDOT. Cardno will review and amend INDOT standard
specifications (Section 601) for guardrail to fit the existing conditions and specific construction
considerations required along North Shore Drive. Assuming that INDOT standard drawings and
specifications are utilized in this guardrail design process, Cardno does not anticipate INDOT review
being required and this review is not reflected in the below fixed fee amount. Should INDOT review be
required, Cardno reserves the right to negotiate this scope change with the Client. This fixed fee amount
does reflect time for the City of South Bend's internal review process.
DELIVERABLES
1. Preliminary submittal of plan view, standard detail and construction specifications related to guardrail
installation. Submittal to be reviewed by City of South Bend.
2. Final 100% plans for the North Shore Bank Stabilization to include plan view and typical detail for
guardrail installation.
3. Final 100% specifications for the North Shore Bank Stabilization project to include construction
guidance for guardrail installation.
The following fixed fee represents Cardno's labor and expenses: $5,000
Current Project Budget: $99,600.00
Additional Fee Requested: $5,000.00
New Total Project Budget: $104,600.00
Cardno, Inc.
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 08/26/2020
Department Public Works
Name Alicia Czarnecki/Sue Ellen Doudrick Division/Bureau Engineering
BPW Date 09/22/2020
Phone Extension 5903
Required Prior to Submittal to Board
Legal ❑
Attorney Name: Clara McDaniels
Controller ❑
Controller review is required for all Contracts $5,000.00 or more and
greater than one year in length per the City Purchasing Policy
Purchasing ❑
Check the Appropriate
Item Type — Required for All Submissions
® Agreement Amendment
❑ Contract ❑ Proposal ❑ Addendum
❑ Professional Services
❑ Resolution
❑ Bid Opening
❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening
❑ Quote Award
❑ Change Order No.
❑ C/O & PCA No. ❑ PCA
❑ Ease/Encroach.
❑ Traffic Control:
I-1 Other:
1 Required Information 1
Company or Vendor Name Cardno, Inc.
❑ Yes ® No ❑ If Yes, Approved by
New Vendor Purchasing
MBE/WBE Contractor ❑ MBE ❑ WBE
MBE/WBE Contractor Requested ❑ No ❑ Yes Name of Company
Project Name St. Joseph Riverbank Stabilization
Project Number 118-005
Funding Source Stormwater Fund (Professional Services)
Account No. 667-605-517-431000/667-605-517-431002
Amount Amendment 2: $5,000.00 New Contract Amount: $104,600.00
Terms of Contract Hourly Not to Exceed
Purpose/Description Engineering design services guardrail installation along North
Shore Drive Bank Stabilization voiect limits
U Required Contractor's Certification Forms Attached (Non -
Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.)
Required For Change Orders Only
Amount of ❑ Increase $
❑ Decrease $
Previous Amount $
Current Percent of Change: %
New Amount $
Total Percent of Change: %