Loading...
HomeMy WebLinkAboutChange Order No 3 - Sewer and Manhole Rehabilitation Proj No. 118-093 - Inland Water Pollution Control, Inc. P HONE 574/ 235-9251 1316 C OUNTY-C ITY B UILDING F AX 574/ 235-9171 227 W. J EFFERSON B OULEVARD S OUTH B END,I NDIANA 46601-1830 C ITY OF S OUTH B END J AMES M UELLER,M AYOR B OARD OF P UBLIC W ORKS September 8, 2020 Mr. Alec Heard Inland Water Pollution Control, Inc. 4086 Michigan Ave. Detroit, MI 48210 AHeard@TEAMIPR.COM Dear Mr. Heard: The Board of Public Works, at its meeting held on September 8, 2020, approved the above referenced Change Order for a decrease of $65,940, bringing the current contract amount to $3,153,439.60. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, s/Linda M. Martin, Clerk Enclosure G ARY A. G ILOT E LIZABETH A. M ARADIK T HERESE J. D ORAU J ORDAN V. G ATHERS J OSEPH R. M OLNAR DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING Tfxfs'NboipmfSfibcjmjubujpo 229.1:44 Project Number: _______________ Project Name: __________________________ Change Order #: ____ 903603131 DATE INITIATED:BPW DATE: Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). FmjnjobufMjofJufn$2)Ofx59#EphipvtfNboipmf.41(Efqui-%36:-611/11*-boebeeuif beejujpobmczqbttbnpvoupg%2:4-671/11/Uijtxjmmsftvmujobdpousbduefevdujpopg%76-:51/11/ Attachments: (List documents support changerequired) DpousbdupsQspqptbm/ 76-:51/11 o Amount of Increase / Decrease: $____________________ Categories (Pick One): :6-214/21 o Scope of Work Previously approved Change Order(s): $___________________ o Differing Site Conditions, Changed Conditions .3/16 Current Percent of Change: ____________________ % Conflicted Specifications and Drawings Failed Materials 4-264-54:/71 New Total Amount: $____________________ Error Omission /:4 Total Percent of Change: ____________________ % Final Quantity Adjustment _______________________ 752.17.713.61:.54:112 Funding Secured From: __________________________ (filled out by PM) RECOMMENDEDBY: KptiFinfs903603131 Project Inspector (Print Name)(Signature)(Date) REVIEWED BY: 1903703131 UpzWjmmb Construction Manager (Print Name)(Signature)(Date) APPROVED BY: 9037031 Engineering Project Manager (Print Name)(Signature)(Date) APPROVED BY: City Engineer (Print Name)(Signature)(Date) IPR Great Lakes, LLC 7100 Huron River Dr. Dexter, MI 48130 7/21/2020 Sue E. Doudrick, P.E. Assistant City Engineer City of South Bend Please review the attached pricing for acceptance to remove; line item 1 New 48” Doghouse Manhole- 30’ depth, from the scope of work on Project No: 118-093, CSO018 Sewer and Manhole Rehabilitation. This will be replaced with: Description: Bypass Adjustments Unit QTY Price Adjusted Bypass LS 1.00 $ 193,560.00 Net Change Order Total $ 193,560.00 This change order is requested to save time on the project, reduce cost to the city, and minimize impacts to the neighborhood. Alec Heard Director of Project Management BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date8/26/20DepartmentPublic Works Name Sue Ellen DoudrickDivision/Bureau Engineering BPW Date 9/8/20 Phone Extension 5992 Required Prior to Submittal to Board LegalAttorney Name: Clara McDaniels Controller review is required for all Contracts $5,000.00 or more and Controller greater than one year in length per the City Purchasing Policy Purchasing Michael Schmidt Check the Appropriate Item Type –Required for All Submissions AgreementAmendmentContractProposalAddendum Professional Services Resolution Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Change Order No. 3 C/O & PCA No. PCA Ease/Encroach. Traffic Control: Other: Required Information Company or Vendor Name Inland WatersPollution Control Yes No If Yes, Approved by New Vendor Purchasing MBE/WBE Contractor MBE WBE MBE/WBE Contractor Requested No Yes Name of Company Project Name Sewer and Manhole Rehabilitation Project Number 118-093 Funding Source Sewer:services & charges – other – other contractual services Account No. 641-06-602-509-439001 Amount 1. Change Order #3: $ -65,940 Terms of Contract lump sum Purpose/Description Eliminate Line Item #1 (New 48" Doghouse Manhole - 30' Depth, $259,500.00), and add the additional bypass amount of $193,560.00. This will result in a contract deduction of $65,940.00. Required Contractor’s Certification FormsAttached(Non- Collusion, Non-Discrimination, Non-Debarment, E-Verify, Iran, etc.) Required For Change Orders Only Increase Amount of Decrease$ -65,940 Previous Amount $3,219,379.60 Current Percent of Change: -2.05% New Amount $3,153,439.60 Total Percent of Change: 0.93% Dispersal After Approval Copy Original