Loading...
HomeMy WebLinkAboutSeptember 2002Special Meeting — 7th Floor — County -City Building Tuesday, September 3, 2002 4:30 PM I. CALL TO ORDER, ROLL CALL II. PUBLIC HEARING A. CERTIFICATES OF APPROPRIATENESS 1. 2002-0717; 924 West Indiana Avenue, The Oliver School: Salvage of artifacts & antique building materials; Demolition of remaining portions of building; Restoration of site & preservation of mature trees. B. HEARING OF VISITORS C. LOCAL LANDMARK, FIRST READING HISTORIC DAIRY BUILDING 502.LAg4Wt'E AVENUE, SOUTH VAL OF MINUTES III. ANNOUNCEMENTS & MISCELLANEOUS MATTERS A. Kessler historic landscape tour & seminar City of Fort Wayne Parks Department, September 8 & 9 Registration forms available, or call 260 / 427-6000. VI. ADJOURNMENT ,�� .';- -- -4 SOUTH BEND & SAINT JOSEPH COUNTY HISTORIC PRESERVATION COMMISSION SEPTEMBER K 2002 MEETING GUESTS: PLEASE SIGN THIS LIST SO YOUR PRESENCE CAN, BE NOTED FOR OUR MINUTES A vm U tv A jok n 9 V W -A I?Vivtq RV/m R'�T -e- -9 a e- t '�-- RVAM -K V AIA 00 ult vu- %�iz v . �r- SOUTH BEND & SAINT JOSEPH COUNTY HISTORIC PRESERVATION COMMISSION SEPTEMBER K 2002 MEETING GUESTS: PLEASE SIGN THIS LIST SO YOUR PRESENCE CAN BE NOTED FOR OUR MINUTES R, Vi✓� ICU N)P-- u -� fl ►� �� C6 0-n I -A ff V �/ A 49-03-2002 2:51AM FROM KIL ARCHITECTURE 216 288 2654 SEP -3-2002 11:50A FROM:MASONRY CONTRACTORS 2192734075 Masonry Contractors Inc. 16839 Douglas Rd.- Mishawaka, IN 46545 September 3, 2002 l&, Greg Kil Kit Architecture and Planning. 1126 Lincolnway East. South Bend, IN 46601 RE: Oliver School Terra Cotta Salvage Project Dear Greg: TO:2892420 P.2 ' P:2/3 Ph: 219273-4025 Pax 2192734075 E -Mail: sbognar@gatewaynet Masonry Contractors Inc. is pleased to submit this estimate for the salvaging of the Terra Cotta located on the Oliver School Building in South Bend. I have prepared and listed below the budget figures according to the format submitted to me for the pieces to be salvaged. The dollar figure assigned per piece salvaged is a price per each unit,. that is, if you decide to salvage more of one item it is the stated price per unit additional. Listed below is the scope of the work: a. Main Entry, North elev. T.C. Marked "B" upper level crockery' pilaster $2,000.00 each. �,- b. Main Entry, North elev. T.C. marked "C' entry surround crockery& pilaster !L $3000.00 each. c. Main entry, North elev. T.C. marked "D" square medallion at upper parapet,) centered over brick pilaster "Yin/Yang" design. $750.0.0. d. Main entry, North elev. T.C. marked `B" special coping piece. $300.00.eachD e. North Elev. T. C. marked "F" standard coping piece. $75.00..)• ta_ " £ West Elevation T.C. marked "G" upper level crockery. & pilaster $3,000.00 each, rrz . g. South Elev. T.C. marked "IT' "hooded pilaster. $5,000.00. each / Stone Pieces a. Salvage single exterior granite step, marked "r, b. Salvage typical stone sill, Classroom 127, marked "Y' c. Salvage typical piece of chalkboard slate. marked "K" Entrance Archway Reconstruction. r � _ 1 S200;.00 no bid. I-, jv )'%4 9-03-2002 2:52AM FROM KIL ARCHITECTURE 219 288 2654 P.3 SEP -3-8008 11:51A FROM:MASONRY CONTRACTORS 2192734075 TO: 2898420 P=3/3 y \ Z have estimated the total cost to reconstruct the Entrance Archway at $70,000.00 this would include salvaging the necessary pieces of terra cotta and using new brick. The existing brick on site would be far too costly to salvage, clean and reuse. New brick that closely matches the existing is readily available from local suppliers. Bid Packages It is my opinion that the demolition and salvaging packages be offered separately. The terra cotta salvaging operation will require knowledgeable personnel who have worked with the material and understand it's installation and anchorage systems. A careful and considerate approach will be needed to salvage suitable pieces for reuse. The idea of removing some examples the terra cotta is in my opinion appropriate. The cost of new terra cotta is astronomical. For instance, the cost to create one new piece marked "B" would be approximately $15,000.00. or more. Mold costs run approximately $1,000.00 per piece and most of the examples to be salvaged would require a dozen or more molds to recreate since each example is constructed of multiple pieces. As for a market for the existing pieces, I know there is one, but further investigation is needed to find out as to what the market is bringing for salvaged terra cotta. Also, our labor rate per man hour is $65.00/hr. The man lift rate is approximately $150.00 per day. Transporting salvaged pieces to another site with a forklift would amount to approximately $1,500.00. I hope that this helps you in your efforts and if you have any further questions please call at anytime. Respectfully, Steven P. Bognar Masonry Contractors Inc. SPB Regular Meeting N 7th Floor — County -City Building Monday, September 16, 2002 7:30 PM I. CALL TO ORDER, ROLL CALL p . II. PUBLIC HEARING &; A tar `� � LSI : : •. 19 C. CERTIFICATES OF APPROPRIATENESS 1. 2002-0806; 119 Portage Avenue; build utility shed. 2. 2002-00815; 217 West Washington Street Tower Building; rooftop sign. [Report from Standards & Maintenance Committee) 3. 2002-0821; 730 Bronson Street; siding replacement. 4. 2002-0822; 1120 East Wayne Street South; window replacement. 5. 2002-0904; 805 Arch Avenue; sash or window replacement. LOCAL LANDMARKS 1. 602 Euclid Avenue, South Bend, Former Nelson & Son Dairy, 1906-1918 2. 1021 Portage Avenue, South Bend, Axtell House, built 1905 HEARING OF VISITORS <, .... , III. REGULAR BUSINESS A. APPROVAL OF MINUTES B. TREASURER'S REPORT C. LEGAL REPORT 1. Leeper Park Settlement status 2. Enforcement status of Franklin Street apartments 3. Enforcement status of 117 West North Shore Drive D. STAFF REPORTS: 1. Director's Reports: C. of A. Approvals; Correspondence. 2. Inspector's Report, Clay Township OLD BUSINESS: A. Oliver School Certificates of Appropriateness; progress of work V. NEW BUSINESS - - - - - - - - - - - - - - - VI. ANNOUNCEMENTS & MISCELLANEOUS MATTERS VII. ADJOURNMENT i S . raaa..Jv.9ih.tiwxrwLu:mnau'umwr'3ix' ` IV. A. APPROVAL OF MINUTES B. TREASURER'S REPORT C. LEGAL REPORT 1. Leeper Park Settlement status 2. Enforcement status of Franklin Street apartments 3. Enforcement status of 117 West North Shore Drive D. STAFF REPORTS: 1. Director's Reports: C. of A. Approvals; Correspondence. 2. Inspector's Report, Clay Township OLD BUSINESS: A. Oliver School Certificates of Appropriateness; progress of work V. NEW BUSINESS - - - - - - - - - - - - - - - VI. ANNOUNCEMENTS & MISCELLANEOUS MATTERS VII. ADJOURNMENT i S . raaa..Jv.9ih.tiwxrwLu:mnau'umwr'3ix' SOUTH BEND & SAINT JOSEPH COUNTY HISTORIC PRESERVATION COMMISSION SEPTEMBER 16, 2002 MEETING GUESTS: PLEASE SIGN THIS LIST SO YOUR PRESENCE CAN BE NOTED FOR OUR MINUTES 71I U STAFF REPORT CONCERNING APPLICATION FOR A CERTIFIATE OF APPROPRIATENESS Application Number: 1999-0821 Property Location: 730 Bronson Street. Property Owner: Walter Berndt Designation: Local Historic District — Edgewater Place Rating: Contributing - 9 HISTORY This is a small bungalow -style house built in 1910, probably by Whitcomb & Keller Co. The Gleva family was the first to live there. It has a more pronounced gable over the front porch than most bungalows, and also has characteristics reminiscent of older "Hall & Parlor" or vernacular type dwellings. The house was sold to Mary Souder Richards, who in turn transferred it to her relative, Oran Souder, in 1925. Mr. Souder was a postal carrier in California, who rented the house out until 1948. In 1948 or shortly thereafter the Berndt family bought it, and members of the Berndt family have lived there ever since. Mr. Berndt informs me that his parents originally bought it because they also owned the business property immediately adjacent, on Lincolnway, and it was convenient to his father to live next-door to his place of business. The elder Berndts are in their 80s, and live there still. I cannot find out that the Berndt family has ever done anything about ensuring proper ventilation in their attic, roof, bathroom, or elsewhere in the house. My questions on the subject elicit detailed information regarding how the family has worked very hard, and spent considerable sums, to seal all walls with special paint, to install insulation with vapor barriers, and generally to battle moisture by a desperate effort to keep it out, with no notion of letting the house breathe. In 2000 and 2001, the Standards & Maintenance Committee, and the City Code Enforcement Department, became concerned about the deplorable condition of the house, and took steps to compel improvement. The Berndt family agreed that some of the required items needed attention, and so applied for and received a Certificate of Appropriateness listing eight items, including: demolishing carport; repair damaged roof; remove steps from roof (steps had been installed years earlier to facilitate repairs which had not been completed); replace or repair wood soffit where damaged; replace gutters on eaves; replace porch floor and ceiling with wood identical to original; replace rotted wood trim boards with identical trim; repair or replace porch steps with wood or cement, at owners option as to material. Most of these items have been attended to, and in fact an entire new roof has been installed in very workmanlike and, satisfactory manner. The porch, however, remains in dreadful shape, and Mr. Berndt believes that the siding on the house is deteriorated beyond repair. Since there seems to be no way for it to ventilate or dry, he is possibly correct, though he does not see ventilation as the problem. Since he believes that the existing siding is beyond repair, and must be replaced, he seeks to replace it with vinyl siding. He may have applied for this before, and been denied. RECOMMENDATION The house is in such dreadful shape that some attention to its porch and siding is imperative. If the house is so poorly ventilated that the wood siding is deteriorating, then vinyl siding will not solve the underlying problem. However, it would provide relief to the neighborhood from an eyesore, and at least a temporary comfort to the inhabitants in their declining years. Therefore, staff recommends that the Commission deviate from the Edgewater Place District Guidelines because of the exceptionally bad condition of the house, and approve the application, with the following conditions: a) The new siding shall be the same size and style as the original wood; b) All original existing architectural detail around windows, porches, doors, and eaves shall be retained, except that any rotted wood trim shall be replaced with identical trim; c) Gutters shall be re -installed on the eaves when the siding is complete; d) The porch floor and ceiling shall be replaced with wood identical to the original; e) The original or existing porch pillars shall be retained & appropriate stair rails replaced. E d g e w a t e r P l a c e H i s t o r i c D i s t r i c t II. EXISTING STRUCTURES A. Building Materials Original exterior wall materials in the District range from brick, clapboard, shingles, and masonry block to aluminum siding. In the majority of the cases the aluminum siding has been applied over the original clapboard. There are some masonry commercial buildings on Lincolnway. Required Existing exterior building materials shall be retained. Deterioration of wood materials shall be prevented through repair., cleaning, and painting. The existing architectural detail around windows, porches, doors, and eaves should be retained or replaced by replicas of the same design and materials when deteriorated beyond repair. Masonry structures shall be maintained, tuckpointed and properly cleaned when necessary. Masonry shall be cleaned only when necessary to halt deterioration or to remove stains and shall be done with the gentlest method possible, such as low pressure water and soft natural bristle brushes. Stucco surfaces shall be maintained by cleaning and repainted when necessary. When repairing stucco a stucco mixture shall be used. Recommended Whenever possible, the original building materials should be restored. Aluminum or vinyl siding may be used when it is the only feasible alternative to maintaining the original surface material. When used over wood surfaces, this siding should be the same size and style as the original wood. However it must be noted that such material can contribute to the deterioration of the structure from moisture and insects. Mortar joints should be repainted only when there is evidence of moisture problems or when sufficient mortar is missing to allow water to stand in the mortar joint. Existing mortar shall be duplicated in composition, color, texture, joint size, method of application, and joint profile. it. t ypirat uaoujrame unlit waerr midst trraar arc freely migrans to the outcirdt. Mouture may tundra+e in the u,4/1 cavity and be absorbed into the adjacent materials and evaporate as the wall is heated by the suit. INTERIOR�� EXTERIOR warm, mond air add. dry rir r � —ct—rood siding i muirtui plasm, J .. r rpuu. uvu 1-t—cun ti -sin smutation am a Vapor' harrier fading in itoward the heated side of the wall). The tNtpor lxrrrirrprevents trttnitturr tnigiatian. thm keeping Ihr intutation mlre. - IN'IERIQR 'J ti �) EXTERIOR r,trm, nnwu air _ t cold. dr, sir maim a,ndtnaunn page30 Tier 41 '�'"CAUztvn:� n Street lull 24, 2002 730 'Brons -. 730 Bronson Street July 24, 2002 STAFF REPORT CONCERNING APPLICATION FOR A CERTIFIATE OF APPROPRIATENESS Application Number: 2002-0822 Property Location: 1120 East Wayne Street. Property Owner: Mr. & Mrs. Robert L: Miller, Jr. Designation: Local Historic District — East Wayne Street Rating: Contributing - 9 HISTORY This is a garrison -style colonial revival built in 1935 for Lydia & James Naus. James Naus, a 1916 graduate of Indiana Dental College, opened an office in the Farmers' Security Building in 1918. He married Lydia F. Miels, and they had a daughter and a son. Naus was a member of the American & Indiana Dental Associations, the 13`h District Dental Society, Delta Sigma Delta Fraternity, Knights of Pythias, Kiwanis Club, and a Mason. In 1955 the Nauses moved their home and Dr. Naus' office to 604 S. Eddy Street, and sold this house to Leila & Tracy H. Madole, V.P. of sales for the South Bend Range Corporation. In 1961, the Madoles sold the house to Barbara & Stephen Lobdell. Mr. Lobdell was president of material Handling Equipment Co. At his death, he left the house to Barbara. She sold the house to Mr. & Mrs. Miller in 1987. RECOMMENDATION The owners seek to remove their original wood window sashes and replace them with aluminum -clad window sashes. On the outside, the windows look so good that at first we were puzzled as to the motive for replacing them. However, there is significant deterioration on the inside of the window sashes. The character defining elements on this home are the excellent and graceful proportions of its front face, its high-quality building materials, and its excellent authentic and stylistically correct details, such as the spherical pendants under the second floor overhang, its flat arch lintels, entablature and fluted pilasters around the front door, corbelled chimney, and — relevant to this Application -- the carved or shaped blocks on each upper window sash, to prevent the upper sashes from crashing down on the sills. The proposed replacement windows are insulated glass, but have "true divided lights" meaning that there are muntons on the outside, on the inside, and between the double panes, so that dimension and shadow line are maintained. Staff recommends approving this Application for window sash replacement as described in the Application, with the following additional conditions: a) That the replacement sashes or windows retain the same appearance as the original windows, so that the excellent proportions of the house are preserved. In other words, we don't want a double window jamb that results in a noticeably smaller window glass. b) That if possible, the decorative little blocks on the upper sashes be removed from the old sashes and re -used on the new ones. X Application for o racier. Cern, fate ofAppropriateness o a Historic Preservation Commission of South Bend & St. Joseph County V 125 South Lafayette Boulevard + �+ r s Mailing addresa: 227 West Iefferson Blvd - South Bend IN 46601-1830 ' Phone: 219-233-9798 Fitt: 219-235-9578 e-mail: historic@m1chiam.ore A Certified Local Government OFt7CSDsaONLYsaoaaspoN0TCOM7 IZArtyF MUMcotvtAavEnnvratsHox«-C4"0j 7CavSaon2r Date Received 2002 Application Namwr 2002. PaatAevimn: E1YRS (n.rtcvrwr )WF2M __.. NO Surf Apprml authotlsed try: Historic Commlwton Revises Da1C ❑ UW Laadmut ❑ NdieaN Re&tar Dhtda s - h ❑ IAW Bhtoric District P r: Ctr=cate of AppropHstmeu: ❑ Dented ❑ Approved and Wood M& ❑ National Landmark ❑ TablW 2012 ❑ Smt To Commlttm Address of Property for proposed work. , o E V -11-E - SO v T /f a..A►.a..+a.ra+�y aty : Sac. to 6 Ea -D Owner's Phone No: '13 4 — 7 SG a Namc of Property Owaer(s):� M � `� M 2 $ R d t3 � R i /1`11 Lt_ �/l Address of Property Owner : I I XO L 4/ ,ff O CIT IF contractor(s) Name: G 4 Q`r Q ��3 ►" Contract Company Name: R(US �� C6 r5i �v`j 10c. Contractor Add,. --b ' �rT L/ Po It/L-- City: /V " 11 S (i 4wt,<.4- Contractor's Phone No: Current Use of Building: i ,�- I` 1-41 ( t_ Type of Building Construction: 0/04) r2*tM L car..+Fiar.&iae-sbs.-aaa Proposed Work: Inkind ❑ Landscape ❑ New ❑ Repiacementt wi.,u.o ❑ Demolition Description of Proposed Work: R FPL 4 CL 7 w 1 tiootr- S (- 3 0 00 /LS Owner/Contmctor. FW 3.�-16 16 T e,.=a: f1>a.�.:Uaay.oarwa.eg. ww�Yas 1 (, _ dtJor .J� sipsture of Owner: Strnstare of � r APPLICATION UQIIMXKZtM ARE LISTED O ItEVYRSE SIDE. DOUBLE -HUNG WINDOWS Traditional cletad with cuttin3-ec1,,3e innovation • Tilt -to -clean sash makes Pella* double -hung windows a breeze to clean. Interior and exterior glass can be easily cleaned from inside the house — standard feature on all Pella double -hung windows. • Our cam -action locks compress weatherstripping for a tighter - than -tight seal. They're recessed into the wood for improved functionality and appearance — standard on Architect Series* and Designer Series* double -hung windows. • Pella double -hung windows can be raised from the bottom and lowered from the top to provide two levels of ventilation. Hot air is pulled from the ceiling to the outside from the top of the window. And cooler fresh air flows in from the bottom. ARCHITECT SERIES* DESIGNER SERIES* PROLINE* The historic appearance Exclusive between -the -glass Basic and beautiful to of true divided light. blinds or muntin bars. maximize your value. 41 i ARCHITECT SERIES® DESIG'' unsurpassed %rchitecturid expression. In Patented Integral Light Technology" creates the historic look of true divided light by permanently bonding muntin ❑b bars to the interior and exterior surfaces of insulating or Nt(}iI11:CT, l�csi}�rxr, glass. A nonglare, insulating spacer is installed between awa, the insulating panes of glass and underneath the muntins to enhance the window's true -divided -light appearance. • Between-the-gl, Goldtone Type -E t • Traditional, Prairie, 9 -Lite Prairie or custom muntin bar patterns. • SmartSash• II glazir • Also available with or without removable interior wood muntins glass plus a removab in standard or Colonial profile. • Distinctive ogee — or S-shaped — profile on the sash. • Choice of primed wood or Hassle -Free" aluminum -clad exterior. Only Pella makes the look of true divided light so authentic and energy-efficient. Between -the -glass blin protected from dust, dam Ff I ARCHITECT SERIESO Unsurpassed architectural expression, FiPatented Integral Light Technology' creates the historic look of true divided light by permanently bonding muntin bars to the interior and exterior surfaces of insulating nki}IIM'Tt glass. A nonglare, insulating spacer is installed between the insulating glass panels and underneath the muntins to enhance the window's true -divided -light appearance. • Traditional, Prairie, 9 -Lite Prairie, Top Row or custom muntin bar patterns. • Also available with or without removable interior wood muntins in standard or Colonial profile. • Distinctive ogee — or S-shaped — profile on the sash. • Choice of primed wood or Hassle -Free" aluminum -clad exterior. only Pella makes the look of true divided light so authentic and energy-efficient. DESIGNER SERIES® Innovations others cant touch. Our Designer Series' hinged patio doors feature of between -the -glass blinds, shades and muntins. Imag that! Blinds and shades tucked neatly between pane, glass— away from dust, damage and little hands. • Between -the -glass options: Slimshade• blinds available in WI, or Goldtone Type -E finish. Fabric pleated shades available in different colors and various patterns. Wood muntin bars in or 1-1/4' profile. • Choose SmartSash• ii with an exterior single panel of dear gl. plus a removable interior panel of clear or Low -E glass; or SmartSash• ill with argon -filled, tow -E InsulShield• insulating plus a removable interior panel of clear or Low -E coated glass Between -the -glass blinds, shades and muntins al protected from dust, damage and little hands. M e ry Mti .I,t1ci l ie �• i 1 •�jr pl �''tY" 1� i�ilft�'�. 14�%� } iJ;+,.`fX ��, � -V, .„t � �� 1mi,°•'; • n=-'. , ..: �t.�±t �L'�i� i .mow , fi !1>> DESIGNER SERIES® Innovations others cant touch. Our Designer Series' hinged patio doors feature of between -the -glass blinds, shades and muntins. Imag that! Blinds and shades tucked neatly between pane, glass— away from dust, damage and little hands. • Between -the -glass options: Slimshade• blinds available in WI, or Goldtone Type -E finish. Fabric pleated shades available in different colors and various patterns. Wood muntin bars in or 1-1/4' profile. • Choose SmartSash• ii with an exterior single panel of dear gl. plus a removable interior panel of clear or Low -E glass; or SmartSash• ill with argon -filled, tow -E InsulShield• insulating plus a removable interior panel of clear or Low -E coated glass Between -the -glass blinds, shades and muntins al protected from dust, damage and little hands. M e ry Mti .I,t1ci l ie �• i 1 •�jr pl �''tY" 1� i�ilft�'�. 14�%� } iJ;+,.`fX ��, � -V, .„t � �� 1mi,°•'; • n=-'. , ..: �t.�±t �L'�i� i .mow Shop Ticket South Bend Sash and Door Co., Inc. The Pella Windowscaping Center O 4150-A Grape Road Mishawaka, IN 46545 Phone: 574.257.3552 Fax: 574.252.7200 Customer - Pxo'eck/ Sbi" J ... P To Order; Robert Miller _. Miller, Mr. & Mrs. Robert Date 07/09/2002 1120 E. Wayne South No. 124P2155C 1120 E. Wayne South Need Date 08/02/2002 South Bend, IN 46615 ST JOSEPH South Bend, IN 46615 Sales Rep. Name Peterson, Randy SJrpsf Prepared by Robert Payment Terms Deposit/Paid on Completion Owner: Mr. & Mrs. Robert Miller Architect Bus. Phone: (574) 246-8080 Bus. Phone: (574) 246- 8080 Dist. Order No. P2 -155C Bus. Fax:( ) - Home Phone: (574) 234- 7562 Cellular:( ) - Comments: Labor & material includes removal of old units, installation of new units, caulk, insulation and new trim. No painting or staining included. Labor costs of i 3,175.00 are payable to Derbin Riverside Construction. Call Gary Derbin (258-0611) to schedule delivery. Delivery Instructions: J COMMON ATTRIBUTES: Unless otherwise noted under "Description" all units contain the following attributes. Fixed units to not contain screens or hardware. Product Brand: Prime Glass: I Screen: I Fins: Exterior Mat'l: DGP Color/Glass: I Muntin• I Brickmould• Color: Shade: Hardware: utside:View :Item Descri tion .:......,......, Item# 10Qty: 1 Branch Assembled..:; :.......:. ...:..:...::.:......:::.. _.. :.; :: , ........ ............: Composite: 5 -Wide Double Hung Location: Family Room A: 3765 (E) Vent -Equal Sash 50:50 Top:Bot Sash Split Double -Hung, -, R.O: 1� 5-3/411 X 5, 5-3/4 Frame:37 X 65: Architect Series Classic, Clad, Model 2, White, 5/8" Clear Jamb Depth: 5-3/16" Loose IG Glazing, Half Screen, Champagne Hardware, 3/4" Rem Trad (muntin pattern: 4Wx3H/4Wx3H), Fins (per design) fff B: 3765 (E) Vent -Equal Sash 50:50 Top:Bot Sash Split Double -Hung, Frame:37 X 65: Architect Series Classic, Clad, Model 2, White, 5/8" Clear IG Glazing, Half Screen, Champagne Hardware, 3/4" Rem Trad (muntin pattern: 4Wx3H/4Wx3H), Fins (per design) C: 3765 (E) Vent -Equal Sash 50:50 Top:Bot Sash Split Double -Hung, Frame:37 X 65: Architect Series Classic, Clad, Model 2, White, 5/8" Clear IG Glazing, Half Screen, Champagne Hardware, 3/4" Rem Trad (muntin pattern: 4Wx3H/4%3H), Fins (per design) . D: 3765 (E) Vent -Equal Sash 50:50 Top:Bot Sash Split Double -Hung, U YU Shop Ticket - Page 1 of 4 Notes: Notes: Notes: Item# 20 Qty: 3 Active/Inactive In -Swing French Door, Frame:49 X 80-5/8: Architect Location: Family Room Series, Clad, Model 2, White, 5/8" Clear Temp IG Glazing, Aluminum RO: 4'l-3/4" X 69-1/8" Hinged Screen, Brass Hardivare/Handle, 7/8" ILT Trad Special (muntin Jamb Depth: 5-3/16" Loose pattern: 2Wx5H), Fins (per design) Unit Value Added Items: Drip cap applied - Qty 5 fA CTE § L Item# 30 Qty: 3 Hardware: Door, Keylock, Keyed Alike, Brass Location: Item# 40 Qty: 2 4159 (E) Vent -Equal Sash 50:50 Top:Bot Sash Split Double -Hung, Location: Elizabeth's Bedroom Frame:41 X 59: Architect Series, Clad, Model 2, White, 5/8" Clear IG RO: 3'5-3/4" X 4' 11-3/4" Glazing, Half Screen, Champagne Hardware, 7/8"ILT Trad Special (muntin Jamb Depth: 5-3/16" Loose pattern: 3Wx2H/3Wx2H), Fins (per design) Unit Value Added