HomeMy WebLinkAboutOpening of Bids - Speed Hump Installation Bid Proj No. 120-043 - Walsh & Kelly, Inc.CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name Speed Hump Installation Bid
Project No. 120-043
For Bids Due August 11, 2020 at 9:30am Local Time
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check
X or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
X executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
X Certification of use of United States Steel Products or Foundry Products.
Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not
met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted
X Form [MWBE-2.1].
X Acknowledge Receipt of 1 Addendum(s) included with the bid.
® All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
X printed or typed underneath signature.
X This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: Walsh
................................................................
By Authorized Rel
Signature:
Print Name & Titl
n Hilac. VP of South
Version 4/2/2019 Contractor's Bid for Public Works - 1
Date: 8/11 /20
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Address: 24358 SR 23
City/State/Zip: South Bend IN 46614 Telephone Number: ( 574 ) 288-4811
Agent of Bidder (if Applicable):
,....., -----------------__.
Pursuant to notices even the under - ---------------
g signed offers to furnish labor and/or material necessary to complete the
public works project of:
Speed Hump Installation Bid
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
.-.._ - --- Troffer rout ......... ............................... _................ _.
and dated 7/14/20 for the sum of (enter the Total Bid as shown on the Proposal)
Two hundred ei� three thousand wone whundred sixteen dollars and zero cents �$ 283,116.00
_._.....
(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are nfx�`�8, ,
shown in the original contract if accepted by the City,of"`S,a ith B
basis, the itemization of the units shall be shown o ,a,;%,6parat
By
Dustin Hlla
th 1 cost of units must be the same as that
If the bid is to be awarded on a unit
(Signature)
VP of South Bend Area
Y4 ® .. .... .._...
C, R�?, , mb � �.. ���
(Printed Name of Person Signing)
V ACCEPTANCE
The above,bid is � aptd-dLt�hi$ Z day of
.... .....
Subject to thofolio i hditio
.m
Gary A. Gilot, President
Elizabeth A. Maradik, Member
Joseph R. Molnar, Member
Jordan V. Gathers, Member
Therese J. Dorau, Member
Attest: Linda M. Martin, Clerk
Version 4/2/2019 Contractor's Bid for Public Works - 2
20
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version 4/2/2019 Contractor's Bid for Public Works - 3
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF Indiana ...... )
SS:
_St., J_ose,h..., COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
Version 4/2/2019 Contractor's Bid for Public Works - 4
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City
of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or
applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions,
or privileges of employment, or any matter directly or indirectly related to employment because of race, sex,
religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or
disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors
certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise
("WBE") as a factor in determining the lowest, responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a subcontract
to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a
discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from
being awarded a City contract for a period of one (1) year from the date of such determination, and such
determination may also be grounds for terminating the contact for which the discriminatory practice or
noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 4/2/2019 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 11,.th day of AUS.................1 2020
Inc.
of Contractor/Bidder or Its Agent
�� Dustin Hilary VP of South Bend Area
Printed Name and Title
Subscribed and sworn to before me this 11ah....... day of u5ust.. , 20 20
M Commission Expires 6/5/22
Y.. .; ...:.:..
Notary Public Alifpza Krueger mN
County of Residence St. Joseph
4C 4 H KRI.iEGER �r
Contractor's Bid for Public Works - 6
,iVtf lift�f ,}
pubVic, state of {nJixna�
�F
�. -a e k
.ICtSB�'Yt�:aUkiTW
F .pir
�,y Crymrriis rJrt s�s
d
Version 4/2/2019
-1, vtl
BID/PROPOSAL011
it
CITY OF SOUTH BEND `
Project Name: Speed Hump Installation Bid , 186 ,
................ ---- ..... ....— — ---------------------- _ „ . ........ .
Project Number: 120-043
----
.---
_ -----------
_____ ....................................................................._.
For Bids Due: August 11, 2020 at 9 30am Local Time — see III w :uitlll�ullllt�m�:� d:u)Ma� t!g4E
for electronic bid submission information
Contractor Name: Walsh & Kell, Inc.
DIVISION A — Harter Heights
Item
No
Description
Quantity
Unit
Unit Price
Total Amount
1
Speed Hump, Concrete
7
Each
$19,450.00
$136,150.00
2
W 17-1
14
Each
$201.00
$2,814.00
3
High Contrast Chevron Pavement
14
Each
Markin Set ...................
_
$.., .. e...
750 00
$10,500.00
Asa ..w..
DIVISION A TOTAL
$149,464.00
DIVISION B — Monroe Park
Item
No
Description
Quantity
Unit
Unit Price
Total Amount
1
Speed Hump, Concrete
4
Each
$20,860.00
$83,440.00
2
W 17-1
8
Each
3
High Contrast Chevron Pavement
8
Each
MarkinSet g
,,,,,,,(
,, $750.00
6 000.00
-------
DIVISION B TOTAL
$91 ,048.00
DIVISION C — Riverside and Lathrop
Item
No.
_
Description
Quantity
Unit
Unit Price
...... ........
.-.-..._.,
Total Amount
...... ........ .
1
Speed Hump, Concrete
.... --- _,,,,,
2
Each
$19,400.00
$38,800.00
2
W 1.7 1_ _..... ............. ������
�.. 4
Each_201.00
... __._..
$804 00......
3
Contrast Chevron Pavement
4
Each
Mark nr Set
$750 00
$3,000.00
DIVISION C TOTAL
$42,604.00
........................................ _................. _............ ---
Bidder (Firm): Walsh...-& Kelly_., -_Inc-_______
.........
___..-__
Address: 24358 SR 23
City/State/zip: South Bend IN 46614 Telephone NumberBy
,
Dustin Hi
(Signature)
VP of South Bend Area
(Printed Name of Person Signing)
Version 4/2/2019 Contractor's Bid for Public Works - 7
umIM&co
✓�,0
C
ti
w
moo
o
..................
0
xlp'b
m
co
bra
st
Q 0
O
,�
N o a
00
r
._
r
o
a m
R O
—
CL
C
w L
''cc
V
C
m O
W
w
m
0
t Q
'oo
O
IL
U
CD
O
�w Cc
w
am
rl-
rn
0
N
c
LU
N
Ln
2 O
O :.
�
CV......
..
.........
.. _ ..................
_ w
th
V �
~
0 0
U
v�
a"
m
CL
w
L
m
w
p
O O
Eco
p
-a o
O
c
w
V N
r
E �
a
ca
Y
j C
in
M
y
I
Z
O
din
3
c
00
N
CD
pwQ
i •�
0c
g
fig
oo
T
� ~-
mwC7
Oa,
O
�a
CO
E
cc
0
2 y a
w V
= 0
o L:
c'�o
d
HW�
m:
HOC
0 3
y
w
E
E
CD
Q N
0-6o
c
OZZ
rn�nw
�a
c
o�g
Q
>
ti7a
0m0
2w
Om
w'�
0c
m
V
t�
m
:°
o
_06
-0_D
O
m
0
....................
,,,.. ....................
Z
Q
++
R 10
cu
Z
c
Z
o
E c
-.
O
N
C
O
a
aL
Mnr
NN
Ecu
O
Z
m c
3
ca
H�
r+
3
U
U C
(N
r
[V
N
L.
'O N
z E
m
01
_
E
E Z
U
(6
I
Y
N =
co
otS
6
CD M
0
L
C
U
as
00
CA
.Fu
sd
w
Emti
L
U >
CD
cn
C/) BO
G
L O
0 N
o
w
� U
H
- y N
L
-0
;� M
O to
O O Z
`�
.0 � 0
d 'C -
E
�
Q
La
� d �
O
(� cn
E=�
z
U Z
LcQ
O
0s�
N
`
E
C.)
(n
co)
�+ d
CD
-0
O
EEO X
r 0
c
cv
2 lLi c
A c
a
m
ILLY
r
cn�-1
N
OJ
2
E
ca
cz
N
a
co
w
0
U
a
0
v
m
N
0
U
w
c
0
U
rn
0
N
N
c
U
m
rs'^°A'nYa�wzro
CITY OF SOUTH BEND' mama
,r" dry
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM..,y.r 1
FORM MWBE-2.0 K
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBEIWBE participation. It is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration ("IDOA").
Project Number: 120-043 Date: 8/11 /20
Project Name: Speed Hump Installation Bid
Bidder: Walsh &...Kelly Inc.
Contact Person: Dustin _Hllal _ Telephone: 574 288-4811
Address: 24358 SR 23
State: Indiana zip: 4614
City: _a out 6 Bend ..... .... ... .... ...............__.._
Email: dustinh�walshkell.com
To determine whether a bidder has demonstrated good faith efforts to reach the MBENVBE utilization goals
g g s set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
.. ............---- .........
EVIDENCE OF GOOD FAITH EFFORTS
........................... ..------...................................................... ...... ...- -- .
MBE/WBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
Owned Business as found on their website (http://www.in.gov/idoa).
ACTION (ADVERTISE/CONTACT):
....... ....--- ---.------------_..-.-._.. -- --- ®, ......
In order for your bid to be deemed responsive, the City of South
Be , uires that all perspective bidders complete no less than 2 of the following:
1.Attend all pre -bid meetings scheduled by the City to inform MBENVBEs of contracting and
°"" subcontracting opportunities.
2. Advertise in general circulation and/or trade association publications concerning subcontracting
opportunities, and allow MBENVBEs reasonable time to respond.
it 37 Perform any and all necessary steps to provide written notice in a manner reasonably calculated
to inform MBENVBEs of subcontracting opportunities and allowed sufficient time for them to
participate effectively.
4. Utilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in the recruitment
and placement of MBENVBE firms.
**Bidder must circle or otherwise notate which of the two (2) required actions were performed.
.........--------
GOOD FAITH NEGOTIATIONS. The bidder negotiated in good faith with interested MBENVBEs,
including providing such MBENVBE's with adequate information about the plans, specifications and other
. requirements of the subcontract and did not reject MBENVBEs as unqualified without sound business
reasons based on a thorough investigation of their capabilities.
�. MBE/WBEONToRAC{biddero increase hekel hood of meeting the MBENUBE goals ( ,
SMALL work to be performed by
including breaking down
contracts into smaller units to facilitate MBENVBE participation)
J'(C on the T RECORDS:
- h ._. ---...........
CONTRA The bidder has maintained the following records for each MBENVBE that has
subcontracting opportunity:
." 1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBENVBE was unqualified to perform the job.
--._ ....... . --- - -- ----- -.-.-. ....... --
*Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 4/2/2019 Contractor's Bid for Public Works - 9
,
CITY OF SOUTH BEND �g OUT,
;,-�-
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY r14 P
� 1
DEVELOPMENT PROGRAM
FORM MWBE-2.1r"'
MBE/WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
PAGE I OF
Project Number: 120 043 MBE/WBE Participation Goal
Project Name: ,,,-,)Speed Hump Installation Bid
Bidder:
By:
h & Keller Inc.
ry
(Title)
E/WBE Firm Traffic Control Specialists, Inc.
Owner or Contact at MBE/WBE Firm Tracey J. Triska
Telephone: 574-772-7001 Fax: 574-772-7002
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Signs & Chevron Pavement Markings
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
(Date)
Email: estimating@tcspeciallsts.net
..............
If Walsh & Kelly Inc is awarded the pro. ct, we_ll subcontract Traffic Control Specialists, Inc.
for their work.
MBE/WBE Firm Slusser's Green Thumb, Inc.
.,. . ......... ..... --
Owner or Contact at MBENVBE Firm John Williamson
Telephone: 574-722-3102 Fax: 574-722-2993 Email: info@slussers.com
. __...... .-
TYPE OF WORK SOLICITED FOR THIS PROJECT;
Sodding
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
If Walsh &Kell..., Inc. is awarded the prole— we'll subcontract Slusser's Green Thumb, _Inc
for their work.
Version 4/2/2019 Contractor's Bid for Public Works - 10
Surety O + 908.903.3485
202B Halls Mill Road, PO Box 1650 F + 908.903.3656
Whitehouse Station, kU 088894650
Federal Insurance Company
AIA Document A310TM - 2010 Bid Bond
Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable.
CONTRACTOR SURETY
(Name, Iegal status and address): (Name, Iegaistatus and principal place of business):
Walsh & Kelly, Inc. Federal Insurance Company
24358 State Road 23 202B Halls Mill Rd., PO Box 1650
South Bend, IN 46614 OWNER Whitehouse Station, NJ 08889-1650
(Name, legal status and address):
City of South Bend, Indiana
227 West Jefferson Boulevard
South Bend, IN 46601
BOND AMOUNT 5% Five Percent of the Base Bid Plus any Alternates
PROJECT
(Name, location or address, and Project number, if any)
Speed Hump Installation Bid, Project No. 120-043
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the
Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor
within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and
Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such
bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted
in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract
and for the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the Owner the
difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount
for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this
obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of
an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver
of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for
acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for
an extension beyond sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall
be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
Printed in cooperation with theAmerican Institute of Architects 6" by Chubb. The language in this document conforms to the language used in
AIA Document A310R1r- 2010.
Form 15.02-0575-M ptev.3117)
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project,
any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted here
from and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein.
When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law
bond.
Signed and sealed this 11 th
(Witness) T Alisha Krueger
(Witness) Kevin T. Parsley
day of August, 2020
Walsh & Kell),, In
(Title)
Federal Insurance Company
(Attorney -in -Fact) Lisa M.
pp
(o ore;
lef
Printed in cooperation with theAmerican institute of Architects (ALA) by Chubb. The language in this document conforms to the language used in
AM DocumentA310 'rm-2010.
Form OW2.0575•FED OW. 3117) 2
CHUBS"
Power of Attorney
Federal Insurance Company I Vigilant Insurance Company I Pacific Indemnity Company
Westchester Fire Insurance Company I ACE American Insurance Company
Know All by These Presents, that FEDERAL INSURANCE COMPANY, an Indiana corporation, VIGILANT INSURANCE COMPANY, a New York corporation, PACIFIC INDEMNITY
COMPANY, a Wisconsin corporation, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY corporations of the Commonwealth of
Pennsylvania, do each hereby constitute and appoint Lisa M. Parsley
Surety Bond Number, Bid Bond
Obligee: City of South Bend, Indiana
each as their true and lawful Attorney -in -Fact to execute under such designation in their names and to affix their corporate seals to and deliver for and on their behalf as surety
thereon or otherwise, bonds and undertakings and other writings obligatory in the nature thereof (other than bail bonds) given or executed in the course of business, and any
instruments amending or altering the same, and consents to the modification or alteration of any instrument referred to in said bonds or obligations.
In Witness Whereof said FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COMPANY
and ACE AMERICAN INSURANCE COMPANY have each executed and attested these presents and affixed their corporate seals on this 1st day of November, 2019.
Dawn M. Chloros, Assistant Secretary
11,
Z�h
STATE OF NEW JERSEY
County of Hunterdon SS
Stephen M. Haney, Vice President
-:cam �� _ Wa
f';
�
On this le day of November, 2019, before in% a Notary Public of New Jersey, personally came Dawn M. Chloros and Stephen M. Haney, to me known to be Assistant Secretary and
Vice President respectively, of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COMPANY
and ACE AMERICAN INSURANCE COMPANY, the companies which executed the foregoing Power of Attorney, and the said Dawn M. Chloros and Stephen M. Haney, being by me duly
sworn, severally and each for herself and himself did depose and say that they are Assistant Secretary and Vice President respectively, of FEDERAL INSURANCE COMPANY,
VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY and know the
corporate seats thereof; that the seals affixed to the foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of said Companies; and that their
signatures as such officers were duly affixed and subscribed by like authority.
Notarial Seal MrmWuNiz J. ADHAAR
TART NOTARY PUBLIC OF NEW JERMY
,
••ems Na 2316M
PiIBLIC OonNtlplOrm July 1%2024 sluaryFWIe
CERTIFICATION
Resolutions adopted by the Boards of Directors of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY on August 30, 2016,
WESTCHESTER FIRE INSURANCE COMPANY on December 11, 2006; and ACE AMERICAN INSURANCE COMPANY on March 20, 2009:
'ABSOLVED, that the following authorizations relate to the execution, for and on behalf of the Company, of bonds, underuddngs, reeognizances, contracts and other written commitments of the Company
entered Into in the ordinary comae of business (each a"Wrhtea Commitment):
(1) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized to execute any Written Commitment for and on behalf of the Company, under the
seal of the Company or othe wlse.
(2) Each duly appointed attorney -in -fact of the Company is hereby authorized to execute any Written Commitment for and on behalf of the Company, under the seal of the Company or otherwise,
to the extent that such action is authorized by the gram of powers provided for In such persores written appointment as such attorney -In -fact
(3) Each of the Chairmen, the President and the Vice Presidents of the Company Is hereby authorized, for and on behalfoftheCompany, toappoint inwriting any person the attorney -In -
fact of the Company with fug power and authority to execute, for and on behalf of the Company, under the seal of the Company or otherwise, such Written Commitments of the
Company as may be specified in such written appointment which specification may be by general type or class of Written Commitments or by specification of one or more particular
Written Comminnentx
(4) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized, for and an behalf of the Company, to delegate In writing to any other officer of the
Company the authority to execute, for and on behalf of the Company, under the Company's seal or otherwise such Written Commitments of the Company as are specified in such
written delegation, which specification may be by general type or class of Written Commitments or by specification ofone or more particular Written Commitments.
(5) The signature of any officer or other person executing any Written Commitment or appointment or delegation pursuant to this Resolution, and the sal of the Company, may be affixed by
facsimile on such Written Commitment or written appointment or delegation.
FARTHER RESOLVED, that the foregoing Resolution shag not be deemed to bean exclusive statement of the powers and authority of officers, employees and other persons to act for and on behalf of the
Company, and such Resolution shall not limit or otherwise affect the exercise of any such power or authority otherwise validly granted or vested.'
I, Dawn M. Chloros, Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE
COMPANY and ACE AMERICAN INSURANCE COMPANY (the "Companies) do hereby certify that
(1) the foregoing Resolutions adopted by the Board of Directors of the Companies are true, correct and In full force and effect,
@t) "#,regoing Power ofAttomey is true, correct and in frill force and effect
'` .�t"° W ' "''" August 11, 2020.
Given ttaiiyr,triy handed `seak of said Companies at Whitehouse Station, NJ, this 9
liv
c �^ � Dawn M. Chloros, Assistant Secretary
eF9 ......._.... ..—. .TRE-EAU
- C-.l-.._-0—F _ .__
x •p++ IN'rIE YOU WISH TO VERIFY THE AVfHENTTCITYOFTHIS BOND ORNOTIFY US OF ANY OTHER MATTER, PLEASE CONTACT US AT:
_, .� ^ Telophone uy 1903- 3493 Fax 0 1Y 03 3656 a mal smuret i r. rubbcom
Comb_-------- ...,..._m.
f......... .. .. ......
i' n J,
Combined: G�PJV! le(rev.tt_iB)
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name Speed Hump Installation Bid
Project No. 120-043
For Bids Due August 11, 2020 at 9:30am Local Time
Contractor Name: Walsh & Keller. Inc.
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 3151 for the upcoming calendar year, or within twelve (12) months of obtaining pre -
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of
the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application
for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal
of the designation, effective January 1 of the following year, or immediately following the twelve (12) months
of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 5/16/2019 General Conditions - 6
SUBMISSIONS:POST BID
Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
2. Each subcontractor„ whose portion of the project is estimated to be at least one -hundred fifty
thousand dollars (150,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall
not create any rights in the Disclosed ubcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder and all subcontractors on a public works project are required to submit
certified payroll utilizing the federal form known as H-347 or a similar form on a bi-weekly basis„
submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall
identify the job title and craft for each employee. Certified payrolls shall be submitted
electronically.
PleaseNote: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide aFire-Qualification Verification Letter. The City specifically reserves the right to
utilize all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
Version 5/16/2019 General Conditions - 7
PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements:
(i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements within
the last twelve (12) months. A copy of my Pre -Qualification verification letter
is attached.
(ii) X By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(b) Attachments:
(i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) X Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
(iii) X List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
(iv) X For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
Version 5/16/2019 General Conditions - 8
PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) _ By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(b) Attachments:
(i) _
Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
List identifying all former business names.
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years.
(iv) _
Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v) _
Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
(vi) _
For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
(vii) _
Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(viii) _
Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
Version 5/16/2019 General Conditions - 9
(ix) _ Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(i) _ List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
t
(runt Name riere)
Walsh & Kelly, Inc.
(Name of Company)
24358 SR 23
(Address of Company)
South Bend ................._..................
(City)
Indiana
(State)
574-288-4811
(Telephone Number)
Version 5/16/2019 General Conditions - 10
Responsible Bidding Practices and Submission
Requirements for Pre -Qualified Bidder Checklist
(b) Attachments
(i) Attached
(ii) Staffing Capabilities: Walsh & Kelly, Inc. is signatory with the following unions
which supply our workforce — Laborers International Union, Teamsters, Operating
Engineers and Cement Masons.
(iii) See Forms 96 and 96a
(iv) All individuals who will perform worn on the public works project on behalf of
Walsh & Kelly, Inc. will be properly classified under applicable state and federal
laws and local ordinances.
B Du,��� _-�ilarv, NIP of South Bend Area Dated:,, __August l l w 2020
Y;....� .. .,.�. �-�........ �......_.....
FE. . . . . . (1) C 0 T ["J", jl�'� L ili I�IRYTI 1 6, Y R
B ill z',V P LJI B)f I C
mom W, M.
=...40 one Q
RE: Pre -Qualification Verification
Dear Mr. Hilary;
This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South
Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you
are required to re -submit a complete application for continuation of pre -qualification status prior to December 31
for the upcoming calendar year.
A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of
South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist and attachments.
If you have any further questions regarding this matter, please call this office at (574) 235-9251.
Sincerely,
Linda M. Martin, Clerk
Part of State Form52414 (R2 / 2-13) Form 96 (Revised 2013)
BID OF
Walsh & Kell.Inc.
(Contractor)
. ..... 23 - ----
(Address)
South Bend IN 46614
FOR
PUBLIC WORKS PROJECTS
OF
City of South Bend Indiana
Speed Hump Installation Bid
Project No. 120-043
Filed ,August, 11th 2020
Action taken
State Form 52414 (R 19-10)
Prescribed by State Board of A counts - __ Form No. 96 Revised 2013',
CONTRACTOR'S BID FOR PUBLIC WORK — FORM 96
PART 1
(To be completed for all bids. Please type or print)
1. Governmental Unit (Owner):
2. County:
3. Bidder (Firm):
Address:
City/State:
4. Telephone Number:
5. Agent of Bidder (If applicable):
Date (month, day, year): _ flu LA St 11thw 2020,
Cityof South,Bend, Indiana ... ... .... .......
__..
St. Joseph
& Ke11, Inc,______ Walsh ......, --- .........
24358 SR 23
South Bend, IN 46614.........
(574) 2„88-4811
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public
works project of City of South Bend, Indiana (Governmental Unit) in accordance with plans and specifications
prepared by City of South Bend Indinaa — Dept. of Publc Works.- En�ineerin b Division and dated July
14t 20200 for the sum of See Attached $ See Attached.
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of
the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any
addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that shown
in the original contract if accepted by the Governmental Unit. If the bid is to be awarded on a unit basis, the itemization of
the units shall be shown on a separate attachment.
The Contractor and his subcontractors, if any, shall not discriminate against or intimidate any employee, or
applicant for employment, to be employed in the performance of this contract, with respect to any matter directly or
indirectly related to employment because of race, religion, color, sex, national origin or ancestry. Breach of this covenant
may be regarded as a material breach of the contract.
CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS
(If applicable)
I, the undersigned bidder or agent as a contractor on a public works project, understand my statutory obligation to
use steel products made in the United States. I.C. 5-16-8-2. I hereby certify I and all subcontractors employed by me for
this project will use U.S. steel products on this project if awarded. I understand that violations hereunder may result in
forfeiture of contractual payments.
ACCEPTANCE
The above bid is accepted this m day of subject to the following conditions:
Contracting Authority Members:
PART II
(For projects of $150,000 or more — IC 36-1-12-4)
Governmental Unit: City of South Bend, Indiana
Bidder (Firm): Walsh & Kelly, Inc.
Date(month, day, year), August _1_ 1, 2020
These statements to be submitted under oath by each bidder with and as part of his bid. Attach additional pages
for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. What public works projects has your organization completed for the period of one (1) year prior to the date of
the current bid?
Contract Amount
Class of Work
When Completed
..
Name and Address of Owner
........
$
12,170,428
Reconstruction
May 2019
Walsh Construction
$
5,489,454
Resurface
November 2019
Lake County Hwy De pt
$
4 356,212
Resurface
2019
December..._
Cilyy of Crown Point
................_
$
...._
3,180,214
Resurface
December 2019
St. Joseph County Hwy
.......
........
._ ...................____ ......................
-
Del t....._............ ._ .......................... .....
3.
What public works projects are now in process of construction by your organization?
CONTRACT AMT
CLASS OF WORK
WHEN TO BE
NAME AND ADDRESS
COMPLETED
OF OWNER
64,740 ......................
Resurface
.. rrr,.m.. ......... ......._.�..........
May 2020
__
INDOT ....... ....._..... �......�.
$..
5,902,953
_..
Reconstruction_
June 2020 ...................M..................
INDOT ...
2,473,069
Reconstruction
...........................
..
November _embe2020
INDOT
$
4,090,509
Resurface
July 2020�������—
South Bend Regional
......
. — —
_ ......... ...._........
..
Air ort...... .......r.. ........
4. Have you ever failed to complete any work awarded to you? No If so, where and why?
5. List references from private firms for which you have performed work.
Gatlin Plumbins �: & Heating Inc. 11„11 E. Main St., Griffith, IN...._Ms Clara, Muc1 — __ ,
Gough, Inc. 2200 E 88t" Dr Merrillville, IN 46410, Mr. Ray,!ppnd Gough _
Deer Construction Co,. 171,,E Sheffield Avenue__.yer, IN Janet Furman __
Grimme.
11 PLAN AND EQUIPMENT QUESTIONNAIRE
1. Explain your plan or layout for performing proposed work. (Examples could include a narrative of when you could
begin work, completed the project, number of workers, etc. and any other information which you believe would
enable the governmental unit consider your bid.)
As required by owner
2. Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have
performed part of the work) that you have used on public works projects during the past five (5) years along with a
brief description of the work done by each subcontractor.
See Attached List
3. If you intend to sublet any portion of the work, state the name and address of each subcontractor, equipment to be
used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a
listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed
project, you are under a continuing obligation to immediately notify the governmental unit in the event that you
subsequently determine that you will use a subcontractor on the proposed project.
Will supply upon award of contract
QUANTITY
_.
ITEM
DESCRIPTION,
CONDITION
Y...
EARS
__....._.. - -
PRESENT LOCATION
SIZE, CAPACITY,
OF
ETC.
...... .
._ ......
SERVICE-
._
_
5
Asphalt Plants
Various
Good
Griffith, South Bend,
Valparaiso, Lowell, LaPorte
19
Asphalt Pavers
Various
Good
South Bend
Grlffith,mIT m,r
4
Slipform Conc. Paver
Various
Good
_ _..-------
Griffith South a
..... Bend
_.
3
Road Widener
- -.
Various — -
Good
-- .........
Griffith, South Bend
.......�.. .._...
_.......
5
_... —
Motor Graders
CAT/J.D, _._.
Good
--- -
.........
Griffith, South Bend
56
_____-._ .........
Rollers
................1
Various
Good
_
Griffith, South Bend
— - 36-.-..
Rubber Tire Loaders .....
- Various
Good
Griffith, South Bend
18
Excavators
Various
Good
—....__
Griffith, South Bend
...._............ m__ ... _ _
9
_ .....
Bulldozers
��,,.,,,,
Various
Good
_
Griffith, South Bend
7
...... _.......
Low Bo Tractors
---.....
Various
Good
Griffith, South Bend
9
Flatbed Dum ads
—
Various... .......
Good..... —
-
__..... i . South Bend
Gnffith,..........�....M....
.... .......
54
........ .....�,,.
/z and /ton Pickups
........
Various
Good
Griffith,Gn rt South
vend
78
Trucks
1 Ton Crew Trucks
... .........
Various
Good
Griffith South Bend
m ..
...... _
3
_
Cold Planers
....._....___
Wirtgen 1900
Good
Griffith, South Bend
DC
72
Tn Axle Dum
Mack
Good
Griffith, South Bend
4. What equipment
do you have available
----
to use for the proposed
project? Any
equipment
to be used by subcontractors
may also be
required to be listed by the
governmental unit.
5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing
your proposal? Otherwise, please explain the rationale used which would corroborate the prices listed.
Yes, we received quotes from potential subcontractors and suppliers
4
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required
by statute shall thereby be rendered invalid. The financial statement provided hereunder to the governing body awarding
the contract must be specific enough in detail so that said governing body can make a proper determination of the bidder's
capability for completing the project if awarded.
SECTION IV CONTRACTOR'S NON -COLLUSION AFFIDAVIT
The undersigned bidder or agent, being duly sworn on oath, says that he has not, nor has any other member,
representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination,
collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person
from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
He further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate,
fee, gift, commission or thing of value on account of such sale
SECTION V OATH AND AFFIRMATION
I HEREBY AFFIRM. I1NDE:R. THE PENA.L'I"IES FORPERJURY IHAT THE FACITS AND INFORMATION
coN':I".AINED IT411. 1E 1701 I;',GOINC RID FOR P . I.,K, 'O:... S .A.RE ":I7EI UE AND CORRECT.
Dated. at, ........ Sera, t.h. en .. this �ill, day of t, �
(Nam.e
(Title of Person Signing)
ACKNOWLEDGEMENT
STATE OF Indiana
) ss
COUNTY OF St.° Joseh
Before me, a Notary Public, personally appeared the above -named _ Dustin-Hila;11` and
swore that the statements contained in the foregoing document are true and correct.
Subscribed and sworn to before me this ,.__ tI!h............... .......... day of — Au gst, 2020,
My Commission Expires:
June 5. 2022
County of Residence: St. Joseph y
4
"sha Krueger, Notary P ` lic F
0n
n r,�rmar �.� R
�6'lllltttt
pp,�r'�m e�.i
Y 6SH
Public. ",a'iSiB ol lnd6
NOWY p
stAL,-
My (,Orfl 11&S{O F.r iris
1
Form 96 Section II, #2
Subcontractors Used on Public Works Contracts Durina the Past 5 Years
SUBCONTRACTORS
COMPANY
SEWER
B & D Sewer
Deboer Egolf
Delta III
Dyer Construction
Gatlin Plumbing & Heating
Gough, Inc.
Grimmer Construction
Hasse Construction
HRP Construction
Rex Construction
Wirtz & Yates, Inc.
Woodruff & Sons
MILLING
C.E. Hughes Milling, Inc.
Javelina Construction, Inc.
Mid America Milling Co.
McCrite Milling
Specialties Company
ELECTRICAL INSTALLATION
Hawk Enterprises
Midwestern Electric
S/T Bancroft Electric
Sweney Electric Company
Trans Tech Electric
SIGN INSTALLATION
Hawk Enterprises
Midwestern Electric
RoadSafe Traffic Systems
State Barricading, Inc.
Traffic Control Specialists, Inc.
PAVEMENT MARKINGS
The Airmarking Company
Blackout Sealcoating
RoadSafe Traffic Systems
State Barricading, Inc.
Traffic Control Specialists, Inc.
Traffic Management Company
TRAFFIC CONTROL
RoadSafe Traffic Systems
Traffic Control Specialists, Inc.
Traffic Management Company
LANDSCAPE
Great American Landscape
Hubinger Landscape
Slusser's Green Thumb, Inc
ADDRESS
531 Winston Ct
5772 Melton Road
2063 W 1250 S
1716 Sheffield Avenue
1111 E. Main Street
2200 E. 88th Drive
2619 Main Street
10 Lincoln Avenue
5777 Cleveland Rd.
700 Schiller Avenue
P.O. Box 41
P.O. Box 450
CITY/STATE/ZIP
Schererville, IN 46375
Portage, IN 46368
Hanna, IN 46340
Dyer, IN 46311
Griffith, IN 46319
Merrillville, IN 46410
Highland, IN 46322
Calumet City, IL 60409
South Bend, IN 46624
Schererville, IN 46375
Kentland, IN 47951
Michigan City, IN 46361
PHONE
(219) 322-2300
(219) 763-9700
(219) 797-4004
(219) 865-2961
(219) 924-6972
(219) 756-2200
(219) 924-1623
(219 )932-1611
(574)271-7800
(219)322-8090
(219) 474-6542
(219) 872-8605
FAX
(219) 865-0065
(219) 763-9703
(219) 797-3008
(219) 865-2963
(219) 924-1401
(219) 756-2202
(219) 924-0328
(219)932-6829
(574)271-0524
(219) 322-0031
19) 8795339
3113 Holmans Lane
Jeffersonville, IN 47130
(812) 725-8665
(812) 725-8672
13476 Britton Park Rd.
Fishers, IN 46038
(317) 841-8364
(317) 841-0075
6200 W. Hwy 62, Ste 400 Jeffersonville, IN 47130
(812) 282-2751
(812) 283-9846
209 Quality Ave. Ste 9
New Albany, IN 47150
(812) 941-0252
(812) 941-0852
9350 E. 30th St.
Indianapolis, IN 46229
(317) 594-0291
(317) 594-0271
1850 E. North St
1620 E. Chicago Ave
25020 State Road 2
9111 Louisiana St.
4601 Cleveland Road
1850 E. North St
1620 E. Chicago Ave
3122 Olympia Dr
24963 U.S. Highway 20
1810 W Pacific Avenue
P.O. Box 526
7440 W. 87th Place
3122 Olympia Dr
24963 U.S. Highway 20
1810 W Pacific Avenue
3542 Highwav Avenue
3122 Olympia Dr
1810 W Pacific Avenue
3542 Hiahwav Avenue
P.O. Box 235
210 E. 113th Avenue
125 Montgomery Street
Crown Point, IN 46307
East Chicago, IN 46312
South Bend, IN 46619
Merrillville, IN 46410
South Bend, IN 46619
Crown Point, IN 46307
East Chicago, IN 46312
Lafayette, IN 47909
South Bend, IN 46628
Knox, IN 46534
Rochester, IN 46975
Bridgview, IL 60455
Lafayette, IN 47909
South Bend, IN 46628
Knox, IN 46534
Hiahland. IN 46322
Lafayette, IN 47909
Knox, IN 46534
Highland, IN 46322
Dyer, IN 46311
Crown Point, IN 46307
Logansport, IN 46947
(219) 662-8090
(219) 397-4444
(574) 287-6490
(219) 769-6007
(574) 272-9673
(219) 662-8090
(219) 397-4444
(317) 780-1825
(574) 287-2078
(574) 772-7001
(574) 223-5817
(219) 864-2300
(317) 780-1825
(574) 287-2078
(574)772-7001
(291) 746-2433
(317) 780-1825
(574)772-7001
(219) 746-2433
(219) 322-7033
(219) 662-9911
(574)722-3102
(219) 662-8093
(219) 397-8888
(219) 769-0565
(574)271-0144
(219) 662-8093
(219) 397-8888
574)772-7002
(574)223-7959
(708) 430-6910
(574) 772-7002
(574)772-7002
(219) 322-4419
(219) 662-6206
(574) 722-1628
T & J Landscape Service
GUARDRAIL/FENCING
Acorn Fence
C Tech Corporation
James H. Drew Company
Security Industries
Specialties Company
TRUCKING/HAULING mm
..-....._..�..... ........_---
C. Lee Construction Services
Condon Trucking, LLC
Fanio Services
Gilmer Trucking
Material Transfer Inc.
Morris Motor Service, Inc.
P & C Trucking
Superior Construction Co., Inc.
V & R Trucking, Inc.
SRPM'S
& S Markers, Inc.
UNDERSEAL--- ..............
Rieth-Riley-Construction Co.,
Inc.
TREE REMOVAL
Dave's Tree Service
Homer Tree Service
Timber Masters LLC
....-LIME STABILIZ�.. Tpp.........wwwu
A ION
...-.... ....
Mt. Carmel Sand &Gravel
Rock Solid Stabilization
Specialties Company
PIPE LINING
Indiana Reline, Inc.
SAW.... CUTT.I..N.G...........
Diamond Coring Co., Inc.
Quality Saw & Seal, Inc.
SEAL COATING/STRIPING
Site Services, Inc.
Blackout Sealcoating
_ UNDERDRAIN
3D Company, Inc.
8253 Wicker Avenue
2041 164th Street
5300 W.100 North
8701 Zionsville Rd.
1000 Georgiana St
9350 E. 30th St.
1011 S. Lake St
18245 Amberley Ln
28015 SR 23
20390 New Road
7811 West 101 st Ave.
10525 W US Hwy 30 Bld
7
4410 Ross Road
1455 Louis Sullivan Dr
1845 Elmer St.
St. John, IN 46373
Hammond, IN 46320
Boggstown, IN 46110
Indianapolis, IN 46268
Hobart, IN 46342
Indianapolis, IN 46229
Gary, IN 46403
South Bend, IN 46637
North Liberty, IN 46554
South Bend, IN 46614
Crown Point, IN 46307
Wanatah, IN 46390
Gary, IN 46408
Portage, IN 46368
South Bend, IN 46628
2189 IN600 W Thorntown, IN 46071
2454 West CR 450 North LaPorte, IN 46350
1555 Park West Circle
14000 S. Archer Ave
P.O. Box 245
1611 College Dr.
5104 Mann Drive
9350 E. 30th St.
312 E. Main Street
11800 S Ewing Ave
7600 W. 79th Street
10117 Kennedy Ave
7440 W. 87th Place
3200 East CR 350 North
Munster, IN 46321
Lockport, IL 60441
Dyer, IN 46311
Mt. Carmel, IL 62863
Ringwood, IL 60072
Indianapolis, IN 46229
Sulphur Springs, IN
47388
, IL 60617
9w, I L 60455
Highland, IN 46322
Bridgview, IL 60455
Muncie, IN 47303
219) 374-9900 (219) 374-9950
(219) 844-8400
(317) 835-2745
(317) 876-3739
(219) 942-9447
(317) 594-0291
(219) 888-9554
(574) 360-4326
(574) 233-3236
(574) 229-3233
(219) 865-9575
(219) 733-9430
(219) 972-0193
(219) 787-0850
(574) 329-2102
482-6184
(219) 362-6178
(219) 922-9829
(815) 838-0320
(219) 864-8733
(618) 262-5118
(815) 653-2585
(317) 594-0291
(219) 844-8441
(317) 835-2781
(317) 876-3829
(219) 942-9448
(317) 594-0271
(219) 888-9564
(574) 271-8984
482-6284
(219) 922-9843
19) 322-9391
(618) 263-4084
(815) 653-2583
(317) 594-0271
(765) 766-5040 (765) 533-5831
3) 978-5000
3) 767-9300
(219) 924-9944
(219) 864-2300 (708) 430-6910
(765) 288-3326 (765) 288-3344
7
The name of the partnership firm under which the above partners are operating is
Give names and titles of all persons having authority to execute and receipt estimate vouchers and to conduct
other business for the partnership, the signatures of whom are legally binding.
The undersigned hereby declares that the foregoing is a true statement of the financial
or corporation herein first named, as of the date herein first given; that this statement is for the ,
whom it is submitted to award the submittor a contract; and that any depository, vendor or outer
to supply such party with any information necessary to verify this statement.
NOTE: A co -partnership must give firm name and signatures of all
partners. A corporation must give full corporate name, signature of official
and affix corporate seal.
of the individual, co -partnership
4se of inducing the party to
A. -in named is hereby authorized
th .BeW6d� sKoa t n
,Z% co
Affidavit for Individual Z
p
STATE OF Wiz,
a
s
_ �w
COUNTY OF ss t
_ being duly sworn, dcl.fso andys Skuatrfh
foregoing fine,
—.._..... -
g g financial statement, taken from his books, is a true and accurate statement of financial condition as d'f he' t- thotarfin'
that the answers to the foregoing interrogatories are true. '41,81111W
(Applicant must sign here)
Subscribed and sworn to before me this
day of 20
Notary Public
Affidavit for Co -Partnership
STATE OF
COUNTY OF { ss
........being duly sworn, deposes and says that he is a
member of the firm of : that he is familiar with the books of the said
firm showing its financial condition; that the foregoing financial statement, taken from the bo
oks of the said fine , is a true and accurate
statement of the financial condition of the said fine as of the date thereof and that the answers to the foregoing interrogatories are true.
(Member of firm must sign here)
Subscribed and sworn to before me this
day of 20
Notary Public
Affidavit for Corporation
STATE OF Indiana
{ COUNTY OF St . Josss
ei h
Dustin Hilw-I .......- being duly sworn, deposes and says that he is,,,,,,President,_, of the Walsh &„.Kelp ._Inc._ ................. the corporation
described in and which executed the foregoing statement; that he is familiar with the books,rfl?khe said corporation showing its financial
condition; that the foregoing financial statement, taken from the books of the said corpoj,,-Ai�ti, is a true and accurate statement of the
financial condition of said corporation as of the date thereof and that the answers to Ohte f(Agoirig iuit rr'ogatoi jcs are true.
Subscribed and sworn to before me this
11 th
Alisha l Oeger, Notary Public
rriiuu A L ISHA K,F,UEG
Notary PE.t hc. 5t�tw� o{ �,xfii�ri G
%e. �y Coonty
n EF�4_ r mot, jose�p
z� of
My
t„firrilsoloatl C-=,r�'sfMB
a 7 C9
(Offs t:.r -sign hc; tr) Dustin Hilary, VP of South Bend Area
15
State of Indiana
Office of the Secretary of State
CERTIFICATE OF EXISTENCE
To Whom These Presents Come, Greeting:
I, CONNIE LAWSON, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws of
the State of Indiana, the custodian of the corporate records and the proper official to execute this
certificate.
I further certify that records of this office disclose that
WALSH & KELLY INC
duly filed the requisite documents to commence business activities under the laws of the State of
Indiana on March 29, 1966, and was in existence or authorized to transact business in the State of
Indiana on July 16, 2020.
I further certify this Domestic For -Profit Corporation has filed its most recent report required by
Indiana law with the Secretary of State, or is not yet required to file such report, and that no notice of
withdrawal, dissolution, or expiration has been filed or taken place. All fees, taxes, interest, and
penalties owed to Indiana by the domestic or foreign entity and collected by the Secretary of State
have been paid.
In Witness Whereof, I have caused to be affixed my
signature and the seal of the State of Indiana, at the City
of 1p°n ianr ,i;aoli,„ July 16, 202
19,V184 057 / 20201527226
All certificates should be vandat.ed here. lr�li ° dt9 Rl ^aar .sin.J;rev/ w ii l ntatwrMr iiww.t
Expires on August 15, 2020.
to provide
CONSTRUCTION SERVICES
for
PUBLIC WORKS PROJECTS
to thd
STATE OF INDIANA
II I I I I I i - let
ME 14EM Raw IN Mr-r, IQ M a,
UNIT
01 EWA 1.1.j q 19)4*"Jidaj LRwjj oluMNICUMNIM FMMUTHUM] ffaMfMT1
VITEIT44221 �.M ► �
i V1411i 21 &T-11 101 11M
Phone 219-924-5900
Fax 219-924-8768
Company Official
VEVIV Y�ELLY —
for the twenty-seven month period stated herein, unless revoked by this Board for cause,
and in the classifications of services stated below. This certificate supercedes any previous certificate.
1611.01 Concrete Construction of Roads & Curbing
402 WEST WASHINGTON STREET, ROOM W467, INDIANAPOLIS, INDIANA 46204,
ALSO ACTS AS THE OFFICIAL NOTICE OF EXPIRATION.
Tracy L. Cross, Executive 9 retary
Certification Board
DAPW P02 State Form 3983R Rev. 07/06
WRITTEN CONSENT TO RESOLUTIONS
of the
BOARD OF DIRECTORS
of
WALSH & KELLY, INC.
The undersigned, being all of the Directors of WALSH & KELLY, INC., an Indiana Corporation,
hereby consent to the following actions to be taken by the Corporation without a meeting of the Board of
Directors under the applicable provisions of the Indiana Business Corporation Law, as amended:
RESOLVED that the following be, and hereby are, elected officers of the Corporation, to
hold the office until the next regular meeting of the Board of Directors and until their
successors are duly elected and have qualified:
John M. Peisker, President
Jeffrey L. Swan, Executive Vice President
John P. Vercruysse, Executive Vice President
Jamie L. Tancos, Vice President of Finance, Secretary & Treasurer
Gregory A. Kelly, Vice President
Charles Potts Jr., Vice President
Albert E.VanDenBergh, Vice President
David L. Franz, Vice President
David J. Misirly, Vice President
Gregory A. Hoffman, Vice President
Dustin P. Hilary, Vice President
Lynn J. Bauer, Vice President
Mark E. Krachenfels, Vice President
RESOLVED FURTHER that the actions of the Officers of the Corporation taken since the
last meeting of the Board of Directors be, and the same hereby are, fully ratified and
approved.
RESOLVED FURTHER that the following be, and they hereby are, authorized to execute
all contracts or similar documents on behalf of the Corporation:
John M. Peisker, President
Jeffrey L. Swan, Executive Vice President
John P. Vercruysse, Executive Vice President
Jamie L. Tancos, Vice President of Finance, Secretary & Treasurer
Gregory A. Kelly, Vice President
Charles Potts Jr., Vice President
Albert E.VanDenBergh, Vice President
David L. Franz, Vice President
David J. Misirly, Vice President
Gregory A. Hoffman, Vice President
Dustin P. Hilary, Vice President
Lynn J. Bauer; Vice President
Mark E. Krachenfels, Vice President
RESOLVED FURTHER that this consent shall be in lieu of an annual meeting of the Board
of Directors of the Corporation and shall be filed in the minute book of the Corporation in
place of any such annual minutes.
<<SIGNATURES ON THE NEXT PAGE>>
EXECUTED this 15`h day of January, 2020.
Fred Fehre feld, Jr.
Albert E. VanDenBergh
Kevin J. Kelly
e� ............
...... ......
James % " Fehsenfeld
4 Jyn P. Vercruysse
EXECUTED this 15"' day of January, 2020.
Fred Fehsenfeld, Jr. James C. Fehsenfeld
Albert E. VanDenBerg h John P. Vercruysse
EXECUTED this 15th day of January, 2020.
Fred Fehsenfeld, Jr.
James C. Fehsenfeld
Albert E. VanDenBergh John P. Vercraysse
p ,
� s
Kevin
Kelly�'�
Walsh 'u�l Ciii;`$III`r IV litrCl Yu i� Oi � IG ND
lore in 7 r 3 19 W'N�i W"%wa,4s,h kuw'µgl�y.collrry 50 th
ioi'"�W �� (Inc �i�a Q (9), 924, '���00 V�li'oan� I�, 40, dreldl ��CiC Yf
Equal Employment Opportunity/Affirmative Action Policy Statement
It is the policy of Walsh & Kelly to afford equal opportunity for employment to all individuals regardless
of race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability, housing
status, or veterans' status. The corporation is committed to this policy by our status as a federally
assisted government contractor. We are far more strongly bound to the policy by the fact that
adherence to the principles involved is the only acceptable American way of life.
Therefore, it is the policy of this corporation to assure that applicants are employed, and that employees
are treated during employment without regard to race, color, religion, sex, sexual orientation, gender
identity, national origin, age, disability, housing status, or veterans' status. Such action shall include:
employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or
termination; rates of pay or other forms of compensation; and selection for training, including
apprenticeship, pre -apprenticeship, and/or on-the-job training.
The successful achievement of a nondiscriminatory employment program requires a maximum of
cooperation between management and employees. In fulfilling its' part in this cooperative effort,
management is obliged to lead the way by establishing and implementing affirmative procedures and
practices which will ensure our objective, namely equitable employment opportunity for all. (Minority
and female employees are encouraged to participate in all company activities and refer applicants.)
Our company will take affirmative action to ensure that we will
(1) recruit, hire and promote all job classifications without regard to race, color, religion, sex,
sexual orientation, gender identity, national origin, age, ancestry, disability, veterans status or housing
status;
(2) base decisions on employment so as to further the principle of equal employment
opportunity;
(3) ensure that promotion decisions are in accord with principles of equal employment
opportunity by imposing only valid requirements for promotional opportunities;
(4) ensure that all personnel actions such as compensation, benefits, transfers, layoffs, return
from layoffs, company sponsored training, education, tuition assistance, social and recreation programs
will be administered without regard to race, color, religion, sex, sexual orientation, gender identify,
national origin, age, disability veterans status or housing status.
I have designated Amy Wright, VP, HR and Talent Development, as the Equal Opportunity Officer to
direct the establishment of and to monitor the implementation of personnel procedures to guide our
affirmative action program. This official is charged with designing and implementing audit and reporting
systems that will keep management informed on a regular basis of the status of equal employment
opportunity and affirmative action. She can be reached at (317)616-4907.
Employees will be made known of our commitment to equal employment through the following means:
• Posting of equal opportunity notice on bulletin boards
EQE M/F/Vets/Disabled
� ��GRIFFITH
r � ��� �Ilf �`'�° i( & 1700 East Main Street 24358 SR 23
Griffith, Indiana 46319 www.walshkelly.com South Bend, Indiana 46614
Phone (219) 924-5900 Phone ISM) 2 -4811
0fi i�1; �' a one, Fax (219) 924-8768 Fax (574) 289-7174
• Including our equal opportunity statement in our Handbook which is disseminated to all
employees
• Annual supervisory training
Potential employees will be made aware of our policy through the following means:
• By including the words "Equal Opportunity Employer" or EOE in all advertisements and notices
for job openings
Sending notices to union affiliations
Posting of equal opportunity notice on all company and job site bulletin boards
Except when precluded byvalid bargaining agreements, we will conduct systematic and direct recruitment
through public and private referral sources likely to yield qualified female and minority group applicants.
This recruitment will be conducted by direct and personal contacts with female and minority organizations
in the project area.
All union organizations with which we come into contact, including Laborers, Carpenters Operators, and
Teamsters, will be made aware of, and provided copies of our plan. They will be informed of our desire
for them to implement our program and will be specifically asked to refer females and minority group
employees for employment.
It is our policy that wages, working conditions and employee benefits will be determined and administered
on a non-discriminatory basis. We will conduct periodic reviews of wage rates, employee benefits, and
promotional capabilities to assure they are administered in a non-discriminatory manner.
Supervision has been made to understand that their work performance is being evaluated based on
their equal employment opportunity efforts and results, as well as other criteria. It shall be a
responsibility of the supervision to take actions to prevent harassment of employees placed through
affirmative action efforts.
We shall comply with the Civic Rights Act of 1964, as amended, the Federal Highway Act of 1968, the
Executive Order #11246 and #11375, the Rehabilitation Act of 1973, as amended, the Vietnam Era
Veterans Readjustment Assistance Act of 1974, as amended, the Indiana Civil Rights Act and other
applicable Federal and State Laws and regulations pertaining to equality of Opportunities and
Affirmative Action policies. We have developed an Affirmative Action Program for Veterans and
Individuals with Disabilities.
p.
_..................... ...... ...........__..
John1 Peisker, President, Walsh & Kelly
ME M/F/Vets/Disabled
J�
.,........... .. ..._ ........
Date
nl IttlO U V fi��ll � (IJ wA I! A� III Y UI III ��C � i,% �k�iV� LX Ill I I MUD
Ul�'Y� U ��
��'WIIIW'��d: '�IMVIY'wvC Owa �. 1,700E s[, �11'�11n SVI2M'�, 24 F5V iQ } s
r A 1 Ike Ni ,�) a 4 63P9 ��°P�f�N ��pd� lUBm��V��w ��1��� u,Nb(r�� pia P1' P c G d �r4ana 46614
4tor lD kl J Y 1� P�rpi� P�Voon �°7�0✓� �YYa �fy9'Yr
00,00! Kiel,�� ��I�6��rr. I r��(V%r714 07'8 PM,l,°>r,P40 289-7l/1
DATE: April 13, 2020
TO: All Employees
RE: EEO Officer Appointment
Amy Wright, VP, HR and Talent Development, has been appointed Equal Employment
Opportunity Officer for Walsh & Kelly. It is her responsibility to coordinate, advise and assist
management and supervisors in their responsibilities of assuring all applicants and employees'
equal opportunities in all aspects of their employment. She will review complaints that allege
discrimination because of race, religion, color, sex, sexual orientation, gender identity, age,
national origin, disability, housing status or veteran status.
Employees of Walsh & Kelly are to submit any issues or concerns to Amy. We are committed to
comply with the provisions of the Civil Rights Act of 1964 and 1991, plus all Executive Orders
issued relating to Equal Employment.
Amy's contact information is listed below.
Heritage Construction and Materials
P.O. Box 421459
Indianapolis, IN 46242
(317) 616-4907 (o)
(317) 474-2559 (m)
If im t
John"Peisker, President
Ca iftrtttr Jorf (Qu tifu-ation
ISSUED BY
INDIANAPOLIS, IN
TO
WALSH & KELLY INC
MAE,
May 21, 2020
GRIFFITH, IN
who has filed with the Department a Contractor's Statement of Experience and Financial Condition as
required under Indiana Code 8-23-10, is hereby qualified to bid at any Department of Transportation
letting in Classes of Work and within the amount and other limitation of each classification as listed
below, for such period as the uncompleted work on hand from all sources does not exceed the Aggregate
amount. Classification references by name or symbol are in accordance with the definitions in the
Contractor's Statement of Experience and Financial Condition. This certificate supersedes any certificate
previously issued, but is subject to revision or revocation according to the law, if and when changes
in the financial condition of the contracting firm or other facts justify such revision or revocation.
Valid May 21, 2020 Thru April 30, 2021
AGGREGATE....................................................................................................................................... $UNLIMITED
A(B)
CONCRETE PAVEMENT: LIMITED.........................................................................................................
$25,000,000
B(A)
ASPHALT PVMT:W/INDOT CERTIFIED HMA PLANT..........................................................................$UNLIMITED
C(B)
LIGHT GRADING........................................................................................................................................$UNLIMITED
E(E)
SMALL STRUCTURES AND DRAINAGE ITEMS....................................................................................
$25,000,000
E(F)
SURFACE MASONRY AND MISC CONCRETE.......................................................................................
$50,000,000
E(G)
TRAFFIC CONTROL: PAVEMENT MARKINGS......................................................................................
$25,000,000
E(H)
DEEP SEWER AND/OR EXCAVATION....................................................................................................
$25,000,000
E(Q)
CONCRETE PAVEMENT: REPAIRS.........................................................................................................
$25,000,000
E(R)
ASPHALT PAVEMENT MILLING..............................................................................................................
$50,000,000
PREQUALIFICATION ENGINEER
State Form 20508 (R3 / 5-05)
COMMISSIONER
o0,!k II If OF SOL 0. 11 .BUND 1V W.MTTII WlYE(i( ' A. �A O!G'M
K.
Project Number: 120-043
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received: 8/7/20
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company:
Walsh & Kelly, I
Authorized Signature:
Dbs 'O Hilary, V� aft outh Bend Area
Date: ..,,,8/11/20 __.
Version 4/2/2015
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name Century Center Esports Arena
Project No. 119-106CR
For Bids Due September 8, 2020 by 9:30 AM Local Time
Contractor Name: TPC Technologies, Inc.
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 31 st for the upcoming calendar year, or within twelve (12) months of obtaining pre -
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of
the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application
for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal
of the designation, effective January 1 of the following year, or immediately following the twelve (12) months
of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 5/16/2019 General Conditions - 6
POST BID SUBMISSIONS:
Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty
thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder and all subcontractors on a public works project are required to submit
certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis,
submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall
identify the job title and craft for each employee. Certified payrolls shall be submitted
electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to
utilize all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
Version 5/16/2019 General Conditions - 7
I. PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements:
W X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements within
the last twelve (12) months. A copy of my Pre -Qualification verification letter
is attached.
(ii) X By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(b) Attachments:
(i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) X Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
(iii) X List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
(iv) X For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
Version 5/16/2019 General Conditions - 8
PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) _ By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) _ By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(b) Attachments:
(i) _
Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) _
List identifying all former business names.
(iii) _
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years.
(iv) _
Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v) _
Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
(vi) _
For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
(vii) _
Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(viii) _
Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
Version 5/16/2019 General Conditions - 9
(ix) _ Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(i) _ List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
Date:
09/04/2020
41111
(Sign Here) "` '"
Kenneth A. Kuespert
(Print Name Here)
TPC Technologies, Inc.
(Name of Company)
165 Pell Rd.
(Address of Company)
Niles
(City)
I, 49120
(State)
(269) 637-9793
(Telephone Number)
Version 5/16/2019 General Conditions - 10
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name Century Center Esports Arena
Project No. 119-106CR
For Bids Due September 8, 2020 by 9:30 AM Local Time
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check
X or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
X executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
X Certification of use of United States Steel Products or Foundry Products.
Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not
met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted
X Form [MWBE-2.1].
Acknowledge Receipt of Addendum(s) included with the bid.
X All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
X printed or typed underneath signature.
X This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: TPC Technologies, Inc.
By Authorized Repre
Signature:
Print Name & Title: Martin Golc , Sales Manager
Date: 09/04/2020
Version 4/2/2019 Contractor's Bid for Public Works - 1
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name
Project No.
For Bids Due
Century Center Esports Arena
119-106CR
September 8, 2020 by 9:30 AM Local Time
PART I
(Must be completed for all bids. Please type or print)
Date: 09/04/2020 Bidder (Firm): TPC Technologies, Inc.
Address: 185 Bell Rd.
City/State/Zip: Niles, MI49120 Telephone Number: ( 269 ) 687-9796
Agent of Bidder (if Applicable): n/a
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
Century Center Esports Arena - Project No. 119-106CR
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
SimplyNew, LLC, 12575 Beatrice Street, Playa Vista, CA 90066
and dated 09/04/2020 for the sum of (enter the Total Bid as shown on the Proposal)
Six Hundred, Nineteen Thousand, Three Hundred, Seventy -One Dollars and 55/100 ($ 619,371.55 )
(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on ate attachment.
By
Ma i C�olob, Sales � �ge�
The above bid is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
Elizabeth A. Maradik, Member
Joseph R. Molnar, Member
ACCEPTANCE
-_-
day of
(Printed Name of Person Signing)
Jordan V. Gathers, Member
Therese J. Dorau, Member
Attest: Linda M. Martin, Clerk
20
Version 4/2/2019 Contractor's Bid for Public Works - 2
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
When the prospective Contractor is unable to certify to any of'the statements below, it shall attach an explanation to this Affidavit.
Version 4/2/2019 Contractor's Bid for Public Works - 3
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF M I )
SS:
Berrien COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
Version 4/2/2019 Contractor's Bid for Public Works - 4
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City
of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or
applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions,
or privileges of employment, or any matter directly or indirectly related to employment because of race, sex,
religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or
disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors
certified by the State of Indiana as a Minority Business (`MBE") or as a Women's Business Enterprise
("WBE") as a factor in determining the lowest, responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a subcontract
to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a
discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from
being awarded a City contract for a period of one (1) year from the date of such determination, and such
determination may also be grounds for terminating the contact for which the discriminatory practice or
noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I. C. 5-16-8-1). I hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
may result in forfeiture of contractual payments.
Version 4/2/2019 Contractor's Bid for Public Works - 5
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this day of , 20
Subscribed and sworn to before me this
My Commission Expires
County of Residence
TPC Technologies, Inc
Contractor/Bidder (Firm)
SEE DIGITAL COPY W/ SEAL
Signature of Contractor/Bidder or Its Agent
Printed Name and Title
day of , 20
SEE DIGITAL COPY / SEAL
Notary Public
Version 4/2/2019 Contractor's Bid for Public Works - 6
BID/PROPOSAL
CITY OFSOUTH BEND
Project Name: —Century CantarEsports Arena
Project Number: 119-106CR
For Bids Due: September 8.2D2DbyS:3DAK8Local Time
Contractor Name: TPC Technologies, INC
BASE BID
Item
Description
Quantity
Unit
Unit Price
Total Amount
BASE BID TOTAL $819.371.55
Bidder (Firm): TPCTechnologies, Inc.
1��BeU�d
Address: .
City/State/Zip: Niles, K1|49127 Telephone 687-9798
By
Martin Golob, Sales Manager
(Printed Name ofPerson Signing)
Version 4/2/2019 Contractor's Bid for Public Works - 7
F-
LU
0
W
N
w
a�
La
LU
z F-
c�
mw 0
a
0zz
N N W
0 m a
0
F-ww
VFW
OD
0
z
a
H
R
0
z_
5
z
0
�a
�a
LU U
mF-
�a
�w
�m
0LL
LU
m
W
m O
O
C Vl
0
_ O
C �
'y
c� 3
N a
O y
a
L �
O N
N
d w i
�= a
m� 0
O V!
O w
co Lo
O
r�
O
_ U
U c L
42 E
c 'O d
N
N —
CL A
+� c
tv ca ai
+�+ L E
V! t co
z
m t U
t )
� d
L
2 > N
sZ p V
CL� o
N � �
� O �
O
O Q
t Vl
V! i
0 y i
N
++ N O p E
Q�'vJdZ
O GN -a
u t N
N N C
H = O
LU
m 0
0
w
m
i
L ..
'm
co 0
0 E
HQ
O
N
o
m U)
O
Q
O
d
O
co
co
m
m
;3
0-
0
o
rn
m
�
c
�
U
�
d
�
c
a�
0 o
is
Q
00
EU
Q W
D
m
�
p
ED
0
0
o O
0
0 a)
N
a CL
a)
Q O
O N
U)
0
tu
c
U
0
a o
t
m
;3
0
a�i
C)
a�
E
m m
E z
ai
d
�
e�
Q7
cn
LU
0
W
oD
o
0
U)i
cn
N
(D
Q
0
E
F-
m
Z
0
N
0
COI
0
CD
E
0
U) -0
N
co
0
N
E
co
z
c
V1
^a
CITY OF SOUTH BEND 4 °UTLF
, MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY'
DEVELOPMENT PROGRAM "-
FORM MWBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS labs"
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration ("IDOA").
Project Number: 119-106CR
Date: 09/04/2020
Project Name: Century Center Esports Arena
Bidder: TPC Technologies, Inc
Contact Person: Martin G®lob Telephone: 269.687.979E
Address: 185 Bell Rd.
City:
Email:
State: Ml
mgolob@tpctechnologies.com
Zip
►,;
To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below":
EVIDENCE OF GOOD FAITH EFFORTS
MBE/WBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
Owned Business as found on their website (http://www.in.gov/idoa).
ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South
Bend requires that all perspective bidders complete no less than 2 of the following:
1. Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and
subcontracting opportunities.
2. Advertise in general circulation and/or trade association publications concerning subcontracting
opportunities, and allow MBE/WBEs reasonable time to respond.
3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated
to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to
participate effectively.
4. Utilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in the recruitment
and placement of MBE/WBE firms.
""Bidder must circle or otherwise notate which of the two (2) required actions were performed.
GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs,
including providing such MBE/WBE's with adequate information aboutthe plans, specifications and other
requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business
reasons based on a thorough investigation of their capabilities.
SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by
MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down
contracts into smaller units to facilitate MBE/WBE participation)
CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has
bid on the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE/WBE was unqualified to perform the job.
"Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
TPC does not require the services of any outside contractors for the completion of this project, therefore,
none were pursued
Version 4/2/2019 Contractor's Bid for Public Works - 9
CITY OF SOUTH BEND 4 °UTLF
, MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY'
DEVELOPMENT PROGRAM "-
FORM MWBE-2.1
MBE/WBE CONTACTED labs"
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
Project Number:
Project Name:
Bidder:
119-106CR
Century Center Esports Arena
,/T�P Technologies, Inc.
PAGE OF.
MBE/WBE Participation Goal n/a
By: , %,--...,- Sales Manager 0/04/2020
(Si-gnat*W , (Title) (Date)
MBE/WBE Firm
Owner or Contact at MBE/WBE Firm
Telephone Fax Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
TPC does not require the services of any outside contractors for the completion of this project, therefore,
none were pursued
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
MBE/WBE Firm
Owner or Contact at MBE/WBE Firm
Telephone Fax
Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
Version 4/2/2019 Contractor's Bid for Public Works - 10
brit.
SAIA Document A31 OTM -2010
CONTRACTOR:
(Narne, legal status and address)
I IV [ echnologics, Inc.
185 Bell Road
Niles, MI,49120
OWNER:
(Nance, legal status and address)
City of'South Bend hoard offlublic Works
SURETY:
(Name;, legal status arid principal place
ot"business)
FVC1 Insurance C'OnlpanN
Sarasota. H.
County -City Building l3th Floor, Room 1.310, 227 West Jefferson
South [lend. IN 46601
BOND AMOUNT:
five Percent of the Fo[af Bid 5') 1) of I otal I lid
PROJECT:
(Narne, location or address, and project number, ifany)
Century Center Fsports Arena
This document has important legal
consequences. Consultation with
an attorney is encouraged with
respect to its completion or
modification.
Any singular reference to
Contractor, Surety, Owner or
other party shall be considered
plural where applicable.
fhe Contractor and Surety are bound to the Owner in the ainoun( set forth above, for the payment of'which the
Contractor and Surety bind themselves, then- heirs, executors, adrit inistrators, successors and assigns, jointly and
severally, as provided herein. The conditions ofthis Bond are such that if the Owner accepts the bid of the Contractor
within the time specified in the bid docurnents, or within such time period as may be agreed to by the (..)wrier and
and the Contractor either ( I) enters into a contract with the Owner in accordance with the terms of such
bid, and gives Such bond or bonds as may be specified in the bidding or Contract Documents, with a Surety admitted
in the jurisdiction of the project and otherwise acceptable to tire Owner, for the faithftil perfortriance ot'such Contract
and For the prompt payment ()I'Iab(.)r and material furnished in the prosecution thereof- or (2) pays to the Owner the
difference, riot. to exceed the amount ofthis Bond, between the afTIOUnt specified in said bid and such larger antOLtnt
for which the ()wrier nray in good faith contract with another party to perforin the work covered by said bid, then this
obligation shall he trull and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of
at) agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of
notice by the Surety shall riot apply to any extension exceeding sixty (60) days it) the aggregate beyond the time for
acceptance of bids specified in the bid clOCUrnents, and the (,)wrier and Contractor shall obtain the Surety's consent for
air extension beyond sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall
be deemed to be Subcontractor and the terin Owner shall be deerned to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project,
any provision in this Bond conflicting with said statutory Or legal requirement shall be deemed deleted herefrorni and
provisions conforming to such statutory or other legal requirement shall be deerned incorporated herein. When so
furnished, the intent is that this Bond shall be construed as a statutory bond and not as a COMIT1011 law bond.
Signed and sealed this fill day of Septernher 2020
I'llc I cc] niologies, Inc,
Ntrl (Seal)
�5510` (ritleXenneth A'X U' pert, Presindet
f,'(. (1 InSlAranceconipan\
(Surety
(Witness)
, t '
critic toWe' i111 " act
CAU1101C You shourM sugn art odgVnal A11A Contract DOCUrnerit, 01in which As text appears ln RED, Arii origins] assures thiat
changes wHf iunot be obscured.
AIA Document A3101" - 2010. Copyright �F) 1963 1970 and 2010 by The American Institute of Architects. All rights reserved, WARNWG� I his ALA"
Docume"t is probected by U S, (,opyrlW,it I aw and nternatioinW q'reafies, Unauthohzed reproduction or distflbubon olf this AlIA" ll)ocurwient, or
any poftkon of it, may result in severe, civit and crilirvirnar Ipeinaitirae, and wili The prosecuted to the irnax6nnurn extent possiblle undertram law.
Purchasers are permitted to reprOdUce ter) (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail
The American Institute of Architects legal counsel, copyright@,aia.org 061110
FCC I Cillkoljp
sNSoRANCf
Know all men by these presents: That the FCC| Insurance Company. a Corporation organized and existing
under the laws cfthe State ofFlorida (the ^Corporation^)does make, constitute and appoint:
Nicole LBicknell; Mark EVVobba; Faith D.Ouot;Jennifer LKuaznio;William JCerneyU|;Barbara EPearson;
Sandra L Junk; Jordan M Scheiber; Theresa M Burns; Megan E Riesenberg; Wesley L Mantooth; 11sa NIThonias
Each, its true and lawful Attorney -In -Fact, to make, exeoute, seal and de|iver, for and on its behalf as ourety, and
amits act and deed in all bonds and undertakings provided that no bond or undertaking or contract of suretyship executed
under this authority shall exceed the sum of(not h)exceed $10.000.000.00)� $10.000.000.00
This Power of Attorney is made and executed by authority of Resolution adopted by the Board of Directors.
That resolution also authorized any further action by the officers of the Company necessary to effectsuch transaction.
The signatures below and the seal of the Corporation may be affixed by facaimi|e, and any such
facsimile aiBncdunam or facsimile seal shall be binding upon the Corporation when so affixed and in the future with
regard to any bond, undertaking orcontract ofsurety to which it is attached.
In witness whereof, the FCCI Insurance Company has caused these presents to be signed byits duly authorized officers
and its corporate seal tobehereunto affixed, this 13thday ofMay, 2O2O,
Attest:
Christopher Shoucair, President Christina D. Welch, EVP, General Counsel,
FCQ Insurance Company Chief Audit & Compliance Officer, Secretary
FCC|Insurance Company
State ofFlorida
County ofSarasota
Before methis day personally appeared ChriatopherShoucair. who is personally known tomeand who
executed the foregoing document for the purposes expressed therein.
N1ycommission expires: 2/27/2023
Notary Public
State ofFlorida
County of Sarasota
Before me this day personally appeared ChriatinaD. VVe|oh, who is personally known to me and who
executed the foregoing document for the purposes expressed therein.
My commission expire& 2/27/2023
Notary Public
CERTIFICATE
i the undersigned Secretary ofRCC| Insurance Company. a Florida Corporotion, DO HEREBY CERTIFY that
the foregoing Power of Attorney remains in full force and has not been revoked-, and furthermore that the February 27,
2020 Resolution of the Board of Directors, referenced in said Power of Attorney, is now in force.
Dated this day of
�l
Christina D.Welch, EVP.General Counsel,
wowA-3592-*x*4 05/2020
1316 COUNTY -CITY BUILDING
227 W.JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/235-9251
FAX 574/ 235-9171
TDD 574/ 235-5567
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
Date:
August 25, 2020
To:
All Planholders
From
Linda M. Martin, Clerk, Board of Public Works
Subject
Addendum Number: 1
Project Name:
Century Center Esports Arena
Project No.:
119-106CR
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received: 08/26/2020
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum by
faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company:
TPC Technologies, Inc.
Authorized Signature:
Date: 08/26/2020
•
1316 COUNTY -CITY BUILDING
227 W.JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
Date: August 25, 2020
To: All Planholders
PHONE 574/235-9251
FAX 574/ 235-9171
TDD 574/ 235-5567
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
Century Center Esports Arena
119-106CR
Addendum No. 1
From: Rebecca Plantz, Project Engineer
Attached is the pre -bid meeting agenda. The pre -bid meeting was live streamed on August 24,
2020 at 1:00 pm ET through Microsoft Teams, and it was noted that the shortened URL did not
initially work until new links were sent to those who communicated interest. All information
covered is on the agenda attached.
Send all bids to bpwbids@southbendin.gov.
Attachments:
Pre -Bid Meeting Agenda
-This addendum consists of a total 5 pages inclusive of "Acknowledgement of Receipt of
Addendum" sheet-
REGISTERED RETAIL MERCHANT CERTIFICATE CONTROL NUMBER
Indiana Department of Revenue
Government Center North
Indianapolis, Indiana 46204
(317) 233-4015 TICS: 0111340861
TPC TECHNOLOGIES INCORPORATED LOG: 001
185 BELL RD FID: 38-3314837/0
NILES, MI 49120-4093 ISSUED: 01/03/20119
IS AUTHORIZED TO COLLECT INDIANA RETAIL SALES TAX
AT THE ADDRESS ABOVE IF DIFFERENT FROM BELOW. EXPIRES�: 01/31/2021
THIS LICENSE:
IS NOT'rRANSFERRABLETO ANY o'rHER PERSON,
IS NOT SUBJECT TO REBA"rE.
IS VOID IF ALTERED.
]ttill[HUIAUBUJUEUERUUUlILEUMI[IU
TPC TECHNOLOGIES INCORPORATED
185 BELL RD
NILES, IVII 49120-4093
(Detach Here)
Dear Customer:
Attached is your Registered Retail Merchant Certificate (RRIVIC). On your certificate, it shows your Taxpayer Identification
Number (TID) and Location Number (LOC). Please make note of these important numbers. You will need to, use there on
exemption certificates and for phone or written communication with the Indiana Department of Revenue (DOR).
Please note the expiration date on the certificate. All Indiana RRMCs must be renewed every two, years with DOR.
Merchants in good standing with DOR will automatically receive a renewed certificate. However, if a merchant has
unpaid tax liability(ios) owed to DOR, they cannot renew their RRMC.
All businesses are required to file sales andl/or withholding taxes online, Please register for INtax today at
www.lNitax.in.gov. When registering, use your preapproved INtax activation code, 61 D54D513-1 861-90BC-EO43-
OA07A8669OBC.
With INtax, you also can manage your obligations for Indiana metered pump sales, tire fees, food and beverage tax, and fuel
taxes. It also gives you 24/7 access to business --tax records, iets you file and pay online right up to the last deadline rninute, and
saves you the cost and hassle of mailing in returns each month.
If you have questions about your sales or withhoiding taxes, you may contact Customer Service at (317) 233-4015, Monday
through Friday 8 a.m. - 430 p.m. EST,
Sincerely,
I Indiana Departmentof -Revenue -
WO
Technologies, r
ProductionYour completeElectronic System Contractor and
Mailing ✓ thiress 185 dell Road -Niles, MI 49120
Showroom AddrCWs 245 Bell Road • Niles, III 49120
Voice 269.687.9798 • Fax 269.687.9804 • www.tpetechnologies.com
Our Company:
TPC Technologies, Inc. (TPC) has been owned and operated by its full-time President, Ken Kuespert
since 1985. TPC is both an A/V Systems Designer/Installer/Integrator as well as a Production Company
with annual sales averaging $3.5 million, 10,000 sq/ft of warehouse and fabrication space and over $1.5
million in rentable A/V equipment. Our reputation has enabled us to establish relationships with over 150
of the industry's leading manufacturers, including names like Crestron, AMX, Sanyo, Epson, Crown, JBL,
Shure & ETC.
This blending of installation experience with production experience brings a unique advantage to our A/V
Customers. Not only does TPC have an intrinsic working knowledge and ability to maintain the
underlying components of A/V systems, but its years of production experience give us first-hand
knowledge of the best way to provide A/V in any environment.
Our People:
TPC has a full-time staff of twelve with over 125 years combined experience in A/V Systems Design,
Installation and Integration and a management to technical staff ratio of 1.2. We have ample capacity
and skills to handle any number of simultaneous projects. TPC's full-time staff has a diverse background
that supports our dual roles as A/V Systems Designer/Installer/Integrator and Production Company. Our
full-time staff holds degrees, certifications and practical experience as follows:
Degrees;
MA — Theater Production & Organizational Leadership
BS — Telecommunications Production
BS — Radio/TV/Film
BA — Business Administration (2)
AS — Electrical Engineering Technology
Certifications;
QSC QSYS Certified Level 2
Crown IQ
JBL Systems Architect
Yamaha M7CL (2)
AMX Designer
AMX Installer
AMX Programmer (2)
Crestron DM Design Certified
Crestron Programmer (2)
Extron Certified
ETC Factory Service
Our Projects:
Four Winds Casino, New Buffalo, South Bend, Hartford & Dowagiac, MI
Event Center, Hard Rock Cafe, Three room conference center with AMX multi -room combining of
lighting, audio, and video. Executive Conference Room and Private Dining Room with full AMX
Multi -Media control. Casino Floor A/V control via AMX and BSS/London Matrix
Howard Park, City of South Bend, IN
Sound, lighting, video, network and controls for renovated Ice Park. Conference center with
AMX multi -room combining of lighting, audio, and video. A/V control via AMX and BSS/London
Matrix. Design by TPC and Alliance Architects and installation by TPC.
Beacon Health System, Norther Indiana
Extensive work at various locations throughout the Beacon network. Provided sound, lighting, video
& control solutions.
Teachers' Credit Union, South Bend, IN
Provided sound, lighting, video & control solutions for call center, executive conference room and
meeting spaces.
Inn at Harbor Shores, St. Joseph, MI
Three room conference center with multi -room combining of lighting, audio, and video. Complete
integration with audio conference and satellite system. AMX control was used in this facility to complete
this task. Design and installation was done by TPC.
Notre Dame University —Notre Dame, IN
Joyce Center Audio Distribution and Patching System. Classroom A/V system upgrades. 13
different classrooms from 100 to 400 seats. Electrovoice speakers, Ashly DSP, and Crown amps
used throughout.
Whirlpool, St. Joseph, MI
Three room conference center with multi -room combining of lighting, audio, and video. Complete
integration with audio conference and satellite system. AMX control was used in this facility to complete
this task. Design and installation was done by TPC.
St. Joseph Public Schools - St. Joseph, MI
Classroom AV systems using an AMX based IP controlled AV system. Complete system with AV rack,
Projector and screen. Web controlled and Ethernet managed. Auditorium (975 seat), Football stadium,
Gym and Pool sound system design and installation. Complete voice, data and broadband for all St.
Joseph Public schools covering six buildings.
First Church of God — St. Joseph, Stevensville and Benton Harbor, MI
Sound, lighting, video for a multi -campus community of faith.
Trinity Lutheran Church — Elkhart, IN
Sanctuary AV System.
Page 2 of 3
Our References:
Notre Dame University, Notre Dame, IN
Jason Railton: Supervisor of Classroom Support 574.631.6306
Ron Grisoli: Washington Hall Program Manager 574.631.2805
Beacon Health System, Norther Indiana
Mark Zakowski: Beacon Communications 574.286.3500
Teachers Credit Union, South Bend, IN
Dan Rouseve: SVP & CIO 574.284.6317
Whirlpool Corporation, Benton Harbor, MI
Daniel Velez: Senior Media Production Specialist 269.923.7641
First Church of God, St. Joseph, MI
Jake Seaton: Worship Pastor: Stevensville Campus- 269.983.1524
Lakeshore Public Schools, Stevensville, MI
Chris Quartermaine: Director of Technology 269.428.1402
St. Joseph Public Schools, St. Joseph, MI
Bryan Parsons: Director of Technology 269.926.3255
Cassopolis Public Schools, Cassopolis, MI
Dave VanLue: Principal of Ross Beatty High School 269.445.0506
Page 3 of 3