HomeMy WebLinkAboutDecember 2015AGENDA OF THE
HISTORIC'PRESERVATION COMMISSION
DECEMBER 21' 2015
Regular Meeting THIRTEENTH FLOOR- ROOM 1308
COUNTY—CITY BUILDING
MONDAY DECEMBER 21, 2015 7:00 PM
I. CALL TO ORDER, ROLL CALL
H. PUBLIC HEARING
A. CERTIFICATE OF APPROPRIATENESS
1.539 Riverside Drive COA#2015-1207 River Bend
2.307 Lamonte COA#2015-1208 Chapin Park
III. HEARING OF VISITORS
IV. REGULAR BUSINESS
A. APPROVAL OF MINUTES
1. November 16, 2015
B., TREASURER'S REPORT
1. Location Report
C. STAFF REPORTS
1. Correspondence
2. Routine Maintenance Exclusion Approvals
3. Interim Director
4. Preservation Specialist
5. Legal Counsel
D. COMMITTEE REPORTS:
1. President
2. Legal Affairs
3. Indiana Bicentennial
4. Deputy Director Search Committee
5. Nominating (Executive Officers)
V. OLD BUSINESS
VI. NEW BUSINESS
A. ELECTION OF OFFICERS
B. INTERNNOLUNTEER RESOLUTIONS
1. Allison Polgar
2. Hannah Allen
3.• George Root
C. PRESERVATION SPECIALIST 2016 CONTRACT
i
VII. ANNOUNCEMENTS & MISCELLANEOUS MATTERS
VIII. ADJOURNMENT
`a otsslo,7*
s0
OJr i
4
c
Hyl Ty?
NOTICE:
FOR HEARING AND SIGHT
IMPAIRED PERSONS
Auxiliary aid or other services are
available upon request at no charge.
Please give reasonable advance
request when possible.
HISTORIC PRESERVATION COMMISSION
PUBLIC SIGN IN SHEET
21 December 2015
Because distribution of federal funds may be involved, the City of South Bend is required to maintain a
record of whether members of the public attending this hearing or event are minorities. Please designate
your status using the following letters: W (White/Caucasian), B (Black), H (Hispanic), O (Other). If
you are female, include F, and if you are disabled, include D.
Hearing of Visitors is limited to three (3) minutes per person.
NAME ADDRESS
'��-- 0�
ti�fi�4 1'C4 6vrv.
/�vY /CI
Aah lam
U �
Le-w-u"�^r i,Lt CaCC
53SJ CiV&-?i�& �A2.
5-A> Dr-
oS' sT
SC V7 -a -56-"40 A-4 4410f
2Plitfe (jt*vld kYl�
d' g k7
W, B,
H, O
F, D
J'
,.4
STAFF REPORT
CONCERNING APPLICATION FOR A
CERTIFICATE OF APPROPRIATENESS
Date: 7 December 2015
Application Number: 2015-1207
Property Location: 539 Riverside Drive
Architectural Style/Date/Architect or Builder: Free Classic/1903/Hammond & Whitcomb
Property Owner: Troy Hanyzewski
Landmark or District Designation: River Bend LHD
Rating: Contributing
DESCRIPTION OF STRUCTURE/ SITE: The house is a Free Classic, four-square plan, two stories
built in 1903 by real estate developers Hammond and Whitcomb that is raised above street level. The
foundation is raised brick; the siding is brick on the 1St storey, wood clapboard on the 2d storey with a
flared string course and wood shingle on the 3d. The roof is a hip with an asymmetrical gabled roof
dormer and is covered with asphalt shingles. The windows are 1/1 and 3/1 double hung with aluminum
storms. A front porch has a hipped roof, square wood supports, and concrete decking and wing walls.
There is a wood 2d storey deck in the rear with a small shed roof addition underneath.
ALTERATIONS: A complete tear -off and re -roof with asphalt shingles, ice shield, gutters and
downspouts was completed with COA42008-0115. Asphalt siding was removed with COA#2013-0805A
and correction to the size of the front entry storm door. The second storey wood deck structure and stairs
in the rear was added to accommodate 'an upstairs rental unit and has been replaced in-kind. Aluminum
storm windows are installed.
APPLICATION ITEMS: A. Replace existing aluminum storm with new. B. Addition of exterior deck.
C. Reside upper portion with historical cedar shake look (vinyl siding) second level with 4" vinyl.
DESCRIPTION OF PROPOSED PROJECT:, New owner originally proposed to replace the original
windows but has updated the request to replace only the existing aluminum windows, in-kind; add an
exterior deck in the rear with similar style as new 2nd storey deck; and add new vinyl siding to the upper
stories to resemble the look of the cedar shake and wood clapboard. A. Owner will be rehabilitating the
original wood double hung windows and proposes to install the new storm windows to replace the
existing which are deteriorated and missing most of the glass. B. Owner proposes a new deck on the
ground level in the rear that will fit directly underneath the new 2,d storey deck posts and will connect to a
freestanding existing concrete stair (evidence that a landing existed here at one point). Material will be
treated lumber. A rail will be installed on three sides in the same style as the upper deck. C. The asphalt
siding removal by l't Source Bank in 2013 revealed the original siding as brick 1', wood clapboard 2nd
and cedar shake 3rd. Minor repairs were made at that time including improper flashing and a fresh coat of
interior paint to the siding. The existing siding is in need of major repairs as can be seen in the
photographs. Owner has provided samples of the proposed vinyl siding. The 2nd storey to show a 4"
reveal, similar to the existing clapboard and the Yd storey to resemble cedar shake but in a slightly
different pattern than the existing saw tooth pattern.
PRESERVATION SPECIALIST REPORT (EDITED): Upon inspection the windows are not
deteriorated beyond repair as suggested by the standards and guidelines. Rather, there needs to be some
new glazing applied and some new ropes installed. A number of the upper sashes are painted in place but
are not fully closed. There are aluminum track storm windows on the house, but many of the sashes are
missing. The siding on the second floor and the dormer reveals are the areas that the owner would like to
add insulating house wrap and vinyl siding. The second floor clap -board has a varying 3 Y2 to 4" reveal.
When the mastic siding was removed from this house in 2013, the contractor failed to do the necessary
repairs to the clap -board as well as the transitional flashing and trim work. They merely painted the poor
areas to match including the flashing and failed trim work. As a result, almost all four corners have
sustained damage and rot where the mitered boards meet. There are also areas where flashing ran
underneath the old mastic siding now remains and actually collects water and allows it to run under the
clap -board or even roofing material instead. I entered the third floor attic and noticed daylight through
many of the loose and damaged cedar shake. Although the shake itself was in a repairable condition, the
transitions are loose, rotted, and would need to be replaced. The owner expressed a desire to replace both
levels as the new siding would be able to transition in a way that the elements would flow more fluidly
over it. The shakes would have to be removed and reinstalled with new wood transitional trim work that
would consist of several "stepping" levels of trim. The rear of the house has a cement steps/landing from
a since removed lean-to storage area and a set of cement steps at rear door. The owner proposes to butt up
to the existing steps/landing and continue with a wood deck that will sit flush in height and sit in between
the support posts of the second level deck and the house. He also suggests matching the upper deck by
using the same lumber and railings on the lower deck. The current stairs/landings lack handrails and
railings which the owner plans to rectify as part of the new deck.
STANDARDS AND GUIDELINES:
II. EXISTING STRUCTURES
A. BUILDING MATERIALS
Original exterior wall materials in the District include brick, stucco, clapboard, wood shingles and masonry block. In
some instances, vinyl or aluminum siding has been applied over the original material.
Required
Original exterior building materials shall be retained. Deterioration of wood materials shall be prevented through
repair, cleaning and painting. The existing architectural detail around windows, porches, doors and eaves should be
retained or replaced by replicas of the same design and materials when deteriorated beyond repair. Masonry
including brick and stucco shall be cleaned only when necessary to halt deterioration or to remove stains, and shall
be done with a method acceptable for the preservation of the surface: i.e. low pressure water and soft natural bristle
brushes. When repairing stucco, only appropriate stucco mixture shall be used.
Recommended
Whenever possible, the original building materials should be restored. Metal or vinyl may be used as an alternative
to maintaining or replacing the original surface material when it resembles the original surface material. When used
over wood surfaces, this siding should be the same size and style as the original wood. Every effort should be made
to retain the original trim around windows, doors, cornices, gables, eaves and other architectural features. Ample
ventilation must be afforded the structure when aluminum or vinyl is to be installed in order to prevent increased
deterioration of the structure from moisture and/or insects. Mortar joints should be repointed only when there is
evidence of moisture problems or when sufficient mortar is missing to allow water to stand in the mortar joint.
Existing mortar shall be duplicated in composition, color, texture, joint size, method of application and joint profile.
Prohibited
Wood siding shall not be resurfaced with material such as artificial stone, brick veneer, asbestos or asphalt shingles,
which is inappropriate or was unavailable when the building was constructed. Sandblasting or the use of harsh
detergents shall not be used on masonry or stucco. This method of cleaning erodes the surface material and
accelerates deterioration.
Not Recommended
Waterproof or water repellent coatings or surface consolidation treatments should not be used on masonry surfaces
unless required to solve a specific problem that has been studied and identified. Coatings are frequently unnecessary
and expensive, and can accelerate deterioration of the masonry. Mortar joints which do not need repointing should
not be. Repointing should not be done with mortar of high Portland cement content, which can often create a bond
that is stronger than the building materials. This can cause deterioration as a result of the differing porosity of the
material and the mortar— the end result being serious damage to adjacent brick. Paint should not be removed from
masonry surfaces indiscriminately.
C. WINDOWS AND DOORS
Window and door frames are in most cases wood. Brick structures have stone sills and brick lintels. In some cases
where synthetic siding has been applied, window trim has been covered. Many structures in the district have
aluminum storm windows. Some houses retain wood framed storm windows.
Required
,1
Original windows and doors including sash, lintels, sills, shutters, decorative glass, pediments, hoods and hardware
shall be retained or when deteriorated beyond repair, replaced with units and trim resembling the original.
Recommended
Wood frame storm windows and doors, painted to match the original, should be used but should not
damage existing frames. If new sash and doors are used, the existing or original materials, design, and hardware
should be used. When metal storm doors are used, they should be painted, anodized or coated to match the existing.
When awnings are used they should be of canvas material.
Prohibited
Original doors, windows, and hardware shall not be discarded when they can be restored and reused in place. New
window and door openings which would alter the scale and proportion of the building should not be introduced.
Inappropriate new window and door features, such as aluminum and insulating glass combinations that require
removal of the original windows and doors, shall not be installed.
Not Recommended
Awnings, hoods or fake shutters made of metal, vinyl or fiber glass should not be used if they would detract from
the existing character or appearance of the building.
STAFF RECOMMENDATION: Staff recommends approval of storm windows, rear deck and 2nd
storey siding. Staff does not recommend approval of 3`d storey residing because the original material does
not appear to be deteriorated beyond repair; additionally, the proposed replacement does not resemble the
original pattern.
Elicia Feasel
Interim Director
December 7, 2015
RE: 539 Riverside Drive
Earlier today, Mr. Troy Havyzewski came to the HPC office looking for information on a property he had
successfully bid on and will be closing on this week. The property in question is 539 Riverside Dr, and is
located in the River Bend Local Historic District. He had expressed interest in replacing the original
windows, adding some new siding, as well as adding a rear deck under the existing one. I agreed to join
him on site immediately to discuss the current conditions of the windows and siding before he pursued
replacement or re -surfacing.
Upon inspection the windows are not deteriorated beyond repair as suggested by the standards and
guidelines. Rather, there needs to be some new glazing applied and some new ropes installed. A number
of the upper sashes are painted in place but are not fully closed. There are aluminum track storm
windows on the house, but many of the sashes are missing. I suggested and the owner agreed that
performing the in-kind repairs and installing new aluminum storms where missing would be a more cost
effective way to relieve his concerns and keep in compliance with the goals of the HPC.
The siding on the second floor and the dormer reveals are the areas that the owner would like to add
insulating house wrap and vinyl siding. He proposes cedar shake style siding over the existing on the
third floor and clap -board style siding over the existing on the second floor. The second floor clap -board
has a varying 3 % to 4" reveal. When the mastic siding was removed from this house in 2013, the
contractor failed to do the necessary repairs to the clap -board as well as the transitional flashing and
trim work. They merely painted the poor areas to match including the flashing and failed trimwork As a
result, almost all four corners have sustained damage and rot where the mitered boards meet. There are
also areas where flashing ran underneath the old mastic siding now remains and actually collects water
and allows it to run under the clap -board or even roofing material instead. I entered the third floor attic
and noticed daylight through many of the loose and damaged cedar shake. Although the shake itself was
in a repairable condition, the transitions are loose, rotted, and would need to be replaced. The owner
expressed a desire to replace both levels as the new siding would be able to transition in a way that the
elements would flow more fluidly over it. The shakes would have to be removed and reinstalled with
new wood transitional trim work that would consist of several "stepping" levels of trim.
The rear of the house has a cement steps/landing from a since removed lean-to storage area and a set
of cement steps at rear door. The owner proposes to butt up to the existing steps/landing and continue
with a wood deck that will sit flush in height and sit in between the support posts of the second level
deck and the house. He also suggests matching the upper deck by using the same lumber and railings on
the lower deck. The current stairs/landings lack handrails and railings which the owner plans to rectify as
part of the new deck.
Steve Szaday-Preservation Specialist
HPCSBSJC
C.,Gn
-� 4�
Li
• '�^��, s
CV"
Uj
ICA.?
;i
i
4
yVF
S
e
I
� ;
z.; .:�.�..: � �;,,,,:;..
:�..;�:
,..
Application
-FOR-
Certificate ofAppropriateness
HISTORIC PRESERVATION COMMISSION
of SOUTH BEND & ST. JOSEPH COUNTY
125 S. Lafayette Blvd., South Bend, IN 46601
http://www.stj osephcountyindiana.com/departments/SJCHP/index.htm
p: 574-235-9798 E 574-235-9578 e: SBSJCB?C@co.st-joseph.in.us
OFFICE USE ONLY»»»DO NOT COVI TLETE ANY ENTRIES CONTAINED IN THIS BOX« < 1
i'2,0 -`5
x n«< OFFICE USE ONLY �
Date Received: �`�\ Application Number: 2,0 `, — 1110-1
0-1
Past Reviews: BYES (Date of Last Review) ❑ NO
Staff Approval authorized by: Title:
�J
Historic Preservation Commission Review Date: l 0-tC__� S`
❑ Local Landmark Local Historic District (Name) 1Z-1VtQaf
❑ National Landmark ❑ National Register District (Name)
Certificate of Appropriateness:CLS� 1
❑ Denied ❑ TabledElSent To Committee ❑ Approved and issued: Q� ;
(Please Print)
Address of Property for proposed work: S �; r✓ 2vs�i., 41
(Street Number— Street Name—Cit)'--Zip Code)
Name of Property Owner(s): A104�,7.Q u� SH,, Phone #: S' orfs-�Cc�
Address of Property Owner(s): Z6 .S- fi ,� ►'ferr`�o+- e) Q)d kltl- 1�>Al. -1-*-, INK, r 7`i
(Street Number— Street Name—City—Zip Code) '
Name of Contractor(s): ( b l r' d2 , C Phone #:
Contract Company Name: U!'0../
r
Address of Contract Company: J,.� l s > q
(Street Number—Street Name—City—Zip Code)
Current Use of Building: ,S'..,
(.SYfngle Family—Mulii-Family—Commercial—Government—Industrial—Vacant—etc.)
Type of Building Construction: rte/®b�%/•fi�r.,�
(Wood Frame Brick--Stone—Steel—Concrete—Other)
Proposed Work: ❑ In -Kind ❑Landscape ❑New Replacement (not in-kind ❑ Demolition
(more than one box may be checked)
G�� 1�Cti' C j�'S�4C i4lom sror►n +k, Jl%2
Description of Proposed Work:
f 1 .. f��,/��, i'' rr - r7 � �_ _. is � :cr .L�•iPe:
r
1"yr�;c.t, /rtl, i 1��.�`E,fR .'�( .aP�►lsc�do`l
1 4� /�l l/ rr 1/rtivl
3/ i °l �'/� S-�COv,� �l.Lt !, 1
Owner/Contractor Fax #: e-mail:
(Staff will correspond with only one designee)
X and/or X f�
Signature of Owner Signature of Ctor
—APPLICATION REQUIREMENTS ARE LISTED ON REVERSE SIDE—
STAFF REPORT
CONCERNING APPLICATION FOR A
CERTIFICATE OF APPROPRIATENESS
Date: 8 December 2015
Application Number: 2015-1208
Property Location: 307 Lamonte
Architectural Style/Date/Architect or Builder: 1921/ Colonial Revival
Property Owner: Bradley Management LLC
Landmark or District Designation: Chapin Park
Rating: Notable
DESCRIPTION OF STRUCTURE/ SITE: This two storey Colonial Revival is set upon a concrete, rectangular
foundation. There are two symmetrical brick chimneys intersecting the gable ends. The first storey is brick while
the second storey is stucco with moulded wood band course between the storeys. The side gable roof has asphalt
shingles. There is a small segmental entrance roof with moulded entablatures and Doric pilasters at the corners.
The windows are 8 -light casement windows grouped in fours on the first storey with soldier lintels. There are 3 -
unit casements in the second storey with a pair of 3 -light casements over the entrance. There are fan lights in the
gables.
ALTERATIONS: The casement windows in the second storey are vinyl replacements. The sidelights at the
entrance have been replaced by wood panels. The entrance is secured by plywood. The fan lights in the gables
were originally segmented. A wood frame, vinyl sided garage was added with COA#2014-1201
APPLICATION ITEMS: Replace all windows with Jeld-Wen W-2500 aluminum -clad casement, double -hung,
and quarter round per quote. Replace asphalt shingles with Certainteed architectural dimensional shingles.
DESCRIPTION OF PROPOSED PROJECT: The owner has been restoring the house to a single family
dwelling. COA#2014-1202 approved a re -roof with Certain Teed architectural shingles; the re -roof is currently in
process. The COA also approved replacement of all windows with Anderson 400 Series Casement with Colonial
Grid plus quarter round windows. There was a misunderstanding over the material of the windows — HPC
approved aluminum clad as presented when in fact the 400 series is vinyl clad. Staff notified owner of the mistake
and owner has determined the Jeld-Wen W-2500 windows to be an acceptable replacement option. The current
metal casement windows are inoperable and not repairable and some have been replaced with single pane vinyl
replacement windows without divided lights. The proposal is to replace all windows throughout the house
including sunroom with a muntin pattern to resemble the originals. The fan lights in the gables will also be
replaced with segmented lights to resemble the originals.
STANDARDS AND GUIDELINES:
I. EXISTING STRUCTURES
C. WINDOWS AND DOORS
Window and door frames are in most cases wood and vary depending upon the style of the home. Many are
double hung windows with wood trim and sills. Brick structures have stone sills and brick lintels. In some cases
where aluminum siding has been applied, the window and door trim has been covered. About half of the
structures in the district have aluminum storm windows; the other half have wood storm windows.
Required
Original windows and doors shall be retained including sashes, lintels, sills, shutters, decorative glass, pediments,
hoods and hardware. When deteriorated beyond repair, they shall be replaced with units and trim resembling the
original.
Recommended
Wood storm windows and doors painted or finished to match the original should be used but should not damage
existing frames. If new sashes or doors are installed, the existing or original materials, design and hardware
should be used. When metal storm doors are used, they should be painted, anodized or coated to match the
existing. When awnings are used, they should be of canvas material.
Prohibited
Original doors, windows and hardware shall not be discarded when they can be restored and reused in place. New
window and door openings, which would alter the scale and proportion of the building may not be introduced.
Inappropriate new window and door features such as metal, vinyl or fiberglass awnings, hoods or aluminum
insulating glass combinations that require removal of original windows and doors, shall not be installed.
Not Recommended
Fake shutters that would detract from the existing character or appearance of the building should not be used.
STAFF RECOMMENDATION: Staff recommends approval.
Elicia Feasel
Interim Director
Royal Sash & Door
P.O. Box 1022
South Bend, IN 46624
574-220-7274
robh@royalsash.com
QUOTE BY: Rob
SOLD TO: Tim Johnson
PROJECT NAME:
PO#:
REFERENCE:
Ship Via:
Ground/Next Truck
LINE NO.
LOCATION BOOK CODE
SIZE INFO DESCRIPTION
Line -1%
001 Dining Main Line Item
Viewed from Exterior. Scale: 1/4" = 1'
Line -1-1 (Al)
Line -1-2 (A2)
Line -1-3 (A3)
Line -1-4 (A4)
QUOTE #: JRH000115
SHIP TO:
JELD WEN
%T.NDO%S A ODOR%
QTY
1
Line -2 002 Dining Main Line Item
Viewed from Exterior. Scale: 1/4" =1'
1
QQ-2.20.900.1618 cust-036580 Page 1 of 10(Prices are subject to change.) JRH000115 - 12/7/2015 - 11:49 AM
Quote Date: 10/9/2015 Drawings are for visual reference only and may not be to exact scale. All Last Modified: 12/7/2015
orders are subject to review by JELD-WEN
I
LINE NO. LOCATION BOOK CODE QTY
SIZE INFO DESCRIPTION
Line -2-1 (Al)
Line -2-2 (A2)
Line -3 003 Living Rm Main Line Item
T _— 7—
Viewed from Exterior. Scale: 1/4" = 1'
1
Line -3-1 (Al)
Line -3-2 (A2)
Line -3-3 (A3)
Line -3-4 (A4)
Line -4 004 Living Rm Main Line Item
I
Viewed from Exterior. Scale: 1/4" = 1'
1
Line -4-1 (Al)
QQ-2.20.900.1618 cust-036580 Page 2 of 10(Prices are subject to change.) JRH000115 - 12/7/2015 - 11:49 AM
Quote Date: 10/9/2015 Drawings are for visual reference only and may not be to exact scale. All Last Modified: 12/7/2015
orders are subject to review by JELD-WEN
LINE NO. LOCATION BOOK CODE QTY
SIZE INFO DESCRIPTION
Line -4-2 (A2)
Line -4-3 (A3)
Line -4-4 (Bi)
Line -4-5 (B2)
Line -4-6 (B3)
Line -5 I 0015 Living Rm
I III ( I
Viewed from Exterior. Scale: 1/4" = 1'
Line -5-1 (Al)
Line -5-2 (A2)
Line -5-3 (Bi)
Line -5-4 (012)
Main Line Item
1
QQ-2.20.900.1618 cust-036580 Page 3 of 10(Prices are subject to change.) JRH000115 - 12/7/2015 - 11:49 AM
Quote Date: 10/9/2015 Drawings are for visual reference only and may not be to exact scale. All Last Modified: 12/7/2015
orders are subject to review by JELD-WEN
LINE NO. LOCATION BOOK CODE QTY
SIZE INFO DESCRIPTION
Line -6 006 Living Rm Main Line Item
�II I
Viewed from Exterior. Scale: 1/4" = 1'
Line -6-1 (Al)
Line -6-2 (A2)
Line -6-3 (61)
Line -6-4 (132)
Line -7 007 Sunroom
Viewed from Exterior. Scale: 1/2" = 1'
1
I
QQ-2.20.900.1618 cust-036580 Page 4 of 10(Prices are subject to change.) JRH000115 - 12/7/2015 - 11:49 AM
Quote Date: 10/9/2015 Drawings are for visual reference only and may not be to exact scale. All Last Modified: 12/7/2015
orders are subject to review by JELD-WEN
(UNE NO. LOCATION BOOK CODE QTY
SIZE INFO DESCRIPTION
Line -8 008 Sunroom
Viewed from Exterior. Scale: 2/2" = 1'
1
Line -9 009 Living Main Line Item
Viewed from Exterior. Scale: 1/4" = 1'
1
Line -9-1 (Al)
Line -9-2 (A2)
Line -10 011 LAUNDRY Main Line Item
Viewed from Exterior. Scale: 1/4" = 1'
1
Line -10-1 (Al)
QQ-2.20.900.1618 cust-036580 Page 5 of 10(Prices are subject to change.) JRH000115 - 12/7/2015 -11:49 AM
Quote Date: 10/9/2015 Drawings are for visual reference only and may not be to exact scale. All Last Modified: 12/7/2015
orders are subject to review byJELD-WEN
LINE NO. LOCATION BOOK CODE QTY
SIZE INFO DESCRIPTION
Line -10-2 (A2)
Line -11
012 Kitchen Main Line Item
4:
Viewed from Exterior. Scale: 1/4" = 1'
1
Line -11-1 (Al)
Line -11-2 (A2)
Line -12 013 stairs
Viewed from Exterior. Scale: 1/2" = 1'
1
Line -13% 014 Bed Back Main Line Item
I
77 -
Viewed from Exterior. Scale: 1/4" = 1'
1
Line -13-1 (Al)
Line -13-2 (A2)
QQ-2.20.900.1618 cust-036580 Page 6 of 10(Prices are subject to change.) JRH000115 - 12/7/2015 - 11:49 AM
Quote Date: 10/9/2015 Drawings are for visual reference only and may not be to exact scale. All Last Modified: 12/7/2015
orders are subject to review byJELD-WEN
LINE NO. LOCATION BOOK CODE QTY
SIZE INFO DESCRIPTION
Line -14 015 Bed Back
J�
Viewed from Exterior. Scale: 1/4" = 1'
1
Line -15 016 Front Bed
T
Viewed from Exterior. Scale: 1/4" = 1'
1
Line -16
017 Front Bed Main Line Item
-7-7—
7—
Viewed
Viewed from Exterior. Scale: 1/4" = 1'
1
Line -16-1 (Al)
Line -16-2 (A2)
Line -16-3 (A3)
QQ-2.20.900.1618 cust-036580 Page 7 of 10(Prices are subject to change.) JRHU00115 - 12/7/2015 - 11:49 AM
Quote Date: 10/9/2015 Drawings are for visual reference only and may not be to exact scale. All Last Modified: 12/7/2015
orders are subject to review by JELD-WEN
LINE NO. LOCATION BOOK CODE QTY
SIZE INFO DESCRIPTION
Line -17 018 Bath Main Line Item
Viewed from Exterior. Scale: 1/2" = 1'
1
Line -17-1 (Al)
Line -17-2 (A2)
Line -188
019\Bed Front Main Line Item
Viewed from Exterior. Scale: 114" = 1'
1
Line -18-1 (Al)
Line -18-2 (A2)
Line -18-3 (A3)
QQ-2.20.900.1618 cust-036580 Page 8 of 10(Prices are subject to change.) JRH000115 - 12/7/2015 - 11:49 AM
Quote Date: 10/9/2015 Drawings are for visual reference only and may not be to exact scale. All Last Modified: 12/7/2015
orders are subject to review by JELD-WEN
LINE NO. LOCATION BOOK CODE QTY
SIZE INFO DESCRIPTION
Line -19 020 Side Bedroom
I
L _
Viewed from Exterior. Scale: 1/4" = 1'
1
Line -20 021 Back Bed Main Line Item
_77—
Viewed from Exterior. Scale: 1/4" = 1'
Line -20-1 (Al)
Line -20-2 (A2)
Line -21 022 Back Bathroom
Viewed from Exterior. Scale: 1/2" = 1'
1
1
QQ-2.20.900.1618 cust-036580 Page 9 of 10(Prices are subject to change.) JRH000115 - 12/7/2015 - 11:49 AM
Quote Date: 10/9/2015 Drawings are for visual reference only and may not be to exact scale. All Last Modified: 12/7/2015
orders are subject to review by JELD-WEN
LINE NO. LOCATION BOOK CODE QTY
SIZE INFO DESCRIPTION
Line -22 023 Attic
Viewed from Exterior. Scale: 1/2" = i'
Line -23 024 Attic
Viewed from Exterior. Scale: 1/2" = 1'
Total Units:
25
Protect yourself when you choose JELD-WEN`D AuraLast@ pine products backed by a limited lifetime warranty
against wood rot and termite damage.
QQ-2.20.900.1618 cost -036580 Page 10 of 10(Prices are subject to change.) JRHU00115 - 12/7/2015 - 11:49 AM
Quote Date: 10/9/2015 Drawings are for visual reference only and may not be to exact scale. All Last Modified: 12/7/2015
orders are subject to review by JELD-WEN
4 1 3 ® 2 j
THIS DRAWING AND ITS CONTENTS ARE CONFIDENTIAL AND ARE NOT REVISION HISTORY
TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART OR USED OR My DESCRIPTION
DISCLOSED TO OTHERS EXCEPT AS AUTHORIZED BY IELD•WEN INC NULL I DATE ZONE/SHEET DATE
D v i
C
B
A
-- .625 -.62s-
.187
.525-
.187 � � .0
.330 .330
77.330 .330
t .047 J
.328 -� -� .297 --�
Wood Aluminum _
Exterior Exterior
Bar Bar
Horizontal Section
1
IBY I APR BY
�n
D
C
0
B
A
TOLERANCES "O"tcTeNc: fuze: OTlOSttt� M? LAKEPORT BLVD.
lFiES55PEIItIM ONrf 6r' SUtt KLAMATHFALLS.OR07601
OTKRM $IflYflPieper 1.1 WINpOW5 d: pOORS PHONE; (SIIIEFZ}tSf
FACMN:1132 aEumar 7me: Builders WOW OH
AIK�E s T ,aR s7; with ST Putty SOL bars
SA a2VENF,>a: ��� DRAM16Nu, SP11-01
Xu i m u^7FAu rrosc I' I'; 1 OF 1
4 1 3 2 1
yynr',K i�+�•�:� - u.?vL� : w •'\ a • - ta}�
'w`;"'Zr
%,off, ♦ i :•• Pt y: ./ L:r�L+�
..
.'\�R 1 t F1r/ +rte
.�.;'� .�' 1�..��.,,,u, s e' k"r.,.2 �r�`'�►�is, W�� ��':N,.•y,: ri"� 't _
tit r A' r��14 �. v wlr t }•
x � � �,,� rY�i'�V';�ijfv �1/� r1p,f s �.� �;�e �y,.4 � ����I�:r:�GF •f't �,�y�.i}, ■--
,1�` t.. �� /`7 .:::' h..����iyy,i*'" x Kf1�`ti3',�,,,,"y, „KEs•M„ "`"`""" a., rlw ��e� r.�y�11�.4,;a. ,,�t�qi'�
EVA
�,�� ���� ryrr„�4 , •tx . � ���ES ��6 ,.!}�V't��.of€►�ir�' .,„a�r"�r►.i`
. '6519
<
QR
f�1'
Agq
w1 �1:. � a {,i��';•. t � �ry/f I ti•� �%ri': Av� �0 � � � wy+;J;Y� \ y.;��.
'1• fit•\, i) €7.� /J !:.;r -'ME .�, , �s, x�,�,� • 1 p`�` 5 _ ` ''!1'►f `b"•'ir'll.. '�'��.�}`,..( T�
y iY
,��s * :,�• ,�• pa �Ure�'�s�t �} ,�, �4ti'�` e,+ ��-�..'i,,5s�• � �'
�a� �'�, .cat 'r���} •""�i` �F , �rd�.✓ Vd.6s � ��1lLa� i r.7JRtli �� rr��/r••��L
i'a ti .. j �f '� - ,sw:'a°r Year �' x'” `"`'ta' ,•,.."":";,�,' .," . u`n9.m—M ^as+'G
MIX—:
'� p*:. r fGy'ZL ,�N 'S'�wCFi'.''.00"' •alr "GNB-_" M~1 v.K '�l yy�iT
sSyy.sa.+`"'�'�x«�.m-•er.-'�'�"." am,,,,`�,. '-c.�' " i��s.�•`.'-•'c a mesZvzn-�'s_"'.,- ^¢r'`v's'��+•-"'°� sem;. �J'n d..,�;. a ':�1:,�.� � �, �►
1� r_ ,,.sear,,a-.�+x:.s."'^my'x"�+r„~,.x�.t,s-'.m°"_s=','-sM. �..ty"g�'-X„yd'••T,ya-mom- -ger-.;.ca '"-":.areti.\:+f -Fr..v'2+..
j� R / c r mow,.. _,rna�z`-• yam_ .,�..:.�::' •-„r,.,�s.¢r'x'.` ..n;z- :�,s Y _an r .. r.�+- rc"r-ec��-,•' vimsu.-•'+m„v S_, '� n �:,c- 'S`^�ef+w�„
i.. :,�` ' ,` `�s .� -'' +��' , < �r*-;'�r'�”-'�a�rn•...�--x'sr"�,-,-:•�u)��/"L" ^=.s"- v�"� ! � �^ =ecn. �'.�., f�•,�•'"-.rc,*ra"s.,�'� �s`�z y`=�" �t F !o-^ x ""�"..'u.;*�y��°�^a�-�tii- .. �j'•`
_.�.. - r •�z., f:' 4z. ..-e.-'.�^�.:•-;"`a�"�.T,a" _ .� :�s',�,'sKt�'� '' .-:nca^�. .cc^•..s�"°>�. .-w- .x c,4,- '"�.�•' "^i�j' ^sd` ^s.. /�j• / ''
�,s�•-'- :� :: �i :•� �'?�..'� .e...:'>�".agu:'fi„�,�fi�"^t+•c^xL',��'�s,-,.,�.-�'r���'"°'4•' aa.;�-'P"'-�'- � mr.y+.�„r,: t3,.:�^,..-':�..,�,w•^�'s�-`"�n,,,� Frw,rm�..�- (^,,+C4• �'�4-r w4m �'.«+��z^t.. ., �Z9 '!S
. '" r ,r', 3 f "" �. ' ' ' ...:.... �+ ... "Q:.�-yt"-��_ ��3\"...+•^.+�-S"'.;... -am- ,,.s. � .«ww �4 � � ae���� r
x f s t� ' _ •
J a '
i . Jlt (.t11�1 tJj
TT _TiM
t
-
^
,.'� -,'.. ', _ :.'. .. :: ,. ;.. �,s.-r �_ ;, ' .2 = .�,krC' I `---:_rt'�' ' .t ~••T ... r"�� r. �•
, 1 r
'Inn,,c• S.ti'L,.� _b. .+ i; l: �• C , k" .. �„•, ,.
" � 1 � `: ;.-, ' r%;, , '� � ?' r'i F f<.`'� wj .-�..a'y`..%i,�� ' �.z '� �.,:,:�I-"s=r�a-s-,nw=? --s;✓rs3 •:`z a..�."`�4•'�.kh,?;x..��,,�r;"j�f;�h�--fAr,,�:; :� •.•`?N r{..,': �,it.. - m 3i.�S b' -
�, 7::Y-
.. ,`xa n ''.r -r: .,�,
-s0-1
^' c
r ?-�e •� r
,_ .. ,.. .. tS.:x.�. • a ".. r+,u. ",r--r"I*.- ]K E -i : 1�I�il. ,/ t _ l ��.r r `r' : M,.
-T. �'�"� +kc�^r'� ��,
s . ", 8 war '3. � , F t ; i . l : } ` „� .; ,r , :.d ✓ L• �y `s :. I -
- .. ti ,^, s,�N�'�'��,��i� t . •Y ..,
_r `„r' R+r. 'aa..,y...,a-r• r..cr �` +, . i�„� �.i: :-`< , i Z 1- r� f , / • � �+, ; s 1 r , i
, i� ;, , ,. n<:F�.lo,7.;'i�w,,,�,ne,.C+9„� _��=�' �'H` �•'ti'i, trt a�517., r .! i n I.F .� r:'p r ,eyr. J' M.,y',.
Rd
. ^sc �s s%;: a: it -1 . + ({ 1 t•:-, -
't .r �', „_,y.. a x: `-5�'•. �' .:�-,.�1', 3'. -�+:7 ::..'j. rs t~ �• r ;� �. .�Y
,�1t e..•:;s,,.S�+..err' ,,.;: :•t.
r. �, r' :♦ , -ar.Kti...r. \'! Js
kc
��r•t'[41 s ry k '-1eL � 1,..CI ..•, �i ; � t - -
. .:r.. :y - :r: �,.+� ..,,,- ,,. , tt;S I �• -d. ^r . v :':, }:.-. ;• i ''`�-e'': �t ,-rr;f;/ ' �� 6 .. fys iC T � _ x i'
.. '�' ' � - . / .! _.$,r ,< �a,..�T ,;,.,`f'i'r �.„1 ..-7X �.' t -! '� _ b;:.ts � �t ti't. _ r r.. r ,, � ,�•Y-�' ,-. ,r .l. . M, � w '!
H
.::. ... { .: _. w y. y l'� .:.1 1 ;-:'3r � r '%.Y�'fi „xr.. f tk Tr.�t�}” �.s. 41:..,Y �:E�"��� •C.•,1'^ 'A� � w,"� '': i5, ..��J t - 1.
L -
,, ., ,., ., ,, rr,,.,:. ;..: ._.... Y. ,,.' .a<. l.' F., ,,..r-u..,,,�s � n e t• ,,i<. .--'—Y1,�-,,, +� 7.r Y ;n: x
,..,,;.. i .r�r•...1 ... r•�'.. :. {:.'y ' S,r.:*•.;, :[s.ti�. s,t. �� ,:. ..'r� f-rvy".'k"�'1 '"4.. '.fi* j s..., q 7. '� ! + \
r
�.a J - _.'.., ., .:. r, -..:: z• -:L �ip :-^' �,.,�_ y.$ i.-.}esasr � :.:t s ` i^����•1 \�' •a:,,..t• s �.�.r Ni •. ::, �+ ,.rs i,:- "4� ..� .
.3.-, :. -. Y,.%. �. f ..:-, r y i..>".s:•.va.�?�e:�,1' 'a�"nx ft•:+,� tib ::..., y'_ ��'t��}.e•.-ai:+x�:x .��r .l .t\ ,ii .. ..•.--_.�_ .,.'_#-,'�.`.I;k • -. >v.R , ... _ _ ., .. <.r y�, , i ,
Application
-FOR-
Certificate
FOR-
Certi icate of Appropriateness
HISTORIC PRESERVATION COMMISSION
of SOUTH BEND & ST. JOSEPH COUNTY
125 S. Lafayette Blvd., South Bend, IN 46601
http://www.stj osephcountyindiana.com/departments/SJCB P/index.htm
p: 574-235-9798 f 574-235-9578 e: SBSJCHPC@co.st-josephJn.us
OFFICE USE OiNL I{y»»>DO NOT COMPLETE ANY ENTRIES CONTAINEDINTHIS BOX«««OOFFICE USE ONLY
Date Received: I J Application'Number:
Past Reviews: YES (Date ofbwReview) Jam, 2n 1,4 ❑ NO
Staff Approval authorized by: t l i Title:
Historic Preservation Commission Review Date: 1 t I l
❑ Local Landmark❑Local Historic District (Name) Cihoti 1 n V C -
❑ National Landmark National Register District (Name) l r \ O F l n PCUK
Certificate of Appropriateness:
❑ Denied ❑ Tabled ❑ Sent To Committee ❑ Approved and issued:
(Please Print) 22 / L-�'
Address of Property for proposed work: J07 �hm v� l GYIAG�
(Street Number—
Street Name—City—Zip Code)
Name of Property Owner(s):Phone #:
Address of PropertyOwner(s):
(Street Number— Street Name—City—Zip Code)
Name of Contractor(s): l��% �l� l✓l� Phone #: 630
i
Contract Company Name: if-�j C�? %'; Piz. L- —C
Address of Contract Company: 2,0
(Street Number— Street Name—City—Zip Code)
Current Use of Building: /( �_,_ ?��A
(Sin/gle�J` ►�F�a-mi4—Multi!Family—Commercial—Government I .)
ndustrial—Vacant—etc
Type of Building Construction: vV �l ul,a,axL
(Wood Frame—Brick—Stone—Steel—Concrete—Other)
Proposed Work: ❑ In -Kind ❑ Landscape ❑ New Replacement (not in-kind) ❑ Demolition
(more than one box may be checked)
Description of Proposed Work: IZr,A j a. C*. 41/ ti" J a Lv5 6 1f_
�ra-ms.,r'% . ,�o�blc-I.�..v� ,,,,.a �.se�r-/k'e-•r �e,�.,.� ozr f�.��,ke_
�O l� to. 0. i"��� Strfn� l�S 1.✓/�L7 1�.�_��-an �Lv� Q is In i +a a('vta� c�rw�C v>>JOry�Lf
Owner/Contractor Fax #:
(Staff will correspond with only one designee)
X
Signature of Owner
e-mail:
and/or X--'
Signatu?--O/-C-
actor
—APPLICATION REQUIREMENTS ARE LISTED ON REVERSE SIDE—
APPLICATION FEE
The following schedule of fees shall apply to any Application For A Certificate Of Appropriateness:
Staff Approval $ 20.00
Commission Review $ 20.00
Payment must accompany the application at the time of submission. For electronically submitted application,
payment must reach the HPC office within 48 -hours following transmission.
REQUIRED DOCUMENTATION AND SITE PLANS
The Historic Preservation Commission of South Bend and St. Joseph County cannot render judgment nor proc-
ess an Application without specific documentation. Comprehensive documentation protects both the owner of the prop-
erty submitting the Application as well as providing a complete understanding of the project for the commissioners and
staff when rendering a decision. Problems -often occur during a project review or during the execution of the project
when one or both parties are unclear as to the specifics. Applications will NOT be processed without all required fees
and documentation.
When an Application has been scheduled for any meeting where a review and decision are to be rendered, the
owner and any architect or contractor (s) retained for the project must attend such meetings. Failure by the owner, ar-
chitect, or contractor to attend such meetings may result in denial of the Application due to insufficient presentation.
Documentation shall include: materials to be used, detailed written description of the project including scale,
dimensions, construction methods, finished, manufacturers' brochures and specifications and photographs of the area (s)
which the project will affect.
Photographs may be submitted in digital format compatible with the Commission's operating software,
or in any glossy photographic print. When a project involves blueprints and/or site plans, one (1) set shall be
submitted with the Application. Any documentation submitted to this office cannot be returned to the applicant.
INSPECTION AUTHORITY
All projects will be inspected during and following execution, for compliance with the decision (s) rendered by
the Historic Preservation Commission of South Bend and St. Joseph County.
Owner acknowledges that while the Historic Preservation Commission only considers Certificates of Appropri-
ateness for exterior features, under certain circumstances it may be necessary for the Commission Staff to have access to
the inferior of the building in order to accurately assess the condition of the exterior feature and that the lack of access to
the interior may prevent the Commission Staff from making a favorable recommendation.
Any work performed on a historic landmark or in an historic district which does not conform to the Certificate of
Appropriateness permit, shall be immediately halted by the Historic Preservation Commission and the Building Depart-
ment of South Bend and St. Joseph County.
INTERGOVERNMENTAL DISCLOSURE
Certificates of Appropriateness will be forwarded to the building Department of South Bend and St. Joseph
County when the applicant also is required to obtain a building permit or other such permit issued by that department
(The applicant will pickup their permit at that location). In all other cases, only a copy of the Certificate will be sent to
that department. In some instances, a copy of the Certificate may also be sent to the Department of Code Enforcement
and the Indiana Department of Historic Preservation and Archaeology. When no building or other permits are required
from the Building Department, the Certificate permit will be mailed directly to the applicant.
MINUTES OF A MEETING OF THE
HISTORIC PRESERVATION COMMISSION
OF SOUTH BEND & ST. JOSEPH COUNTY
November 16, 2015
13'h Floor Conference Room
County — City Building
South Bend, IN 46601 _
I. CALL TO ORDER
President Klusczinski called the meeting to order at 7:07 p.m.
Members Present: Timothy S. Klusczinski, Tom Gordon, Mike Voll, Brandon Anderson,
Elizabeth Hertel, Kevin Buccellato
Members Not in Attendance: Jennifer Parker, Michele Gelfman
Staff Present: Catherine Hostetler, Director; Elicia Feasel, Deputy Director; Tony Zappia,
Attorney; Steve Szaday, Preservation Specialist/Inspector
Members of the Public Present: Joan Downs
II. PUBLIC HEARING
A. CERTIFICATE OF APPROPRIATENESS
1. 806 Leland COA#2015-1102 Chapin Park
Representation by Joan Downs, owner
STAFF REPORT
CONCERNING APPLICATION FOR A
CERTIFICATE OF APPROPRIATENESS
Date: November 4, 2015
Application Number: 2015-1102
Property Location: 806 Leland
Architectural Style/Date/Architect or Builder: , Free Classic/ I 894/Elbel House
Property Owner: Joan Downs
Landmark or District Designation: Chapin Park LHD/NRD
Rating: Contributing
DESCRIPTION OF STRUCTURE/ SITE: A 2'/2 storey irregular plan house set upon a brick foundation. Roof is asphalt
shingle. Walls are a clapboard and wood shingles. There is a partial front porch. Windows are 1/1 wood double hung with storms.
ALTERATIONS: Alterations noted on survey card have been restored to original. COA#2014-1205 installed hand railings in
three locations including a metal rail at garden steps, and wood rails at front and back porch.
APPLICATION ITEMS: Install privacy fence along southern border of property up to area across from our basement door thus
not obscuring the window of the neighboring home to the south.
DESCRIPTION OF PROPOSED PROJECT: Owner proposes a 6' tall cedar 4" dog-eared picket style fence in the same location
as an existing chain link and deteriorating wood fence (see diagram).
STANDARDS AND GUIDELINES:
I. THE ENVIRONMENT
A. THE DISTRICT ENVIRONMENT
The Chapin Park Local Historic District is a particularly fine residential area located close to downtown South Bend, the St.
Joseph River, Memorial Hospital and Leeper Park. This section is meant to protect and guide appropriate maintenance of the
common areas of the district (i.e. visual landscape and streetscapes).
Required
Brick streets contribute greatly to the character of the neighborhood. These streets have always been essentially passenger car
thoroughfares. The appointments of the streets (i.e. lighting, curbs, horse hitches and monuments) should contribute as much as
possible to their architectural, historic and residential character. Retention and maintenance of existing brick streets in the district
is required. Repair work to fill voids and gaps must utilize brick paver materials and acceptable installation methods whenever
applicable. When utility work dictates the removal of street sections (pavers), the original materials will be reinstalled. Brick
-streets shall be patched with brick pavers. Concrete, asphalt, fillers and similar materials shall not be used. All original
streetlights shall be maintained, especially the George Cutter "Park View" streetlights designed by the Cutter Company for this
neighborhood. Present efforts by the Neighborhood Association and the Historic Preservation Commission to restore "Park
View" streetlights to the district shall continue. Any change in lighting must receive approval of the Historic Preservation
Commission. New or different fencing requires a C of A and shall reflect the style and character of the individual property and
the surrounding environment and properties.
Recommended
The current or historic character of lawns should be preserved. Front yard areas, common lawns and tree lawns should remain
open. New or replacement trees should be compatible in variety with those presently growing. Vacant lots should be kept
landscaped appropriately while vacant, and may be used for recreational or residential development. When replacement of utility
poles or power supply lines is necessary, consideration should be given to underground conduits or utility poles erected along
rear property lines.
Prohibited
Existing relationships of buildings and their environments shall not be destroyed by widening existing streets, applying asphalt or
other bituminous coverings or by introducing new streets or parking lots. Signs, streetlights, benches, new plant materials,
fencing, walkways and paving materials which are out of scale or inappropriate to the neighborhood may not be used. The
erection of high walls or barriers, which would alter the relationship of the houses, shall be prohibited. Utility poles with high
intensity overhead lights shall not be used on main thoroughfares.
B. BUILDING SITE, LANDSCAPING & ACCESSORIES
This section focuses on individual properties and amenities. Building sites tend to be irregularly shaped, of varying topography
and with different setbacks with regard to plots. Alleys are generally behind houses. Landscape accessories like fences are unique
to each structure. Chapin Place presents a unique situation within the district. Applications from properties that have property
lines on Chapin Place will be considered on a case-by-case basis.
Required
Fencing, walkways, outbuildings, private yard lights, signs (i.e. house numbers) and benches (visible from the street) as well as
trees located in a yard or tree lawn which reflect the property's history and development shall be retained. A tree located in such
areas shall only be removed if the removal is required due to storm damage, disease, threatened damage to a structure or for such
other reason acceptable to the Historic Preservation Commission. Storm damaged or diseased trees should then be replaced with
an approved species at the same or approximate location wherever possible. Fencing visible from the street in front of the
structure shall be open (meaning spaces between the pickets) and consistent with the historic character of a structure enclosed.
Recommended
New site work should be based upon actual knowledge of the past appearance of the property found in photographs, drawings
and newspapers. New site work should also be appropriate to existing surrounding site elements in scale, type and appearance.
Front yard areas should remain open. (See above for information regarding fences.) Trees in close proximity to a building may
cause structural damage. Owners are encouraged to remove these trees and replace (or replant) them at a more appropriate
location as soon as planting season permits and upon approval of a C of A.
Prohibited
No changes may be made to the appearance of the site by removing trees, fencing, walkways, outbuildings or other elements
before evaluating their importance to the property's history and development. Front yard areas shall not be transformed into
parking lots nor paved nor blacktopped, nor enclosed by solid fences, chain link, nor industrial/commercial style fences. The
installation of unsightly large devices, such as television satellite dishes, skylights or solar panels, shall not be permitted in areas
where they detract from the architecture of a building, are intrusive to the public view of the building or are highly visibly from a
public street, or ruled inappropriate after Commission review. Utility poles with high-intensity overhead lights should be installed
so that they cannot be seen from a street. The Commission will evaluate all installations as well as any potential exceptions
resulting from special circumstances, before granting a C of A.
STAFF RECOMMENDATION: Staff recommends approval of the proposed project.
Elicia Feasel
Deputy Director
On a motion by Tom Gordon with a second by Elizabeth Hertel to approve application as
presented.
Vote: 6 — 0 unanimous.
COA#2015-1102 Approved.
III. HEARING OF VISITORS — none.
IV. REGULAR BUSINESS
A. APPROVAL OF MINUTES —
1. October 19, 2015 — approved by general consent.
2. October 26, 2015 Special Meeting — approved by general consent.
B. TREASURER'S REPORT
1. Location Report — Distributed. Discussion.
C. STAFF REPORTS
1. Correspondence — Circulated. Discussion regarding CLG audit and educational
opportunities. Staff to locate CLG resource library of publications. Discussion
regarding publishing COA statistics on HPC website and forwarding a press release
to the media.
2. Routine Maintenance Exclusion Approvals — Circulated. Discussion regarding
trees, stump removal timeframe in particular.
3. Director — Distributed.
4. Deputy Director — Distributed.
5. Preservation Specialist — Distributed. Discussion regarding tours.
6. Legal Counsel —None.
D. COMMITTEE REPORTS
1. President — Distributed.
2. Legal Affairs — Discussion regarding upcoming tasks including Deputy Director
search, enforcement, and trees.
3. Indiana Bicentennial — Update by Elizabeth Hertel.
4. Executive Director Selection — On a motion by Mike Voll to disband the Executive
Director Selection Committee with a second by Elizabeth Hertel. Vote: 6 — 0 unanimous.
5. Deputy Director Search — Discussion regarding personnel policy.
V. OLD BUSINESS
VI. NEW BUSINESS
A. Programmatic Agreement — Discussion. On a motion by Brandon Anderson to approve the
Programmatic Agreement with a second by Tom Gordon. Vote: 6 — 0 unanimous. On a motion by
Brandon Anderson to amend the Programmatic Agreement to authorize the Executive Director to
execute the agreement on behalf of HPC with a second by Tom Gordon. Vote: 6 — 0 unanimous.
B. Nominating Committee (Executive Officers) — Chair calls for formation of a Nominating
Committee for Executive Officers with all members of the Commission minus the current
President per Roberts Rules and will meet between now and the December meeting to develop a
slate of candidates that it will present at that December meeting for officers of the 2016 year.
Brandon Anderson was invited and agreed to Chair the Committee with all Commissioners
invited to join. If you do not wish to join, notify the Chair so the quorum numbers can be
adjusted; right now there would need to be four members to meet quorum, a simple majority.
C. Interim Executive Director — To remedy a lapse in administrative authority, Tim Klusczinski
moves at the request of our Deputy Director to appoint Elicia Feasel Interim Executive Director
with the authority to execute the duties of that position and to represent the Historic Preservation
Commission without additional compensation from November 25, 2015 until an Executive
Director successor is duly appointed and qualified with a second by Brandon Anderson.
Vote: 6 — 0.
3
D. Executive Director — Discussion. On a motion by Brandon Anderson that the Executive
Directory salary be set at $40,700 and the Deputy Director salary make up the rest of the
budgetary allocation and that it move forward to the due process to be approved by the County
for the budget with the condition that Elicia Feasel, current Deputy Director, accept the position
of Executive Director with a second by Kevin Buccellato. Vote: 6 — 0 unanimous.
VII. ANNOUNCEMENTS AND MISCELLANEOUS MATTERS — none.
VIII. ADJOURNMENT
On a motion by Elizabeth Hertel with a second by Mike Voll to adjourn.
Vote: 6 — 0 unanimous.
Meeting adjourned at 8:35 p.m.
Attest:
Elizabeth Hertel, Secretary Date
4
Historic Preservation Commission
President's Report — December 21St, 2015
• 11/16/2015 7P: HPC Monthly Meeting (County -City Building; Room 1308).
• 11/20/2015 2P: History Museum. Attended Special year end celebration and
delivered words of tribute to honor Catherine Hostetler, for twenty-one years of
service to the Historic Preservation Commission.,
• 11/21/2015 12-2P: St. Joseph County Public Library (Humphreys Multimedia
Room) "Michiana Memory and a History of Documentary Photography"
Description: Local photographer Lou Sabo will discuss documenting buildings
and spaces with traditional photography. This is a Restore Michiana program co-
sponsored by SJCPL's Local & Family History Services and the Historic
Preservation Commission of South Bend and St. Joseph County.
• 11/25/2015: Brief meeting with staff. Final goodbye to Catherine (her official last
day). Copied file information for 817 Forest Avenue for use on the Chapin Park
ornament for 2015. Got a quick peek at the new storage room modular shelves
and inventoried material.
• 12/4/2015: Lunch meeting with current and former Preservation Inspectors and
discussion over COA procedures and follow-up inspections.
• 12/9/2015: Staff Meeting. Miscellaneous topics.
• 12/14/2015: Staff discussion over miscellaneous security and budget topics.
• 12/15/2015 5:30P: St. Joseph County Council: Land Use & Planning Committee
(County -City Building; Room 411). Petitioner for the HPC approved In-line
transfer of $3,700 from Deputy to Executive Director salary for 2016.'Also
fielded questions about the Fagade-Easement transfer (HPC to Indiana
Landmarks) for the Kiser House by Council Members Catanzarite and Morton.
LUP Committee granted favorable recommendation for the salary transfer.
Council Members asked to be included on future discussions regarding HPC
fagade-easement topics. Anticipated review of the HPC salary transfer request by
the County Council expected on January 13th, 2016.
Historic Preservation Commission of South Bend & St. Joseph Countv
Interim Director Report - Elicia Feasel -12.21.2015
Local Historic Districts
1.ge Project: With the money raised from guiding tours, begin planning for
n nage.
2. water: 705 E. Lincoln Way-RME#2015-1203, roof.
3. East Wayne Street: 1130 E. Jefferson -meeting with owner regarding approved
COA#2015-08038.345 Sunnyside-RME#2015-12088, roof. 1220 EWS-RME#2015-
1211, roof.
4. Chapin Park: 806 Leland-RME#2015-1214A, window. 307 Lamonte-COA#2015-
1208, windows. 720 Park-RME#2015-1215, chimney.
5. River Bend: 539 Riverside-COA#2015-1207, siding, deck, storm windows.
HPC Meetinas Restore Michiana 2015
Attend November Meeting. Prepare Updating RestoreMichiana.com.
November minutes, forward to Working with Lou Sabo on 2
Commissioners, revise as requested, print for occasions on a PowerPoint
December meeting. Prepare COA and mail. preparation. Correspondence
Deliver signed minutes to Clerk and Mayor. with SJCPL. Attend Photography
Prepare and email December agenda and lecture at SJCPL. Follow up tasks.
packets. Post notices.
Local Historic Landmarks
National Reaister
1. City Cemetery: Received a letter
from DHPA.
Marketina: Building South Bend: Past, Present, Future
Postcards, Survev Books, Salvaae Working with volunteer, George, to scan data from HPC files, obtain
Fulfill order for Visit South Bend Mishawaka photos from Facebook and SJCPL. Continue work with George on
and Just Goods. Update inventory of downtown South Bend historic properties map and data to the
postcards. Process payments. spreadsheet.
Interns/Volunteers
Prepare Intern Resolutions. Prepare spring
semester Intern descriptions and promote.
1.ge Root, Volunteer: File organization,
gl research and Building South Bend.
2. Claire Thornton, Indiana Bicentennial:
Communications.
3. Ty Pellow, Resource Center: File labeling,
organization and general research.
4. Robin Becker, PR: Working on writing for
media.
Grants
1. Hotel Motel Tax grant: Working with Steve
on the details of applying.
Indiana's 2016 Bicentennial
Working in tandem with the County Commissioners office to coordinate
various events for 2016. Continued supervision of Claire, County
Commissioner Intern. Correspondence with Evie Kirkwood regarding
partnerships and sponsor solicitations. Attend Education sub -committee.
Attend Tribune interview at County Commissioner office. Prepare
agenda for whole committee meeting, attend and facilitate meeting,
follow up tasks. Correspondence with Sharon at Commissioners office
regarding Proclamation. Email proclamation information to committee
and attend Commissioner meeting. Attend ALL -IN Block Party meeting
at The History Museum. Phone call with Joyce Chambers regarding
Education sub -committee. Meeting with Lou Sabo regarding photo
exhibit. Meeting with Marketing sub -committee regarding new volunteer
to work on special writing samples. Attend Education sub -committee.
Attend flag raising at County City Building with County officials.
Heritage Tours: Local Historic Districts
Heritage Tours: Studebaker - Bendix Trail
Heritage Tours: South Bend Citv Cemetery
Heritage Tours: Downtown South Bend
Providing information regarding private tours for 2016.
Brownfield Coalition
Correspondence regarding a partnership to
scan the 1932 Assessor's Cards. Meeting at
HPC to check out the cards and discuss
sharing costs of scanning. Attend whole
committee meeting for a preview of the
project.
Research Requests
1. Notre Dame student project for a
pedestrian bridge over St. Joseph River at
Lafayette.
2. Notre Dame student project on the 2nd
County Courthouse.
3. 61723 Oak Road: Scan historic photos from
file and email.
Area Plan Commission
Preview agendas.
Redevelopment Commission
Preview agendas.
Green Ribbon Commission
Attend whole commission
meeting.
Heritage Tours
Working with Visit South Bend
Mishawaka to develop standardized
pricing for "step -on" services to tour
buses. Working on a docent to
guide training curriculum with S�
Update website.
HPC Research Center
Continue unifying spreadsheets of
numerous interns for consistency into
a Master Catalogue. Working with
volunteers, George and Ty. Printing
labels typed by Ty.
Miscellaneous
Complete Fixed Asset Disposal requests with Steve, attend County
Commissioners meeting, and coordinate removal. Training with
Catherine on budgets and other office duties. Meeting with Vicki of
Archives at HPC to go over steps to discard unused files. Attend Visit
South Bend Mishawaka Industry Partner meeting. Visit with Bob Yapp, in
for a visit from Hannibal, Missouri. Plan and execute surprise retirement
party for Catherine. Meeting with DCI staff regarding Oliver smokestack.
Attend County Council committee meeting and public meeting
regarding out -of -line transfers. Working with IT to swap computers.
Meeting with Ian in IT to discuss technology needs for the department
and place an order. Setting 2016 HPC meeting dates, forward to Tri
and HPC. Meeting with Sue Solmos of North Liberty to discuss joining Ul
downtown fagade grant committee to distribute grants funds to buil
owners to make improvements. Meeting with Daniel of EnFocus to
discuss goals for HPC webpage on County website. Attend Open House
at Bendix building for Excel Center and Bendix Coffee. Attend Ivy Tech
Environmental Design Advisory Committee meeting and student
portfolio review. Attend County Council meeting regarding salary
ordinance.
HISTORIC PRESERVATION COMMISSION
PRESERVATION SPECIALIST REPORT
December 21, 2015
Hello Commission!
As last month's weather continued this month, we have several roof repairs, tree
trimmings, and painting even so far as this past week. Although, I believe we may past
the time for painting, roofs and trees will be ongoing until the snow flies and remains.
There have been so many meetings in regards to next year's events and special projects
my head is spinning!These include the Bicentennial, the Studebaker Fountain committee,
the Park's Department master plan and even St' Joseph County parks 50th anniversary.
I am happy to report that the office reorganization project is continuing under Interim
Director Feasel's guidance and diligent efforts to streamline the layout and filing
systems. This is an exciting time to be a part of the office and I look forward to an even
better 2016!
As always, I would like to thank the Commission for yet another year of "other
contractual services." I feel that we have grown and have done concrete good work this
year. I think of all the property owners that have come to us for assistance and have
walked away educated and within the commission's approval. I am very proud of what
we do and look forward to doing even more in 2016.
To all, Happy Holidays and Happy New Year!
Thank you,
Steve Szaday
Preservation Specialist
December 10, 2015
Historic Preservation Commission,
would like to request a change in my hourly pay. This request does not
alter the Other Contractual Services annual budget. I have not received
a pay increase since my initial 90 day review whereas $12 per hour
increased to $15 per hour.. I feel confident that over the last three
years I have been able to manage my allotted budget to be available at
key times in an efficient and productive manner and will continue to do
so in 2016.
am requesting that my hourly be increased from its current $15 per
hour to $20 per hour. Although this will decrease the number of total
hours I can work for HPC, this will increase my ability to pursue other
outside contracting projects. I will do my best to schedule those outside
projects at slow times for COA applications which have been timely
consistent since my tenure began.
I look forward to another great year of being a part of,this wonderful
organization as it further grows under new leadership and additions to
the staff allow even further advancement.
Thank you for your time and consideration.
Steve Szaday
Preservation Specialist
Historic Preservation Commission of
South Bend & St. Joseph County
PRESERVATION SPECIALIST -INSPECTOR SERVICES CONTRACT
THIS AGREEMENT entered "into effective the 1st day of January, 2016, by. and
between the Historic Preservation Commission, governing body of the Historic Preservation
Commission of South Bend and St. Joseph County, Indiana, organized and operating pursuant to
joint ordinances adopted by the Common Council of the City of South Bend, Indiana and the St.
Joseph County Council (the "HPC"), and Steve Szaday (the "Inspector"), for part time services
to be performed by the Inspector:
WHEREAS, the HPC is established with the purpose to preserve and protect historic
structures in South Bend and Saint Joseph County, Indiana; and
WHEREAS, the Inspector has the training, knowledge, experience and expertise to serve
as the HPC's inspector of historic landmarks and of structures within historic districts; and
WHEREAS, the HPC desires to hire the Inspector to perform certain services as more
fully set forth herein; and
WHEREAS, the Inspector is willing to provide those services upon the terms and
conditions set forth herein.
NOW, THEREFORE, the HPC and the Inspector agree as follows:
1) The Inspector will perform the following services for the HPC as needed or requested by
the HPC:
a) Inspect all Local Landmarks and Historic Districts on a regular basis, looking for
any unauthorized alterations, repairs, renovations, removals or additions. This
includes buildings, structures, natural landscape items and man made landscape
items.
b) Inspect properties that have received a Certificate of Appropriateness to ensure
that the work being done complies with the terms of the Certificate as approved.
c) When needed, assist the HPC staff in reviewing new applications for a Certificate
of Appropriateness.
d) Contact the Building Department to have "Stop Work Orders" placed on any
projects that are in violation of proper HPC authority or a Certificate of
Appropriateness.
e) Document all violations in writing and with photographs, and submit this
documentation to the HPC Executive Director or Deputy Director for further
process.
f) Keep complete records of all inspections, as well as complete time logs for
services rendered to the HPC. The time logs shall be submitted on a regular basis
for purposes of payment for inspection services rendered. The Inspector shall
provide a monthly report to the HPC of activities for the prior month.
g) Inspect designated properties for compliance with the minimum maintenance
standards established by the HPC, discuss violations with the HPC staff, and, if
necessary after discussion, report violators to Building Department and Code
Enforcement authorities and attend pertinent Code Enforcement meetings or
hearings.
h) Attend HPC meetings as needed or as requested by HPC members or the
Executive Director or Deputy Director.
i) Maintain the confidentiality of all information disclosed to the Inspector during
the course of providing the services set forth herein, which the HPC deems to be
confidential, unless the HPC consents in writing to the disclosure of that
information.
2) The HPC will pay the Inspector at the rate of twenty dollars ($20.00) per hour for
services provided and for which the Inspector submits proper logs or records of those
services provided as described above.
3) Payment for the Inspector's services shall be made by St. Joseph County on a weekly
basis pursuant to funds appropriated to the HPC for such services.
4) The Inspector shall provide at least four (4) hours of service per week and up to the
budgeted amount as determined by the Executive Director.
5) The HPC will provide a desk and work area for the Inspector in the HPC office for the
Inspector's use in performing the tasks and duties set forth above.
6) The Inspector shall be deemed an independent contractor for all purposes and nothing
contained in this Agreement shall be construed to create an employer/employee
relationship, partnership or joint venture between the Inspector, the HPC, the City of
South Bend, Indiana, or St. Joseph County, Indiana, with respect to the Inspector's
activities conducted pursuant to the terms of this Agreement. The Inspector shall, as
such, assume and pay in full any and all payroll taxes, unemployment insurance, workers
compensation insurance, or other legally mandated costs, expenses, or withholdings
associated with the services provided herein.
7) All work product of the Inspector that is produced while performing services for the HPC
shall be the sole property of the HPC.
8) The HPC may modify this Agreement or terminate this Agreement at any time provided
that the HPC notifies the Inspector in writing of its decision to modify or terminate this
Agreement at least forty-eight (48) hours in advance of the effective time of such
modification or termination. Any payment due to the Inspector at the time of termination
of this Agreement shall be made to the Inspector no later than the date of the next regular
services payment date.
9) The Inspector may terminate this Agreement upon thirty (30) days written notice
delivered to the HPC at or prior to a regular monthly meeting of the HPC. This notice
period may be shortened to seven (7) days if health or other urgent circumstances require.
2
10) Upon termination of this Agreement, whether by mutual consent or at the election of a
parry, the Inspector shall promptly return to the HPC any of the HPC's materials,
documents or other tangible property of any kind which the 'Inspector acquired from the
HPC, or as a consequence of those services rendered for the HPC, or which the Inspector
produced for the HPC.
11) This Agreement shall begin on January 1, 2016 and shall terminate on December 31,
2016. This Agreement replaces all prior agreements between the parties and all prior
agreements between the parties shall be null and void. This Agreement shall continue in
effect for one-year terms until it is canceled or terminated by either parry as provided
hereinabove.
12) This Agreement shall inure to the benefit of and be binding upon the parties hereto, their
successors and permitted assigns. This Agreement shall be governed by and enforced
and construed in accordance with the laws of the State of Indiana and any action to
enforce any of the terms hereof shall be filed in the Superior Court of St. Joseph County,
Indiana. This Agreement may be executed in any number of counterparts, each of which
shall be deemed an original without the production of the other and all such counterparts
together shall constitute but one and the same instrument.
13) Neither party hereto may assign, either wholly or in part, any of its rights or obligations
under this Agreement to any other natural person or legal entity without the prior written
consent of the other party hereto.
14) This Agreement shall constitute the entire agreement between the parties hereto relative
to the subject matter hereof and supersedes all prior and contemporaneous agreements
and understandings of the parties and no variance or modification hereof shall be valid or
enforceable except by supplemental agreement in writing, dated subsequent to the date
hereon and executed by the parties in the same manner as this Agreement.
(Signature Page Follows)
Signature Page To
PRESER VA TION SPECIALIST -INSPECTOR SERVICES CONTRACT
HISTORIC PRESERVATION COMMISSION "PRESERVATION SPECIALIST"
OF SOUTH BEND & ST. JOSEPH COUNTY
President STEVE SZADAY
Date: Date:
Secretary
Date:
Executive Director
Date:
ATTEST:
St. Joseph County Auditor
Date:
BOARD OF COUNTY COMMISSIONERS OF
ST. JOSEPH COUNTY, INDIANA
President
Vice President
Member
C!
Date:
Date:
Date:
. ...JV.IVa.0 V� V.u.V uVu.V VI I'IVVVu.1.J
• Governmental Unit
4.r.. . V.... I.V. VJ. �. r.• LV V.//'.�
To.................................................................................... Dr.
IDEM South Bend Tribune
225 West Colfax Ave
............................................County, Indiana South Bend, Indiana 46628
Tax ID# 35-13-1571
PUBLISHER'S CLAIM
LINE COUNT Ad #: 8073
Display Master (Must not exceed two actual lines, neither of which shall total more than four solid lines of type
in which the body of the advertisement is set) -- number of equivalent ...................................
Head --Number of lines ...................................
Body -- Number of lines ...................................
Body -- Number of lines ...................................
Total number of lines in notice
16
COMPUTATION OF CHARGES
16 lines, 1 columns wide equals f6.gquivalent lines at 0.3555, -cents per line
• Additional charges for notices containing rule or tabular work . ....
(50 per cent of above amount) ...................................
Charge for extra proofs of publication
($1.00 for each proof in excess of two)
TOTAL AMOUNT OF CLAIM $5.69
DATA FOR COMPUTING COST -
Width of single column in picas 9.4ems Size of 8. point,
Number of Insertions 1
Pursuant to the provisions and penalties of IC 5-11=10-1; 1 hereby certify that the foregoing account is just
and correct, that the amount claimed is legally due, after allowing all just credits, and that no part of the same has
been paid.
I also certify that the printed matter attached hereto is a true copy, of the same column width and type size,
which was duly published in said paper 1 time(s). The dates of publication being as follows: South Bend Tribune:
12/14/15.
South Bend Tribune
225 W. Colfax Ave. South Bend, IN 46628_
ON ACCT OF APPROPRIATION FOR
$5.69
Appropriation No. Tax ID# 35-138-1571
ALLOWED
IN THE SUM OF $5.69
Attest
Cheryl leloA�r�ey,otary Public
Resident of St. Joseph County
My Commission expires December 21, 2016
That it is duly authenticated as required by law.
That it is based upon statutory authority.
correct
That it apparently c.
-incorrect
I certify that the within claim is true and correct; that
the services there in itemized and for which charge is
made were ordered by me and were necessary to the
public business
0
g Ad #: 8073
A meeting of the Historic Pres-
ervation Commission (HPC)
of South Bend and St. Joseph
County will be held Decem-
ber 21 at 7:00 p.m. 13th floor,
Room 1308 of the County-City
Building, South Bend, Indiana.
Agendas are available in the
HPC Office or may be obtained
via email at SBSJCHPC@
co.st-joseph.in.us. Additional
matters not requiring a Public
Hearing May be added prior to
the Meeting.
Timothy Klusczinski, President
Hspaxlp 1t 12: 14