HomeMy WebLinkAboutChange Order No 1 - Small Drainage & Design Repair - Sampson & Overlook Proj No. 118-063 - HRP Construction, Inc. P HONE 574/ 235-9251 1316 C OUNTY-C ITY B UILDING F AX 574/ 235-9171 227 W. J EFFERSON B OULEVARD S OUTH B END,I NDIANA 46601-1830 C ITY OF S OUTH B END J AMES M UELLER,M AYOR B OARD OF P UBLIC W ORKS August 25, 2020 Ms. Nancy Knapik HRP Construction Inc. 5777 Cleveland Rd., PO Box 266 South Bend, IN 46624 joej@hrpconstruction.com Project No. 118-063B Dear Ms. Knapik: The Board of Public Works, at its meeting held on August 25, 2020, approved the above referenced Change Order for an increase of $122,458.91, bringing the current contract amount to $346,638.91. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, s/Linda M. Martin, Clerk Enclosure G ARY A. G ILOT E LIZABETH A. M ARADIK T HERESE J. D ORAU J ORDAN V. G ATHERS J OSEPH R. M OLNAR INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Linda M. Martin, Clerk Board of Public Works FROM: Sue Ellen Doudrick, PE SUBJECT:Sampson and Overlook (Small Drainage Design and Repair)Project No. 118-063B DATE: August 4, 2020 The purpose of this project was to implement a stormwater collection solution that reduces and possibly prevents overflow of a ditch to Overlook Court and flooding the Overlook Court cul-de- sac, which overtops during heavy rain events and floods private properties. The issue has been in existence for many years. Construction began on the project in Spring 2020 and was completed earlier this summer. This memo was prepared to present in grander detail the unforeseen conditions briefly presented in the Board of Public Works Request. The project consisted of 2 major unforeseen conditions: 1. Sanitary sewer conflict ($74,343.24 roughly 33% increase) a. The sewer in Sampson jogged east towards the storm sewer and required either a shift in the proposed storm sewer or realignment of the sanitary sewer. Due to other utilities including a duct bank existing on the east side of Sampson, significant utility relocations would be required, which would yield project delays. The west side of the street contained a water main which did not leave room for a storm sewer installation. It was decided that relocating roughly 200’ of sanitary sewer would be the best option. Due to assumptions made in the sewer alignment by the surveyor, there was no anticipation of the sewer being in conflict. The conflict was not discovered until potholing was performed during construction. The new sanitary sewer now allows for sewer video inspection equipment to be utilized as the bend in the sewer did not allow for a camera to get thru. 2. Storm sewer and channel conflicts/issues ($48,115.67 roughly 21% increase) a. It was discovered that no erosion control was planned for the storm channel construction. To maintain and preserve the seeding that would be installed in the channel, it was decided to add erosion control matting into the project (less than $1,200). b. During construction of the storm sewer, the planned doghouse/saddle manhole north of Overlook Court had to be altered as the existing storm sewer we were intercepting was not round but elliptical shaped and required alterations to the manhole. Survey by the consultant indicated a round storm sewer. ($3,500) c. Quantity overruns occurred for various items. The major items include: clearing \\\\COSB-FS1\\Share\\Public Works\\Projects\\Projects by Year\\2018 Projects\\118-063 Small Drainage Design and Repair\\PROCUREMENT\\AGENDA REQUESTS\\Memo to BPW - Sampson and Overlook Change Order Background.doc and grubbing, concrete, mulched seeding, etc. with several underruns that include excavation, sodding, topsoil, etc. A full list of the items with quantity over and underruns is provided in the attachments (less than $44,000) We do want to memorialize that the majority of the items under the storm sewer portion of the change order would have been required as part of the project and agree that these items should not have been missed by the Consultant, surveyor, or the engineering team. The engineering team relies and expects our professional service representatives to thoroughly quality control and assure the design and data from their work is accurate to the best of their ability. With respect to the sanitary sewer, this was unexpected. After redesign of this storm sewer multiple times over the past 2 years, the design proposed appeared to be our best option with the highest capacity and capture of runoff from the neighborhood bordering Sampson. The current installation has performed well with the utilization of the existing basin south of the Overlook Court cul-de-sac and was designed with increased storm capacity and cost considerations in mind. The newly installed stormwater collection system has prevented the drainage issue from impacting residents at the east end of Overlook Court during the storms incurred this summer. Large storm events exceeding the capacity of our storm sewers may yield overflows to the existing ditch northwest of Overlook Court, but the smaller and regular storm events are now being captured. The design concept for capturing the storm runoff to this subdivision is something that should have been designed and implemented as part of the development of the subdivision on Overlook Court. The relocation of the sanitary sewer allowed for this maximized solution to be implemented and has an added benefit of providing access to the sanitary sewer for inspections. Cost savings was provided by teaming up with our Streets Department to mill and install the surface asphalt layer on Sampson as well as down Overlook Court. The developer failed to install the surface asphalt on Overlook Court. If you have any questions on this change order, please feel free to reach out. Thank you. \\\\COSB-FS1\\Share\\Public Works\\Projects\\Projects by Year\\2018 Projects\\118-063 Small Drainage Design and Repair\\PROCUREMENT\\AGENDA REQUESTS\\Memo to BPW - Sampson and Overlook Change Order Background.doc DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TnbmmEsbjobhfEftjho'Sfqbjs.Tbnqtpo'Pwfsmppl 229.174B2 Project Number: _______________ Project Name: __________________________ Change Order #: ____ 5.6.317.34.31 DATE INITIATED:BPW DATE: Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). Beefetbojubsztfxfsjotubmmbujpoevfupfyjtujohdpogmjduxjuiofxtupsntfxfs/Bmtpjodmveft jodsfbtftjotfwfsbmmjofjufntevffsspstjoqmboofervboujujftdbmdvmbujpot/ Attachments: (List documents support changerequired) CsfblepxopgDPjufnt 233-569/:2 o Amount of Increase / Decrease: $____________________ Categories (Pick One): 1/11 Scope of Work Previously approved Change Order(s): $___________________ o Differing Site Conditions, Changed Conditions 65/74 Current Percent of Change: ____________________ % Conflicted Specifications and Drawings Failed Materials 457-749/:2 New Total Amount: $____________________ o Error Omission 65/74 Total Percent of Change: ____________________ % o Final Quantity Adjustment _______________________ 778.716.628.553113'752.17.713.61:.54:112 Funding Secured From: __________________________ (filled out by PM) RECOMMENDEDBY: EboKpoft7.21.31 Project Inspector (Print Name)(Signature)(Date) REVIEWED BY: 1802403131 UpzWjmmb Construction Manager (Print Name)(Signature)(Date) APPROVED BY: TvfFmmfoEpvesjdl8024031 Engineering Project Manager (Print Name)(Signature)(Date) APPROVED BY: LbsbCpzmft City Engineer (Print Name)(Signature)(Date) DATE (MM/DD/YYYY) CERTIFICATE OF LIABILITY INSURANCE 08/06/2020 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). CONTACT PRODUCER Theresa Burns NAME: FAX PHONE Gibson Insurance Agency, Inc.(800) 814-2122(800) 836-2122 (A/C, No): (A/C, No, Ext): E-MAIL 202 S.Michigan St., Suite 1400tburns@gibsonins.com ADDRESS: INSURER(S) AFFORDING COVERAGENAIC # South BendIN46601National Trust Ins Co20141 INSURER A : INSURED FCCI Ins Co10178 INSURER B : G. E. Marshall, Inc.Travelers Prop Cas Co of Amer25674 INSURER C : 1351 Joliet Road INSURER D : PO Box 242 INSURER E : ValparaisoIN46384 INSURER F : 7-15-20/21 Liab Updated COVERAGESCERTIFICATE NUMBER:REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ADDLSUBR INSRPOLICY EFFPOLICY EXP TYPE OF INSURANCELIMITS POLICY NUMBER LTR(MM/DD/YYYY)(MM/DD/YYYY) INSDWVD COMMERCIAL GENERAL LIABILITY 2,000,000 EACH OCCURRENCE$ DAMAGE TO RENTED 2,000,000 CLAIMS-MADEOCCUR$ PREMISES (Ea occurrence) XCU10,000 MED EXP (Any one person)$ AContractual LiabilityCPP10005076907/15/202007/15/20212,000,000 PERSONAL & ADV INJURY$ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER:GENERAL AGGREGATE$ PRO- 2,000,000 POLICYLOCPRODUCTS - COMP/OP AGG$ JECT Per Project AggregateIncluded $ OTHER: COMBINED SINGLE LIMIT AUTOMOBILE LIABILITY 1,000,000 $ (Ea accident) ANY AUTOBODILY INJURY (Per person)$ OWNEDSCHEDULED ACA10000392807/15/202007/15/2021 BODILY INJURY (Per accident)$ AUTOS ONLYAUTOS HIREDNON-OWNEDPROPERTY DAMAGE $ (Per accident) AUTOS ONLYAUTOS ONLY $ UMBRELLA LIAB 5,000,000 OCCUREACH OCCURRENCE$ B EXCESS LIAB UMB10004968507/15/202007/15/20215,000,000 CLAIMS-MADEAGGREGATE$ 0 DEDRETENTION$$ PEROTH- WORKERS COMPENSATION STATUTEER AND EMPLOYERS' LIABILITY Y / N 1,000,000 ANY PROPRIETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT$ BN N / A WC010005936107/15/202007/15/2021 OFFICER/MEMBER EXCLUDED? 1,000,000 (Mandatory in NH) E.L. DISEASE - EA EMPLOYEE$ If yes, describe under 1,000,000 DESCRIPTION OF OPERATIONS belowE.L. DISEASE - POLICY LIMIT$ Limit$14,000,000 Excess Liability CZUP16N5664020NF07/15/202007/15/2021Deductible$10,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) RE: Small Drainage Design & Repair project #118-063 GEM #3098; Certificate holder is additional insured (primary) with respect to general liability and auto liability coverages regarding work performed by the insured. OID 1-3-18 CERTIFICATE HOLDERCANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of South Bend, Indiana 227 W Jefferson Blvd AUTHORIZED REPRESENTATIVE South BendIN46601 © 1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03)The ACORD name and logo are registered marks of ACORD BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date7/13/20DepartmentPublic Works Name Sue Ellen DoudrickDivision/Bureau Engineering BPW Date 7/28/20 Phone Extension 5922 Required Prior to Submittal to Board LegalAttorney Name: Clara McDaniels Controller review is required for all Contracts $5,000.00 or more and Controller greater than one year in length per the City Purchasing Policy Purchasing Michael Schmidt Check the Appropriate Item Type –Required for All Submissions AgreementAmendmentContractProposalAddendum Professional Services Resolution Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Change Order No. 1 C/O & PCA No. PCA Ease/Encroach. Traffic Control: Other: Required Information Company or Vendor Name HRP Construction Inc Yes No If Yes, Approved by New Vendor Purchasing MBE/WBE Contractor MBE WBE MBE/WBE Contractor Requested No Yes Name of Company Project Name Small Drainage Design and Repair– Sampson and Overlook Project Number 118-063B Stormwater Fund / Sewer Utilities (Services and Charges/Other Funding Source Contractual Services) 667-605-517-442002 ($48,115.67) Account No. 641-06-602-509-439001 ($74,343.24) Amount $122,458.91 Terms of Contract Unit prices and time & materials for unforeseen sewer work Unforeseen conditions: sanitary sewer conflict and manhole configuration due to an elliptical pipe instead of round. Quantity Purpose/Description issues for stormwater work & additional erosion control added into project to prevent erosion in the new storm channel. Required Contractor’s Certification FormsAttached(Non- Collusion, Non-Discrimination, Non-Debarment, E-Verify, Iran, etc.) Required For Change Orders Only $ 122,458.91 Increase Amount of Decrease$ Previous Amount $ 224,180.00 Current Percent of Change: 54.63% New Amount $ 346,638.91 Total Percent of Change: 54.63% Dispersal After Approval Copy Original Kara Boyles