Items: Jamb est. LOOSE for up to 5 3/16" wall - Qty 17, With stool loose - Qty 4 Shop Ticket - Page 2 of 4 Shop Ticket for Customer Robert Miller Project: Miller, Mr. & Mrs. Robert Order No: 124P2155C Notes: y,., Y(- Y y Item# 60 Qty: 1 3759 (E) Vent -Equal Sash 50:50 Top:Bot Sash Split Double -Hung, Location: 4th Bedroom Frame:37 X 59: Architect Series, Clad, Model 2, White, 5/8" Clear IG ILO: 3' 1-3/4" X 4' 11-3/4" Glazing, Half Screen, Champagne Hardware, 7/8" ILT Trad Special (muntin Jamb Depth: 5-3/16" Loose pattern: 3Wx2H/3Wx2H), Fins (per design) Unit Value Added Items: Jamb ext. LOOSE for up to 5 3/16" wall - Qty 17, With stool loose - Qty 4 Notes: � �.. � yt -If Item# 70 Qty: 1 4159 (E) Vent -Equal Sash 50:50 Top:Bot Sash Split Double -Hung, Location: Amanda's Bedroom Frame:41 X 59: Architect Series, Clad, Model 2, White, 5/8" Clear IG ILO: 3'5-3/4" X 4' 11-3/4" Glazing, Half Screen, Champagne Hardware, 7/8" ILT Trad Special (muntin Jamb Depth: 5-3/16" Loose pattern: 3Wx2H/3Wx2H), Fins (per design) Unit Value Added Items: Jamb ext. LOOSE for up to 5 3/16" wall - Qty 17, With stool loose - Qty 4 Notes: �✓ Y (� y y Item# 80 Qty: 1 3759 (E) Vent -Equal Sash 50:50 Top:Bot Sash Split Double -Hung, Location: Amanda's Bedroom Frame:37 X 59: Architect Series, Clad, Model 2, White, 5/8" Clear IG ILO: 3' 1-3/4" X 4' 11-3/4" Glazing, Half Screen, Champagne Hardware, 7/8" ILT Trad Special (muntin I I Jamb Depth: 5-3/16" Loose pattern: 3Wx2H/3Wx2H), Fins (per design) Unit Value Added Items: Jamb ext. LOOSE for up to 5 3/16" Nvall - Qty 17, LL With stool loose - Qty 4 Notes: yy v Item# 90 Qty: 1 36 X 81 Standard Series, Opening:36 x 81 : Support Products, 4601 1-5/8" Location: Entry Extruded Nv/plain glass, Type 1 - Rectangle, Black, Pe«ter Handle & ILO: 3'0" X 69" Expander i Shop Ticket - Page 3 of 4 Notes: Item# 111 Location: Notes: Need to ship qty. of 9 Item# 120 Location: Notes: Qty: 1 Return 1 pc. 96" Receptor Qty: 10 144 Frame Expander (#47D3—D6/47E3), Length:: 2-1/2" Frame Expander (#47D6), White Item# 130 Qty: 1 06B36144: Frame Exp Receptor, White, 144" (10) - (#72A7) Location: ';..l\'•��.,T .C; `}l``. 1" .\' \ ��: Y Ya 14 !',' 'fit• - ��� �t 7r. ",. � .. 1 .S� .• y � i t r • ' I�. ., tet, •v I � 1- ti .. I ---mow 1 A 20 - Wgyne Steet August 23 �. � 2pp2 � ust 23 III:3. teC St• `' yen �ayrie 2� 2p02 lllppppppp�- inteC%°C of centeC 1120 E. Wayne St. S windows on new addition August 24, 2002 Doors on left part of old home, doors on right part of new addition. STAFF REPORT CONCERNING APPLICATION FOR A CERTIFIATE OF APPROPRIATENESS Application Number: 2002-0904 Property Location: 904 Arch Avenue. Property Owner: Terri & Steve Zornig Designation: Local Historic District — Edgewater Place Rating: Contributing - 9 HISTORY This house was designed by a Whitcomb & Keller architect in 1902, and built as part of that company's real estate ventures. In 1923 it was purchased by Fern & William Ponader, the Secretary & Treasurer for the Suburban Development Corporation, later President of Maple Lane Realty. In 1944, through their realty company, they sold to Margaret & Frank G. Swonk. Mr. Swonk lived there until his death in 1957, and then Margaret liver there alone until 1960, when Mrs, Francis Bender came to live with her. Margaret Swonk either died or moved in 1961, but Mrs. Bender continued to live there, possibly until about 1980. In 1980, the City Directory shows her no longer there, and Mr. James Mahler living there. Later, Jeff Beers and Donna Schlarb purchased the house, and lived there until 1994, when they sold it. I am not sure whether they sold it to the present owners, or whether there was another owner in between. In 1990, Ron Farr received a C of A to install 5" cream colored vinyl siding, and to cover all fascias, soffits, and window trim with brown aluminum trim matching the original in size and exposure. Computer records are summary records and do not show the reason for this deviation from guidelines, but I believe it was because the house had already been covered with artificial siding prior to the district being designated historic. In May of 1991, Jeff Beers received a C of A to re roof the house, and to re -construct the rear entry porch, and to replace the gravel driveway with poured concrete. Also, he received a C of A to grind down the stumps of dead trees, and to replant dying lilac bushes. RECOMMENDATION The owners seek to remove their original wood window sashes and replace them with aluminum -clad window sashes. On the outside, the windows look so good that at first we were puzzled as to the motive for replacing them. However, the owner believes there would be energy and comfort efficiencies. The character defining elements on this home are the regularity and balance of its proportions, and its large, sunny windows. The proposed replacement windows are Marvin windows. Some of the windows in the documentation accompanying the application have the same six -over -one light divisions that the existing windows have. Staff recommends approving this Application for window sash replacement as described in the Application, with the following additional conditions: a) That the replacement sashes or windows retain the same exterior dimensions and appearance as the original windows, so that the excellent proportions of the house are preserved. In other words, we don't want a double window jamb that results in a noticeably smaller window glass. b) That the new sashes have the same six over one light divisions as the existing windows. Application -for- Certificate of Appropriateness Historic Preservation Commission of South Bend & St. Joseph County 125 South Lafayette Boulevard Mailing address: 227 West Jefferson Blvd - South Bend IN 46601-1830 Phone: 219-235-9798 Fax: 219-235-9578 e-mail: historic@michiana.org A Certified Local Government OFF/CE USE ONLY»»»DO NOT COMPLETE ANY ENTRIES CONTAINED IN THIS BOX«««OFFICE USEONLY Date Received 9 y b & 2002 Application Number. 2002 - Past Reviews: YES (DATEOFLWAEVIEhtn n NO Staff Approval authorized by: Historic Commission Review Date: ❑ Local Landmark ❑ National Register District meq: ❑ Local Historic District (N ,): Certificate of Appropriateness: Denied ❑ Approved and issued Title: ❑ National Landmark ❑ Tabled 2002 ❑ Sent To Committee a Address of Property for proposed work: 80S A rc H Sara AS -b end Sven Nam•) City:����.,etl1� Owner's Phone No: Name of Property Owner(s):,PjuNo ZO f fl r� Address of Property Owner: 'A OJ Contractor(s) Name: 001") � Contract Company Name: Contractor Address: 044 city: 00 $�—✓1 Contractor's Phone No: Current Use of Building: Q>. -t 4.� :Lq (Sinsle Fansffy-Multi-FamU onunndd-Govwr V -Industria! -Vacant eta Type of Building Construction: (,� f��Ov��l As �� oc •�1� — (w !:}ame-13riaY-stoma-Stsd-Conuste-Ot%er) _ u � I Proposed Work: ❑ Inkind ❑ Landscape ❑ New E� Replacement(natin-s;nd)A��. (mora than m Ux inay be checked) a Demolition Description of Proposed Work: v . Owner/Contractor: Fax: e-mail: (This offin mU correspond Mth only one designee) .- -7 3,—,? &/or Signature of Owner Q Signature of Contractor APPLICATION REQUIREMENTS ARE LISTED ON REVERSE SIDE. 1'. Informational Submittal Proposed Sash & Window Replacement System At The Residence Of Steve & Teresa Zornig 805 Arch Avenue Edgewater Historical District Home Phone: 288-9131 TILT PAC: Marvin's Tilt Pac sash replacement system can do wonders for a room full of old, drafty double hungs. You can make a dull, chilly breakfast nook cozy and inviting again. Add a traditional style with authentic divided lites. Or, use Tilt Pacs to preserve and upgrade unusual sizes and designs from years past. From simple to exotic, from Victorian to Colonial you can 0, get a Tilt Pac for virtually any double hung window. And no matter what you choose, the Marvin Tilt Pac easily lets you recapture the comfort, beauty and value originally built into your home. t A SYSTEM THAT TURNS OLD WINDOWS INTO NEW ONES. Many old double hung windows are drafty and inefficient, but the frames and trim are still in good condition. Marvin's Tilt Pac® system lets you replace only the sash. So you can make your old windows like new, with a minimum of time, labor and expense. R ®Snap -in jamb liners allow the sash to tilt in for easy cleaning. ®Energy-efficient wood sash are made to fit into your home. Just give us the sizes and options you want, and we'll build them. Each Tilt Pac includes two energy efficient wood sash and all the hardware you need to install them. So you pay for the sash, not the whole window. It installs quickly with simple, easy to follow instructions. So you save on installation costs, too. All the work is done from inside the room, without removing plaster, siding or outside trim. And, like the Marvin Double Hung, both sash of the Tilt Pac will tilt into the room for easy cleaning. WHAT`S IN THE HAS? The contents ofyour Tilt Pa& package Snap -in jamb liners make for easy installation and operation. On .