Loading...
HomeMy WebLinkAboutFirst Amendment to PSA - Design Services Related to the Douglas Road Lift Station – DLZ Indiana LLC1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS June 23, 2020 Mr. Jamie Poczekay DLZ Indiana, LLC 2211 E. Jefferson Blvd. South Bend, IN 46615 1 c� )d z.co RE: Amendment No. 1 to Professional Service Agreement Dear Mr. Poczekay: PHONE 574/235-9251 FAx 574/ 235-9171 The Board of Public Works, at its meeting held on June 23, 2020, approved the above referenced amendment for design services related to the Douglas Road Lift Station Project in the amount of $24,800. Enclosed please find a copy of the amendment for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, s/Linda M. Martin, Clerk Enclosure GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR This is EXHIBIT K, consisting of 3 pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated March 26, 2019. AMENDMENT TO OWNER -ENGINEER AGREEMENT Amendment No. 1 1. Background Data: a. Effective Date of Owner -Engineer Agreement: March 26, 2019 b. Owner: City of South Bend acting by and through the Board of Public Works C. Engineer: DLZ Indiana, LLC, 2211 East Jefferson Blvd. South Bend, Indiana 46615 d. Project: DOUGLAS ROAD LIFT STATION RELOCATION 2. Description ofModications: a. Engineer shall perform or furnish the following Additional Services: 1) Add the following to the end of the Project Description of Engineer's Services: Professional engineering services for the City's relocation of approximately 275 lineal feet of 12" water main due to conflicts with the Douglas Road Reconstructions Project Des. No. 1400639 project, which includes added travel lanes and bridge reconstruction from Ivy Road to S.R. 23. The 12" water main will be relocated in the segment in the immediate vicinity of Juday Creek. The existing water main is in conflict with the proposed bridge crossing of Juday Creek. The relocation of the 12" water main will include an approximate 75-foot segment that will be above grade and supported on the bridge (near the road elevation). The above grade water mains will include heat trace, insulation and a hanger system to suspend the watermain on the side of the bridge deck. b. The Scope of Services currently authorized to be performed by Engineer in accordance with the Agreement and previous amendments, if any, is modified as follows: 1) ADD Item A.2.e in Exhibit A Paragraph A1.02 Final Design Plans as follows: e. Water Main Design 1) The relocation of the approximate 275 ft segment of 12" water main will be incorporporated into the road reconstruction plans, of which 75 ft will be above grade and supported by the bridge structure. Page 1 (Exhibit K— (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright �) 2008 National Society of Professional Engineers for EJCDC. All rights reserved. a) Modify the bridge design as required for additional water main loading. b) Design the structural bridge support system for the water main. c) Design the water main, insulation, heat trace, and jacketing system. d) Design the electrical power supply and monitoring system. e) Provide sequencing of construction guidance development. 2) ADD Item A.7.a.4 in Exhibit A Paragraph A1.02 Final Design Plans as follows: 4) IDEM Notice of Intent for Water Main Construction C. For the Additional Services or the modifications to services set forth above, Owner shall pay Engineer the following additional or modified compensation: 1) ADD Items A.l.a.8 and A.l.a.8 to Exhibit C Paragraph C2.01 Compensation for Basic Services as follows: 8) Water Main Design $19,800.00 9) Water Main Notice of Intent $1,000.00 2) REVISE the Total Lump Sum Fee in Exhibit C Paragraph C2.01 Compensation for Basic Services as follows: $116,800.00 3) REVISE Item A.l.a in Exhibit C Paragraph C2.01 Compensation for Basic Services as follows: a. Bidding Phase and Construction Phase Office Services (Hourly Rate) $14,800 4) REVISE the Total Hourly Rate Fee in Exhibit C Paragraph C2.01 Compensation for Basic Services as follows: $16,800.00 e. The schedule for rendering services is modified as follows: 1) DELETE Items A.9 and A.10 in Exhibit A Paragraph A1.00 Project Schedule 5. Agreement Summary (Reference only) a. Original Agreement Lump Sum amount: $ $96 000.00 b. Original Agreement Hourly Rate amount: $ $ 12,800.00 c. Net change for prior amendments: $ n/a d. This amendment Lump Sum amount: $ $20 800.00 e. This amendment Hourly Rate amount: $ $ 4,000.00 f. Adjusted Agreement Lump Sum amount: $ $116 800.00 g. Adjusted Agreement Hourly Rate amount: $ $16,800.00 Page 2 (Exhibit K— (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright �) 2008 National Society of Professional Engineers for EJCDC. All rights reserved. The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in. Exhibit C. Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Elate of this Amendment is June 23, 2020 ENGINEER: BOARD OF PUBLIC WORKS Gary A. A Gdot, President 'Therese J. Doran, Member B Andrew Lemberis, PE Title: Vice President Elizabeth A. Maradik, Member Jordan V. Gathers, Member ATTEST: Late Signed: C/Z. Z �Zlt;i(t C%i1ltlZlll Joseph R. Molnar, Member Linda M. Martin, Clerk Page 3 (Exhibit K — (.Amendment to Owner-Engincer Agreement) — Attachment i) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright CO 2008 National Society oi' Professional Engineers for E,ICDC., All rights reserved. BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 06/15/2020 Name Zach Hurst Department DPW BPW Date 06/23/2020 Phone Extension 3057 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer ❑ Officer Name BPW Attorney ❑ Attorney Name Dept. Attorney ❑ Attorney Name Purchasing ❑ Check the Appropriate Item Type — Re uired or All Submissions ® Professional Services Agreement ❑ Contract ❑ Proposal ❑ Open Market Contract ® Amendment/Addendum ❑ Special Purchase, QPA ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes ❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA ❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution n Other: n Ease./Encroach Company or Vendor Name New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Information DLZ Indiana LLC ❑ Yes ❑ If Yes, Approved by Purchasing ® No Z MBE ❑ WBE Completed E-Verify Form Attached ❑ Yes No Douglas Road Lift Station 118-116 Douglas Road DA TIF 435-10-102-121-431002 $24,800 Amendment 1 to Professional Services Agreement for design services related to the Douglas Road lift station. For Change Orders Only Amount of ❑ Increase $ ❑ Decrease ($ ) Previous Amount Current Percent of Change: New Amount Increase Decrease Increase Total Percent of Change: Decrease Time Extension Amount: New Combletion Date: