Loading...
HomeMy WebLinkAboutContribution in Aid of Construction Agreement - Disconnect and Reconnect Electrical Feed Miami Basin – Indiana Michigan Power Co.1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS August 25, 2020 Mr. Toby L. Thomas American Electric Power I & M CIAC — IMPC 20 PO Box 60 Fort Wayne, IN 46801-2604 RE: Contribution in Aid of Construction Agreement Dear Mr. Thomas: PHONE 574/235-9251 FAx 574/ 235-9171 The Board of Public Works, at its meeting held on August 25, 2020, approved the above referenced agreement for the disconnect and reconnect of the electrical feed for the Miami basin control valve panel in the amount of $530.38. Enclosed please find the original of the agreement for your signature. Please sign and return the original agreement to iiie��slc 'Osotalibc��Idiri,u v. Please retain a copy for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, s/Linda M. Martin, Clerk Enclosure GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Members of the Board of Public Works Clara McDaniels, Assistant City Attorney Public Works Linda M. Martin, Clerk FROM: Jacob M. Klosinski, Assistant City Engineer SUBJECT: Contribution -in -Aid of Construction Agreement with American Electric Power / Indiana Michigan Power to Disconnect and Reconnect Electrical Feed for the Miami Basin Control Panel (One Agreement) DATE: August 11, 2020 The Department of Public Works and Division of Engineering request the Board of Public Works approval of a Contribution -in -Aid of Construction Agreement with American Electric Power / Indiana Michigan Power for the disconnection and reconnection of the electrical feed for the Miami Basin Control Valve Control Panel for Project No. 116-082D Miami Basin Control Valve Replacement. Agreement 1 American Electric Power disconnect and Miami Basin Control Valve Control Panel. Total Cost: $530.38 reconnect the primary electrical feed to the Funding for this work will be out of Public Works, Engineering, Local Roads & Streets, Capital Account (251-06-600-506-442001) DFO PR-00003227 For questions regarding the above recommendation or the subject project, contact Jacob M. Klosinski (Ext. 9496) at the Division of Engineering. Contribution -In -Aid -Of -Construction Agreement For Electric Distribution Service OWM'S'00000493698 Work Request 4 77022658 Date, 6/29/2020 CusL<xr€er NamaiSouth Bend Waste Water Tariff; GS-Sar 9 1. 0 E J. P., EIAN J.) P L) SOUTH BEND, IN Project Description: The Customer has requested the installation of electric distribution faciliLles (hereinafLer referred to as "Basic Service") as Eollows: Relocate existing sing]e, phase 120/240V 200A underground service per City A SB Waste WaLcr Dept, Indiana MAchigan Power Company - IN (hereinafter rererred to as "Company") agrees to Cut existing underground service, hard dig 10 feet, splice 35' of 110AI UT, abandon 10' of exisLing underground service, wansfet existing meter N3000 to now cabinet. Customer agrees to reimburse AEP for the relocation of the existing service per the Terms & Conditions of Service (see attached) 1. custypplevenue Credit - Customer hereby agrees that the following electrical load and/or housing units will A� installed A) &Lhin three (3) months from completion of extension unless stated otherwLse in the comments above; or B) wiLhin six (6) yeais from compieLion of extension if customer is developing a subdivision or manufactured housing park. NUMBER OF SUBDIVISION LOTS 0 CSC i3ER OF LOTS USED To DE.ERM- ktEVET 11E 001 House Size Base Load Geothermal & esistance AOHP P r' r jASHP(# i0nits'') ETS(# units) unit - ) 0 - - ------- COMMERCIAL INDUSTRIAL Demand kW Month1v kWH 7 Lowd Factor Based on the custmner's preceding rep resenration, the ConTany estimates the 2-1/2 year Yevenue to be 0320.33. Customer agrees to pay to the Company the potentially refundable amount of $0.00, which is the difference between the Company's cost of installing the necessary facilities and the estdmated revenue credit. Tn addition, the. customer agrees to pay as non-infundable amount of $530.38, kur any work requested that exceeds what is required to piuvide adequate service. Tobal amoumt due including both the refundable and the pion -re fundalble amount is $530.38 Payment shall be made prior to the start of Company's construction ob facilities. A. Recalculated Re nne - It the customer has not installed or contracted for the installation of the electr&,, equipment as Mated in paragraph 13, Lhen the Company shalt recalculate the estimaLed revenue. If the recalculated revenue is less Lhan the Company's cost of lac ilities, then the customer shall, within thirty (30) ddYS Of ceceiv&g an invoice from the Company, pay to Cmapany as aid to construction, the difference between the estimated revenue and the Company's cost of the tacilities . The fact that the customer may no longer be associated with or have a properly interest in the project served under this agreement does not release the customer from this obligation, 3. Cus-omer Refund - It the customer made an aid to construction payment, then the customer shall, after the number of services used in the original revenue calculation has been instaLled, receive a refund for any additional permanent customers utilizing the same line extension wiLhLn six (6) years from compieLion of the extension. Refund, WIL be made for each additional purownent customer equal to 2-1/2 times the estimated annual revenue, less Lhe estimated cost of service diop or laterals and metering equipment required to serve the new permanent custower(s). The Mal of all refunds or allowances shall not exceed the total payment made by the cusLomei, Refunds will be mado ones customer has notifiad the Company of any new cusLomers that are added to this extension. 4. UndergKpVRd Service a. The customer shall provide, at no cost Lo the company, the necessary right of way for the underground electric..,. service and shall make the right of way accessible to the company's equipment. The owner shall remove all. obstacles, grade Lhe r1ghL of way to within 4" of finished grade, and provide continuing access to the Company for expansion, operation, and maintenance of all elect do service Eacilitles.Soedinq and restoration or replacement A all Lrees, 2hrubs,and landscape ing,shall be thp rpspnnsibiliky of the customer. b. The Compaiitr may provide tho necessary excavation, trenching and backlill- and shali install the electrical Conductors and related facilities. The custome, may elect to do all trenching and backfiLl in order to reduce company charges for installing underground service. ALI nrenchinq and backfili must be done in accordance Kith Company specifications. Foi Electiiu Distribution Bervico has been accepted, the customer shall pay those charges resulting from the abnormal conditions which are in excess of the original customer payment. d. The customer hereby agrees Lao install an approved electric service entrance of sufficient capacity for present requiremeuLs of the building to be erected on the property. Service shall nointally terminate on the building exterior at a location suitabJe to the Company. Service entrance capacity shall he as indicated on the ContribuL!on-In-Aid-Ot-ConsLruction Agreement For Electric Distribution Service, u. The customer shall coordinate the installation at underground el.ectric facilities with other ut-ilities and sorviros to permit efficient complotinn of Company's woKk, unimpeded acceoo to the installation site, and installation of underground facilities at proper depth to avoid accidental diq-lns or other insta0aLlon prublems. f. Customer undersLands that in order for Company to perform the above described work, Company (and/or its contractor) may he required to excavate, dig, bore or bring large, heavy equipment onto the property. This presents a danger to hidden underground styuctuies/taciAties. It is the customer's responsibilAy to locate and/or exposr,,, all pAvately owned Krear-heal es/tac!Mies located within the propnsad work area. The Company (and/or its cons racLur) will not ILSSUM Lespon sibility for damarle to water lines, drain tiles, septic systems, eLc., that have not heen per identified and/or exposed by the customer. Customei understands Lhat ali facilities installed by the Company will be and remain property Q the Company. The Company expressly retains the right to use said lines and equipment LOL any purpose whi-ch Company deems advisable, including the distribution cat alecLAw service Lu other customers. Other KiliLieu may have lines and/or equipment Lhat utilize Company's pole or other facilities.Company