Loading...
HomeMy WebLinkAboutOpening of Quotes - Olive Street Station Roof Repairs Proj No. 120-028 - Midland Engineering Company, Inc. CONTRACTDOCUMENTSAND SPECIFICATIONS FOR OLIVE ST STATION ROOF REPAIR Project No. 120-028 Prepared for CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS By Jones Petrie Rafinski 325South Lafayette Boulevard South Bend, Indiana 46601 ________________________________ Registered Architect State of Indiana No. 11700117 8-18-20 FOR QUOTES DUE: August 25, 2020, 9:30am (Local Time) to: bpwbids@southbendin.gov City of South Bend, Indiana Department of Public Works OLIVE ST STATION ROOF REPAIR Project No. 120-028 General Conditions 4 Pages Special Provisions 8 Pages Pages Specifications 4 pages pages Version 1/11/2017 Table of Contents CITY OF SOUTH BEND EQUAL EMPLOYMENT OPPORTUNITY CONTRACTING PROVISIONS DIVERSITY UTILIZATION It is the policy of the City of South Bend to provide equal employment andbusiness opportunity for all persons, partnerships, companies, and corporations in accordance with the rules, regulations andguidelines of the applicable federal, state and local laws. This policy of equal employment and business opportunity shall apply to every contractor or subcontractor quoting or holding a public contract with the City of South Bend. In furtherance of this policy, the following Equal Opportunity Clauses are hereby made a part ofevery construction contract entered into bytheCity of South Bendand all subcontractors entered into pursuantto any such contract and the bidder hereby certifies that it/he/she will abide by these provisions. The contractor will not discriminate against any applicant or employee because of race, color, religion, sex, national origin, or handicap. The contractor will take affirmative action to ensure thatall applicants or employees are treated fairly and equitably. Such action shall include but not be limited to the following: hiring, up- grading, demotion or transfer, recruitment, advertising, lay-offs or termination, rates of pay or other forms of compensation and selection for training including apprenticeship programs. The contractor shall agree to post in conspicuous places available to employees and applicants,noticesto be provided setting forth the provisions of the Non-Discrimination Clause. The contractor will, in all solicitations or advertisements for employees placed by or on behalf of thecontractor, state that all qualified applicants will receive consideration foremployment without regard to race, color, religion, sex, or national origin. The contractor will send to eachlabor union or representative of workers with which he has a bargaining agreementor other contract or understanding, a notice to be provided, advising the labor union or worker's representatives of the contractor'scommitment under thissection, and shall post copies of the notices in conspicuous places available to applicantsand employees. T he contractor will comply with all provisions of Executive Order 11246 (as amended by 11375) and of the rules, regulations and relevant orders of the Department of Labor. Subpart B -- Contractors' Agreements Sec. 202.Except in contracts exempted in accordance with Section 204 of this Order, all Government contracting agencies shall include in every Government contract hereinafter entered into the following provisions: "During the performance of this contract, the contractor agrees as follows:" "(1) The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The contractor will take affirmative action to ensure that applicantsare employed, and that employeesare treatedequally during employment, without regard to their race, color, religion, sex or national origin. Such action will include, but not be limited to Version 4/17/2015 General Conditions - 1 the following:employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination;rates ofpayor other forms of compensation;andselectionfortraining,includingapprenticeship. Thecontractor inconspicuous places, available toemployees and applicantsfor agrees to post employment, notices to be provided by the contracting officer setting forth the provisions of this nondiscrimination clause." "(2) The contractor will, in all solicitations oradvertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex or national origin." "(3) The contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement orother contract of understanding, a notice, to be provided bythe agency contracting officer, advising the labor union orworkers'representativeofthecontractor'scommitmentsunderSection202of Executive Order No. 11246 of September 24, 1965, and shall post copies of the notice in conspicuous places availableto employees and applicants for employment." "(4) The contractor will comply with all provisions of Executive Order No. 11246 of September 24, 1965, and of the rules and regulations,and relevant orders of the Secretary of Labor." "(5) The contractor will furnish all information and reports required by Executive Order No.11246 of September 24, 1965, and bythe rules,regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the contracting agency and the Secretary of Labor for purposesof investigation to ascertain compliance withsuch rules, regulations, and orders." "(6) In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or with any of such rules,regulations, or orders, in this contract may be cancelled, terminated or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts in accordance with procedures authorized in Executive Order No. 11246 ofSeptember 24, 1965, and such other sanctions may be imposed and remedies invoked* as provided in Executive Order No 11246 of September 24, 1965, or by rule, regulations, or order of or as otherwise provided by law." the Secretary of Labor, "(7) The contractor will include theportion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchaseorder unless exempted by rules, regulations, or orders of the Secretary ofLabor issued pursuantto Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such actionwithrespect to any subcontract or purchase order as the administering agencymay direct as a means of enforcing such provisions including sanctions for noncompliance: Provided, however, that in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency the contractor may request the United States to enter into such litigation to protect the interests of the United States." The applicant further agrees that it will be bound by the above equalopportunity clause withrespectto its own employment practices when it participates in federally assisted construction work: Provided, that if the applicant so participating is a State or local government, the above equal opportunity clause is not applicable to any agency,instrumentality or subdivision of such government which does not participate Version 4/17/2015 General Conditions - 2 in work on or under the contract. T he applicant agrees that it will assist and cooperate actively with the administering agency and theSecretary of Laborin obtaining the compliance of contractors and subcontractors with the equal opportunity clause and therules, regulations, and relevant ordersof the Secretary of Labor, that it will furnish the administering agency and the Secretary of Labor such information as they may require for the supervision of such compliance,and that it willotherwise assist the administering agencyinthedischargeof the agency's primary responsibility for securing compliance. Theapplicantfurtheragreesthatitwillrefrainfromenteringintoanycontractor contract modification subject toExecutive Order11246of September 24, 1965, with a contractordebarred from, or who has not demonstrated eligibility for, Government contractsand federally assisted construction contracts pursuant to the Executive Order and will carry out such sanctions and penaltiesfor violation of the equal opportunity clause as may be imposed upon contractors and subcontractors by the administering agency or the Secretary of Labor pursuant to Part II, Subpart D of the Executive Order. In addition, the applicant agreesthat if itfails or refuses to comply with these undertakings, the administering agency may take any or all of the following actions: Cancel, terminate, or suspend in whole or in part this grant (contract, loan, insurance, guarantee); refrain from extending any further assistance to the applicant under the program with respect to whichthe failureor refund occurred until satisfactory assurance of future compliance has been received from such applicant;and referthe case to the Department of Justice for appropriate legal proceedings. *Corrected to read "invoked". In the original text the word "involved" was printed in error. Version 4/17/2015 General Conditions - 3 MINORITYANDWOMENBUSINESS ENTERPRISEINCLUSION PROGRAM PLAN The City of South Bend, Indiana has shown its commitment to addressing Minority and Women’s Business Enterprise (“MWBE”) participation in public contracting through the adoption of the City of South Bend Ordinance No. 10693-19. Persons, partnerships, corporations, associations, or joint ventures awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect tohire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age or disability that does not affect that person’s ability to perform work. Minority and Women’s Business Enterprises (MWBEs) are described in the Ordinance. A list of certifiedMWBEs has been included for your review and a cross reference list of MWBEs (both certified and non-certified) can be found on the Indiana Department of Administration website: http://www.in.gov/idoa/. Documentation shall be provided with the bid that states the MWBE that will be contracted, the dollar amount of the work that will be performed on the project and the percentage of the dollar amount as it relates to the total bid amount by using Form MWBE-1.0, MWBE Utilization Plan. The City, its agencies, boards, or commissions requires the Contractor’s good faith efforts to obtain participation by those Contractors classified as a MWBE. Failure to provide ALL the required evidence of good faith efforts with the bid will be grounds for rejecting a bid as non-responsive. Bidders shall demonstrate good faith efforts to have active participation from MWBEs on this Project and supply written documentation evidencing such efforts by using Form MWBE-2.0, Evidence of Good Faith Efforts and Form MWBE-2.1, MWBE Contacted. Such documentation shall include, but is not limited to, the following items: a.A listing of all MWBEs contacted including: (1) the name and address of the MWBE; (2) the date of contact; (3) the type of contact (i.e., phone call, written solicitation, etc.); (4) the nature or type services or goods requested; and (5) the result of the contact. b.Written evidence of outreach and copies of email exchanges inviting and receiving quotes or other responses from MWBEs or other documentation of efforts to encourage and secure competitive quotes from MWBE and local businesses to be included in the benefits of building this Project. c.Written documentation of letters of introduction, invitations to forging majority/minority strategic alliances for capacity building, including but not limited to, mentoring, extensions of assistance on payroll, insurance, bonding, line of credit, technical skills or business skills. All bidders are actively encouraged to reach out to the MWBEs in St. Joseph County, Indiana, other local Indiana counties, Berrien County, Michigan, and Wabash and Kankakee Counties in Illinois to utilize a good faith effort to forge constructive and lasting business partnerships. Notwithstanding the foregoing, the award and performance of all City contracts shall comply with applicable federal, state, and local laws. Version 2/14/2020Public Works Quote DEPARTMENT OF PUBLIC WORKS CITY OF SOUTH BEND, INDIANA SPECIAL PROVISIONS OLIVE ST STATION ROOF REPAIR Project No. 120-028 I. PROJECT DESCRIPTION Work to be performed shall include furnishing all labor, services, materials, insurance, labor and equipment to provide and install the Olive St Station Roof Repair project including, but not limited to, facia and gutter repair, remove clay tile, replace damaged substrate, and replace clay tile, according to the intent of the plans and specifications. The project site is located at the southwest corner of Olive Street and Sample Street in South Bend, Indiana. II.PREVAILING SPECIFICATIONS AND DESIGN & CONSTRUCTION STANDARDS The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and DESIGN & CONSTRUCTION STANDARDS, most recent version, are to be used on this project. Each Quote provider is specifically instructed to become completely familiar with the most recent version of the PREVAILING SPECIFICATIONS and the DESIGN & CONSTRUCTION STANDARDS prior to submitting a Quote. Wherever the PREVAILING SPECIFICATIONS refer to “State Specifications,” it shall mean the 2020 INDOT Standard Specifications for the letting effective after September 1, 2019. These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING SPECIFICATIONS and are to be used only in conjunction with the PREVAILING SPECIFICATIONS. In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING SPECIFICATIONS, the SPECIAL PROVISIONS will govern. III.TERM "OR EQUAL" A. Prevailing Specifications: None B. Additions: 1.Where the term "or equal" is used in these specifications, the Quote provider deviating from specified item shall file with his/her Quote a letter fully explaining and justifying his/her proposed article or equal. The City of South Bend shall be the sole judge in determining if the “or equal” offered meets the specification. IV.TAX EXEMPT A. Prevailing Specifications: None B. Additions: Version 7/01/2016 Special Provisions - 1 1.Materials and properties purchased under contract with the Owner that becomes a permanent part of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax). The exemption number will be furnished to the Contractor upon award. V. INDEMNIFICATION A. Prevailing Specifications: None B. Additions: 1.Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its agents, officers and employees, from all costs, losses, claims and suits, including court costs, attorney fees, and other expenses, arising from or out of the negligent performance of this Contract by Contractor, or because of arising out of any defect in the goods, materials or equipment supplied by the Quote provider. VI.INSURANCE A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 103 B. Additions: 1.All Contractors and subcontractors doing business with the City of South Bend shall present a Certificate of Insurance showing coverage in the following minimum amount: a.General Liability: Premises-Completed Operations or Products, Bodily Injury and Property Damage Combined Single Limit - $5,000,000. b.There shall be no exclusion for explosion, collapse or underground hazard. c.Workmen's Compensation: Statutory State of Indiana Employer's Liability - $100,000. d.Auto Liability: Bodily Injury and Property Damage Combined Single limit - $1,000,000 e.City of South Bend shall be named as additional insured on the Certificate of Insurance. VII.CONTROL OF WORK A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 105 B. Additions: 1.The complete responsibility for this project lies with the Director of Public Works of the City of South Bend, Indiana acting through his authorized representatives. 2.Construction Engineering - The Contractor shall provide all the necessary, qualified personnel, equipment and supplies to perform all work required under this item. There will be no direct payment for this item. 3.The contractor is responsible to maintain the site which includes but is not limited to; dust control, site security, erosion control, and protecting adjacent properties. 4.Work hours for the Project shall be from 7:00 a.m. through 6:00 p.m., Monday through Friday. No work shall be permitted on weekends, Holidays, or after hours unless approved Version 7/01/2016 Special Provisions - 2 by the City of South Bend Department of Public Works. VIII.LEGAL RELATIONS A.Prevailing Specifications:2020, INDOT Standard Specifications Section 107 B. Additions: 1.The Owner, where mentioned in these documents, is the City of South Bend. The Engineer, where mentioned in these documents, is Jones Petrie Rafinski, Corp. 2.The Contractor shall apply for and obtain any and all required permits for the work from local, state, and federal agencies and shall comply with permit requirements, including the St. Joseph County / City of South Bend Building Department. 3.If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the Contractor shall provide the Engineer with proof that the Contractor is duly licensed, qualified and registered with the Secretary of State of Indiana to engage in business within the State of Indiana. 4.The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The Owner reserves the right to immediately terminate the public work project awarded should the Contractor be found to be in violation of any provision of Indiana Code 5-16-13 and such violation shall result in the forfeiture of Contractor’s performance bond to the Owner. IX.SUBMITTALS A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 106 B. Additions: 1.Submit four (4) copies or an electronic version of the submittals for all equipment or materials used in this project to the South Bend Department of Public Works for approval. All submittals must be delivered within 7 calendar days from the notice to proceed. 2.The Department of Public Works will review and return two (2) copies or an electronic version of the submittals within five (5) working days. 3.The review of the submittal information by the Department of Public Works is to facilitate the satisfactory acceptance of the equipment. This review shall neither relieve the contractor from the responsibility for deviations from the Specifications, nor from errors and omissions in the shop drawings or literature. Parts found not meeting the requirements of these Specifications shall be removed, repaired or replaced at no cost to the OWNER. 4.Submittals shall include complete manufacturer’s descriptive information and shop drawings for all the parts furnished under this contract. 5.Upon completion of project, the Contractor will supply one (1) conformed set of all submittals to the City of South Bend. X. PROSECUTION AND PROGRESS A. Prevailing Specifications: 2020, INDOT Standard Specifications Sec. 108 B. Additions: Version 7/01/2016 Special Provisions - 3 th 1.The project will have a completion date of November 20, 2020 for all work. The contract time will start when the Notice to Proceed is delivered and signed. 2.The City, Engineer, and Contractor will hold a pre-construction meeting following award of the contract. The date of the Notice to Proceed will be agreed at that meeting. 3.Contractor shall provide a schedule to the Owner prior to beginning any work on the site. XI.CHANGE OF CONTRACT TIME A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 108 B. Additions: 1.The Contract Time may only be changed by Change Order. Any Claim for an extension in the Contract Time shall be based on written notice delivered to the Department of Public Works within seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent of the claim with supporting data shall be delivered within fourteen (14) calendar days after such occurrence unless an official of the Public Works Department allows an additional period of time to ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost to delays beyond the control of the Contractor if a claim is made in accordance with this provision. Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God. 2.Unless otherwise provided, the Contract time is based upon normal weather conditions. An extension is granted for weather conditions significantly more severe than normal if the Contractor demonstrates to the satisfaction of the City that the delay in the progress of the work was due to such weather. The basis to define normal weather with be the data compiled by the United States Department of Commerce, National Oceanic and Atmospheric Administration (NOAA). 3.No extension of time will be granted if the Contractor, by his/her/its own action or inaction, including fault or negligence of Contractor’s subcontractors, caused the delay, or for which any remedies are provided under any other provision of this agreement. 4.The grant of an extension of time under this Section in no way constitutes a waiver by the City of any rights or remedies existing under this contract at law or in equity. XII.DEFAULT AND TERMINATION A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 108 B. Additions: 1.Events of Default shall include Contractor’s failure to perform any of its obligations under this contract including failure to commence work at the time specified, failure to perform the work in accordance with these specifications, unauthorized discontinuation of the work, failure to carry out the work in a manner acceptable to the City, failure to observe Federal, State, or local laws or regulations, and failure to comply with any other term of this contract. 2.If an Event of Default occurs, the City shall provide Contractor written notice and may permit Contractor ten (10) calendar days after the date of the notice to cure the default. If the default is not cured within the ten (10) day cure period, the City may at any time thereafter terminate this contract in which case the termination shall be final and effective. Version 7/01/2016 Special Provisions - 4 3.Upon an Event of Default, the City may invoke the following remedies in addition to those remedies provided under separate provisions of this contract, the right of set-off against any payments due or to become due to the Contractor against the retainage, the right to take over and complete the Work. If the City notifies Contractor that City is invoking its right to complete the Work, all rights that the Contractor has in order under Contractor’s subcontracts are assigned to the City, subject to the City’s right to take assignment of all or only selected subcontracts at the City’s discretion. The sole obligation accepted by the City under such subcontracts is to pay for Work satisfactorily performed after the date of the assignment. In the event a conditional assignment has not been executed, the Contractor shall execute or cause to be executed any assignment, agreement, or other document that may be necessary in the sole opinion of legal counsel to the City’s Board of Public Works to evidence compliance with this provision. The Contractor shall promptly deliver such documents upon the City’s request. In the case of such assignment, unless otherwise agreed in writing, The Contractor remains liability to subcontractors for any payment already involved, and for any claim, suit or cause of action based upon or resulting from any error, omission, negligence or other breach of contract by the Contractor, its officers, employees, or agents arising prior to the date of assignment to the City. XIII.LIQUIDATED DAMAGES A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 108 B. Additions: 1.The contractor shall proceed with the work at such rate of progress to ensure full completion within the Contract Time. It is expressly understood and agreed, by and between the Contractor and the Owner, that the Contract Time for completion of the work described herein is a reasonable time, taking into consideration the average climatic and economic conditions and other factors prevailing in the locality of the work, and excludes the time for unavoidable delays which were beyond the control and without the fault of the Contractor. 2.If the Contractor shall fail to complete the work within the Contract Time, or extension of time granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages a sum of five hundred dollars ($500.00) for each calendar day that the Contractor shall remain in default after the time of completion stipulated in the Contract Documents. 3.The Contractor shall not be charged with liquidated damages or any excess cost when the delay in completion of the work is due to the following and the Contractor has promptly given written notice of such delay to the Owner and Engineer/Architect. a.To any preference, priority, or allocation order duly issued by the Owner. b.To unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to acts of God, acts of public enemy, acts of the Owner, acts of another Contractor in the performance of a Contract with the Owner, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and unforeseeable weather. 4.The Contractor is hereby alerted that failure to submit shop drawings in a timely manner or failure to order materials in a timely manner, such that material manufacturing and delivery to the project site are delayed, will not be considered as unforeseeable causes in the determination of liquidated damages, extension of time granted by the Owner, or any excess cost. Version 7/01/2016 Special Provisions - 5 XIV.RETAINAGE AND FINAL PAYMENT A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 109 B. Additions: 1.Payments will be made every thirty (30) calendar days. 2.Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a percentage of payments throughout the duration of the project. 3.Before final payment and retainage are released the Contractor must satisfy the following: a.All parts and labor meet requirements stated in the specifications. b.Provide copies of test reports or cut sheets on all materials supplied. c.Provide As-Built drawings in accordance with the City of South Bend Prevailing Specifications for Public Works. d.One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final Waiver of Lien. XV.WARRANTY A. Prevailing Specifications: None B. Additions: 1.All parts shall include the following: (i) Performance specifications; (ii) Bill of materials (iii) Warranties on all parts; and (iv) Installation and safety requirements. XVI.OTHER UTILITIES A. Prevailing Specifications: None XVII.DESCRIPTION OF WORK A. Prevailing Specifications: None B. Additions: 1.Work to be performed shall include furnishing all labor, services, materials, insurance, labor and equipment to provide and install the Olive St Station Roof Repair project including, but not limited to, facia and gutter repair, remove clay tile, replace damaged substrate, replace clay tile, according to the intent of the plans and specifications, according to the intent of the plans and specifications. Version 7/01/2016 Special Provisions - 6 2.The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and their property from damage caused by the Contractor’s operations. 3.Architectural site improvements shall be completed in accordance with plan details and separate architectural specifications. XVIII.PLANS A. Prevailing Specifications: City of South Bend Design and Construction Standards B. Additions: 1.Roof Repair a.The plans consist of three (3) sheets. 2.The work shall conform to the plans. 3.The drawings are schematic in nature. 4.The CONTRACTOR is responsible for estimating dimensions and quantitiesof materials. 5.In the event that the Special Provisions and the Plansconflict, the Special Provisionsshall govern. XIX.MUNICIPAL OPERATIONS A. Prevailing Specifications: None B. Additions: 1.The Contractor shall coordinate with the City of South Bend Solid Waste, Olive Street office personnel, Waste Management, and other pickup services as requested to ensure collection services are maintained. 2.The Contractor shall be responsible for snow removal within the project limits and shall coordinate with City of South Bend Public Works. The Contractor is responsible for protecting his project site from excessive wear and tear during snow removal. Version 7/01/2016 Special Provisions - 7 XX.PUBLIC SAFETY A. Prevailing Specifications: 2020, INDOT Standard Specifications Sections 107.08 B. Additions: 1.It shall be the Contractor’s responsibility to secure the construction site against unauthorized entrance by persons and vehicles outside of and during work hours. This includes securing the site against dumping and public safety of the Owner, Owner’s representatives, pedestrians, bystanders and neighborhood residents. aintaining public safety will not be paid for directly, but shall be included in the cost of 2.M various items of the contract. XXI.PERMITS A. Prevailing Specifications: None B. Additions: 1.The Contractor shall be solely responsible for filing all paperwork required for City of South Bend permits, including but not limited to the City building permit. 2.The Contractor shall be required to observe and obey all requirements of the permits. Version 7/01/2016 Special Provisions - 8 CITY OF SOUTH BEND, INDIANA CONTRACTOR’S QUOTEFOR PUBLIC WORK Project Name Olive St StationRoof Repair Project No. 120-028 th For Quotes Due August 25, 2020 at 9:30am (Local Time) PART I (Must be completed for all quotes. Please type or print) Date: Bidder (Firm): Address: City/State/Zip: Telephone Number:( ) Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: the City of South Bend, Indiana, in accordance with plans and specifications prepared by: and dated for the sum of (enter the Total Quoteas shown on the Proposal) ($) (Enter sum of Total Base Quoteplus Alternates shown on (Numerical) Proposal) The undersigned further agrees to furnish a bond or certified check with this quote for an amount specified in the notice of the letting. If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the quoteis to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. By (Signature) (Printed Name of Person Signing) ACCEPTANCE The above quote is accepted day of 20 this Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President, Member Elizabeth A. Maradik, MemberTherese J. Dorau, Member , Member Attest: Linda M. Martin, Clerk Version 10/17/2016 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR’S NON-COLLUSION AND NON-DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes. Please type or print) STATE OF ___________ ) ) SS: COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1.Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be quote by anyone at such letting nor to prevent any person from quoting nor to induce anyone to refrain from quoting, and that this quote is made without reference to any other quote and without any agreement, understanding or combination with any other person in reference to such quoting. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2.Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3.Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a.For purposes of this Certification, “Iran” means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time-to-time. b.As provided by Ind. Code § 5-22-16.5-8, as amended from time-to-time, a Contractor is engaged in investment activities in Iran if either: i.Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii.Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. Version 10/17/2016 4.Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor’s newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor’s documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5.Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6.Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public quoting laws or other contracts in which public quotes are not required by law, the City, its agencies, boards, or commissions may consider the Contractor’s good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business (“MBE”) or as a Women’s Business Enterprise (“WBE”) as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City’s MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7.The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my quote that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of quote which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 10/17/2016 may result in forfeiture of contractual payments. *** I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing quote for public works are true and correct. Dated this day of , 20__ Contractor/Bidder (Firm) Signature of Contractor/Bidder or Its Agent Printed Name and Title Subscribed and sworn to before me this day of , 20 My Commission Expires Notary Public County of Residence Version 10/17/2016 QUOTE/PROPOSAL CITY OF SOUTH BEND Project Name Olive St Station Roof Repair Project No. 120-028 th For Quotes Due August 25, 2020 at 9:30am (Local Time) BASE QUOTE Item Description Total Amount No. 1 Roof Repair according to plans. BASE QUOTETOTAL ALTERNATES Item Description Total Amount No. Tuck point head and bed joints at stone parapet cap ALTERNATE #1 TOTAL ADD ALTERNATES Item Description Total Amount No. Remove/repair/reinstall all stone parapet caps ADD ALTERNATE TOTAL Bidder (Firm): Address: City/State/Zip:Telephone Number:() By (Signature) (Printed Name of Person Signing) Version 10/17/2016 ___ ____of Total Percentage of Bid/Proposal icipation. It _______ Page MWBE Goal: ions. Component Date Dollar Amount of MWBE Public Works Quote INCLUSION PROGRAM PLAN 1.0 - Scope of Work to be Performed scope/schedule if you need additional space) Total Bid Amount: (Attach FORM MWBE ITY OF SOUTH BEND Signature C MWBE UTILIZATION PLAN ame: N Project (Name/Telephone) Primary Contact Person MINORITY AND WOMEN BUSINESS ENTERPRISE ersion 2/14/2020 V Print Name Name & Address of MWBE Project Number:Bidder:Submitted by: This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MWBE partis the bidder’s sole responsibility to verify whether any listed minority or woman business meets the MWBE qualificat CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number:Date: Project Name: Bidder: Contact Person:Telephone: Address: City:State:Zip: Email: To determine whether a bidder has demonstrated good faith efforts to reach the MWBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALLof the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MWBE LIST(S): The bidder reviewed 1) the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non- certified) found at: http://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN MWBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MWBE participation in the awarded contract. Iaffirmthat I reviewed the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan and theIndiana Department of Administration’s certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). Iaffirmthat I have made good faith efforts to select portions of the contract work to be performed by MWBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate MWBE participation. Iaffirmthat I havemade good faith efforts to solicit through all reasonable and available means the interest of all MWBEs in the scopes of work of the contract. Iaffirmthat I attended all pre-bid meetings scheduled by the City of South Bend to inform MWBEs of contracting and subcontracting opportunities. Iaffirmthat I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MWBEs reasonable time to respond to such advertisements. Iaffirmthat I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MWBEs of subcontracting opportunities and allowed sufficient time for MWBEs to participate effectively. Iaffirmthat I followed up on initial solicitations with interested MWBEs. Iaffirmthat I negotiated with interested MWBEs in good faith, including providing such MWBEs with adequate information about the plans, specifications and other requirements of the subcontract. Iaffirmthat I have made good faith efforts to assist interested MWBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 2/14/2020Public Works Quote CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Iaffirmthat I have made good faith efforts to assist interested MWBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. Iaffirmthat I did not reject any MWBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MWBE that has bid on the subcontracting opportunity: 1.Name, address, and telephone number; 2.A description of information provided by the bidder or subcontractor; and 3.A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. *Proper demonstrationof Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 2/14/2020Public Works Quote CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MWBE-2.1 MWBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MWBEs. It is the bidder’s sole responsibility to verify whether any listed minority or woman business meets the MWBE qualifications. Attach additional pages if necessary. PAGE_______OF________ Project Number:MWBE Participation Goal Project Name: Bidder: By: (Signature)(Title)(Date) MWBE Firm Owner or Contact at MWBE Firm Telephone:Fax:Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MWBE FIRM: MWBE Firm Owner or Contact at MWBE Firm Telephone:Fax:Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MWBE FIRM: Version 2/14/2020Public Works Quote Specifications FOR OLIVE ST STATION ROOF REPAIR SOUTH BEND, INDIANA Prepared For: CITY OF SOUTH BEND, INDIANA 46601 Prepared By: 325 S Lafayette South Bend, IN 46601 (574) 238-4388 2020-0xxx August 18, 2020 SECTION 00005 TABLE OF CONTENTS SPECIFICATIONS Division 4 - Masonry: 04920 Masonry Restoration Repair Division 6 - Wood and Plastics: 06100 Carpentry Division 7 - Thermal and Moisture Protection: 07321 Clay Roofing Tiles 07600 Flashing and Sheet Metal 07710 Copper Gutters 07920 Sealants and Caulking END OF SECTION TABLE OF CONTENTS 00005-2 SECTION 00009 PROJECT DIRECTORY OWNER: City of South Bend Board of Public Works 1316 County City Building 227 West Blvd. Jefferson South Bend, Indiana 46601 Attn: Zach Hurst ARCHITECT: Jones Petrie Rafinski 325 S. Lafayette Blvd. South Bend, IN 46601 Attn: Mr. Edward J. Kowalczyk, AIA Phone: (574) 238-4388 END OF SECTION PROJECT DIRECTORY 00009-1 Herewith is the list of unit prices referenced in the bid submitted by: (Bidder) ...................................................... To: City of South Bend Board of Public Works Dated and which is an integral part of the Bid Form. The following amounts shall be added or deleted to the Bid Sum. 1. g. Description: remove and replace damaged roof wood decking beyond that identified on the contract drawings Unit of Measurement: Square foot of wood decking. Unit Price No. 1 2. piece to replace damaged tiles beyond that identified on the contract drawings. Provide a unit price for each of the following pieces. A. Roof tile-Price 2A B. Ridge tile-Price 2B 3. scription: remove and replace damaged and deteriorated mortar beyond that identified on the contract drawings. Unit of Measurement: Lineal foot of facia. Unit Price No. 3 4. ription: remove and replace damaged and deteriorated gutter beyond that identified on the contract drawings. Unit of Measurement: Lineal foot of gutter. Unit Price No. 4 END OF DOCUMENT Bid Form Supplements 00430-4 DIVISION 4 MASONRY INDEX 04920 Masonry Restoration Repair END OF SECTION MASONRY INDEX SECTION 04920 MASONRY RESTORATION REPAIR PART 1 - GENERAL 1.1 SUMMARY A. The work required under this Section consists of Masonry Restoration Repair as noted on the drawings and as specified herein. B. In general, the work consists of: 1. Tuckpoint parapet cap stone. 2. filled with sealant. 3. Patch and repair damaged stone. 1.2 SUBMITTALS A. Submit manufacturer's technical data covering products proposed and method of cleaning for approval prior to start of repair operations. B. Manufacturer's Specifications and Application Instructions for Sealant: 1. Submit manufacturer's technical specifications and application instructions for sealant specified. 2. Submit type of sealant material used - for field use. 1.3 QUALITY ASSURANCE: A. Applicator's Qualifications: 1. Not less than 5 years in business and experience in masonry restoration work of the type specified herein. 2. Submit a list of projects completed in the last 2 years of similar size and complexity. B. Industry Standards: 1. Work specified by reference to the published specifications of a manufacturer or association shall comply with the requirements of the specification listed. a. In case of conflict between the referenced specification and the project specifications, the project specifications shall govern. 1.4 GUARANTEE: A. All repair and restoration work shall be unconditionally guaranteed for ten (10) years against leakage. Should leakage develop in the treated elevation at any time within ten (10) years, the contractor shall repair at no expense to the Owner. MASONRY RESTORATION REPAIR 04920-1 B. Contractor shall furnish a written ten (10) year guarantee on the following described work and shall cite at least ten (10) buildings so done, with dates of completion, as evidence of his ability to perform the work and fulfill the terms of the Guarantee. Contractors shall provide Owner with statement of protection against loss arising from use of any patents or patents pending in connection with this work. 1.6 ENVIRONMENTAL CONDITIONS: A. Tuckpointing operations shall not be performed below 40 degrees F or above 95 degrees F. PART 2 - PRODUCTS 2.1 WATER: A. Water for chemical dilution and for pressure washing must be clean, potable and free of any chemicals such as iron or copper which may cause a surface disfigurement. 2.2 TUCKPOINTING MORTAR MATERIALS: A. Approved Manufacturers: 1. Jahn Restoration Mortars by Cathedral Stone Products, Inc. a. M110 Historic Pointing Mortars. B. Water: Clean and potable. 2.5 SEALANT MATERIALS A. Sealants: 1. Tremco DYMERIC - Three part epoxidized polyurethane 2. Tremco DYMONIC Polyurethane or approved equal. B. Cleaners and Primers: 1. Furnish Tremco 200 cleaner for use with Tremco Sealants. 2. Furnish manufacturer's recommended primers for application to the various substrates. C. Backer Rods: 1. Backer Rod: Closed cell polyethene foam equal to "HBR" backer rod as manufactured by Hercules, Inc., or approved equal. PART 3 - EXECUTION 3.1 WORKMANSHIP A. Job Superintendent: This Contractor shall have a job superintendent (foreman), who is known for his integrity and expertise in this type of work, on the Project full time once the work is started. MASONRY RESTORATION REPAIR 04920-2 1. He shall have no less than five (5) years of field experience as a superintendent for the type of work specified and required by this Project. B. The highest standards of craftsmanship shall prevail from the start of the work to completion. 3.2 JOINT REMOVALS AND REPAIRS A. Remove all sealant in joints within the limits of restoration work. B. Remove mortar in all vertical and horizontal mortar joints within limits of restoration work by means of joint rakers, hand tools, grinders and/or pneumatic tools. Remove mortar to a min. depth of 2 - 2½" times the width of the joint to surface to a watertight condition. 1. Exercise care not to damage the edges and corners of the stone. 2. Bottom of joints shall be square cornered (perpendicular with the bed face of the stone). 3. All joints are to be cleaned and free of all clinging mortar from the edges of the joints. The joints shall be cleaned with air or flushed clean with water to ensure the adherence of the new mortar. C. Cut out damaged stone and replace with new stone. Replace missing brick with new stone, matching existing precisely. 3.3 TUCKPOINTING MASONRY A. Inspection: 1. Examine the wall surfaces to determine that joint removal work is complete, cleaning is complete, and joints are clean and free of loose materials, ready for installation of tuckpointing mortar. B. Mortar Mixes: 1. The mixing ratio is approximately 4½ - 5 parts powder to 1 part water by volume, depending on temperature and humidity. More water may be required as ambient temperature rises. The mixing may be done by hand, stirring until the mortar is thoroughly mixed. For best results, add the powder to the water slowly. The working time will vary, depending upon wind, temperature and humidity. Using excessive water in the mix may affect the color of the repair. C. Placing Tuckpointing Mortar: 1. Joints shall be wetted before installation of new mortar to prevent rapid setting, but not wet beyond saturation point of the brick. 2. Where existing mortar has been removed to a depth greater than one inch (1"), these deeper spaces shall be filled first, compacting new mortar in several layers. 3. Start placing new mortar from the back of the entire joint filling about a one-quarter (1/4") inch thick layer for several feet at a time. Pack tightly, MASONRY RESTORATION REPAIR 04920-3 allow to set to "thumbprint hardness" and apply another layer finally bringing flush to the exterior face of the brick surfaces. a. When placing in layers, it is imperative to allow each layer to become stiff before the next layer is installed. b. Pointing tools shall not exceed the width of the joint being tuckpointed 4. Tooling Joint: a. When the final layer is "thumbprint" hard, tool the joint with a convex runner tool to produce a dense, tight, flush slightly concave joint. b. Those joints which are to be recessed to receive other materials may be tooled smooth with the pointing tool. D. Final Wetting Cure: 1. Periodically, mist joints using clean water for at least a 72 hour period. E. Clean-up: 1. Remove uncured mortar from the perimeter of the joint before it dries, using clean water and a rubber sponge or a dry brush. Cured mortar may only be removed chemically or mechanically. 3.4 MISCELLANEOUS REPAIRS A. Fractures in Brick Masonry: 1. It is intended that the stress cracks which are in the exterior face brick and which range from 1/32" to 1/8" in width are to be injected with a silicone sealant to seal the joint and to match the brick color. 2. Those fractures which are larger than 1/8" are to be: a. Cut out following line of fracture, to a minimum depth of one and one-half inches (1-1/2"). Thoroughly clean each joint, removing all loose materials. Leave masonry sides of joints exposed and clean. b. If a fracture is due to structural movement, repair the fractures with a sealant of suitable color especially prepared as a flexible bonding material and in such a manner that expansion and contraction in these stress-inclined areas will still be permitted. c. If the fracture is not the result of structural movement, repair with special mortar mix containing suitable materials to match brick color. 3.5 SEALANT RESTORATION A. Removal Work: 1. Remove existing sealant in those joints which are currently caulked or sealed with sealant. B. Preparation of Surfaces: 1. A clean, dry surface is required. 2. Rake joints clean, brush and dry where necessary. MASONRY RESTORATION REPAIR 04920-4 3. Remove all oils, grease, wax, tar, asphalt, putty, caulking, mastic, laitance protective films, waterproofing, form release agent, paint, dirt, and other foreign matter. 4. Wipe surfaces with solvent wipe or cleaner as recommended by the sealant manufacturers. 5. Mask adjacent to joints, as required, in continuous strips. 6. Apply primer as recommended by sealant manufacturer. Note: Primer is not required with silicone or urethane on some surfaces. 7. Mortar replacement shall be complete and properly cured before placing sealant. C. Where spaces around openings are deeper than 3/8", they shall be packed with backer rod to this depth prior to filling with sealant. Larger openings may require other fill methods which should be submitted (prior to actual work) for approval. D. Where joints are subject to movement install backer rod. E. Sealant Color: 1. Color used shall match the materials being sealed and be approved by Architect/Engineer/Engineer in charge. F. Application: 1. Install backer rod in joints over 3/8" deep. a. Install backer rod with blunt instrument compressing 25% to 50% to fit joint, so joint depth is a minimum 1/4" or 50% of width. b. With silicone sealants, provide joint depth of ½". c. Do not stretch or twist backer rod while installing. d. Measure depth to crest of backer rod. 2. Apply sealant by gun with a tip size that will seal the opening or joint with one pass of the gun, giving a smooth finish free of wrinkles, voids or pockets. 3. Install sealant to fill joint and bring flush with stone or brick face and dress (tool) to a smooth, tight joint free of fins, smears or overlaps. 4. Tooling: a. Perform tooling within ten (10) minutes of sealant application. b. Compress sealant into joints with tooling rod. c. Neatly tool finish all joints on flush surface flush. d. Point internal corners with coving tool. 5. Remove masking materials immediately after tooling. G. Clean Up: 1. Clean adjacent surfaces immediately of excess materials and smears as work progresses. 2. Repair and correct all defective work. 3.6 ADJUST AND CLEAN: A. Protect adjacent surfaces against damage during the Work of this Section. MASONRY RESTORATION REPAIR 04920-5 B. Satisfactorily repair any damaged surfaces or materials, or replace with new materials. C. Upon completion of work, remove all unused materials, equipment, debris, etc., and leave the premises in a clean and acceptable condition. END OF SECTION MASONRY RESTORATION REPAIR 04920-6 DIVISION 6 WOOD AND PLASTICS INDEX 06100 Carpentry END OF SECTION WOOD AND PLASTICS INDEX SECTION 06100 CARPENTRY PART 1 - GENERAL 1.1 SUMMARY A. Furnish and install: 1. Wood, nails, bolts, screws, framing, anchors and other rough hardware, and other items needed, and perform rough carpentry for the construction shown on the Drawings, as specified herein, and as needed for a complete and proper installation. 2. All finished carpentry. 1.2 QUALITY ASSURANCE A. Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the work of this Section. B. Codes and standards: 1. In addition to complying with the pertinent codes and regulations of governmental agencies having jurisdiction, unless otherwise specifically directed or permitted by the Architect/Engineer comply with: a. "Product Use Manual" of the Western Wood Products Association for selection and use of products included in that manual; b. APA Engineered Wood Association; 1.3 DELIVERY, STORAGE, AND HANDLING A. Protection: 1. Deliver the materials to the job site and store, in a safe area, out of the way of traffic, and shored up off the ground surface. 2. Identify framing lumber as to grades, and store each separately from other grades. 3. Protect metals with adequate waterproof outer wrapping. 4. Use extreme care in off loading of lumber to prevent damage, splitting, and breaking of materials. PART 2 - PRODUCTS 2.1 GRADE STAMPS A. Identify framing lumber by the grade stamp of the Southern Pine Inspection Bureau or West Coast Lumber Inspection Bureau, or such other grade stamp as is approved in advance by the Architect/Engineer. CARPENTRY 06100-1 B. Identify plywood as to species, grade, and glue type by the stamp of the APA Engineered Wood Association. C. Identify other materials of this Section by the appropriate stamp of the agency approved in advance by the Architect/Engineer. 2.2 MATERIALS A. Provide materials in the quantities needed for the Work shown on the Drawings, and meeting or exceeding the following standards of quality: 1. Structural lumber, including all floor joists, ceiling joists and beams, and exterior entrance platforms: Southern Pine, No. 1, Kiln Dried. 2. Non Structural Horizontal framing members: Douglas Fir-Hemlock, Table 1, Construction grade. 3. Non Structural Vertical framing members: Douglas Fir-Hemlock, Table 1, Standard grade. 4. Sheathing: a. Exposure 1. 5. Wood preservative: Ammoniacal copper arsenite, or 5% solution of pentachlorophenol. 6. Rough hardware: a. Steel items: (1) Comply with ASTM A36. (2) Use galvanized at exterior locations. b. Machine bolts: Comply with ASTM A307. c. Lag bolts: Comply with Fed Spec FF-B-561. d. Nails: (1) Use common except as otherwise noted. (2) Comply with Fed Spec FF-N-1. (3) Use galvanized at exterior locations. e. Powder-actuated Fasteners: 1. Comply with ASTM B633, SCI, Type III 2. As manufactured by Hilti fastening systems or equal as approved by the Architect/Engineer. f. Expansion Anchors: 1. Use wedge type anchors with a single three section wedge 2. Comply with Federal Specifications A.A 1923A, Type 4. g. Joist hangers and Metal Straps & Brackets: Simpson, Teco, or equal as approved by the Architect/Engineer. 2.3 OTHER MATERIALS A. Provide other materials, not specifically described but required for a complete and proper installation, as selected by the Contractor subject to the approval of the Architect/Engineer. PART 3 - EXECUTION 3.1 SURFACE CONDITIONS CARPENTRY 06100-2 A. Examine the areas and conditions under which work of this Section will be performed. Correct conditions detrimental to timely and proper completion of the Work. Do not proceed until unsatisfactory conditions are corrected. 3.2 DELIVERIES A. Stockpile materials sufficiently in advance of need to assure their availability in a timely manner for this Work. B. Make as many trips to the job site as are needed to deliver materials of this Section in a timely manner to ensure orderly progress of the Work. 3.3 COMPLIANCE A. Do not permit materials not complying with provisions of this Section to be brought onto or to be stored at the job site. B. Promptly remove non-complying materials from the job site and replace with materials meeting the requirements of this Section. 3.4 WORKMANSHIP A. Produce joints which are tight, true, and well nailed, with members assembled in accordance with the Drawings and with pertinent codes and regulations. B. Selection of lumber pieces: 1. Carefully select the members. 2. Select individual pieces so that knots and obvious defects will not interfere with placing bolts or proper nailing, and will allow making of proper connections. 3. Cut out and discard defects which render a piece unable to serve its intended function. 4. Lumber may be rejected by the Architect, whether or not it has been installed, for excessive warp, twist, bow, crook, mildew, fungus, or mold, as well as for improper cutting and fitting. C. Do not shim any framing component. 3.5 GENERAL FRAMING A. General: 1. Install wood blocking and backing required for the work of other trades. B. Installation: 1. Set rough carpentry to required levels and lines, with members plumb, true to line, cut and fitted. Fit rough carpentry to other construction, scribing and coping as needed for an accurate fit. 2. Securely attach rough carpentry work to substrate as indicated on the plans. Connections not detailed on the plans shall be in accordance with Table 2304.9.1, fastening schedule, contained in the Indiana Building Code. Make tight connections between members. Install fasteners without splitting wood; predrill holes as required. CARPENTRY 06100-3 3.6 SLEEPER AND NAILERS A. Install where indicated and when required for attaching other work. Form to shapes and thicknesses required for true line and level of attached work. B. Attach to substrate as indicated on the plans, recess anchors with surface of member. 3.7 BLOCKING AND BRIDGING A. Install blocking as required to support items of finish and to cut off concealed draft openings, both vertical and horizontal, between ceiling and floor area. 3.8 WOOD STRUCTURAL PANEL INSTALLATION A. General: Comply with applicable recommendations contained in APA 3.9 FASTENING A. Nailing: 1. Use only common wire nails or spikes of the dimension shown in Table 2304.9.1, fastening schedule of the Indiana Building Code, except where otherwise specifically noted on the Drawings. 2. For conditions not covered in the Nailing Schedule provide penetration into the piece receiving the point of not less than the length of the nail or spike, provided, however, that 16d nails may be used to connect two pieces of 2" (nominal) thickness. 3. Nail without splitting wood. 4. Pre-bore as required. 5. Remove split members and replace with members complying with the specified requirements. B. Bolting: 1. Drill holes 1/16" larger in diameter than the bolts being used. 2. Drill straight and true from one side only. 3. Do not bear bolt heads on wood, but use washers under all nuts. C. Screws: 1. For lag screws and wood screws, pre-bore holes same diameter as root of threads, enlarging holes to shank diameter for length of shank. END OF SECTION CARPENTRY 06100-4 DIVISION 7 THERMAL AND MOISTURE PROTECTION INDEX 07321 Clay Roofing Tiles 07600 Flashing and Sheet Metal 07710 Copper Gutters 07920 Sealants and Caulking END OF SECTION THERMAL AND MOISTURE PROTECTION INDEX SECTION 07321 CLAY ROOFING TILES PART 1 - GENERAL 1.1 SUMMARY A. Repair clay roofing system where indicated on the Drawings, as specified herein, and as needed for a complete and proper installation. B. Related Sections: 1. 2. 1.2 SUBMITTALS A. Manufacturer's specifications and other data needed to prove compliance with the specified requirements; B. One Sample of thoroughly dry mortar proposed to be used, showing the proposed color. 1.3 QUALITY ASSURANCE A. Roofing contractor shall have no less than five (5) years of experience on projects of similar size and scope. B. Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the work of this Section. 1.4 DELIVERY, STORAGE, AND HANDLING A. Field tile is generally shipped in pallets and fittings in boxes. Upon receipt of shipment, the pallets and boxes should be examined for possible damage in transit and if any, should be noted on the shipping papers and a claim must be filed promptly against the delivering carrier. B. The pallets and boxes of tile should be placed in a level, safe place away from traffic and construction activity. Pallets of tile must not be stacked on top of each other. PART 2 - PRODUCTS CLAY ROOFING TILES 07321-1 2.1 MEMBRANE A. perimeter, B. Exposed decking shall be covered with two layers of No. 30 asphalt- impregnated roofing felt. New roofing felt shall overlap existing a minimum of 2.2 FLASHING A. Provide 20 oz. per square foot copper flashing for all valleys. Flashing shall underlayment required in paragraph 2.1.B. B. All pipe and vent penetrations shall have lead boots. 2.3 NAILS AND FASTENERS A. Use only nails and fasteners approved by the manufacturer of the clay roofing tiles used. 2.4 MORTAR A. Provide a good grade mortar complying with recommendations of the manufacturer of the clay roofing tiles used, and mixed with a suitable pigment to produce a color matching the color of the approved roofing tiles. 2.5 ROOFING TILES A. Provide Two-piece Italian Pan tiles and accessories to match existing. 1. Assume minimum 200 hip tiles for replacement. 2. Assume minimum 10 ridge tiles for replacement. 3. Assume 5 hip starters for replacement. 4. Assume minimum 20 eave closure pieces. 5. Field verify required field tile required for replacement before bids are made to client. 2.6 CLEANER A. Prosoco, Inc. EnviroKlean 2010 All Surface Cleaner. 2.7 OTHER MATERIALS CLAY ROOFING TILES 07321-2 A. Provide other materials, not specifically described but required for a complete and proper installation, as selected by the Contractor subject to the approval of the Architect/Engineer. PART 3 - EXECUTION 3.1 SURFACE CONDITIONS A. Examine the areas and conditions under which work of this Section will be performed. Correct conditions detrimental to timely and proper completion of the Work as noted on the drawings. Do not proceed until unsatisfactory conditions are corrected. 3.2 INSTALLATION A. Membrane: 1. Replace/repair deteriorated areas of the existing wood deckings and provide a completely smooth substrate for installation of the membrane. 2. Cover imperfections with not less than 18 gage metal. 3. Scatter-nail or scatter-mop base sheet to the deck. 4. Install the top sheet of membrane in a flood coat of hot asphalt, smoothing out wrinkles and fishmouths. 5. Install ice and water shield as required by the Manufacturer. B. Flashing: 1. Install min. 20 oz. copper gutter lining. Extend up roof slope as required by clay tile manufacturer. 2. Install valley flashing as required by clay tile manufacturer. 3. Install step flashing, apron flashing and counter flashing around dormer and chimney as required by clay tile manufacturer. C. Tiles: 1. Headlap the tiles uniformly in each course to provide the designed installation. 2. In the field of the roof, fasten each tile. a. Install spot repair tiles using 12 gauge copper wire as directed by clay tile manufacturer. 3. Use mortar sparingly and, except as otherwise shown on the Drawings, only to provide proper bedding for tiles in special situations. 4. Do not mortar the interlocking joints between field tiles or the joints between ridge, hip, and rake tiles. 5. Use mortar where required as a bedding material, but take care to prevent slopping or mortar onto exposed portions of the roof and to prevent the accumulation of mortar where it could have a damming effect on drainage. 6. Firmly secure accessory tiles in place. 7. Perform cutting of tiles in a manner to provide neat edges and a uniformly straight line. CLAY ROOFING TILES 07321-3 8. Finish the clay tile roofs as a completely waterproof and weatherproof system requiring no further normal maintenance. 9. All tiles are to be carefully removed from the canopy walkway roof and stored for reuse. 3.3 CLEAN UP A. Promptly upon completion of this portion of the Work, remove from the site the tools, equipment, surplus materials, tile-ends, and debris resulting from the clay tile roof installation. 3.4 CLEANING A. PREPARATION 1. Protect people, vehicles, property, plants and all surfaces not set for cleaning from the product, splash, rinse, residue, fumes and wind drift. Test all surfaces that may come in contact for compatibility. Immediately rinse non-target materials with large quantities of water. Divert pedestrian and auto traffic if necessary. 2. No cleaning shall take place when temperatures are below 50°F. 3. Contractor may not walk on clay tile roofing during cleaning. B. APPLICATION 1. Prewet the surface with clean water. 2. Apply the appropriately diluted solution to surface using a brush or low- pressure spray. 3. Let the cleaner stay on the surface 1-10 minutes, based on testing. Gently scrub heavily soiled areas. NOTE: Do not let EK Zolo dry and reapply the cleaner in a gently scrubbing manner. 4. Rinse the surface thoroughly with clean water. 5. Repeat steps 1 through 4 if necessary. C. CLEAN-UP 1. Clean tools and equipment using fresh water. D. SAFETY 1. and spills. END OF SECTION CLAY ROOFING TILES 07321-4 SECTION 07600 FLASHING AND SHEET METAL PART 1 - GENERAL 1.1 SUMMARY A. Provide flashing and sheet metal not specifically described in other Sections of these Specifications but required to prevent penetration of water through the exterior shell of the building. B. Related Sections: 1. 2. 1.2 SUBMITTALS A. Manufacturer's specifications and other data needed to provide compliance with the specified requirements: B. Shop drawings in sufficient detail to show fabrication, installation, anchorage and interface of the work of this Section with the work of adjacent trades: C. Manufacturer's recommended installation procedures, (if any), which, when approved by the Architect / Engineer, will become part of the basis for accepting or rejecting actual installation procedures used on the Work. 1.3 QUALITY ASSURANCE A. Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the work of this Section. B. In addition to complying with pertinent codes and regulations, comply with pertinent recommendations contained in the current edition of "Architectural Sheet Metal Manual" published by the Sheet Metal and Air Conditioning Contractors National Association (SMACNA). C. Standard commercial items may be used for flashing, trim, reglets, and similar purposes provided such items meet or exceed the quality standards specified. 1.4 DELIVERY, STORAGE, AND HANDLING A. All fabricated materials must be adequately packaged for handling the project site. Packaging should be minimum necessary to provide the fabricated materials to the project site free of dents, buckles, scratches or other imperfections. B. Stored materials must be elevated and sloped for moisture to drain from the surfaces. FLASHING AND SHEET METAL 07600-1 1. Copper and copper alloys should be stored in a clean dry location away from curing concrete and uncured masonry. Cover in a waterproof material and vent to prevent condensation. PART 2 - PRODUCTS 2.1 MATERIALS AND GAUGES A. Where sheet metal is required, and no material or gage is indicated on the Drawings, provide the highest quality and gage commensurate with the Conditioning Contractors National Association (SMACNA). 2.2 COATED COPPER WALL FLASHING A. B. Acceptable manufacturers for the coated copper flashing: 1. Polytite: 1-800-776-0930. 2. Advanced Building Products: Ceprcote 1-800-252-2306 or equal approved by the Architect / Engineer. 2.3 COOPER ROOF FLASHING A. Provide minimum 20 oz. copper flashing as required by clay tile roofing manufacturer. 2.4 NAILS, RIVETS, AND FASTENERS A. Use only copper rivets, copper coated nails, and Architect / Engineer approved washers in connection with the coated copper flashing. 2.5 OTHER MATERIALS A. Provide other materials, not specifically described but required for a complete and proper installation, as selected by the Contractor subject to the approval of the Architect / Engineer. PART 3 - EXECUTION: 3.1 SURFACE CONDITIONS A. Examine the areas and conditions under which work of this Section will be performed. Correct conditions detrimental to timely and proper completion of the work. Do not proceed until unsatisfactory conditions are corrected. 3.2 WORKMANSHIP A. General: FLASHING AND SHEET METAL 07600-2 1. Form metal accurately and to the dimensions and shapes required, finishing molded and broken surfaces with true, sharp and straight lines and angles. 2. Unless otherwise specifically permitted by the Architect / Engineer, turn exposed edges back 1/2". B. Form, fabricate, and install so as to adequately provide for expansion and contraction in the finished Work. C. Weatherproofing: 1. Finish watertight and weather tight where so required. 2. Make lock seam work flat and true to line. 3. Make lap seams, when sealed, at least ½ " wide. 4. Where lap seams are not soldered or sealed, lap according to pitch, but in no case less than 3". 5. Make flat and lap seams in the direction of flow. D. Joints: 1. Provide suitable watertight expansion joints for runs of more than 40'-0", except where closer spacing is indicated on the Drawings or required for proper installation. 2. Join parts with rivets or sheet metal screws where necessary for strength and stiffness. 3.3 EMBEDMENT A. Embed metal in connection with roofs in a solid bed of sealant, using materials and methods described in Section 07920 of these Specifications or other materials and methods approved in advance by the Architect / Engineer. 3.4 TESTS A. Upon request of the Architect / Engineer, demonstrate by hose or standing water that the flashing and sheet metal are completely watertight. END OF SECTION FLASHING AND SHEET METAL 07600-3 SECTION 07710 COPPER GUTTERS PART 1 - GENERAL 1.1 SUMMARY A. Provide copper guttering and accessories where shown on the drawings, as specified herein and as needed for a complete and proper installation. B. Related Sections: 1. 2. 1.2 SUBMITTALS A. Shop Drawings 1. Submit shop drawings showing location of each item, dimensional plans and elevations, large scale details, attachment devices and other components. B. Samples 1. 1.3 QUALITY ASSURANCE A. Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the work of this Section. 1.4 DELIVERY, STORAGE, AND HANDLING A. All fabricated materials must be adequately packaged for handling to the project site free of dents, buckles, scratches or other imperfections. PART 2 - PRODUCTS 2.1 APPROVED MANUFACTURERS A. Copper Craft, Inc. B. Vande Hey-Raleigh C. Ornamentals LLC 2.2 MATERIALS A. Copper: ASTM Specification B370 cold rolled, weighing not less than 20 oz. per square foot natural finish. B. Solder: per manufacturers recommendation. C. Fasteners: Use same metal. COPPERS GUTTERS 07710-1 PART 3 - EXECUTION: 3.1 INSPECTION A. All surfaces to which sheet metal is to be applied shall be smooth, sound, clean, dry, and free from defects that might affect the application. 3.2 INSTALLATION A. Gutters 1. Gutters shall match existing historic copper gutters in size and profile. 2. Shop-fabricate work to greatest extent possible. Fabricate for waterproof and weather-resistant performance, with expansion, provisions for running work, sufficient to permanently prevent leakage, damage, or deterioration of the work. 3. Seams: Tin edges to be seamed, form seams and solder. Rivet joints for additional strength where required. 4. Underlayment: Where installation is to be directly on wood, install a ship sheet of red rosin paper on a course of asphalt saturated felt. 5. Bed flanges of work in a thick coat of bituminous roofing cement where required for waterproof performance. 6. B. Joints: 1. Provide suitable watertight expansion joints for runs of more than 40'-0", except where closer spacing is indicated on the Drawings or required for proper installation. 2. Join parts with rivets or sheet metal screws where necessary for strength and stiffness. 3.3 CLEANING AND PROTECTION A. Clean exposed copper, surfaces, removing substances that might cause corrosion of copper or deterioration of finishes. B. Protection: Advise Contractor of required procedures for surveillance and protection of flashings and sheet copper work during construction to ensure that the work will be without damage or deterioration other than natural weathering at time of substantial completion. END OF SECTION COPPERS GUTTERS 07710-2 SECTION 07920 SEALANTS AND CAULKING PART 1 - GENERAL 1.1 SUMMARY A. Throughout the Work, seal and caulk joints where shown on the Drawings and elsewhere as required to provide a positive barrier against passage of moisture and passage of air. All joints are to be sealed and caulked whether specifically identified in this Section or not. Appropriate materials shall be used for the conditions being sealed. 1.2 SUBMITTALS A. Manufacturer's specifications and other data needed to prove compliance with the specified requirements. B. Manufacturer's recommended installation procedures which, when approved by the Architect/Engineer, will become the basis for accepting or rejecting actual installation procedures used on the Work. C. Samples: Accompanying the submittal described above, submit samples of each sealant, each backing material, each primer, and each bond breaker proposed to be used. Samples to include the following: 1. 2. Substrate test report for each sealer. 3. Certified Product test reports: Independent testing agency reports showing compliance with all specified requirements. a. Reports may be on tests conducted up to and including 24months before submission, provided the tests were conducted using aged specimens of the same products scheduled to be installed. 4. Field installation reports. 5. Certificates a. product complies with the Specifications and is appropriate for the intended use. 6. a. List all conditions detrimental to the performance of the scheduled installation of joint sealer. 1.3 QUALITY ASSURANCE A. Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the work of this Section. SEALANTS AND CAULKING 07920-1 1.4 DELIVERY, STORAGE, AND HANDLING A. Packing and Shipping: Deliver products in original unopened packaging with B. Storage and Protection 1. Protect from damage caused by elements and construction procedures. 2. Store at temperature recommended by material manufacturer. C. Do not retain at the job site material which has exceeded the shelf life recommended by its manufacturer. 1.5 DEFINITIONS A. Substrates: 1. a. Metals, porcelain, glazed tile and smooth plastics. 2. a. Concrete, concrete masonry units, brick, mortar, natural stone. work. 3. a. Wood, unglazed tile and substrates not included under other categories. 1.6 WARRANTY A. Submit written warranty signed by the Contractor and Installer guaranteeing to correct failures in the sealer installation that occur within 5 years after substantial completion, without reducing or otherwise limiting any other rights to correction which the Owner may have under the Contract Agreement. Failure is defined as the inability to remain weather tight due to faulty materials or workmanship. Correction is limited to the replacement of sealants. PART 2 - PRODUCTS 2.1 MATERIALS - GENERAL A. Provide only products which are recommended and approved by their manufacturer for the specific use to which they are to be installed and which comply with all requirements of the Contract Documents. 1. For each generic product: Use only the products of one manufacturer. 2. Provide and install only materials which are compatible with each other and with the joint substrates on which they are scheduled to be installed. 3. Colors: All colors are to be as selected by the Architect/Engineer from SEALANTS AND CAULKING 07920-2 2.2 ELASTOMERIC SEALANTS A. indicated complying with ASTM C 920, including specific type, Grade, Class and Uses indicated as well as all other requirements specified. 1. Where movement capability exceeding that measured by ASTM C 920 is specified, sealant shall withstand the total movement indicated while remaining in compliance with the other requirements specified when tested in accord with ASTM C 719, with base joint width measured at the time of application. 2. 3. 4. B. Medium Movement Silicone Sealant: One or two part, non-acid curing, Grade NS, Class 25, Use NT, plus movement capability of more than 25 percent but less than 50 percent in both tension and compression. C. Mildew Resistant Silicone Sealant: One part, Type S, Grade NS, Class 25, Use NT, formulated with fungicide for interior use on non-porous substrates. D. Silicone Sealant for Use T: One part, non-acid curing, Type S, Grade NS, class 25, Use T / Use M, plus movement capability of at least 50 percent in both tension and compression. E. All Purpose Urethane Sealant: Multi-part, non-sag, Type M, Grade NS, Class 25, Uses NT, M, G and A. F. Multi-part Pourable urethane Sealant: Type M, Grade P, class 25, Use T. G. One Part Non-sag urethane Sealant: Type S, Grade NS, Class 25, Use NT. H. One Part Pourable Urethane Sealant: Type S, Grade P, class 25, Use T. 2.3 SOLVENT RELEASE CURING SEALANTS A. Acrylic Sealant: Non-sag, one-part, solvent release curing; complying with ASTM C 920, Type S, Grade NS, Use NT, with the following exceptions: 1. Weight Loss: 15 percent maximum. 2. Movement capability: 7-1/2 percent minimum in both tension and compression. 2.4 LATEX SEALANTS A. Acrylic Latex Emulsion Sealant: One part, non-sag, mildew resistant, paintable; complying with ASTM C 834. SEALANTS AND CAULKING 07920-3 2.5 NON-CURING SEALANTS A. Non-curing Butyl Sealant: Non-drying, non-hardening, non-skinning, non- staining, gunable synthetic rubber sealant. B. Butyl Polyisobutylene Sealant: Non-curing, non-drying, solvent release; complying with 809.2 as described in AAMA 800. 2.6 COMPRESSION SEALANTS A. Compressible Foam Sealant: High-densityopen-cell urethane foam saturated with non-drying water repellent; pre-compressed in rolls or sticks; permanently flexible, mildew resistant and non-staining. 1. For vertical above grade applications: a. Select sizes so that the installed sealer is compressed as recommended by the manufacturer to provide a weather-tight seal. b. 2.7 SEALANT BACKERS A. manufacturer for specific use. B. Foam tubing joint filler: Flexible, non-absorbent, compressible neoprene, butyl or EPDM foam tubing, unless otherwise restricted by the sealant manufacturer; complying with ASTM D 1056; suitable for exposure to weather for an extended period and subsequent installation of sealant with no further preparation; size and shape as required to provide a weather seal. 2.8 PRODUCTS A. (Joints subjected to horizontal traffic): 1. Self-leveling, complying with ASTM C920-79, grade P, class 25. 2. Acceptable products: a. b. B. (Joints subject to extreme movement): 1. Non-sag, complying with ASTM C920-79, type S, grade NS, class 25. 2. Acceptable products: a. b. C. (Joints not listed above): 1. Acrylic latex, complying with ASTM C834-76; 2. Acceptable products: a. D. Color: SEALANTS AND CAULKING 07920-4 1. standard range of available colors by the Architect/Engineer. 2. In concealed installations, and in partially or fully exposed installation where so approved by the Architect/Engineer, use standard gray or black sealant. 2.9 MISCELLANEOUS MATERIALS A. Primers: Use primes determined to be required by substrate testing for each particular installation. Primers used to be non-staining and shall be suitable for the installation and the substrate. B. Cleaners: As recommended by the sealant manufacturer, not damaging to the substrate. C. Masking Tape: Non-absorbent and non-staining type. D. Tooling Agents: Approved by the sealant manufacturer; non-staining to the sealant or the substrate. E. Provide other materials, not specifically described but required for a complete and proper installation, as selected by the Contractor subject to the approval of the Engineer. PART 3- EXECUTION 3.1 SURFACE CONDITIONS A. Examine the areas and conditions under which work of this Section will be performed. Correct conditions detrimental to timely and proper completion of the work. Do not proceed until unsatisfactory conditions are corrected. 3.2 PREPARATION A. Cleaning: Prior to the start of the sealer installation, clean out joints n accord with the recommendation of the sealer manufacturer and as follows: 1. Remove all material that could impair adhesion, including dirt, dust, coatings, paint, oil and grease. Exception: Materials tested to show acceptable adhesion and compatibility. 2. Dry out damp and wet substrates thoroughly. 3. Clean M-type and O-type substrates by suitable mechanical or chemical methods. 4. Remove loose particles by vacuuming or by blowing with oil-free compress air. B. Steel surfaces: 1. Steel surfaces in contact with sealant: a. Sandblast as required to achieve acceptable surface for bond. b. If sandblasting is not practical, or would damage adjacent finish, scrape the metal or wire brush to remove mill scale. SEALANTS AND CAULKING 07920-5 c. Use solvent to remove oil and grease, wiping the surfaces with clean white rags only. 2. Remove protective coatings on steel by sandblasting or by using a solvent which leaves no residue. C. Aluminum surfaces: 1. Aluminum surfaces in contact with sealant: a. Remove temporary protective coatings, dirt, oil, and grease. b. When masking tape is used for protective cover, remove the tape just prior to applying the sealant. 2. Use only such solvents to remove protective coatings as are recommended for the purpose by the manufacturer of the aluminum work, and which are non-staining. 3.3 INSTALLATION OF BACKUP MATERIAL A. When using backup of tube or rod stock, avoid lengthwise stretching of the material. Do not twist or braid hose or rod backup stock. B. Installation tool: 1. For installation of backup material, provide a blunt-surfaced tool of wood or plastic, having shoulders designed to ride on the adjacent finished surface and a protrusion of the required dimensions to assure uniform depth of backup material below the sealant. 2. Do not, under any circumstance, use a screwdriver or similar tool for this purpose. 3. Using the approved tool, smoothly and uniformly place the backup material to the depth indicated on the Drawings or otherwise required, compressing the backup material 25% to 50% and securing a positive fit. 3.4 PRIMING A. Use only the primer recommended by the manufacturer of the sealant, and approved by the Architect/Engineer for the particular installation, applying in strict Architect/Engineer. 3.5 BOND-BREAKER INSTALLATION A. Provide an approved bond-breaker where recommended by the manufacturer of the sealant, and where directed by the Architect/Engineer, adhering strictly to the installation recommendations as approved by the Architect/Engineer. 3.6 INSTALLATION OF SEALANTS A. Prior to start of installation in each joint, verify the joint type according to details on the Drawings, or as otherwise directed by the Engineer, and verify that the required proportion of width of joint to depth of joint has been secured. B. Equipment: SEALANTS AND CAULKING 07920-6 1. Apply sealant under pressure with power-actuated or manually-operated hand gun, or by other appropriate means. SEALANTS AND CAULKING 07920-7 2. Use guns with nozzle of proper size, and providing sufficient pressure to completely fill the joints as designed. C. Thoroughly and completely mask joints where the appearance of sealant on adjacent surfaces would be objectionable. D. thoroughly filling joints to the recommended depth. E. Tool joints to the profile shown of the Drawings, or as otherwise required if such profiles are not shown on the Drawings. 1. Provide uniformly smooth joints with slightly concave surface. 2. Clean adjacent surfaces free from sealant as the installation progresses, using solvent or cleaning agent recommended by the manufacturer of the sealant used. F. Cleaning up: 1. Remove masking tape immediately after joints have been tooled. 2. Clean adjacent surfaces free from sealant as the installation progresses, using solvent or cleaning agent recommended by the manufacturer of the sealant used. 3. Upon completion of the work of this Section, promptly remove from the job site all debris, empty containers, and surplus material derived from this portion of the work. END OF SECTION ,0.!94(!.!5!203#!)GW*,0.!9(!.!22#!)GW* 22#!)GW* ,0.!214(!.!1!2027#!)GW* SPVOE!QFOFUSBUJPO