#'pig All parts packaged in one box and coded for each specific location. Comes complete with instructions for easy installation. Law -maintenance extruded aluminum cladding is available in five colors for an attractive, durable exterior. 'A Insulating glass provides I energy efficiency. Excellent weather- stripping on jamb liners and sash offers protection against drafts and energy loss. t INSTALLING YOUR NEW TILT PAC® WINDOW It `s As Simple As This Step 1: Remove the old sash. Carefully remove the inside casing from your window. If your old window has a weight -and -pulley system, cut the cords. Lift out the bot- tom sash. Then, slide the top sash down, cut the cords (if any) and remove the stops. Now take out the top sash. Step 2: Prepare the frame. Nail the metal brackets evenly down both sides of the win- dow. Start about 47 from the top and finish about 4"from the bottom. Step 3: Install the jamb liners. Put in the new stops and foam gaskets. Now, simply snap the vinyl jamb liners onto the brackets. With small finishing nails, install the new stop at the top with weather- stripping facing outward. Step 4: Install the new sash. Pull down and lock the metal clutches in the jamb liners with a screwdriver. Place the top sash into the exterior track and ease it into place, lowering it onto the clutches. Install the lower sash on the - interior track the same way. Replace the original casing. You're finished! Old, drafty double hungs are new and energy efficient again. Both sash will slide up and down effortlessly. They'll also tilt into the room for easy cleaning. Or, they can be removed altogether. HOW 001 ORDER? Important! Accurate Measurements For Accurate Ordering Since all Marvin windows are made to order, it's extremely important to obtain the proper measurements before ordering a Tilt Pac'. Consult -a Marvin dealer or professional window installer. Your first measurement should be the width of the sash opening. Place yourtape measure againstthe inside of the jamband measure across to the inside of the opposite jamb (see drawingand photo). Lower the top sash a few inches, and mea- sure from the spot where the top sash touches the header to where the exterior side of the bottom sash touches the sill when closed. This is the sash opening height. Ifyourwindow has wooden blocks holding the top sash in place, remove them. E Top View ........ Screen Opening Width Width of Sash Opening G Sash Opening Height 0 Screen Opening Height 0 Sill Angle Measure the angle of the sill. A standard sill angle for Marvin's Tilt Pac is 14 degrees. On wood Tilt Pacs, nearly any angle is available, but you must tell us which angle you need. You can get a convenient, palm - sized sill angle finder at most stores where tools are sold. Side View If you would like a screen with your Tilt Pac, two screen measurements are needed. Important: Make these measurements separately, after you are certain all other measurements are correct! First, measure the distance across your exterior' casing, from inside edge to inside edge. This is your total screen opening width. Now measure from the lower edge of the top casing down to where the screen will rest on the sill. This is your total screen opening height. TILT PACO OPTIONS. Standards: • Insulatingglass • Bronze sash lock installed • Bare wood • Beige jamb hardware • 14 degree bevel on bottom rail • Clad Tilt Pac and Clad Magnum Tilt Pac exteriors are extruded aluminum. Options: • Sash lift in statuary bronze, white or brass • Historical package' • White or brass sash lock • Combination storm and screen2 • Rectangular grilles • Screen, aluminum surround in white, bronze, brown or gray • Custom bevels' • White jamb hardware Glazing Options: • Single glazing' with or without removable energy panel • Authentic divided lites, single glazing with or without removable energy panel' • Authentic divided lites, insulating glass6 • Northern or Southern low E glass with or without argon gas' • Gray tint or bronze tint glass • Tempered glass • Simulated divided liter with %" (22) or 1'/s"i2q) munts Finish Options: • Interior prime and/or exterior prime • Aluminum clad exterior in: white, bahama brown', medium bronze, pebble gray or evergreen ' Wood Magnum Tilt Pac only 2 Wood and Clad Tilt Pac and Wood Magnum lilt Pac only 3 Wood Tilt Pac and Wood Magnum Tilt Pac only All standard one lite Northern and Southern low E glass units automatically include argon gas ' Clad Tilt Pac only - B Wood and Clad Magnum Tilt Pac and Wood Tilt Pac only 2 Lt. Glass 2 Lt. Glass Sash Opening Size Size Size Size 16" x 12" 1-8 x 2.6 30" x 12' 2-10 x 2-6 16" x 14" 1-8 x 2-10 30' x 14' 2-10 x 2-10 16" x 16' 1-8 x 3-2 30" x 16" 2-10 x 3-2 16" x 18" 1-8 x 3-6 30"x 18" 2-10 x 3-6 16'x 20' 1-8 x 3-10 30" x 20" 2-10 x 3-10 16" x 22" 1-8 x 4.2 30'x 22" 2-10 x 4-2 16" x 24" 1-8 x 4-6 30" x 24' 2-10 x 4-6 16" x 26' 1-8 x 4-10 30" x 26" 2-10 x 4-10 " 16" x 28' 1-8 x 5-2 30" x 28' 2-10 x 5-2 16" x 30' 1-8 x 5-6 30" x 30' 2-10 x 5-6 16" x 32' 1-8 x 5-10 30" x 32" 2-10 x 5-10 16" x 34' 1-8 x 6.2 30'x 34" 2-10 x 6-2 w 16" x 36" 1-8 x 6-6 30" x 36" 2-10 x 6-6 20" x 12' 2-0 x 2-6 32' x 12' 3-0 x 2-6 20" x 14' 2-0 x 2-10 32' x 14" 3-0 x 2-10 20'x 16' 2.0.x 3-2 32'x 16" 3-0 x 3-2 20'x 18" 2-0 x 3-6 32" x 18" 3-0 x 3-6 20" x 20', 2-0 x 3-10 32" x 20" 3-0 x 3.10 20" x 22" 2-0 x 4-2 32" x 22" 3-0 x 4.2 20" x 24' 2-0 x 4-6 32' x 24" 3-0 x 4.6 20" x 26' 2-0 x 4-10 32" x 26" 3-0 x 4-10 20" x 28" 2-0 x 5-2 32' x 28' 3-0 x 5-2 20" x 30" 2-0 x 5-6 32" x 30" 3-0 x 5-6 20' x 32" 2-0 x 5-10 32' x 32" 3-0 x 5-10 20" x 34" 2-0 x 6-2 32' x 34" 3-0 x 6-2 20" x 36" 2-0 x 6-6 32' x 36" 3-0 x 6-6 24" x 12' 2.4 x 2-6 36'x 12" 3-4 x 2-6 24' x 14' 2-4 x 2-10 36" x 14" 3-4 x 2-10 24'x 16" 2-4 x 3-2 36" x 16" 3-4 x 3-2 24" x 18" 2-4 x 3-6 36" x 18" 3-4 x 3-6 24" x 20" 2-4 x 3-10 36'x 20' 3-4 x 3-10 24' x 22' 2-4 x 4-2 36" x 22' 3-4 x 4.2 24' x 24' 2-4 x 4-6 36" x 24" 3-4 x 4-6 24" x 26" 2-4 x 4-10 36" x 26" 3-4 x 4-10 24" x 28" 2-4 x 5-2 36" x 28" 3-4 x 5-2 24" x 30" 2-4 x 5-6 36' x 30' 3-4 x 5-6 24" x 32" 2-4 x 5-10 36' x 32' 3-4 x 5-10 24" x 34' 2-4 x 6-2 36" x 34" 3-4 x 6-2 24' x 36' 2-4 x 6-6 36" x 36" 3-4 x 6-6 26" x 12" 2-6 x 2-6 40" x 12" 3.8 x 2-6 26" x 14' 2-6 x 2-10 40" x 14' 3-8 x 2-10 26' x 16" 2-6 x 3-2 40" x 16" _-3-8 x 3-2 26' x 18' . 2-6 x 3-6 40" x 18" 3-8 x 3-6 26" x 20" 2-6 x 3-10 40" x 20"3-8 x 3-10 26' x 22" 2-6 x 4-2 40'x 22" 3-8 x 4-2 26" x 24" 2-6 x 4-6 40" x 24" 3-8 x 4-6 26" x 26" 2-6 x 4-10 40" x 26" 3-8 x 4-10 26" x 28" 2-6 x 5-2 40" x 28" 3.8 x 5-2 26" x 30" 2-6 x 5-6 40' x 30' 3-8 x 5.6 26' x 32' 2-6 x 5-10 40" x 32' 3-8 x 5-10 • 26." x 34" 2-6 x 6-2 40" x 34' 3-8 x 6-2 26" x 36" 2-6 x 6-6 40" x 36" 3-8 x 6-6 28" x 12" 2-8 x 2.6 28" x 14" 2-8 x 2-10 n 28" x 16" 2-8 x 3-2 28" x 18" 2-8 x 3-6 28" x 20" 2-8 x 3-10 28" x 22" 2-8 x 4-2 28' x 24" 2-8 x 4.6 28' x 26' 2-8 x 4-10 Custom SIZ@S 28" x 28' 28" x 30' 2-8 x 5-2 2-8 x 5-6 are available. 28" x 32" 2-8 x 5-10 28" x 34" 2-8 x 6-2 28" x 36" 2-8 x 6-6 TILT PACS � M" SIDE CASING 81aE CASitJG .................... /ViG"w ir r . r TOP CASING , , , Stu. i 4 . .. . . . . . J 5 THE HISTORIC PRESERVATION COMMISSION OF SOUTH BEND & ST. JOSEPPH COUNTY MONTHLY MEETING MINUTES September 15, 2002 7h Floor, Commissioner's Conference Room County -City Building, South Bend, IN MEMBERS PRESENT: JoAnn Sporleder, Diane Wrobel-illes, Martha Choitz, Gerald Ujdak, John Oxian, President, Mary Jane Chase, Treasurer, Catherine Hostetler, Vice President, Virginia O'Hair STAFF PRESENT: Karen Hammond -Nash, Director Thomas Bodnar, City Attorney Wayne Doolittle, Inspector ALSO PRESENT: Gary Derbin, Wally Berndt, Sarah Eldred, Jason Jones, Terri & Steve Zornig, Don Sporleder I. CALL TO ORDER JOHN OXIAN: Called the meeting to order at 7:30_ II. PUBLIC HEARING A. CERTIFICATES OF APPROPRIATENESS 1. 2002-0806; 119 LaPorte Avenue; build utility shed. This was a Certificate of Appropriateness presented at the last commission meeting and tabled by those of the commission so that the owner Mr. Jeffrey Berndt could be present. CATHERINE HOSTETLER: Makes a motion to deny application 2002-0806, because Mr. Jeffrey Berndt did not show up for the meeting. The C. of A. could not be tabled again because sixty days have passed. The commission had no choice but to deny his C. of A. He will therefore have to submit another application; since he did not attend the meeting to sign for an extension. MARTHA CHOITZ: Seconds the motion and the motion carries unanimously. sign. 2. 2002-0815; 217 West Washington Street Tower Building; rooftop F (Report from Standards & Maintenance Committee) MARTHA CHOiTZ: The Standards and Maintenance Committee met at the Tower Bank Building last week with all the people involved We gave them the mission of going back to find a more suitable sign that is smaller than the one they had presented to us at our last meeting. So they are currently working on this and they will be getting back to us. I think they liked our suggestions and they were willing to cooperate with us as far as I know. They plan to do some drawings that they will present to the staff, and we will then have another meeting. Tonight I would like to make a motion that 2002-0815 be denied for the rooftop sign on the Tower Bank Building. MARY JANE CHASE: I will second the motion and the motion carries unanimously. The reasons for denial of the rooftop sign on top of the Tower Bank Building are as follows: 1. The size of the sign was inappropriate for the size of the building. 2. Historical Gothic Tower Buildings never have signs on top of them. 3. Our research shows that there was no precedent for signs like these on that? building or any other building in South Bend or on any of the main gothic structures in Chicago. 3. 2002-0821; 730 East Bronson Street; siding replacement. KAREN HAMMOND NASH: The house is in such dreadful shape that some attention to its porch and siding is imperative. If the house is in fact poorly ventilated causing the wood siding to deteriorate, then vinyl siding will not solve the underlying problem. However, vinyl siding would provide relief to the neighborhood from a dilapidated house and at least a temporary comfort to the inhabitants. Therefore, staff recommends that the Commission deviate from the Edgewater Place District Guidelines because of the exceptionally bad condition of the siding and approve the application with the following conditions: A. The new siding shall be the same size and style as the original wood. B. That all existing architectural detail around windows, porches, doors, and eaves be retained, except that any rotted wood trim be replaced with identical trim. C. That the gutters be re -installed on the eaves when the siding is complete. D. That the ceiling shall be replaced with wood identical to the original. E. The original or existing porch pillars be retained & appropriate stair rails replaced. F. Repair sorts using adequate ventilation, either with screens or a continuous ventilation strip across the back. 0 WALTER BERNDT: I am from 730 East Bronson. For about thirty -some years we have had asbestos siding hanging on the outside of the other siding. I think this problem has led to some of the deterioration of the other siding. The roof has already been completely replaced. The rotted boards have all been replaced and the roof has been ventilated We have addressed the problem with vapor from the inside of the house. We have used the correct types of paint on the walls that is adequate for vapor barrier according to the information i got from Historic Preservation last year. As far as I know it wasn't leaking into the walls when the asbestos siding was on the house. I know the other siding was in bad shape when we took the asbestos siding off. During 1964-1967, we replaced some of the rotted boards. We have even painted the siding many, many times since then, and the paint still continues to peel. We have even gone to the most popular paints places and we have taken them siding which appears to be rotted We are not sure if the siding is permeated with some other kind of elements that we have not been able to get off of the siding. In 1966 or 1967 we took the asbestos siding off the house. The types of insulation that we currently have in the house are a spun glass and a pellet type. The last amount of insulation we have put in the house was done in early May. When we put a new roof on the house the soffits and the overhangs were rotted out. We have not corrected this problem yet; but, we are planning to correct it when we do the rest of the work that needs to be done that Karen mentioned earlier. Discussion was then held among commission members as to whether Mr. Berndt's rotted wood siding was due to an interior or exterior problem. Members also discussed what possible solutions may be available to Mr. Berndt to correct this problem. JOANN SPORLEDER: I make a motion that application 2002-0821 be approved under the following guidelines: 1. Remove the deteriorated siding and replace with new vinyl siding which shall be the same size and style as the original wood, 2. All the original existing architectural details around the windows, doors, porches, eaves shall be retained; except that any rotted wood shall be replaced with identical trim 3. Gutters shall be re -installed on the eaves when the siding is complete. 4. The ceiling of the porch shall be replaced with vinyl wood siding identical to the original; and that it be properly ventilated. 5. The original or existing porch pillars shall be retained and appropriate stair rails replaced. 6. Fix the soffits with appropriate ventilation so that they don't rot out again CATHERINE HOSTETLER: Seconds the motion and the motion carries unanimously. 4. 2002-0822; 1120 East Wayne Street South; window replacement. KAREN HAMMOND-NASH: The owners seek to remove their original wood window sashes and replace them with aluminum -clad window sashes. On the outside, the K windows look so good that at first we were puzzled as to the motive for replacing them. However, there is significant deterioration on the inside of the window sashes. The character defining elements on this home are the excellent and graceful proportions of its front face, its high-quality building materials, and its excellentt authentic and stylistically correct details, such as the spherical pendants under the second floor overhang, its flat arch lintels, entablature and fluted pilasters around the front door, and relevant to this application the carved or shaped blocks on each upper window sash. The proposed replacement windows are insulated glass that have what Pella calls the "true divided lights" meaning that there are mentons on the outside, on the inside, and between the double panes, so that dimension and shadow line are maintained. Staff recommends approving this application for window sash replacement as described in the application, with the following additional conditions: A. That the replacement sashes or windows retain the same appearance as the original windows, so that the excellent proportions of the house are preserved In other words, we don't want a double window jamb that results in a noticeably smaller window glass. B. That if possible, the decorative little blocks on the upper sashes be removed from the old sashes and re -used on the new sashes. GARY DER.BIN: I am from Riverside construction, representing Mr. Miller and Pella Windows. I don't have any objections to the conditions that have been given by the commission. Pella can make the windows right to the exact size of the existing windows. The squares in the windows can be costume built, and can be made any size that is identical to what is already there. We can even try and reuse those blocks, even if it is for looks. The blocks are only used on the double -hung windows. There are some windows in the new addition that are going to be replaced. There are also a couple of windows in front of the house that are going to be replaced because they are completely rotted out. but, there are also some in the front of the house that are going to be replaced too. The windows upstairs in front of the house are completely destroyed We will be replacing six or seven of the windows in the new addition of the house. There was no beveled glass in any of the windows. There is no reason we would have to remove the shutters from around any of the windows. For the windows that do not currently have shutters, I am not sure if the owner intends to install another pair of shutters. MARY JANE CHASE: I make a motion on application 2002-0822 that we accept the recommendation of the staff in Item A. That the replacement sashes or windows retain the same appearance as the original windows. JOANN SPORLEDER: Seconds the motion and the motion carries unanimously. 5. 2002-0904; 805 Arch Avenue; sash or window replacement. KAREN HAMMOND NASH: The owners here seek to remove their original wood window sashes and replace them with aluminum -clad window sashes. On the outside, the windows look so good that at first we were puzzled as to the motive for replacing them. However, the owner believes there would be energy and comfort efficiencies; because, the original wooden stone windows have been replaced with aluminum storm windows. The character defining elements on this home are the regularity and balance of its proportions, and its large, sunny windows. The proposed replacement windows are Marvin windows. Some of the windows in the documentation accompanying the application have the same six -over -ane light divisions that the existing windows have. Staff recommends approving this application for window sash replacement as described in the application, with the following additional conditions: A. That the replacement sashes or windows retain the same exterior dimensions and appearance as the original windows, so the excellent proportions of the house are preserved In other words, we don't want a double window jamb that results in a noticeably smaller window glass. B. That the sashes have the same six -over -one light divisions as the existing windows. C. Removal of existing aluminum storm windows. WAYNE DOOLITTLE: The windows have had a great deal of neglect over the years. The windows need to be re -glazed., scraped, and re -painted. I was not able to see any rotting holes around the windows. I stopped by and knocked on the door and nobody came to the door. I then took some pictures of the outside of the house. When I was there I did notice that the windows have had bad maintenance; but, other than that I can not attest to how they operate. The windows have not had maintenance done to them for quite some time. KAREN HAMMOND NASH: Let me note in this context that the owners here are new owners of the property located at 805 Arch Avenue. If there was any neglect it would have been done under a previous owner. STEVE ZORNIG: My wife Terri and I are the current property owners of 805 Arch Avenue. First of all, the windows we are proposing to use are wooden sash, not aluminum -clad sash. These wooden sash windows can be made much like the Pella windows approved previously. The wooden sash windows are made to order and they are made to size. As far as the operation of the existing windows, they are very loose in the frames. We have had some leaking and some water damage and the old windows are very drafty. The windows are so drafty that we have put on clear bizqueen window insulators inside the house during the winter to help eliminate heat from escaping from the windows. In the future we would like to be able to stop doing this with our windows. As the owner of the house I do see a need to replace the window sashes. I can't say that there is any rot on the window sashes yet; but, we do get some water that leaks in through the windows. Since the windows have been neglected, I think this is an efficient way to address the problem and improve the house. This house is unique in the fact that there was aluminum siding put on it prior to the Historical Society being informed. We were informed that the people who lived there at the time ran out of money half way through the house. Now the house currently has half wooden siding and half aluminum siding on the house. Since this has happened, we still have some of the old storm windows on the wood sided part of the house that are actually on the exterior of the house itself. On the aluminum sided part of the house, they're interval to the sash. The windows on both sides of the house are in relatively bad shape. Even the windows on the inside of the wooden storm windows are in relatively bad shape. The old storm windows we currently have on the house are the windows that you can hook on and then take off and store during the summer. Unfortunately, I can only find half of the old storm windows for the house. Mr. Zomig and commission members discussed the type, style, and design of the new replacement windows that he would like to have installed in the house. There was also some discussion about the two different types of siding on the house and what possible future plans he has for correcting this problem. JOANN SPORLEDER: I make a motion that application 2002-0904 be approved with the following additional criteria as recommended by staff. I would also like to include Item C, which is the removal of the existing aluminum storm windows. JOHN OXIAN: I am against approving application 2002-0904 because even though the wooden storm windows can be attached and detached from the windows of the house, they should still be considered a part of the house. I also think that the motion being made should include all ofthe storm windows being removed from the house; not just the aluminum storm windows. MARY JANE CHASE: Seconds the motion and the motion carries with one commission member, (John Oxian), voting again the motion. B. LOCAL LANDMARKS 1. 602 Euclid Avenue, South Bend; Former Nelson & Son Dairy, operating 19061918. (This is only a first reading). 2. 1021 Portage Avenue, South Bend, Axtell House, built 1905. JOHN OXIAN: This property is coming in both as a local landmark and as a listing on the National Register. For National Register we have to have first and second readings; but, with an owner's consent we can do both of them tonight or we can do them both at the same time when we also do national; the first one tonight and the second one next month. Sarah Eldred and Jason Jones, (wife and husband): We are the owners of the property located at 1021 Portage Avenue. We just bought this house in July, and we have done a lot of work on the house so far. Our main plan for the house is to rehab and to stabilize the property and the houses that are located on the property including the carriage house in the back of the property. There is little to note on the change in the historical aspect of the house, except for the attic which we intend to make inhabitable. The property at one time did have multiple apartments in it in the 1970's, and then someone else bought it from the original owner and turned in back into a duplex instead. Later on the Near Northwest Neighborhood Association bought it; they re -gutted the walls and changed it back into a single family home again. The house sits on the corner between Golden and Portage. The roof we had replaced had five layers of shingles on it. Since there were five layers of shingles on the roof it caused a lot of the joists to rot out and there was quite a bit of water damage done to the property as well. When we had our roof put on we did not have an ice sheet put on close to the eaves; but, the roofer is not completely done with the roof yet either. The roofer still needs to put on the gutters and one part of the roof has not been put on yet because we need to do some structural damage repair first. We do still have the staircase in the house, but just before we bought the house vandals came in and kicked about twenty of the round spindles out of the staircase. CATHERINE HOSTETLER: I make the motion to declare this property a local landmark. VIRGINIA O'HAIR: Seconds the motion and the motion carries unanimously. JOHN OXIAN: Your property has been approved by the commission for local landmark status, and next month we will go for the National Register. KAREN HAMMOND NASH: The reason for this is that we have to have newspaper publication of notice before we can vote on National Landmark Status. C. HEARING OF VISTORS (No visitors came forward to speak during the meeting). IIL REGULAR BUSINESS A. APPROVAL OF THE MINUTES GERALD UJDAK: I make a motion to approve the minutes for the month of August. MARTHA CHOITZ: Seconds the motion and the motion carries unanimously. B. TREASURER'S REPORT MARY JANE CHASE: What we plan to do with the treasurer's report from now on is to go over the income and the expenses monthly and give a profit and loss statement. C. LEGAL REPORT 1. Leeper Park Settlement status r% THOMAS BODNAR: I got a letter from the P.A.N.A.'s attorney today, indicating that there would not be a settlement. That we could arrange something in terms of possibly flipping the HPC on to the plaintiffs side. We discussed earlier that if they weren't going to agree that I would file a motion for a judgment. A judgment could be filed based on the fact that they did not file a claim. Their objection against us is a failure to list the item on the agenda. Secondly, there is a statute of limitations, which has a time limit of thirty days. The statute is based upon when the person did know or should have known. The statute then goes on to say when the minutes were adopted. In this case, October's minutes were not adopted until the following January, 2001; which was ten months before the suit was even filed. So, I think a strong statue of limitations defense should not take that much work; and I can have it on file by our next regular meeting. This is what we had agreed upon in our executive meeting. A discussion was then held among commission members. The following important points of this discussion are as follows: 1. The legal letter that was received from P.A.N.A.'s attorney. 