Loading...
HomeMy WebLinkAboutAmendment No 4 to PSA - Design Services for Olive Water Treatment Plant Improvements – Black & Veatch Corp.1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS Mr. Donnie H Ginn, P.E. Black & Veatch Corporation 8415 Allison Pointe Blvd., Suite 410 Indianapolis, IN 46250 �_..jH YDq�( ;b cc � c�z lcl �z ..('j>,bv.corn RE: Amendment No. 4 to Professional Service Agreement Dear Mr. Ginn: PHONE 574/235-9251 FAx 574/ 235-9171 The Board of Public Works, at its meeting held on June 23, 2020, approved the above referenced amendment for additional design services for the Olive St. water treatment plant improvements in the amount of $41,124, for a new total of $399,293. Enclosed please find the original of the amendment for your signature. Please sign and return the original amendment to flierislcry„(��> c t;;�z � ;i � goo . Please retain a copy for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Enclosure Sincerely, s/Linda M. Martin, Clerk June 23, 2020 GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR This is EXHIBIT K, consisting of 2 pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated June 12, 2018. AMENDMENT TO OWNER -ENGINEER AGREEMENT Amendment No. 4 1. Background Data: a. Effective Date of Owner -Engineer Agreement: June 12, 2018 b. Owner: Board of Public Works, City of South Bend, Indiana C. Engineer: Black & Veatch Corporation d. Project: Hydraulic Modeling Training and Olive WTP Improvements Preliminary Engineering 2. Description of Modifications: a. Engineer shall perform or furnish the following Additional Services: Task 402 — Design and Contract Document Development The Engineer will prepare, develop and provide a signed and sealed design for a new lintel and doorjamb based a change in the overhead door size that resulted from the value engineering phase that occurred during bid negotiations. Task 406 — Construction Administration Additional responses to Requests for Information (RFIs) submitted by the Owner or Contractor. The original scope included 10 RFIs. An additional 5 RFIs are expected to be submitted by the Contractor resulting in a total number of 15 RFIs. Task 408 — Shop Drawing and Submittal Review Engineer will review additional shop drawings and other data submitted by the Contractor as required by the Construction Contract Documents. The Engineer's review shall be general conformity to the Construction Contract Documents for the project and shall not relieve the Contractor of any of his contractural responsibilities. Such reviews shall not extend to means, methods, techniques, sequences, or procedures of construction or to safety precautions and programs incident thereto. The original scope included 30 submitals/shop drawings. Based on the Contractor's project submittal list an additional 37 submittals will require review resulting in a total of 67 submittals and resubmittals to be reviewed for the project. Page 1 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright C0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. b. The -cTeepc-vrc7civiC�S-Czirr2i?miry-iicrcrrvrrcccrt6v2per-form "gHnccriir aeear-danee with the Agr-eefneat and �,adfneats, if any, is madified as f 1 d. For the Additional Services or the modifications to services set forth above, Owner shall pay Engineer the following additional or modified compensation: For professional services described under Task 4, Owner agrees to pay Engineer in accordance with the Agreement for Professional Services on a lump sum basis. The total compensation for Amendment 4 shall increase the lump sum amount by $41,124 and shall not be revised without written authorization. e. The schedule for rendering services is modified as follows: Engineer will complete the work during the project construction period ending in Agreement Summary (Reference only) a. Original Agreement amount: $_76,077 b. Net change for prior amendments: $_282,092 c. This amendment amount: $ 41,124 d. Adjusted Agreement amount: $_399,293 The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in Exhibit C. Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is June 23, 2020 OWNER: BOARD OF PTTBLIC WORKS Gary A Gd t. President —t---3.,Q_ lid c% Elizabeth A. Maradik, Member Joseph R. Molnar, Member ENGINEER: Therese J. D° ., NI —be, By: Donnie H. Ginn, P.E. Title: Vice President lo,dan V. Gathers, Member AI'll; S'I: Date Signed: Linda M. Martin, Clerk Page 2 (Exhibit K - (Amendment to Owner -Engineer Agreement) - Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright C0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. im „ r7 uulu w w a w w 0 cO m 0 m c�Oo N In LL� ' �I ' m IIE' VI II Phm, m Q J N M�w V y 2 IIII//I 11 YI i U,W � I III r'I a � III I ry a .. nK O N fA N LL� V IliYff III �v III III J �IIIIIII N +' O N l0 , 'Il p Q O 6 IlII O 0 O GN :,. 0 O U . I Ii �1 1 N (O of f F F F I IIIPf BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 06/17/2020 Name Becca Plantz Department Public Works BPW Date 06/23/2020 Phone Extension 5998 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer ❑ Officer Name Michael Patton BPW Attorney ® Attorney Name Clara McDaniels Dept. Attorney ❑ Attorney Name Purchasing ❑ Check the Appropriate Item Type — Re uired or All Submissions ❑ Professional Services Agreement ❑ Contract ❑ Proposal ❑ Open Market Contract ® Amendment/Addendum ❑ Special Purchase, QPA ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes ❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA ❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution n Other: n Ease./Encroach Company or Vendor Name Black & Veatch New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Information ❑ Yes ❑ If Yes, Approved by Purchasing ® No ❑ WBE Completed E-Verify Form Attached ❑ Yes No Olive Water Treatment Plant Improvements 118-024 Water Works Professional Services 620-06-604-608-431002 Amount Amendment Total $41,124 (New Total = $399,293.00) Terms of Contract Lump Sum Purpose/Description _Amendment 4 to PSA with Black & Veatch for design services. For Change Orders Only Amount of ❑ Increase $ ❑ Decrease ($ ) Previous Amount Current Percent of Change New Amount Increase Decrease Increase Total Percent of Change: Decrease Time Extension Amount: New Combletion Date: