Loading...
HomeMy WebLinkAboutChange Order No 1 - Sewer & Manhole Rehabilitation Western Ave. - Inland Waters Pollution Control P HONE 574/ 235-9251 1316 C OUNTY-C ITY B UILDING F AX 574/ 235-9171 227 W. J EFFERSON B OULEVARD S OUTH B END,I NDIANA 46601-1830 C ITY OF S OUTH B END J AMES M UELLER,M AYOR B OARD OF P UBLIC W ORKS July 14, 2020 Mr. Jeremy Recklein Inland Waters Pollution Control, Inc. 4086 Michigan Ave. Detroit, MI 48210 jrecklein@TEAMIPR.COM Ave. Sewer & Manhole Rehabilitation Project No. 118-093 Dear Mr. Recklein: The Board of Public Works, at its meeting held on July 14, 2020, approved the above referenced Change Order for an increase of $70,378, bringing the current contract amount to $3,194,654.50. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, s/Linda M. Martin, Clerk Enclosure G ARY A. G ILOT E LIZABETH A. M ARADIK T HERESE J. D ORAU J ORDAN V. G ATHERS J OSEPH R. M OLNAR DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING Tfxfs'NboipmfSfibcjmjubujpo 229.1:42 Project Number: _______________ Project Name: __________________________ Change Order #: ____ :02102:802503131 DATE INITIATED:BPW DATE: Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). GpvoeefufsjpsbufetfxfstpoXftufsoBwfuibuoffefemjofeupqsfwfoudpmmbqtf/ Bmtp-3TfxfsQjqfsvotxfsfgpvoeupcfuifjodpssfdutj{fjouifgjfme/ Attachments: (List documents support changerequired) Dpousbdupsqsjdjoh/ 81-249/11 Amount of Increase / Decrease: $____________________ Categories (Pick One): 1 Scope of Work Previously approved Change Order(s): $___________________ Differing Site Conditions, Changed Conditions 3/36 Current Percent of Change: ____________________ % Conflicted Specifications and Drawings Failed Materials 4-2:5-765/61 New Total Amount: $____________________ Error Omission 3/36 Total Percent of Change: ____________________ % Final Quantity Adjustment _______________________ 753.1732.526/53.16)VujmjuzFyqfotf* Funding Secured From: __________________________ (filled out by PM) RECOMMENDEDBY: KptiFinfs210:02: Project Inspector (Print Name)(Signature)(Date) REVIEWED BY: Construction Manager (Print Name)(Signature)(Date) APPROVED BY: TvfFmmfoEpvesjdl7041031 Engineering Project Manager (Print Name)(Signature)(Date) APPROVED BY: City Engineer (Print Name)(Signature)(Date) IPR Great Lakes 4086 Michigan Ave. Detroit, MI 48210 Tel: (313) 899-3014 Fax: (313) 899-3011 Project: South Bend, IN- Sewer and Manhole Josh Ehmer Rehabilitation Change Order 1 Location & Owner: South Bend, IN (Revision 1) Engineer: VS Engineering Date: September 19, 2019 IPRGreatLakesproposestofurnishthenecessarylabor,equipmentandmaterialtocompletelyperformthefollowingitemsof workandatthepricesstated: ItemDescriptionEst.UnittypeUnitPriceTotal Quantity Shot1CleanandTV322LF$9.50$3,059.00 Shot2CleanantTV338LF$9.50$3,211.00 Shot1CIPPLiningonWesternAve325LF$81.50$26,487.50 Shot2CIPPLiningonWesternAve340LF$81.50$27,710.00 TOTAL$60,467.50 CONDITIONSOFPROPOSAL: INCLUDED: Onemobilizationanddemobilization BypassingofmainlineforCIPPinstallation,viaTowBehindPumpandLayFlatHose NormalCleaningandCCTVforCIPPinstallations Removalofobstructionsthatcanberemovedwithconventionalsewercleaningequipment. Dryweatherwork. InstallationofCIPPhostlinerperASTMF121603Designparameters. CD/USBwithofinternalinspectionpreandpost. EXTRA: Performance/PaymentBond,ifrequired,at2%ofabovetotal. BYOTHERS: TrafficControl20LFAccessonShoulder,ROADISCLOSED. tƩźĭĻŅźƩƒŅƚƩЌЉķğǤƭͲƓƚƩĻƷĻƓƷźƚƓƷƚĬĻǞźƷŷŷĻƌķ͵ Submittedby:NandishDoshi ACCEPTANCEOFPROPOSAL Theaboveitemsofwork,theunitprices,andtheconditionsaresatisfactoryandareherebyaccepted.Youareauthorizedtodothe workspecified.Paymentwillbemadeasoutlinedabove. Date:Signature: BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date6/30/2020DepartmentPublic Works Name Sue Ellen DoudrickDivision/Bureau Engineering BPW Date 7/14/20 Phone Extension 5992 Required Prior to Submittal to Board LegalAttorney Name: Clara McDaniels Controller review is required for all Contracts $5,000.00 or more and Controller greater than one year in length per the City Purchasing Policy Purchasing Michael Schmidt Check the Appropriate Item Type –Required for All Submissions AgreementAmendmentContractProposalAddendum Professional Services Resolution Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Change Order No. 1 C/O & PCA No. PCA Ease/Encroach. Traffic Control: Other: Required Information Company or Vendor Name Inland WatersPollution Control Yes No If Yes, Approved by New Vendor Purchasing MBE/WBE Contractor MBE WBE MBE/WBE Contractor Requested No Yes Name of Company Project Name Sewer and Manhole Rehabilitation Project Number 118-093 Funding Source Sewer: services & charges – other – other contractual services Account No. 641-06-602-509-439001 1. Change Order #1: $70,378.00 Amount Terms of Contract Unit prices Purpose/Description Emergency Sewer Lining required at Western Avenue See attached change order documentation. Required Contractor’s Certification FormsAttached(Non- Collusion, Non-Discrimination, Non-Debarment, E-Verify, Iran, etc.) Required For Change Orders Only $ 70,378.00 Increase Amount of Decrease$ Previous Amount $ 3,124,276.50 Current Percent of Change: 2.25% New Amount $3,194,654.50 Total Percent of Change: 2.25% Dispersal After Approval Copy Original