Loading...
HomeMy WebLinkAboutFebruary 2012SOUTHe AGENDA OF THE - "�55,oNFgso HISTORIC PRESERVATION COMMISSION FEBRUARY 27, 2012' 1865 Regular Meeting THIRTEENTH FLOOR- ROOM 1308 County-City Building MONDAY, FEBRUARY 27, 2012 7:OOPM I. CALL TO, ORDER, ROLL CALL II. PUBLIC HEARING A. CERTIFICATE OF APPROPRIATENESS 1. 803 W. Washington COA#2012-0213 Facade Easement B. NATIONAL REGISTER NOMINATION 1. Updates P III. HEARING OF VISITORS IV. REGULAR BUSINESS A. APPROVAL OF MINUTES January 23, 2012 B. TREASURER'S REPORT ~ Location Report C. STAFF REPORTS r 1. Correspondence 2. Routine Maintenance Exclusion Approvals 3. Director's Report 4. Assistant Director's Report 5. Preservation Specialist Report �.{ 6. Legal Counsel D. COMMITTEE REPORTS: j 1. President's Report NOTICE: V. OLD BUSINESS FOR HEARING AND SIGHT IMPAIRED PERSONS ' Auxiliary aid or other services are VI. NEW BUSINESS available upon request at no charge. 1. Southhold Awards Committee Please give reasonable advance VII. ADJOURNMENT request when possible. MINUTES OF A MEETING OF THE HISTORIC PRESERVATION COMMISSION OF SOUTH BEND & ST. JOSEPH COUNTY February 27, 2012 13'' Floor Conference Room County City Building South Bend, IN 46601 I. CALL TO ORDER President Klusczinski called the meeting to order at 7:02 p.m. Members Present: Timothy S. Klusczinski, David Steinhauer, Jerry"Ni 4godski, Lynn Patrick, Kevin Buccellato, Alice McLane "" Members Absent: Mike Voll, Sandra Rossow x , , Staff Present: Larry Meteiver, Legal Counsel; Catherine Hostetler; Director; Elicia Feasel, Assistant Director Members of the Public Present: none H. PUBLIC HEARING A. CERTIFICATE OF APPROPRIATENESS 1.803 West Washington COA#2012-0213 Fagade Easement No applicant representation 'STAFFREPORT CONCERNING APPLICATION FOR A CERTIFICATE OF APPI1`OP,RIATENESS Date: 14 February 2012 Application Number: 2012-0213 Property Location: 803 West WashingtonE: Architectural Style/Date/Architect or Builder: Queen Ann6/1890 Property Owner: Indiana Landmarks Landmark or District Designation: West Washington national register district/fagade easement Rating: Outstanding 9 DESCRIPTION OF STRUCTURE/ SITE: This is a large solid stone Queen Anne that has two storeys and an attic with turrets and gables and dormers. The roof is asphalt. It has a solid stone foundation. There is an open front porch with stone steps and a port cochere`on the"rear east side with stone steps leading up to the house. The windows are 1/1 double hung set within stone frames, Heavy sione lintels and stone sills. The house has two stone chimneys. There is a stone carriage house in the rear. The two sttu"ctures are set on a comet; lot with minimal landscaping and surrounded by concrete parking areas. ALTERATIONS: The tile roof was replaced with asphalt shingles after the 1987 fire. The rear porch was enclosed. There is an additional stricture enclosing anotlier,entrance at the rear. The house was converted into four family units in 1945, with further subdivisions°after 1945. APPLICATION ITEMS: Remove scrub brush and associated stumps along east property line, remove chain link fence along east property line, install dirt and grass! Remove non-contributing windows installed in carriage house door openings and associated rough sawn siding. Install finish grade exterior plywood in openings as temporary cover. Paint Brown to match trim. Permanent opening treatmentswill be determined and submitted at a later time. Remove later enclosure of rear porch and associated doors and windows. All per attached listing and photographs. DESCRIPTION OF PROPOSED PROJECTS: Indiana Landmarks proposes to remove the white metal enclosures on and off the rear porch. This would return the porch to its original open air form. Indiana Landmarks also proposes to remove the non - original windows and wood in the carriage house door openings and replace it temporarily with exterior grade plywood painted brown to match the trim. This would suggest the look of the original carriage house doors. Indiana Landmarks proposes to remove the current landscaping items, re -grade the site as needed plant grass; replace the arbor vitae shrubs with mulch. STANDARDS AND GUIDELINES: Deed of Easement 8324891 2. No extension of existing buildings or improvements, and no additional buildings or improvements, and no future development of any kind whatsoever shall be permitted on the Property, unless the plans and exterior designs of such proposed future development have first been approved in writing by the Grantee, and only if such proposed future development shall conform with applicable local, state or Federal standards for construction or rehabilitation with the district wherein the Property is situate. 1 STAFF RECOMMENDATION: Staff recommends approval of the proposed work on the main house to remove non -original materials in the rear as well as the work on the carriage house. Since landscaping is not specifically addressed in the easement document it can be done without written permission from the Grantee. On a motion by Dave Steinhauer with a second by Jerry Niezgodski to approve application as submitted. Vote: 5-0-1 abstention. COA#2012-0213 Approved. Chair originally announced the vote tally as 6-0 unanimous. Later, under New Business, Lynn Patrick called for a Point of Order and clarified that she had in fact abstained and did not vote in favor of the application, reasoning that the project specified the removal of a young maple tree without the possibility of transplanting. Chair ordered the correction and added that there is general consensus to seek new locations for healthy (and manageable) trees whenever relocation becomes necessary. B. NATIONAL REGISTER NOMINATION 1. West LaSalle Street NR District -Update " 1St rding in April, public hearing in May. III. HEARING OF VISITORS IV. REGULAR BUSINESS A. APPROVAL OF MINUTES —January 23, 2012 approved by consensus. B. TREASURER'S REPORT —Catherine recognized Chcr'l oftheTurchasing Department for offering the toner from the Prosecutors office to HPC. C. STAFF REPORTS 1. Correslfondence, —Circulated. 2. Routine Maintenance Exclusion Approvals None. 3. Dir"ector's Report I —Marquette School walkthrough with Rev. Williams. 4. kssistant'Director"Report —Discussion of Southhold Preservation Awards. 5. Preservation SpecialistReport�„Distributed. 6. Legal Counsel"" Larry preparedyand distributed a resolution for 1922 Portage Avenue as a historic landmark for City ordinance and a form of ordinance for the March 13 meeting of the Common Council. Timothy Klusczinski mgved to adopt the resolution recommending the establishment of 1922 Portage Avenue for Landmark status with a second by Kevin Buccellato. Vote: 6-0 Unanimous. D. COMMITTEE REPORTS 1. Presidents Report —Distributed. V. OLD BUSINESS A. CVB Hotel Motel Tax Grant -Update announcing that HPC did not receive the grant. VI. NEW BUSINESS A. Southhold Preservation Awards -Update on nominations. VII. ADJOURNMENT On a motion by Lynn Patrick with a second by Jerry Niezgodski to adjourn. Vote: 6-0 Unanimous. Meeting adjourned at 7:30 p.m. 2 Attest: Lynn Patrick, Secretary Date 3 0• STAFF REPORT CONCERNING APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS Date: 14 February 2012 Application Number: 2012-0213 Property Location: 803 West Washington Architectural Style/Date/Architect or Builder: Queen Anne/1890 Property Owner: Indiana Landmarks Landmark or District Designation: West Washington national register district/facade easement Rating: Outstanding DESCRIPTION OF STRUCTURE/ SITE: This is a large solid stone Queen Anne that has two storeys and an attic with turrets and gables and dormers. The roof is asphalt. It has a solid stone foundation. There is an open front porch with stone steps and a port cochere on the rear east side with stone steps leading up to the house. The windows are 1/1 double hung set within stone frames, heavy stone lintels and stone sills. The house has two stone chimneys. There is a stone carriage house in the rear. The two structures are set on a corner lot with minimal landscaping and surrounded by concrete parking areas. ALTERATIONS: The tile roof was replaced with asphalt shingles after the 1987 fire. The rear porch was enclosed. There is an additional structure enclosing another entrance at the rear. ' .The house was converted into four family units in 1945, with further subdivisions after 1945. APPLICATION ITEMS: Remove scrub brush and associated stumps along east property line, remove chain link fence along east property line, install dirt and grass. Remove non-contributing windows installed in carriage house door openings and associated rough sawn siding. Install finish grade exterior plywood in openings as temporary cover. Paint Brown to match trim. Permanent opening treatments will be determined and submitted at a later time. Remove later enclosure of rear porch and associated doors and windows. All per attached listing and photographs. DESCRIPTION OF PROPOSED PROJECTS: Indiana Landmarks proposes to remove the white metal enclosures on and off the rear porch. This would return the porch to its original open air form. Indiana Landmarks also proposes to remove the non -original windows and wood in the carriage house door openings and replace it temporarily with exterior grade plywood painted brown to match the trim. This would suggest the look of the original carriage house doors. Indiana Landmarks proposes to remove the current landscaping items, re -grade the site as needed plant grass; replace the arbor vitae shrubs with mulch. STANDARDS AND GUIDELINES: Deed of Easement 8324891 2. No extension of existing buildings or improvements, and no additional buildings or improvements, and no future development of any kind whatsoever shall be permitted on the Property, unless the plans and exterior designs of such proposed future development have first been approved in writing by the Grantee, and only if such proposed future development shall conform with applicable local, state or Federal standards for construction or rehabilitation with the district wherein the Property is situate. STAFF RECOMMENDATION: Staff recommends approval of the proposed work ori the main house to remove non -original materials in the rear as well as the work on the carriage house. Since landscaping is not specifically addressed in the easement document it canbe done without written permission from the Grantee. Application - FOR - Certificate of Appropriateness Historic Preservation Commission of South Bend & St. Joseph County 125 S. Lafayette Blvd., South Bend, Indiana 46601 Mailing Address: County -City Building, South Bend, Indiana 46601 Phone: 574-235-9798 • Fax: 574-235-9578 • Email: SBSJCF1PCCco.st joseph.inus Website: http://www.sgosephcountyindiana.com/s chp/index.htnd OFFICE USE ONLY »»» DO NOT COMPLETE ANY ENTRIES CONTAINED IN THIS BOX »»» OFFICE USE ONLY Date Received 2- R- 0- Application Number 2 Q I IL 02- 1 Past Reviews: F1 YES (Date of Iaet Review) Staff Approval authorized by: Historic Commission Review Date: Local Landmark National Landmark Certificate of Appropriateness: ❑ Local Historic District (Name) ❑ National Register District (Name) MEM Title: E] Denied E] Tabled n Sent To Committee E] Approved and Issued DATE Address of Property for proposed work: __8Vs Street Ni jj,,nber and Street Name Name of Property Owner(s): (Please Print) :.iAa i kt. A LAt zom&z. _5 -CIA 160th Z6/'6E0_ Address of Property Owner(s): "—b2 W. VJM�A1N610NJ _ 5Wx henflr. 96160.) Contractor(s) Name: i*401*4E- �IOISJn CAC it40de. QVVA Se1i GCILneCJ" Contract Company Name: N I A Contractor Address: t -J ) A City: IJ) JA Phone: ___,57 A - Z32- 4 _ Current Use of Building: - G /+ (Single Family — Multi-Farnily — Commercial — Government — Industrial — Vacant — etc.) C1Q Type of Building Construction: QT t'p. I f bONJO (Wood Frame — Brick — Stone — Steel — Concrete — Other) Proposed Work: ❑ In-kind ❑ Landscape [:] New E] Replacement (not in-kind) emolition (more than one box may be checked) Description of Proposed Work: EukalL 5t-610 54Umpc QkoAn £wfb�_ '?CC0,26 ( lim t f owt chr.�CNUC C -%%c:e alar i Rc e2�'C l;ne� �s��tll d�� -� 9,�►1ss. Renes f10ti�Con���bt5�'tng winczjs WJ8 i,� mrr;q�e harA &e_ aoanincjs and hssca. d It# bower sdn�. 'IA*1l �ntbh -*We- m cqe i'm<. as ler►,p~V ccrlee. ?i A A • Q _ : Owner/Contractor: Fax:574 232 -SA �l e-mail i Z���e� 1 N diAnAlcinofm (This office will correspond with only one designee) and/or — APPLICATION REQUIREMENTS ARE LISTED ON REVERSE SIDE — See aklx,h� V INDIANA LANDMARKS Northern Regional Office 402 West Washington Street, South Bend, fndiam 46601 574 232 4534/ 800 450 4534/ivit u,,indioiwlandmorlrs ory Proposed exterior work — 803 W. Wash " ington Submitted as attachment to COA application of February 12, 2012 1. Remove young maple tree in front yard and stump — Figure 1 2. Remove stone around base of maple — replace with dirt and grass — Figure 1 3. Remove dead arbavitae bushes planted in fall of 2011. Replace with mulch — Figure 2 4. Remove all scrub brush along east property line and associated stumps — Figure 3 5. Remove all scrub tress along east elevation of carriage house and associated stumps — Figure 4 6. Remove chain link fence along east property line — Figure 3 7. Install black dirt and grass in areas disturbed by tree and fence removal — Figure 3 8. Remove non-contributing windows and associated rough sawn siding installed in original carriage house door openings. Install smooth face exterior plywood within openings to secure. Paint brown to match trim. Permanent opening treatments will be determined and submitted as a later time — Figures 5 to 8 9. Remove later enclosure of rear porch and associated doors and windows — Figures 9 and 10. } ['I1gi9t4'<c•3rrtkPPJjiJ !' l".S'� '.ir,;tg47 rry.+ i'a t'^t.{' Y :°kC,;w `'�'-: '.�`: t`°' •4 - -' f�! t7t;{frl- '. .,t4 ��'a`y �,.>,,. f� ��.r". �f,. � ,f Idly POR at ";- ( - :�"" gip[ -,',x1 � "•"i i.,; :. 7-1 oLV lip 11 JL .-'�� 4 _ >,F'fC:a» a �•^t, �,� .., �•-•� 'S `:'+.:,a ::,< n.1., A It f � �' a - :•. :Sy,�„'r` a ,'>,; 4. .Y 7'tj�f(jf��jy/�jiC IFW Will saki 01 � rd M :�? hS" �;s'.r<5': • f{°.+3� b -'t. Y • ��tA/ Gl •'j •R, - ; , f1 �. LS,, .µi'y.Y a • � '�M F Y �,i '7 r �f / fes¢ -g / �� p,4'��7 f• }CYT` ��•`iry t.� >fp 3a f✓e ,Ti - !4 .tyYV`a l ' t� %�13� �i'f v e�;,- 4 1 ` �'',. ff r '1•x •d` I ' ` ;, Asa ' `n �� & »�.�:, :, �� i '.� '� + �, ,a� �,�?���� -', �' i.,r�Ty��¢,'�'y .; �i :°:�,��w-w.• i4, p..;. .. i,• �� ���}, ..L gyp-"��." �Y r.'"✓�.y. �«— ?., .> _' .'i lf'�� rM�W{�rv^�_ • 4� aS[4�;T }� �A •9 � , ".i. � 1V sl +�°',.�•`, '-:•b` �:•, -88$w? ¢ _� - � t �isp, bPr g� Jr yt : Y y ..,-" x. ,,t ?:-'-, ry !qp .W. t•,;-•�r f H,' �i„ i G.: K'. ('"-� 7r fr.'�x-: w._€�.. �. �c -4•� `. �'� "�:.�p� s.f .i .'p.r' � d�•�'4'�',�� `a 4y r �, <.;�:N �< - ty�. �.�-.�i•�.`r""" r, 1 `' )" �' i'' r•A :'diz'� r.�',�:•6f rk� F• �.; SS"".�'•• '3" �r ,�>y�.,`;.�'a, i�; �:t1" Oxy � � �"1'� i♦isi i,'♦p' 4,` '{•a`'^""+�� �r' (3r ,/w•- �"�..�� T. , �q ,�rF ��, r�,..r4/,1r�,N' ',�ir�.;+ 9�71"`wv�"'.. �s •"Y, �f.'. � ,{$` �sE.�� :,y: �,�-+ :.ta'` ,�y�.`i ._ '=Y •';' - � � ¢' k +�`� tar', � 'r, �T"f .�x t ( t 1 Jr. • M!y •rs i kill Ulu, On I Nt a& F..E°TA »'¢'`':j,.c','9-1'drf. ; Y •"'S 1`.�j..,}�.'.f -.<+' j4. pi;j'• ^ . , Aja , i , • 4: r Ay &on.<!.„b:.y w,r ..: a o • d ..d a j.. .:.4xF:it,- r�r:.. J.'{e>. .r.�_i, x'µ5 h ff{ .,. ... , < =v .+✓ li .� -y Z aaf)211 ai n3i j Figure 3 Figure. 4 Figure 7 Figure 8 �}� aan��� � a.�n�i� Location Budget as of 01-31-2012 Note: Includes transactions after the last posted date of 12-31-2011. . Fund: 0001 County General for 01/01/2012 thru 01/31/2012. Loc: 0037 Historic Preservation -Account Unencumbered Original I AddYl/Adj Total Balance/Percent Object Description Appropriation Appropriation Appropriation Encumbrance 11075 Deputy Director 33,000.00 0.00, 33,000.00 0.00 000 General GovT. 64,737.24 92.31 92.31 11309 Historic Preservation Admin. 37,132.00 0.00 37,132.00 0.00 000 General GovT. 788.12 95.34 95.34 10000 Totals 70,132.00 0.00 70,132.00 0.00 21030 Office Supplies 400.00 329.19 729.19 53.14 000 General GovT. 16, 216.00 99.18 99.18 22010 Gas Oil & Lubricants 800.00 26.63 826.63 0.00 000 General GovT. 0.00 0.00 0.00 22120 Garage & Motor Supplies 225.00 0.00 225.00 0.00 000 General GovT. 798.00 50.13 100.00 20000 Totals ""' 1,425.00 355.82 1,780.82 53.14 31070 Other Contractual Services 16,216.00 133.67 16,349.67 0.00 000 General GOVT. 32020 Travel 100.00 0.00 100.00 0.00 000 General GovT. 32053 Public Relations 0.00 150.00 150.00 0.00 000 General GovT. 32200 Telephone 160.00 0.00 160.00 0.00 000 General GovT. 32350 Postage 400.00 398.00 .798.00 398.00 000 General GovT. 33010 Publication Of Legal Notices 200.00 10.54 210.54 0.00 000 General GovT. 33100 Printing 100.00 172.50 272.50 0.00 000 General GovT. Saint Joseph County User ID ksobecki 02/18/2012 05:01 PM Page 59 Unencumbered Unexpended Expenditure Balance/Percent Balance/Percent 2,538.46 30,461.54 30,461,54 92.31 92.31 2,856.30 34,275.70 34,275.70 92.31 92.31 5,394.76 64,737.24 64,737.24 92.31 92.31 329.19 346.86 400.00 47.57 54.86 38.51 788.12 788.12 95.34 95.34 0.00 225.00 225.00 100.00 100.00 367.70 1,359.98 1,413.12 76.37 79.35 133.67 16, 216.00 16, 216.00 99.18 99.18 0.00 100.00 100.00 100.00 100.00 150.00 0.00 0.00 0.00 0.00 0.00 160.00 160.00 100.00 100.00 0.00 400.00 798.00 50.13 100.00 10.54 200.00 200.00 94.99 94.99 172.50 100.00 100.00 36.70 36.70 User ID ksobecki 02/18/2012 05:01 PM Page 59 Location Budget as of 01-31-2012 Note: Includes transactions after the last posted date of 12-31-2011. Fund: 0001 County General for 01/01/2012 thru 01/31/2012 Loc: 0037 Historic Preservation Account Original Addt'UAdj Total Object Description Appropriation Appropriation Appropriation Encumbrance 34040 Auto Liability 1,100.00 0.00 1,100.00 0.00 000 General GovT. 39010 Dues & Subscription 245.00 0.00 245.00 0.00 000 General GovT. 30000 Totals 18,521.00 864.71 19,385.71 398.00 Location Totals 90,078.00 1,220.53 91,298.53 451.14 Investment Accounts Transfer Accounts Saint Joseph County 0.00 6,229.17 User ID ksobecki 02/18/2012 05:01 PM Page 60 Unencumbered Unexpended Expenditure Balance/Percent Balance/Percent 0.00 1,100.00 1,100.00 100.00 100.00 0.00 245.00 245.00 100.00 100.00 466.71 18, 521.00 18, 919.00 95.54 97.59 6,229.17 84,618.22 85,069.36 92.68 93.18 0.00 0.00 6,229.17 User ID ksobecki 02/18/2012 05:01 PM Page 60 Director's Report February, 2012 24 January Prepared information on the Norfolk and Southern Landmarked Bridge for Chad Slider at the Indy DNR. Photographed bridge to send to Indy. On site inspection of East Wayne Street for damaged street light near Jacob Street that Commissioner Buccellato reported. 25 January Attended the Convention and Visitors Bureau luncheon at Legends with Elicia and Steve. Networked with CVB Staff and DTSB Staff discussed tours and potential district tours. 106 Review at 935 West LaSalle for Habitat project. Located damaged light post on EWS-lantern was missing. On site visit and photographs of doors at local landmark Emmaus Church on 929 Milton. Doors appear to have been altered with the addition of wood paneling. Noted that there was some badly re -pointed bricks on the south side and that a metal awning had been installed improperly causing the lintel to crack. Sent information to The Tiffany Group on local landmark 1601 Kemble. On sight visit with Steve to 1601 Kemble met with potential buyer Matt, owner Bruce and vinyl replacement window sales person. Advised them to restore the wood windows and use storm windows. 26 January Sent e-mail to Brian Haygood and Catherine Toppel about the burnouts and abandoned houses along LWE which boarder the Edgewater LHD. Also bcc'd Henry Davis and Cyd Maravolo. Mailed out the Sons Of Israel Synagogue National Register Nomination to Holly Tate at the DHPA. Provided contact information for James Cronk 232 7140 for the Studebaker Administration Building. Provided Matt Gingerich at 5 Star 574 825 4100,(matt@5starhouses.com) with website, Contractor listing and meeting/Coa dates for 1601 Kemble proposed work. Don and Darcy Troyer stopped in to make arrangements with Steve Szaday to tour the interior of Local Landmark 60649 Hickory Road. Brent Gregory called for information on 1304 S. Ironwood -Mishawaka; referred him to Ken Prince and the Genealogy Room. 27 January Attended Energy Sustainability Workshop at Logan Center for the morning with Elicia and Steve. Joint Presentation between IUSB, City of South Bend Department of Energy, I&M and Nipsco. Worked on Lynn Patrick's Common Council re- appointment to Commission. Met with Kathy Sobecki to clean up discrepancies in year end Location Report. 30 January Interviewed two intern candidates from Notre Dame School of Architecture with Elicia. Sent Bill Sniadecki the information on School Assessment from the Energy Workshop. E-mailed Ryan Dvorak and encouraged him to vote on HB 1111. Worked with Mark Lyons on the requirements for blade sign for Navarre Cafe on American Trust Building. Spoke with Sidney Blancett owner of 1922 Portage which is up for landmarking about obtaining her information for our files. 31 January Read the new report by the National Trust: The Greenest Building: The Research to Back it Up On Tuesday the National Trust for Historic Preservation's Preservation Green Lab released The Greenest .Building: Ouantifvinz the Environmental Value of.Buildin¢ Reuse, the most comprehensive research to date showing that preservation is good for the environment. Using life cycle assessment this study compares the reuse of existing buildings to demolition and new construction, revealing that building reuse typically yields fewer environmental impacts than new construction when comparing buildings of similar size, functionality, and energy efficiency. This is just one of the findings in this report that supports the critical link between preservation and sustainability. Sent link to all applicable elected officials and new interns. Interviewed a third Intern Candidate from Notre Dame. Spoke with Jackie Beals from Custom Awning about their proposed project on the American Trust Place. Sent information to Donna Whipple about landmarked farm house on Hickory. 1 February Discussion with Shane Fimbel, COO of Global Access at Union Station about their plans and goals for 2012. Also requested use of the Union Station for the 4 May Southhold/Pride of Place Awards. Set up appointment on 10 February for him to review our files and to share information on the 5 May tour group of 1300 from the New York Central Historical Society. Rotary guest speaker was SBCSC Superintendent, Carole Schmidt. Introduced myself to her as Director of the Rotary Charitable Foundation that funds the Phoenix Scholarships and the3R's projects with school buildings and as Director of HPC with the landmarked School Buildings. Marquette was positioned by me as an Intermediate Montessori, which she then indicated that there was parental support for that to happen -but the building needs work. I responded with a Building trades class doing the window restorations and then leaving with a marketable skill. She wasn't really interested and mentioned that it needed new heating and cooling systems (like a new building wouldn't need those). She seemed rather distant and rather cold. Responded to Donna Whippo's phone inquiry on the Hickory Road Landmark; and that vinyl siding and windows would not be an option. Read Krupali's article on the Taj Mahal. 2 February Meeting with Tom and Alice of the Oliver Inn with Elicia about the exterior of the House. After about two hours of discussion exploring the options concerning grants, tax credits, etc. it was decided to have Tom conduct a paint work shop at the Inn "a la Bob Yapp" on 14 April. Worked with Sue Solmos on an advertising piece. Investigated 125 N. Lafayette (1907 Neoclassic 20th Century Motor Car Company) for Building/Engineering inquiry. Spoke with Matt Gingerich about the landmark at 1603 Kemble. All the work he is now proposing will be restoration and repair -including the windows. There will be re -pointing and some additional maintenance work. All could be staff approved. Requested a meeting with our attorney to discuss landmarked properties that are in disrepair. 2 3 February Spoke with Marco Marian, South Bend Heritage, about the possible work in River Bend LHD from the NNRO and Memorial Hospital and the Rushton Apartments. On site visit to Oliver Inn with Elicia, Steve and Intern, Hannah. Steve contacted the SBCSC Building Trades Director about having a field trip to teach the students about stripping paint, etc. Returned Jeff Dierbeck's phone call about 61369 Miami Highway. The barn is rated notable in the survey and sent to him a link for the National Trusts "Barn Again" web page. Jeff is considering purchasing the property and restoring the barn that the previous owner let the roof implode. Responded to Rob Nichols' e-mail about the language for the COA for the Leeper Bridge repairs. Responded to Todd Zeiger's e-mail and photographs about the work he proposed for the Kizer House at 803 W. Washington that HPC has the fagade easement; advised him the removing non -original additions to the main house and non -original windows in the Carriage House would require a COA; referred issue to Larry Meteiver as well. 6 February Completed 4 106 Reviews. Sent Contractor listing to Troyers so that they could get a licensed contractor to give estimates for interior work on Hickory Road landmark. Contacted Marcia Qualls on the downed light post in the 1200 block of East Wayne Street; lantern is missing. Responded with window restoration information to 1733 E. Wayne Street for Dan and Christine Hatcher. 7 February Meeting with HPC Attorney about three problem landmarks in downtown South Bend; 110-112 Franklin, 115 S Lafayette (Dean Building) and 319 N. Williams. Requested letters to be sent with stern language before turning into Code. Lunch with Sue Solmos discussions about 2012 Lunch and Learn, Landlord registration issue and Code. Returned e-mail Matt Sikora, Assistant to Mayor, Terry Bush's contact information so that Mayor Pete can give an address to Rotary in April. Researched Historic District Information on revitalization. Spoke with Jackie Beals from Custom Awning about the proposed awnings along the south facade and entry canopies for the Navarre Cafe; Brad Toothaker is requesting variances, etc. Setting up meeting with Patrick Henthorn, Engineering, about proposed sewer work in the brick streets of the E. Washington National Register District. 8 February The initial review of West La Salle National Register District. General Office work. 9 February On site visit with Elicia to 1733 E. Wayne to determine if front door was original to the house. It is not. Also checked up on house on North St. Joseph Street that has been having interior work done. Photographed E. Washington intersection, subject of meeting with Engineering. Met with Patrick Henthorn and Brian Arterbery of RW Armstrong. Currently in the planning stages of the CSO work for E. Washington which will require excavating down 10 feet after all the bricks are removed. They are considering options such as narrowing the street, new street light, curbing and guttering, removing disruptive trees in the tree lawn and handicapped accessible corners. Finished West LaSalle nomination and began to look up homeowners for notification letters. Attempted to contact Royce Baier of Royce Restorations who is an expert on Brick Streets. 3 10 February Elicia and I met with Shane Fimbel and Kevin Smith of Global Access and Union Station about their vision and future plans centering around Union Station. E- mailed Bob Yapp for leads on Brick Street experts. Finished looking up the homeowners for West LaSalle. Drafted a letter for sending to the homeowners. Requested that Steve Szaday follow up on a report of a hole in the roof at 417 E. Navarre in Chapin Park. The roof isn't the problem and Steve sent over pictures to Code showing broken windows in the rear and tarps on the rear fagade. 13 February Responded to Linda Martin on the Board of Public Works request for HPC to give opinion on the awnings and canopy on the All American Trust Building. Brad Toothaker is requesting height variances for the awnings and the canopies. This is a National Register Property, so our permission or approval isn't even necessary. However, I responded: The entrance canopies look appropriate to the building and its use as a restaurant. I think that the window awnings detract from the windows and the neo classical style of the building. But if the owners feel that these are their only practical option, it won't be the end of the world since they can be safely removed since they will be installed in the mortar joints. I attended and participated the Finance Committee meeting of the Northern Indiana Center for History, went over December and January numbers, 2012budget and upcoming audit. Proof read HPC Newsletter. Acted upon a letter from Thomas Keller, President of the East Wayne Street Neighborhood Association requesting action on the mismatched entry gate light. Marcia Qualls, Engineering and I worked out that HPC will order the lantern, take delivery of the lantern, EWSNS will be billed for the cost and Engineering will see that it is installed. Met with Linda Riley again on this issue. Followed up with IVYTech student on marketing internship. 14 February Spoke with Royce Baier of Royce Restorations about the East Washington Brick Street project that Patrick Henthorn approached me on last week. Explained the project to Royce and he did seem to have an interest and followed up with Patrick and gave him Royce's contact information. Followed up in e-mail with Rob Nichols on the Leeper Bridge in-kind COA repairs since HPC hadn't heard from INDOT. Travis Mast of MOT then contacted me for that information. Followed up in e-mail with Shane Fimbel about using Union Station for the Pride of Place/ Southhold Awards on May 4. Responded to Linda Riley on the replacement lantern, reiterated procedure and said that we would verify all specs with Steve Szaday and place the order and have it billed to her address as treasurer. Prepared Staff Report for 803 W. Washington. It's a fagade easement and the work requires a COA. Spoke with Joan Downs Krostenko concerning 739 Leland, Ramiro and Amporo Acuna—all work performed without COA or building permits ---removed front windows, reduced openings installed vinyl, removed chimney top above roofline and replaced with pipe. Also behind on property taxes. 801 Forest has a COA and building permit for in-kind replacement of porch and deck above entry. They have installed vinyl instead. Also the windows may have been changed to vinyl. 4 15 February Turned in 801 Forest and 739 Leland to Building Department. Sent Councilman Oliver and e-mail requesting up to 15 minutes before the Zoning and Annexation Committee about the HPC. Attended a Parks Foundation Meeting on lunch hour with Heidi Gray and Andrew Schnabel. The Parks Foundation wants to make the Conservatories part of their mission. Spoke with Rev. Williams at WUBS who is interested in Marquette School as a Senior Driven Initiative—like Mishawaka's Battell Center. Researched 1621 Eldora Ct. for Building Department. Continued to research Ethan Allen Reynolds and family for St. Joseph County Parks. Finished arranging the EWS gateway replacement light with Marcia Qualls and Linda Riley. Attended the BSSB Board meeting at 5:30. 16 February Received an e-mailed invitation to tour Marquette School with Rev. Williams and Health professionals, community leaders and stakeholders at 11:00 on 23 February. Received notification from Shane at Global Access that Union Station would be the venue for Pride of Place and Southhold Awards. Notified Randy Kelly of DTSB. Completed the research for the owners of record for the West La. Salle National Register letters to go out before week's end. Spoke at length with Julie Johnson of 801 Forest after house was red tagged by Gary Goddard. Explaining again the procedures and encouraged her to call with any questions. Received $550.00 check from EWS that will go to Spring City Electrical for replacement luminaire. Advised John Marintez, on appropriate activities/projects for a Notre Dame student volunteer day at Leeper Park. 17 February Prepared Commissioners packets for mailing. Letter and check mailed to Spring City for EWS Luminaire. Prepared letter and enclosure to all homeowners of record in West La Salle National Register District and mailed out. Continued research on Reynolds family and the horse trough. Edward Reynolds has a memorial one in Leeper Park West that was relocated from the City Hall or Court House. Turned in 1118 E. Wayne for re -roof without permit or COA to building department. Steve photographed, Elicia, issued RME. 18 February Attended NNN Annual Meeting and breakfast with Mayor Pete at Holy Cross School gym. Spoke with Derek Dieter about a proposal for Central High School installation on the roof for security and communication systems. Participated in Events Committee meeting at the Conservatories for a black tie fall gala fundraiser for BSSB and ribbon cutting for 18 May. 20 February Presidents' Day. Office Closed. 21 February 7:30 Rotary Board Meeting, gave Foundation Report and update of Potawatomi Park from Rotary's involvement with Kids Kingdom, Chris Wilson Bad Shell and the Botanical Conservatories. Contacted Connie Tooley about the pending NR nomination for West La Salle. The apartment building at 601 she claims is filled with prostitutes and drug dealers. Advised her to contact Code and Police as a nuisance , 5 property. She will write in favor of the nomination. Received follow up information on the Reynolds Family from Dana Groves in New Carlisle. Received and reconciled January's Location Report from the Auditor's Office, reported discrepancy for correction. Jitin Kane from Community and Economic Development called about joining and participating in the Events Committee at the Conservatories. Answered two inquiries on Local Landmark 60649 Hickory. Attended Green Drinks at 5:30 at the Oliver Inn 22 February Attended Webinar on Green Preservation and Transit Stations. Staff met with South Bend Heritage Marco Mariani, Patrick Lynch and Jessica Kitchens about partnering with HPC for grant funding for workshops: Marco suggested that we target Neighbor Works Week -a HUD national event in June. Also addressed National Register Nomination on West LaSalle, South Bend Heritage owns two homes; they are in favor of the designation. Met with Tom Gordon owner of 629 West LaSalle at Office. He is not in favor for the nomination, claims it will raise his home insurance and that the replacement value of his home is over $600,000.00 as it is and he can only afford $200,000.00 of insurance. Refused to give Insurance company's information, but it is not true. Explained how the NR process worked. He also complained about crime in the area and the lack of response from police and code. 23 February Met with Rev. Sylvester Williams, WUBS and his group and John Strauss, South Bend School Corp. Building Superintendent, at local landmarked Marquette School. Rev. Williams wishes to begin to place a Senior Center with emphasis on respite care for caregivers in the daytime as well as evenings, plus offer programs and events for Seniors like the Battell Center. Wants to start small in the old auditorium and build the program to encompass the whole school. Strauss says the SBCSC has $450,000.00 set aside to demo the building, wouldn't consider taking down just part of it or using the funds to upgrade the facility.. The issue is funding. Sent Myra Butts and Janice Owens links to National Charitable Foundations Statistics data base. Next meeting will be at WUBS on 2 March at noon. Attended Green Ribbon cutting with Elicia at the Martin Luther King Center. Long discussion with Gary Gilot about the work proposed by John Martinez at Leeper Park with the students and assured him that the Commission approved the changing of the Lift Station and proposed garden work. at Leeper East. Spoke with Councilman Henry Davis about training youth to do salvage work and window restoration as a means of neighborhood revitalization. Spoke with Jonathan Burke about his concerns with funding for work in the City with the Hydraulics proposed. Sent him the link to Private Foundations in St. Joseph County. Also had another opportunity to be with Mayor Pete. 24 February Processed payroll. Reviewed 106s for demolition before giving to Steve. Some were incomplete. Routine Office Work. Drove W. LaSalle proposed National Register District. 0 HISTORIC PRESERVATION COMMISSION PRESERVATION SPECIALIST REPORT February 27, 2012 February has seen a few agreeable days of weather, and therefore a few homeowners looking ahead toward spring and summer projects. We have had several calls in regards to guidance about future projects. I did visit 60649 Hickory Road, 509 Edgewater, 929 Milton, and 605 Edgewater and looked over projects in hope of providing some direction. We also experienced a great deal of activity in regards to 106s and demolitions. Fourteen houses were considered for 106 grants and seven houses considered by the city for demolition. None of which were significantly historic. On January 25th, we were able to attend an event hosted by the Convention and Visitors Bureau, as we awaited news of the grant the HPC applied for. We were also able to attend a sustainability class hosted by the NSB Center for Sustainability Studies on January 27th. Preservation and sustainability have common threads and will definitely grow together as public awareness develops. We had the pleasure of spending some time at the Oliver Inn trying to understand their restorations needs and where we could help. We were able to confirm Craig Barber as our expert/instructor for the May 19th, exterior paint removal workshop in New Carlisle. We have also lined up Love & Sons to be the experts/instructors for the November wood floor workshop in South Bend. Tim from NNN is coordinating schedules with us and will let us know which address we will be holding the workshop at. I was also able to do a walkthrough on 709-711 Linclon Way East with the realtor that was awarded the listing through a third party. The apartments are a mess with some areas burned out by way of squatters and vagrants. The structure itself seems sound and is dry inside even though it was raining outside that day that I visited. The building is being listed at $13,900.. We were also able to stop and find a lack of permit for 1118 East Wayne S for re -roofing Work being —performed by Geans Roofing Houses turned in for Code Violation: 615 S St Joseph 733 Bronson Street 700 Block of LWE 1032/1034 Woodward Structures photographed as items for concern/maintenance 417 Navarre 225 S. William 115 S. William 110/112 Franklin Place 115 S Lafayette Steve Szaday Preservation Specialist Ad Number: 4341166, Publication: A meeting of the Historic Preser- vation Commission (HPC) of State of Indiana South Bend and St. Joseph County will be held on February St. Joseph County ss: 27, 2012 at 7:00 p.m. 13th floor, Room 1308 of the County -City Building, South Bend, Indiana. I Personally appeared before me, a notary public in and for said county and Agendas are available in the HPC Office or may be obtained i state, the undersigned Kim Wilson who, being duly sworn says that she is via email at SBSJCHPC@co.stioseph.in.us of competent age and is President &Publisher of the South Bend Tribune, Additional matters not requiring a Public Hearing may be added to a daily newspaper which for at least five (5) consecutive years has been this agenda prior to the Meeting. i published in the City of South Bend, county of St. Joseph, State of Indiana, Timothy Klusczinski, President 1t: 2:17 and which during the time, has been a newspaper of general circulation, having a bona fide paid circulation, printed in the English Language and - entered, authorized and accepted by the post office department of the United States of America as mailable matter of the second-class as defined by the act of Congress of the United States of March 3, 1879, and that the printed matter attached hereto is a true copy, which was duly published in said newpaper. 1 time(s), the dates of.publication.being as follows: February 17, 2012. :. Subscribed and sworn to before me this 17th day of- February 2012 Cron W >�� Leslie Ann Winey Notary Public Resident of St. Joseph County My commission expires December 21, 2016 Charges: $ 5.59 MINUTES OF A MEETING OF THE HISTORIC PRESERVATION COMMISSION OF SOUTH BEND & ST. JOSEPH COUNTY February 27, 2012 13`h Floor Conference Room County City Building South Bend, IN 46601 I. CALL TO ORDER President Klusczinski called the meeting to order at 7:02 p.m. Members Present: Timothy S. Klusczinski, David Steinhauer, Jerry Niezgodski, Lynn Patrick, Kevin Buccellato, Alice McLane Members Absent: Mike Voll, Sandra Rossow Staff Present: Larry Meteiver, Legal Counsel; Catherine Hostetler, Director; Elicia Feasel, Assistant Director Members of the Public Present: none II. PUBLIC HEARING A. CERTIFICATE OF APPROPRIATENESS 1.803 West Washington COA#2012-0213 Fagade Easement No applicant representation STAFF REPORT CONCERNING APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS Date: 14 February 2012 Application Number: 2012-0213 Property Location: 803 West Washington Architectural Style/Date/Architect or Builder: Queen Anne/1890 Property Owner: Indiana Landmarks Landmark or District Designation: West Washington national register district/fagade easement Rating: Outstanding DESCRIPTION OF STRUCTURE/ SITE: This is a large solid stone Queen Anne that has two storeys and an attic with turrets and gables and dormers. The roof is asphalt. It has a solid stone foundation. There is an open front porch with stone steps and a port cochere on the rear east side with stone steps leading up to the house. The windows are 1/1 double hung set within stone frames, heavy stone lintels and stone sills. The house has two stone chimneys. There is a stone carriage house in the rear. The two structures are set on a corner lot with minimal landscaping and surrounded by concrete parking areas. ALTERATIONS: The tile roof was replaced with asphalt shingles after the 1987 fire. The rear porch was enclosed. There is an additional structure enclosing another entrance at the rear. The house was converted into four family units in 1945, with further subdivisions after 1945. APPLICATION ITEMS: Remove scrub brush and associated stumps along east property line, remove chain link fence along east property line, install dirt and grass. Remove non-contributing windows installed in carriage house door openings and associated rough sawn siding. Install finish grade exterior plywood in openings as temporary cover. Paint Brown to match trim. Permanent opening treatments will be determined and submitted at a later time. Remove later enclosure of rear porch and associated doors and windows. All per attached listing and photographs. DESCRIPTION OF PROPOSED PROJECTS: Indiana Landmarks proposes to remove the white metal enclosures on and off the rear porch. This would return the porch to its original open air form. Indiana Landmarks also proposes to remove the non -original windows and wood in the carriage house door openings and replace it temporarily with exterior grade plywood painted brown to match the trim. This would suggest the look of the original carriage house doors. Indiana Landmarks proposes to remove the current landscaping items, re -grade the site as needed plant grass; replace the arbor vitae shrubs with mulch. STANDARDS AND GUIDELINES: Deed of Easement 8324891 2. No extension of existing buildings or improvements, and no additional buildings or improvements, and no future development of any kind whatsoever shall be permitted on the Property, unless the plans and exterior designs of such proposed future development have first been approved in writing by the Grantee, and only if such proposed future development shall conform with applicable local, state or Federal standards for construction or rehabilitation with the district wherein the Property is situate. STAFF RECOMMENDATION: Staff recommends approval of the proposed work on the main house to remove non -original materials in the rear as well as the work on the carriage house. Since landscaping is not specifically addressed in the easement document it can be done without written permission from the Grantee. On a motion by Dave Steinhauer with a second by Jerry Niezgodski to approve application as submitted. Vote: 5-0-1 abstention. COA#2012-0213 Approved. Chair originally announced the vote tally as 6-0 unanimous. Later, under New Business, Lynn Patrick called for a Point of Order and clarified that she had in fact abstained and did not vote in favor of the application, reasoning that the project specified the removal of a young maple tree without the possibility of transplanting. Chair ordered the correction and added that there is general consensus to seek new locations for healthy (and manageable) trees whenever relocation becomes necessary. B. NATIONAL REGISTER NOMINATION 1. West LaSalle Street NR District -Update. 1" reading in April, public hearing in May. III. HEARING OF VISITORS IV. REGULAR BUSINESS A. APPROVAL OF MINUTES —January 23, 2012 approved by consensus. B. TREASURER'S REPORT —Catherine recognized Cheryl of the Purchasing Department for offering the toner from the Prosecutors office to HPC. C. STAFF REPORTS 1. Correspondence —Circulated. 2. Routine Maintenance Exclusion Approvals None. 3. Director's Report —Marquette School walkthrough with Rev. Williams. 4. Assistant Director Report —Discussion of Southhold Preservation Awards. 5. Preservation Specialist Report —Distributed. 6. Legal Counsel —Larry prepared and distributed a resolution for 1922 Portage Avenue as a historic landmark for City ordinance and a form of ordinance for the March 13 meeting of the Common Council. Timothy Klusczinski moved to adopt the resolution recommending the establishment of 1922 Portage Avenue for Landmark status with a second by Kevin Buccellato. Vote: 6-0 Unanimous. D. COMMITTEE REPORTS 1. Presidents Report —Distributed. V. OLD BUSINESS A. CVB Hotel Motel Tax Grant -Update announcing that HPC did not receive the grant. VI. NEW BUSINESS A. Southhold Preservation Awards -Update on nominations. VII. ADJOURNMENT On a motion by Lynn Patrick with a second by Jerry Niezgodski to adjourn. Vote: 6-0 Unanimous. Meeting adjourned at 7:30 p.m. Attest: Lynn Patrick, Secretary J`RRy .assT /tor F6010; SE C. Date x -19-/Z 1444rr- 0