HomeMy WebLinkAboutAmendment No 2 to Owner-Engineer Agreement - Engineering Design Services for St. Joseph Riverbank Stabilization – Cardno Inc.1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS September 22, 2020 Mr. Greg Quartucci Cardno Inc. 708 Roosevelt Rd. Walkerton, IN 46574 i ss.st:.clait-((�),cat-dti .c �-yI RE: Amendment No. 2 to Owner -Engineer Agreement Dear Mr. Quartucci: PHONE 574/235-9251 FAx 574/ 235-9171 The Board of Public Works, at its meeting held on September 22, 2020, approved the above referenced amendment for engineering design services for the guardrail installation along the North Shore drive riverbank stabilization project in an amount, not to exceed $5,000 bringing the new total amount to $104,600. Enclosed please find a copy of the amendment for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, s/Linda M. Martin, Clerk Enclosure GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR This is EXHIBIT K, consisting of 9 pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated November 12, 2018. AMENDMENT TO OWNER -ENGINEER AGREEMENT Amendment No. 2 1. Background Data: a. Effective Date of Owner -Engineer Agreement: November 12, 2018 b. Owner: Board of Public Works, City of South Bend, Indiana C. Engineer: Cardno, Inc. d. Project: St. Joseph River Bank Stabilization LARE Feasibility: Riverside Drive at Yukon 2. Description ofModications: [NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity with respect to the modifications to be made. Use paragraph numbers in this document for ease of reference herein and in future correspondence or amendments.] a. Engineer shall perform or furnish the following Additional Services: Cardno Inc. will complete design, plan development and specification development for guardrail up to 700 feet (685' anticipated to be required) along North Shore Drive in conjunction with the current St. Joseph River Bank Stabilization engineering design study. The necessary plan information and standard details along with construction specifications will be added to the previously mentioned St. Joseph River Bank Stabilization design plans and specifications. Deliverables: 1. Preliminary submittal of plan view, standard detail and construction specifications related to guardrail installation. Submittal to be reviewed by City of South Bend. 2. Final 100% plans for the North Shore Bank Stabilization to include plan view and typical detail for guardrail installation. 3. Final 100% specifications for the North Shore Bank Stabilization project to include construction guidance for guardrail installation. b. The Scope of Services currently authorized to be performed by Engineer in accordance with the Agreement and previous amendments, if any, is modified as follows: See Attachment for additional scope detail. Page 1 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright �) 2008 National Society of Professional Engineers for EJCDC. All rights reserved. c. The responsibilities of Owner are modified as follows: See Attachment A. d. For the Additional Services or the modifications to services set forth above, Owner shall pay Engineer the following additional or modified compensation: $5,000.00 e. The schedule for rendering services is modified as follows: f. Other portions of the Agreement (including previous amendments, if any) are modified as follows: [List other Attachments, if any] 5. Agreement Summary (Reference only) a. Original Agreement amount: $40,000.00 b. Net change for prior amendments: $59,600.00 c. This amendment amount: $5,000.00 d. Adjusted Agreement amount: $104,600.00 The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in Exhibit C. Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is July 8, 2020. OWNER: ENGINEER: BOARD OF'PUBLIC WORKS (J Gary A. Gilot, President Lli,Aeth A Maradik, Member Joseph R Molnar, Member Therese J. Doom, Member By: Greg Quartucci Title: Senior Consultant I Office Manager Jordan V. Gathers, Member ATUsT, Date Signed: July 8, 2020 Linda M. Martin. Clerk Page 2 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright �) 2008 National Society of Professional Engineers for EJCDC. All rights reserved. Project Name: St. Joseph River Bank Stabilization Project Number/ Phase: J18X465600 Date: July 1, 2020 Change Order Number: 02 Prepared By: Lisa Setnor Project Manager: Ross St. Clair John Richardson Change Requested: Cardno Inc. will complete design, plan development and specification development for guardrail up to 700 feet (685' anticipated to be required) along North Shore Drive in conjunction with the current St. Joseph River Bank Stabilization engineering design study. The necessary plan information and standard details along with construction specifications will be added to the previously mentioned St. Joseph River Bank Stabilization design plans and specifications. Work related to guardrail design will be completed at the fixed fee price stated below. Design and Bid Documents 1.Cardno will complete design of up to 700 feet of INDOT guardrail along North Shore Drive to encompass the entirety of the North Shore Bank Stabilization project (325') currently being developed by Cardno and the previously installed 100' of rock bank stabilization immediately adjacent to the east. With the two previous bank stabilization areas identified as area of concern (hazard) measuring 425', a total length of approximately 685' of guardrail is anticipated with a 130' runout length required on either end of the hazard. Based on utility locates and existing site survey, Cardno assumes that the guardrail will terminate prior to the gas line indicated east of the project areas and no utility relocation will be required. It is also assumed that relocation of the overhead power and associated light poles will be performed by others prior to any construction of guardrail. Based on existing site survey, Cardno also assumes that the minimum 2'6" embankment width behind the post is available and therefore would not require INDOT review and approval which comes with detail modification. Slope Break. faro x S" x 11_21",_. Timber a:r Composite Blockout. FGuarFace of MGS � W Beam -ci Srk-�eal drail Slope 20:1 De5kable--- 1 Sloping clurta rci uar Flaltcrc Shoulder Slope— .�MWT 1" — 4 (max°) ,lf �a) steel l��a w 6 x � ..m„ ..� � n . 6r flra ber post 6"x S'° ..__� . � III Furze of curb TYPICAL MGS W-BEAM INSTALLATION AT CURB 2. Cardno will amend the North Shore Bank Stabilization design plans and specifications with the addition of the INDOT guardrail. Cardno will review the INDOT standard drawings (Drawing Series E 601), previously approved and stamped by INDOT engineers, to confirm existing conditions along North Shore Drive support minimum requirements of INDOT. Cardno will review and amend INDOT standard specifications (Section 601) for guardrail to fit the existing conditions and specific construction considerations required along North Shore Drive. Assuming that INDOT standard drawings and specifications are utilized in this guardrail design process, Cardno does not anticipate INDOT review being required and this review is not reflected in the below fixed fee amount. Should INDOT review be required, Cardno reserves the right to negotiate this scope change with the Client. This fixed fee amount does reflect time for the City of South Bend's internal review process. DELIVERABLES 1. Preliminary submittal of plan view, standard detail and construction specifications related to guardrail installation. Submittal to be reviewed by City of South Bend. 2. Final 100% plans for the North Shore Bank Stabilization to include plan view and typical detail for guardrail installation. 3. Final 100% specifications for the North Shore Bank Stabilization project to include construction guidance for guardrail installation. The following fixed fee represents Cardno's labor and expenses: $5,000 Current Project Budget: $99,600.00 Additional Fee Requested: $5,000.00 New Total Project Budget: $104,600.00 Cardno, Inc. BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 08/26/2020 Department Public Works Name Alicia Czarnecki/Sue Ellen Doudrick Division/Bureau Engineering BPW Date 09/22/2020 Phone Extension 5903 Required Prior to Submittal to Board Legal ❑ Attorney Name: Clara McDaniels Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ Check the Appropriate Item Type — Required for All Submissions ® Agreement Amendment ❑ Contract ❑ Proposal ❑ Addendum ❑ Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Change Order No. ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control: I-1 Other: 1 Required Information 1 Company or Vendor Name Cardno, Inc. ❑ Yes ® No ❑ If Yes, Approved by New Vendor Purchasing MBE/WBE Contractor ❑ MBE ❑ WBE MBE/WBE Contractor Requested ❑ No ❑ Yes Name of Company Project Name St. Joseph Riverbank Stabilization Project Number 118-005 Funding Source Stormwater Fund (Professional Services) Account No. 667-605-517-431000/667-605-517-431002 Amount Amendment 2: $5,000.00 New Contract Amount: $104,600.00 Terms of Contract Hourly Not to Exceed Purpose/Description Engineering design services guardrail installation along North Shore Drive Bank Stabilization voiect limits U Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) Required For Change Orders Only Amount of ❑ Increase $ ❑ Decrease $ Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Change: %