Loading...
HomeMy WebLinkAboutJanuary 2010- `0N,M155lpryEgs 45pllTH AGENDA OF THE JANUARY "25;.2010. m COMMISSION MEETING 865 Regular Meeting THIRTEENTH FLOOR- ROOM 1308 County -City Building MONDAY, January 25, 2010 7:OOPM I. CALL TO ORDER, ROLL CALL II. PUBLIC HEARING A. CERTIFICATE OF APPROPRIATENESS 1. 1126 E. Wayne COA#2009-1026 E. Wayne LHD 2. 908 Leland COA#2010-0111 Chapin Park B. National Register Nominations: ~ 1. City Cemetery—update C. Landmarks }"{ 1. St. Paul's Cemetery- New Landmark 12 January 2010 III. HEARING OF VISITORS �. IV. REGULAR BUSINESS A. APPROVAL OF MINUTES December 21, 2009 ' B. TREASURER'S REPORT Location Report C. STAFF REPORTS 1. Correspondence 2. C of A Approvals 3. Directors Report 4. Assistant Director Report 5. Legal Counsel v D. COMMITTEE REPORTS: 1. Presidents Report q f� IV. OLD BUSINESS g 1. Election of Officers V. NEW BUSINESS . 1 Architectural Historian 2. Restore/Southhold Event VI. ADJOURNMENT z , STAFF REPORT CONCERNING APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS Date: October 30, 2009 Application Number: 2009-1026 Property Location: 1126 E. Wayne Street S. Architectural Style/Date/Architect or Builder: Colonial Revival/1927/H. Russell Stapp, Architect/Whitcomb & Keller Property Owner: Berry, Daniel and Deborah Landmark or District Designation: East Wayne Street Rating: Contributing DESCRIPTION OF STRUCTURE/ SITE: The home at 1126 E. Wayne Street is a two storey structure with an irregular plan set upon a concrete foundation. The exterior walls are brick. It has a slate gable roof with simple entablature and gable returns. One storey side wing'with pent roof at 2nd floor line carried around house. Gable canopy entry with arch under and gable returns with brackets, brick stoop. The windows are double hung 6 over 1, brick soldier course lintels and cast concrete sills. One storey rear enclosed porch, enclosed by vertical wood siding with flat roof, concrete slab on brick. Two car brick garage with double swinging doors with windows, slate gable roof with wood cornice and trim returns. Center, support also of wood. ALTERATIONS: None known APPLICATION ITEMS: Replace (2) garage doors (carriage style) with (1) carriage door. No windows. Have not used for cars in 30 years (doors small). Want (1) door so is more able to be utilized for cars. DESCRIPTION OF PROPOSED PROJECT: The homeowner has engaged Raybuck Construction to replace the existing garage doors with a single, insulated overhead door in a style sympathetic to the existing carriage doors, trim and hardware, see style P2C. The proposed garage door will not have the windows as in existing for safety precautions. Homeowner states that the new garage door will be, "more conducive to being used for our autos and more accessible by me." Discussion with Wayne Raybuck concludes that they will shore up to remove center post and trim. A new laminated beam (LVL) and framing will be installed. Framing and door will be installed; finished with trim to match original. STANDARDS AND GUIDELINES: H. EXISTING STRUCTURES C. WINDOWS AND DOORS Window and door frames are of wood or steel (some casements) or in the case of brick structures, stone sills and brick lintels. Where metal or vinyl siding has been applied, window trim has been covered. Storm windows are of wood or aluminum. Required Original windows and doors shall be retained including sashes, lintels, sills, shutters, decorative glass, pediments, hoods, and hardware. When deteriorated beyond repair, they shall be replaced with units and trim resembling the original. Recommended Wood frame storm windows and doors painted to match the original should be used but should not damage existing frames. If new sashes or doors are installed, the existing or original materials, design, and hardware should be used. When metal storm doors are used, they should be painted, anodized or coated to match the existing. When awnings are used they should be of canvas material. Prohibited Original doors, windows and hardware shall not be discarded when they can be restored and re -used in place. New window and door openings which would alter the scale and proportion of the building shall not be introduced. Inappropriate new window and door features such as aluminum insulating glass combinations that require removal of the original windows and doors shall not be installed. Not Recommended Awnings, hoods, and fake shutters made of metal, vinyl, or fiberglass should not be used if they would detract from the existing character or appearance of the building. STAFF RECOMMENDATION: Staff recommends approval of the replacement of the garage door, supported by the auxiliary nature of the structure and its placement toward the rear of the house. Furthermore, the carriage style of the garage door is comparable in style to that of the two original garage doors and will not detract in appearance from the surrounding structures. I STAFF REPORT CONCERNING APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS Date: January 13, 2010 Application Number: 2010-0111 Property Location: 908 Leland - Architectural Style/Date/Architect or Builder: Gabled-ell/1898 Property Owner: Troy Badali Landmark or District Designation: Chapin Park LHD Rating: Contributing DESCRIPTION OF STRUCTURE/ SITE: The house located at 908 Leland is a 2 storey wood frame gabled -ell with an irregular plan set upon a brick foundation. The walls are 4 %2" wood clapboard with frieze and moulded cornice. The roof is a cross gable with asphalt shingles. The porch is located in the corner between the front gable and south wing; it has 2 wood column supports with simple balustrade. The windows are double hung 1/1 with moulded entablatures; the doors have wide moulded entablatures. ALTERATIONS: The house has been vinyl sided and has replacement storm windows and doors;"the original pine exterior trim is no longer visible and is probably removed. The first storey window shutters photographed in 1987 have not been replaced. It was noted in August 1949 that the original wood shingle roof was replaced or covered with asphalt shingles. In 1932 the home was remodeled into a 2 family dwelling and in 1949 it housed 3 families. The garage attached at the rear of the house was removed prior to the 1940sand replaced with a detached concrete block two car garage before 1949. In August, 2009 a report from Code Enforcement indicated that a new front porch deck, steps and guardrail were installed along with a re -constructed set of rear steps to the second floor. There was also a newly reconstructed pressboard covering of the exterior access to the basement. APPLICATION ITEMS: Turn 3 unit house into single family. Remove upstairs outside door and put siding over hole. Also, remove stirs (outside) leading up to the door. DISCRIPTION OF PROPOSED PROJECT: The owner wishes to remove the non- conforming outside door (upstairs) and repair opening using 4'x 8' sheet of plywood and 2"x 4" studs. The outside will be finished off with siding that matches the rest of the house: After that the stairs that are outside which are leading to the upstairs door will be removed. The house will then be restored to single family occupancy. STANDARDS AND GUIDELINES: D. ENTRANCES, PORCHES AND STEPS Most houses in the district have either an open or enclosed porch across the front. Most porches have either hip or gabled roofs or are covered by the main roof of the house. Required When deteriorated beyond repair, existing or original porches, stoops, patios and steps, including handrails, balusters, columns, brackets, tiles and roof decorations, shall be retained or replaced by replicas of the same design or by a design more in keeping with the historic period of the structure. _ _ Porches and additions reflecting later architectural styles and which are important to the building's historical integrity shall be retained. Recommended When enclosing porches for heat conservation or for other reasons, it should be done in a manner that does not alter the architectural or historical character of the building. Prohibited Front porches, stoops, patios and steps that are important to the building's style and development shall not be altered or removed; if in need of replacement, see above Required section. See also Section IV B. Access for Handicapped or Disabled Persons. Not Recommended Original porch details should not be replaced with materials representing a different period or style from the original. STAFF RECOMMENDATION: Staff recommends approval of the removal of the non- conforming (Code) exterior rear door and stairs and the application of the match siding in order to comply with Code Enforcement's mandate to return to single family after the house lost its grandfathered multi family status. v` Application -FOR- Certificate of Appropriateness Historic Preservation Commission of South Bend & St Joseph County 125 S. Lafayette Blvd., South Bend, Indiana 46601 Mailing Address: County -City Building, South Bend, Indiana 4660] Phone: 574-235-9798 o Fax: 574-235-9578 • Email: SBSJCHPCCIco.st joseplu.ii-us Website: hitp://www.sgoseplicountyhidiana.com/sjchp/in.dex.lutml OFFICE USE ONLY »»» DO NOT COiWPLETE ANY ENTRIES CONTAINED IN THIS BOX »»» OFFICE USE ONLY Date Received A0/6 Application Number Past Reviews: � YES (Date o; Last Review)_ oZ� 9 ❑ NO Staff Approval authorized by: Title: Historic Commission Review Date: aTJ'roc, 01010 Local Landmark ocal Historic District (.Name) 1` f National Landmark ❑ National Register District (Name) Certificate of Appropriateness: Denied ❑ Tabled E] Sent To Committee Approved and Issued DATE Address of Property for proposed work: 05 Z t2 la 1"A Street Number and Street Name Name of Property Owner(s): (Please Print) Address of Property Owner(s): qC0x � ,IX0 L •• a � � ± �4 1 1 i �-�-r�� f_ Contractor(s) Name: a 775 d"'i? 1 4'� ► �r . Contract Company Name: �P Nor". WoPeR_r/c,S Contractor Address: t t City: Phone: 3 Current Use of Building: (Single Family Multi -Family - Commercial e-�Government - Industrial - vacant - etc.) Type of Building Construction:1i �t✓.I��+ Wood Frame - BrickStc - Steel- Conciete - Other) Proposed Work: In-kind Landscape E]- New Replacement (not in-kind) [:] Demolition (more thart one box nwtt be checked) Description of Proposed Work:/�i` 1(.-'��,�#'�t Owner/Contractor: Fax:% i' e-mail � t1-'-��� (Tris r>jftn: wtll m�cslxmd uitir and y rnt esigr:ee) t • �- �.���'' 0=dor — APPLICATION REQUIREMENTS ARE LISTED ON REVERSE SIDE - 906 Leland. January 12, 2010 Location Budget as of 12-31-2009 Note: Includes transactions after the last posted date of 07-01-2009. Fund: 001 County General for 01/01/2009 thru 12/31/2009 Loc: 037 Historic Preservation Account Unencumbered Original Addr[/Adj Total Balance/Percent Object Description Appropriation Appropriation Appropriation Encumbrance 11075 Dgputy Director 30,000.00 (28,731.00) 1,269.00 0.00 000 General GovT. 10,657.56 35.53 35.53 11309 Historic Preservation Admin. 36,050.00 0.00 36,050.00 0.00 000 General GOVT. 151.01 (187.41) 19.44 11428 Part Time (Hrly) 0.00 30,000.00 30,000.00 0.00 000 General GovT. 4.98 1.99 1.99 10000 Totals 66,050.00 1,269.00 67,319.00 0.00 21030 Office Supplies 500.00 276.90 776.90 1,607.00 000 General GovT. 28.45 28.45 28.45 22010 Gas Oil & Lubricants 880.00 (400.00) 480.00 0.00 000 General Gov'T. 264.17 82.55 82.55 22120 Garage & Motor Supplies 700.00 (450.00) 250.00 0.00 000 General GovT. 514.06 37.94 44.94 20000 Totals' 2,080.00 (573.10) 1,506.90 1,607.00 31070 Other Contractual Services 24,500.00 2,000.00 26,500.00 2,288.00 000 General GovT. 32020 Travel 500.00 (400.00) 100.00 0.00 000 General Gov'T. 32050 Instruction & Training 900.00 (400.00) 500.00 0.00 000 General GovT. 32053 Public Relations 1,320.00 (1,000.00) 320.00 0.00 000 General Gov'T. - 32200 Telephone 160.00 0.00 160.00 0.00 000 General Gov'T. 32350 Postage 1,594.00 (450.00) 1,144.00 80.06 000 General Gov'T. Saint Joseph County User ID ksobecki 12/1011 01:58 PM Page 6 Unencumbered Unexpended Expenditure Balance/Percent Balance/Percent 1,268.96 0.04 0.04 0.00 0.00 33,276.96 2,773.04 2,773.04 7.69 7.69 19,342.44 10,657.56 10,657.56 35.53 35.53 53,888.36 13,430.64 13,430.64 19.95 19.95 625.89 (1,455.99) 151.01 (187.41) 19.44 399.61, 80.39 80.39 16.75 16.75 245.02 4.98 4.98 1.99 1.99 1,270.52 (1,370.62) 236.38 (90.96) 15.69 26,097.00 (1,885.00) 403.00 (7.11) 1.52 71.55 28.45 28.45 28.45 28.45 0.00 500.00 500.00 100.00 100.00 55.83 264.17 264.17 82.55 82.55 0.00 160.00 160.00 100.00 100.00 629.94 434.00 514.06 37.94 44.94 User ID ksobecki 12/1011 01:58 PM Page 6 Location Budget as of 12-31-2009 Note: Includes transactions after the last posted date of 07-01-2009. Unencumbered Fund: 001 County General for 01/01/2009 thru 12/31/2009 Encumbrance Expenditure Balance/Percent Loc: 037 Historic Preservation 0.00 77.40 222.60 Account Original Addt'I/Adj Total Object Description Appropriation Appropriation Appropriation 33010 Publication Of Legal Notices 300.00 0.00 300.00 000 General GovT. 0.00 300.00 0.00 33100 Printing 700.00 (0.20) 699.80 000 General GovT. 0.00 255.20 250.00 37100 Auto Lease 300.00 0.00 300.00 000 General Gov'T. 0.00 0.00 195.00 39010 Dues & Subscription 300.00 205.20 505.20 000 General Gov'T. 2,368.06 27,922.72 433.22 39750 Data Processing 400.00 (205.00) 195.00 000 General Gov'T. 3,975.06 83,081.60 12,493.24 30000 Totals """"""" """`"""" 30,974.00 (250.00) 30,724.00 Location Totals """" """" 99,104.00 445.90 99,549.90 Investment Accounts Transfer Accounts Saint Joseph County User ID ksobecki 12/10/2009 01:58 PM Page 7 Unencumbered Unexpended Encumbrance Expenditure Balance/Percent Balance/Percent 0.00 77.40 222.60 222.60 74.20 74.20 0.00 435.80 264.00 264.00 37.73 37.73 0.00 300.00 0.00 0.00 0.00 0.00 0.00 255.20 250.00 250.00 49.49 49.49 0.00 0.00 195.00 195.00 100.00 100.00 2,368.06 27,922.72 433.22 2,801.28 1.41 9.12 3,975.06 83,081.60 12,493.24 16,468.30 12.55 16.54 0.00 0.00 83,081.60 User ID ksobecki 12/10/2009 01:58 PM Page 7 Location Budget as of 12-31-2009 Saint Joseph County Note: Includes transactions after the last posted date of 07-01-2009. Fund: 013 County Special Gifts for 01/01/2009 thru 12/31/2009 Loc: 637 Historic Preservation Account Original Addt'UAdj Total Unencumbered Unexpended Object Description Appropriation Appropriation Appropriation Encumbrance Expenditure Balance/Percent Balance/Percent 00000 Gen Gov't 0.00 9,368.25 9,368.25 0.00 0.00 9,368.25 9,368.25 000 General GOVT. 100.00 100.00 00000 Totals 0.00 9,368.25 9,368.25 0.00 0.00 9,368.25 9,368.25 100.00 100.00 23240 Other Supplies 0.00 2,608.00 2,608.00 0.00 0.00 2,608.00 2,608.00 000 General GovT. 100.00 100.00 20000 Totals' 0.00 2,608.00 2,608.00 0.00 0.00 2,608.00 2,608.00 100.00 100.00 Location Totals y 0.00 11,976.25 11,976.25 0.00 0.00 11,976.25 11,976.25 100.00 100.00 Investment Accounts 0.00 Transfer Accounts " 0.00 0.00 User ID ksobecki 01/04/2010 11:49 AM Page 137 CITY OF SOUTH BEND, ST. JOSEPH COUNTY AND THE HPC DECEMBER 31, 2009 106 REVIEWS: 2002 86 CITY OF SOUTH BEND 2003 94 2004 115 2005 249= 2006 99 2007 227 2008 192 2009 393 CERTIFICATE OF APPROPRIATENESS: 1 1 ST. JOSEPH COUNTY 6 10 30 2005 80 CITY OF SOUTH BEND 1 ST. JOSEPH COUNTY 2006 105 3 2007 107 3 2008 82 3 2009 103 2 INVENTORY STRUCTURES IN NATIONAL REGISTER DISTRICTS: 1,667 IN CITY OF SOUTH BEND O IN ST. JOSEPH COUNTY SINGLE SITE NATIONAL REGISTER LANDMARKS: 32 IN CITY OF SOUTH BEND 21N ST. JOSEPH COUNTY STRUCTURES IN LOCAL HISTORIC DISTRICTS: 748 IN CITY OF -SOUTH BEND LOCAL LANDMARKS: 0 IN ST. JOSEPH COUNTY 133 1N CITY OF SOUTH BEND * 73 IN ST. JOSEPH COUNTY 1 13 S. LAUREL AND 305 S. EDDY LAND MARKED 22 JUNE 2009 RUSHTON APARTMENTS LAND -MARKED ON 23 NOVEMBER 2009 Director's Report January, 2010 December 22 Added Amendment 9.5 to the By -Laws and sent revised copy to Commissioners .via e-mail; completed approved COA forms and mailed to homeowners; contacted Maintenance, Housekeeping and Public Works with 2010 meeting schedule and that HPC will use Conference Room 1308; contacted David Fazio with change request to COA in Permit System to include Routine Maintenance Exclusion option December 23 E-mailed legal counsel concerning 2010 Preservation Specialist contract; Staff given tour of Copshaholm, Dom Robotnika and the Lincoln Exhibit by David Bainbridge December 24-25 Office Closed December 28-29 Began reorganizing the Land -mark files into the new lateral file; began preparing year end reports and statistics to be used in CLG Reports and reports to the City and County December 30 Submitted year end payroll, purchase orders and fees; compiled information from files for inquiry for potential purchaser of 701 Pennsylvania, on-site visit to Ryan Dvorak's newly finished exterior and porch restoration, drove through Riverside and turned 1001 Hudson into the building department for work without permit. December 31 E-mailed Marco Mariani and Stan Molenda for additional information on interior of 701 Pennsylvania; submitted draft of December HPC minutes and amended By.- Laws y-Laws to Mayor's Office and City Clerk January 1 Office Closed January 4 _ Began the reorganization of the Office files. January 5 Completed the Commission Data Project for the National Alliance of Preservation Commissions; continued with the reorganization of the Office files; 2009 year and budget reconciliation with Auditor's Office. Contacted David Steinhauser concerning supplying resume for Commissioners if he was still considering selection as Architectural 'Historian. January 6 The death of Martha Lewis left me the only Officer of the BSSB with check writing capabilities to pay Conservatory Director; met with Ann Puzzello concerning Conservatories and Marquette School as a future Montessori Intermediate Center creating a Marquette Montessori campus from pre-school through grade 8; spoke with Phil St. Claire and coordinated responses for anticipated questions; met with various community leaders and state and national political liaisons concerning BSSB activities after Martha's death; conducted meeting of BSSB with Heidi Gray and Greg Leyes to secure BSSB property at Martha Lewis' residence and to secure the Conservatories against the coming cold and snow. Met with William Coleman, an independent architect, who had expressed an interest in the Architectural Historian position in the past and is still considering it. January 7 Attended Realtor Class at Northern Indiana Center for History and spoke briefly about HPC Office as a resource center, historic districts and district standards and guidelines. Spoke with Mayor Luecke concerning BSSB and assuring him that the work will go on. Attended the Lunch and Learn lecture at SB Library sponsored by Community and Economic Development & HLFI. Met with Edgewater Liaison, Sandy Wilson and emailed HPC meeting schedule. Contacted Mike Dyszkiewicz concerning cracks in glass and areas of disrepair that need to be addressed at the Conservatories. January 12 Presented at the St. Joseph County Council for the land -marking of St. Paul's Cemetery. The land -marking passed unanimously. January 13 Completed Staff Report for January meeting; attended Lunch and Learn at St. Joseph County Library on the History of Studebaker and Oliver. January 14 Mailed out Commissioners' meeting packets. Submitted payroll for staff. January 18 Office closed for Martin Luther King Holiday. January 19 Followed up on CJ Cunningham's emailed 106 report on the Adams Road Round About. Reviewed and signed 106 reports for City demolitions and grants. January 20 Discussion with Randy Ray about moving the Sons of Israel Synagogue to a northern location on William Street. Discussion with Sean Coleman, St. Joseph County Treasurer concerning the Rushton's inclusion on County's Tax Sale listing. January 21 Attended presentation by Jeff Gibney concerning the "strategic plans" for various projects around the downtown, TIF Districts and the zoning overlay needed for Ignition Park; the renewed interest in the LaSalle Hotel as apartments to condo development. Attended Lunch and Learn presentation by Assistant Director concerning the development of neighborhoods around the Studebaker and Oliver plants. Reviewed the tax sale listsing- several properties in W. Washington N.R. district 501 W. Washington (Rushton) and 609-11-613 W. Washington were identified. January 22 Re -proofed the final Location Report for 2009 for errors. Met with Jill and Tom LaFountain, Paul Brenner at lunch concerning the Conservatories and potential new board members. Began reconciliation of Special Gifts Location Report. Reviewed and signed 106 reports for City grants. January 25 Submitted Memo requesting carry forward of the balances in the Special Gifts Budget; on site 106 Reviews of two grant prospects; reviewed and signed off on 4106 reports for grants. Assistant Director's Report HPC Meeting 01.25.2010 1. City Cemetery National Register Nomination Organized and condensed file; Reviewed what needs to be done; Begin gathering additional research. 2. Lunch and Learn Lecture Weekly meetings with Sue Solmos; Continuing to put the lecture material together Attend 01.14.09 presentation by Center for History, Andy Beckman & Dave Bainbridge-Studebakers and Olivers. 01.21.10 Present on the Neighborhoods the Studebakers & Olivers Built 3. 2010 Commission Courier Continue to edit content of newsletter; Troubleshooting and emailing to 400+ people 4. Attend "Sell South Bend" 01.07.10 class for realtors at the Center for History with speeches by Mayor Steve & Sue Solmos, City of South Bend, lecture by Marilyn Thompson, Center for History and presentation on Industrial History of South Bend by Travis, Center for History. Attend "SSB" 01.14.10 at the Morris Performing Arts Center with presentations by several groups. Attend "SSB" 01.21.10 at the Airport with presentation by Jeff Gibney of SB C&ED, the Chamber of Commerce, and the Airport managers. 5. Restore Michiana/Southold event Initial meeting with Paul Hayden and Jennifer of HLFI to discuss past events and possibilities for 2010 event. Send out email inviting all to attend a committee meeting. Reserve library room. Cancel library room. Calling on other possible venues. Developing a tentative RM schedule, including possible speakers and vendors. —2nd planning meeting included Tim Klusczinski, Jennifer and myself. Sent an email recapping what we discussed. Contacted DTSB to inquire on sponsoring EcoFest. 6. Attend Center for History "Voyages Gallery" on the lower level to capture the spirit of the history of South Bend and past industry. 7. Met with President of Near Westside Neighborhood Association, Noreen Deane -Moran to learn more of what they do and then hood boundaries. 8. Reviewing files of past Restore Michiana and Southhold Awards. 9. Review past grant applications to determine our eligibility for funding for Indiana's Preservation Conference in April. Begin the grant procedure. SOUTH BEND & SAINT JOSEPH COUNTY HISTORIC PRESERVATION COMMISSION JANUARY 25, 2010 MEETING GUESTS: PLEASE SIGN THIS LIST SO THAT YOUR PRESENCE CAN BE NOTED FOR OUR MINUTES Print Name Address Signature MINUTES OF A MEETING OF THE HISTORIC PRESERVATION COMMISSION OF SOUTH BEND & ST. JOSEPH COUNTY January 25, 2010 13`i' Floor Conference Room County City Building South Bend, IN 46601 I. CALL TO ORDER: President Klusczinski called the meeting to order at 7:02 p.m. Members Present: Todd Zeiger, Linda Riley, Secretary; Timothy S. Klusczinski, President; Jerry Niezgodski, Treasurer Staff Present: Larry Meteiver, Legal Counsel; Catherine Hostetler, Director; Members Absent: Lynn Patrick, Vice President; Sandra Rossow Staff Absent: Elicia Dadlow, Assistant Director Members of the Public Present: Wayne Raybuck II. PUBLIC HEARING: A. CERTIFICATE OF APPROPRIATENESS STAFF REPORT CONCERNING APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS Date: October 30, 2009 Application Number: 2009-1026 Property Location: 1126 E. Wayne Street S. Architectural Style/Date/Architect or Builder: Colonial Revival/1927/1-1. Russell Stapp, ArchitectlWhitcomb & Keller Property Owner: Berry, Daniel and Deborah Landmark or District Designation: East Wayne Street Rating: Contributing DESCRIPTION OF STRUCTURE/ SITE: The home at 1126 E. Wayne Street is a two storey structure with an irregular plan set upon a concrete foundation. The exterior walls are brick. It has a slate gable roof with simple entablature and gable returns. One storey side wing with pent roof at 2nd floor line carried around house. Gable canopy entry with arch under and gable returns with brackets, brick stoop. The windows are double hung 6 over 1, brick soldier course lintels and cast concrete sills. One storey rear enclosed porch, enclosed by vertical wood siding with flat roof, concrete slab on brick. Two car brick garage with double swinging doors with windows, slate gable roof with cornice and trim returns. ALTERATIONS: None known APPLICATION ITEMS: Replace (2) garage doors (carriage style) with (1) carriage door. No windows. Have not used for cars in 30 years (doors small). Want (1) door so is more able to be utilized for cars. DESCRIPTION OF PROPOSED PROJECT: The homeowner has engaged Raybuck Construction to replace the existing garage doors with a single, insulated overhead door in a style sympathetic to the existing carriage doors, trim and hardware, see style P2C. The proposed garage door will not have the windows as in existing for safety precautions. Homeowner states that the new garage door will be, "more conducive to being used for our autos and more accessible by me." Discussion with Wayne Raybuck concludes that they will shore up to remove center post and trim. A new laminated beam (LVL) and framing will be installed. Framing and door will be installed finished with trim to match original. EAST WAYNE STANDARDS AND GUIDELINES: II. EXISTING STRUCTURES C. WINDOWS AND DOORS Window and door frames are of wood or steel (some casements) or in the case of brick structures, stone sills and brick lintels. Where metal or vinyl siding has been applied, window trim has been covered. Storm windows are of wood or aluminum. Required Original windows and doors shall be retained including sashes, lintels, sills, shutters, decorative glass, pediments, hoods, and hardware. When deteriorated beyond repair, they shall be replaced with units and trim resembling the original. Recommended Wood frame storm windows and doors painted to match the original should be used but should not damage existing frames. If' new sashes or doors are installed, the existing or original materials, design, and hardware should be used. When metal storm doors are used, they should be painted, anodized or coated to match the existing. When awnings are used they should be of canvas material. Prohibited Original doors, windows and hardware shall not be discarded when they can be restored and re -used in place. New window and door openings which would alter the scale and proportion of the building shall not be introduced. Inappropriate new window and door features such as aluminum insulating glass combinations that require removal of the original windows and doors shall not be installed. Not Recommended Awnings, hoods, and fake shutters made of metal, vinyl, or fiberglass should not be used if they would detract from the existing character or appearance of the building. STAFF RECOMMENDATION: Staff recommends approval of the replacement of the garage door, supported by the auxiliary nature of the structure and its placement toward the rear of the house. Furthermore, the carriage style of the garage door is comparable in style to that of the two original garage doors and will not detract in appearance from the surrounding structures. On a motion by Todd Zeiger with a second by Linda Riley Vote: 4-0 COA 2009-1026 was approved with a unanimous vote STAFF REPORT CONCERNING APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS Date: January 13, 2010 Application Number: 2010-0111 Property Location: 908 Leland Architectural Style/Date/Architect or Builder: Gabled-ell/1898 Property Owner: Troy Badali Landmark or District Designation: Chapin Park LHD Rating: Contributing 2 DESCRIPTION OF STRUCTURE/ SITE: The house located at 908 Leland is a 2 storey wood frame gabled -ell with an irregular plan set upon a brick foundation. The walls are 4 !/2" wood clapboard with frieze and moulded cornice. The roof is a cross gable with asphalt shingles. The porch is located in the corner between the front gable and south wing; it has 2 wood column supports with simple balustrade. The windows are double hung 1/1 with moulded entablatures; the doors have wide moulded entablatures. ALTERATIONS: The house has been vinyl sided and has replacement storm windows and doors; the original pine exterior trim is no longer visible and is probably removed. The first storey window shutters photographed in 1987 have not been replaced. It was noted in August 1949 that the original wood shingle roof was replaced or covered with asphalt shingles. In 1932 the home was remodeled into a 2 family dwelling and in 1949 it housed 3 families. The garage attached at the rear of the house was removed prior to the 1940s and replaced with a detached concrete block two car garage before 1949. In August, 2009 a report from Code Enforcement indicated that a new front porch deck, steps and guardrail were installed along with a re -constructed set of rear steps to the second floor. There was also a newly reconstructed pressboard covering of the exterior access to the basement. APPLICATION ITEMS: Turn 3 unit house into single family. Remove upstairs outside door and put siding over hole. Also, remove stairs (outside) leading up to the door. DESCRIPTION OF PROPOSED PROJECT: The owner wishes to remove the non -conforming outside door (upstairs) and repair opening using 4'x 8' sheet of plywood and 2"x 4" studs. The outside will be finished off with siding that matches the rest of the house. After that the stairs that are outside which are leading to the upstairs door will be removed. The house will then be restored to single family occupancy. STANDARDS AND GUIDELINES: D. ENTRANCES, PORCHES AND STEPS Most houses in the district have either an open or enclosed porch across the front. Most porches have either hip or gabled roofs or are covered by the main roof of the house. Required When deteriorated beyond repair, existing or original porches, stoops, patios and steps, including handrails, balusters, columns, brackets, tiles and roof decorations, shall be retained or replaced by replicas of the same design or by a design more in keeping with the historic period of the structure. Porches and additions reflecting later architectural styles and which are important to the building's historical integrity shall be retained. Recommended When enclosing porches for heat conservation or for other reasons, it should be done in a manner that does not alter the architectural or historical character of the building. Prohibited Front porches, stoops, patios and steps that are important to the building's style and development shall not be altered or removed; if in need of replacement, see above Reauired section. See also Section IV B. Access for Handicapped or Disabled Persons. Not Recommended Original porch details should not be replaced with materials representing a different period or style from the original. STAFF RECOMMENDATION: Staff recommends approval of the removal of the non -conforming (Code) exterior rear door and stairs and the application of the match siding in order to comply with Code Enforcement's mandate to return to single family after the house lost its grandfathered multi family status. On a motion by Linda Riley with a second by Jerry Niezgodski Vote: 4-0 COA 2010-0111 was approved with a unanimous vote B. NATIONAL REGISTER NOMINATION 1. City Cemetery update Catherine Hostetler -It is a work in progress C. LOCAL LANDMARKS 1. St. Paul's Lutheran Church Cemetery — Madison Twp. Update Catherine Hostetler -Land -marked with a unanimous vote on 12 January 2010. III. HEARING OF VISITORS No visitors IV. REGULAR BUSINESS . A. APPROVAL OF MINUTES — December 21, 2009 Approved most current draft form by acclamation. B. TREASURER'S REPORT Linda Riley requested clarification on hourly vs. salary for Deputy Director. Catherine Hostetler provided clarification. Linda Riley requested clarification on dues and subscriptions. Catherine Hostetler provided clarification. C. STAFF REPORTS 1. Correspondence -File Circulated 2. C of A Approvals -Distributed. 3. Director's Report -Distributed. Discussion of Botanical Society. Discussion of Marquette School. 4. AD Report -Distributed. 5. Legal Counsel -Distributed Wayne Doolittle, Preservation Specialist contract. Todd Zeiger requested a "thumbnail overview" of what Wayne does. Catherine Hostetler provided clarification. There was further discussion on the job description and future position fulfillment. On a motion by Todd Zeiger with a second by Jerry Niezgodski Vote: 4-0 Contract is approved with a unanimous vote, subject to the provision that a report will be submitted on what the contractor is doing on a monthly basis. D. COMMITTEE REPORTS L President's Report -None. Distributed the preliminary list of the Standing Committees; subject to change after the appointment of more commission members. V. OLD BUSINESS A. Election of Officers -Approved Slate of officers at December meeting. On a motion by Tim Klusczinski with a second by Jerry Niezgodski Vote 4-0 Officers are as follows: Tim Klusczinski, President, Jerry Niezgodski, Vice President, Linda Riley, Treasurer and Lynn Patrick, Secretary. 4 On a motion by Tim Klusczinski with a second by Todd Zeiger Vote 4-0 Jerry Niezgodski, Assistant Secretary when needed. VI. NEW BUSINESS A. Architectural Historian There are two potential candidates but they have not been interviewed. Some interest on whether the Commission can capture both of them; One as Architectural Historian, another to fill a vacancy, dependant on political affiliation. B. Restore/Southhold Event Catherine Hostetler and Tim Klusczinski explained the preliminary meeting of the Event and invited everyone to join at Friday January 29 2pm meeting. VII. ADJOURNMENT On a motion by Linda Riley with a second by Jerry Niezgodski Vote: 4-0 Meeting adjourned at 8:04 p.m. Attest: Ly O Patrick, Secretary ` Date