is not responsible for the AnstallaLion, relocation or removal of lines and/or equLpment owned by other uAliLies at this location. Each utility is responsible foi its own equipment and the time it takes to insLall, remove or relacabo it. My fees charged by other utilities are the responsibility of Lhe cusLamer, not Lhe Company. The customeL is responsible for contacLing the other ut-ilities and making arrangements with them for any work that must be done to facilitate this contract. Nothing herein contained shall be construed as a waiver or relLnquishment by Company or any right it has or may hereafter have to discontinue service for or an account at detault in the payment of any bill owing or to becomo owLng thereunder or for any reason or cause staLed in the Company's Tariff. It is agyeed and under sLood thaL, if Customer alLers the terms of this Agreement, it may be voided at the discretion of the Company. It is iuzLher understood and agreed that should circumstances, on the part of either the Company or the customer, delay rendering service beyond 90 days after this AgueeuRnt is signed, the torms of Uds agreement may bo renegoLialed at the request Q either. pauty. The quoted price and iterms sot tarth in this Contiibution-Tn-Aid-Of-ConstrucL!on Agreement For Electric Distribution may be withdrawn if not accepLed before. 01/29/2020 Terms of this agreement begin upon Company's completion of the line extension Binding Authority - The individual executing this Agieement hereby war ranLs to the Company that he or she has full authority to do so and has authority to bind the customer. CusLomer agrees to accept abovo dosribed Leans and condihions and larhear agrees WaL the Company shatl not be liable fur any claim at loss, injury, or damage, caused by the installation of service to the customer or for wark, on behalf of customer under this AqTeemont except that which results from the negligence of the Company. CUSTOMER USE: Date - August 25, 2020 BOALRD OF PUBLIC WORKS GM A GW, President 11wrese J. Dorau. Member -InA04-1- A-0111- Ffi-bdh A. M.—dik, Member Joseph R. MO]Tiai, Member Jordan V. Gathers, Member MTMT: No& 0161al Linda M. Martin. Clerk COMPANY USE: Date: Pri-Tit Cane: Accepted By: Title - I.U.R.C. NO. 18 INDIANA MICHIGAN POWER COMPANY STATE OF INDIANA TERMS AND CONDITIONS OF SERVICE (Cont'd from Sheet No. 3.11) ORIGINAL SHEET NO. 3.12 Where service is supplied from an underground distribution system which has been installed at the Company's expense, the customer shall make arrangements with the Company for the Company to install a continuous run of cable conductors, including necessary ducts, from the manhole or connection box to the meter location. Where it is necessary that the location of the meter be inside the customer's building, the customer shall reimburse Company for the cost of the portion of cable and duct from the exterior building wall to the meter location; however, all right and title to the cable shall remain with the Company. 10. Relocation of Company's Facilities at Customer's Request. Whenever, at customer's request, the Company's facilities are relocated solely to suit the convenience of customer, the customer shall reimburse the Company for the entire cost incurred in making such change, including any and all required engineering studies. 11. Company's Liability. The Company will use reasonable diligence in furnishing a regular and uninterrupted supply of energy, but does not guarantee uninterrupted service. The Company shall not be liable for damages in case such supply should be interrupted or fail by reason of an act of God, the public enemy, accidents, labor disputes, or orders or acts of civil authority. Further, the Company shall not be liable for damages in case such supply should be interrupted due to causes or conditions beyond the Company's reasonable control, including extraordinary repairs, breakdowns or injury to machinery, transmission lines, distribution lines, or other facilities of the Company when the Company has carried on a program of maintenance consistent with the general practices prevailing in the industry. Further, the Company shall not be liable for damages for interrupting service to any customer whenever, in the judgment of the Company, such interruption is necessary in order to prevent or limit any instability or disturbance on the electric system of the Company or any electric system interconnected with the Company, such interruptive action to be taken in accordance with a predetermined plan and only in situations that threaten massive curtailments of service on the Company's system. Notwithstanding any other provisions of the terms of these Tariffs and Terms and Conditions of Service, the Company may shut off service temporarily for reasons of health, safety, maintenance of Company facilities, infrastructure improvements, and new construction of Company facilities. To the extent possible, the Company will make a reasonable attempt to inform all affected customers in advance of such events. Unless otherwise provided in a contract between Company and customer, the point at which service is delivered by Company to customer, to be known as "delivery point," shall be the point at which the customer's facilities are connected to the Company's facilities. The Company shall not be liable for any loss, injury, or damage resulting from the customer's use of customer -owned equipment or occasioned by the energy furnished by the Company beyond the delivery point. ISSUED BY TOBY L. THOMAS PRESIDENT FORT WAYNE, INDIANA (Cont'd on Sheet No. 3.13) EFFECTIVE FOR ELECTRIC SERVICE RENDERED ON AND AFTER MARCH 11, 2020 ISSUED UNDER AUTHORITY OF THE INDIANA UTILITY REGULATORY COMMISSION DATED MARCH 11, 2020 IN CAUSE NO. 45235 211059676 00000530380000000001702126137080000000000004 City of South Bend Waste Water 3113 Riverside Drive South Bend IN 46628 Make Check Payable and Send To: American Electric Power PO Box 371883 Pittsburgh PA 15250-7883 Invoice: 170-212613708 Invoice Date: July 14, 2020 Please tear on dotted line and return top portion with your payment. Invoice: 170-212613708 INVOICE N�' 1�IC' ELEN' P Invoice Date: July 14, 2020 Payment Terms: Net 30 Due Date: August 13, 2020 Page: 1 Contract No: Customer No: 11059676 Purchase Order: WR# 77022658 Line Description Quantity UOM Unit Amt Net Amount 1 Relocation at Customer Request 1.00 EA 530.38 530.38 Cost to relocate existing single phase 120/240v 200A underground service per city of SB Waste Water Dept. Work done at 910 E Ireland Rd, South Bend, IN. Subtotal: 530.38 TOTAL AMOUNT DUE: 530.38 USD Debit/Credit card payments using Discover, MasterCard or Visa can be made online at www.aepmiscreceivables.com or by calling 1-866-270-7946. Minimum payments of $40 with a maximum of two $1,500 payments within 30 days per card are accepted. Please Wire/ACH Funds To Indiana Michigan Pwr Co - Dist Citibank, N.A. New York ABA/Routing# 021000089 Account# 00034403 For billing questions, please call: 260 408 3594 Original BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date August 11, 2020 Department Name Jacob M. Klosinski Engineering/Utilities BPW Date August 25, 2020 Phone Extension Ext. 9496 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer ❑ Officer Name Michael Patton BPW Attorney ❑ Attorney Name Clara McDaniels Dept. Attorney ❑ Attorney Name Clara McDaniels Purchasing ❑ Michael Schmidt Check the Appropriate Item Type — Required for All Submissions ❑ Professional Services Agreement ❑ Contract ❑ Proposal ❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes ❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA ❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution N Other: Utility Agreement n Ease./Encroach Company or Vendor Name New Vendor MBE/WBE Contractor Proj ect Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Amount of ❑ El Previous Amount Current Percent of Change New Amount Total Percent of Change: Time Extension Amount: New Completion Date: Information American Electric Power / Indiana Michivan Power ❑ Yes❑ If Yes, Approved by Purchasing ® No E] MBE ❑ WBE Completed E-Verify Form Attached ❑ Neos Miami Basin Control Valve Replacement 116-082D Public Works, Engineering, Local Roads & Streets, Capital 251-06-600-506-442001 (PR-00003227) $530.38 Lump Sum The Division of Engineering requests the Board of Public Works approve one (1) Contribution -in -Aid of Construction Agreement with American Electric Power / Indiana Michivan Power for the disconnection and reconnection of For Change Orders Onl Increase Decrease Increase Decrease Increase Decrease