2. What current and future steps the commission plans to take on this legal matter. 3. That there should be an Executive Meeting between commission members so that this matter can be discussed in further detail. It was unanimously agreed upon by commission members to have an Executive Meeting to discuss this matter in further detail, and to answer any further questions that commission members may have on this matter. 2. Enforcement status of Franklin Street Apartments THOMAS BODNAR: I have not sent my letter to them yet; because, I am still trying to figure out what they have done down in Code Enforcement. Code Enforcement can't seem to find the file on these properties. This is a case where their concern isn't so much with the historical accuracy of the repairs as that there are no repairs at all being done, other thari perhaps to shore up the one porch by piling one brick on top of another. These repairs that are not being done are causing very serious health and safety hazards. Perhaps we can discuss this matter in connection with 117 West North Shore -Drive. This is a case where we are worried about the appropriateness of what they are going to do. In the case with 117 West North Shore Drive they had their hearing, and Code Enforcement fined them a thousand dollars. They now have until next Monday to appeal that fine. But, nobody wants the thousand dollars. Code Enforcement doesn't want the thousand dollars. We wouldn't, if we had the power, want the thousand dollars either. What everybody does want is to have the house repaired We, the commission, are not in a position to take over the apartment buildings on Franklin Street. Code Enforcement may be well on their way to being in a position to do something about this matter. The address numbers for the Franklin Street apartment buildings are 125 &127. 0 A discussion was then held among commission members on what else could still be done to make sure that the Franklin Street apartment buildings are repaired. What other possible steps can be taken to make sure that Code Enforcement follows through on their legal action to ensure that these repairs are completed. Following this discussion, John Oxian, President, then instructed Karen Hammond -Nash, Director, to send a letter to Code Enforcement stating that we want them to take immediate legal action against the owners of these properties. Martha, Virginia, Joann, Karen, and Wayne attended the Code Enforcement hearing. They were also very concerned about the work that is being done on the property by the owners. After the hearing they did not even bother to talk to her in the hallway; because, she was too upset. During the hearing, she insisted that work is actually being done on the property. Wayne Doolittle did go out to the property on Wednesday and Thursday. He also went to the property the day after the Code Enforcement hearing to see if anyone was actually working on the property. He did notice that there were two workers there that were slowly burning paint off the house with heat guns. The workers were doing a good job; but, it was taking them forever to remove the paint from the house. Wayne then informed the workers that he would be back the next day at 2:30 and that he would bring them an advertisement for an electrical paint remover that simultaneously cleans the bottom of the fibers and to all the sides. When Wayne arrived the next day at 2:30 the workers were not there, so he left the advertisement with the lady of the house. He also told the lady of the house that even though the workers were doing a wonderful job of removing the paint from the house; that they still needed to be there more often that what they are now so that they can get the job done sooner. Wayne did manage to talk to a man who told him that they expected to have the job done within six weeks. Wayne also noticed when he was there that most of the wood trim for the house that was still there was lying in the driveway in front of the garage, and that most of the wood trim was in bad shape. KAREN HAMMOND-NASH: The Code Enforcement Order dated November 29, 2001 was for surface conditions such as peeling, flaking, and chipping paint from wood surfaces on siding, roof overhangs, windows, doors, casings, and trim. The wood siding also has areas of deterioration and damage. The roof has rotted wood at the sections of the group overhangs. The rear porch has rotted flooring. The garage has peeling, flaking, and chipping paint from wood surfaces such as siding, roof overhangs, windows, doors, casing, trim. There were additional problems reported about the property in February, 2002 also. The Code Enforcement Hearing Officer left the collection of the fine up to the discretion of the City Attorney Ann -Carol Nash. Mrs. Nash then informed the owner that if within six weeks the house was completely painted that she would then waive the thousand dollar fine. If the house was not completely painted within six weeks, Mrs. Nash would then seek an additional second thousand dollar fine. 0 D. STAFF REPORTS 1. Director's Reports: C. of A. Approvals; Correspondence KAREN HAMMOND-NASH: I mailed to commission members some correspondence regarding the street lights on Riverside Drive. There were questions raised because several of the new street lights had been taken down and dismantled in preparation for repainting, because of concern about whether the commission would approve of the color of the streetlights. Having checked with commission members, I found out that neither the staff nor any commission member knew of any demand to have these street lights taken down and sandblasted, because of complaints about their color. I then wrote the City Engineer's Office informing them that the commission had no complaint, and that we had not been apprised of any complaints. I also informed them that there were no complaints from the Neighborhood Association about the color of the street lights. I then went on to further inform them that the commission was very surprised that the City Engineer's Office would actually take down and dismantle these street lights and have them repainted based on the fact that they thought the commission would not approve of the current color of the street lights without first asking our office if this was in fact true. The street lights that were taken down and dismantled to be painted were new street lights just installed The contract requirement and the C. of A. specify that the luminaries be cast -metal -factory -finish in a dark green. Based on this fact, the City Engineer's Office had anticipated that the dark green would be a pine forest green and not the bottle green that was used on the street lights instead JOHN OXIAN: I not only received a call on this, but, when Daren asked me about this I specifically told her to write a letter because I don't want the commission or any of us to be accused of something as petty as taking down street tights because of their color. I noticed that they even took down the earlier street lights around the North Pumping Station by the Water Works and had them repainted I feel that we have more important things to do than worry about which green looks better on the street lights. I have set up a meeting with Gary Gilot, Public Works Director, for October 2, 2002, to discuss the following matters: 1. The painting of these new street lights on Riverside Drive. 2. How the people of the Riverbend area would like to have installed the same type of street lights that are presently in Leeper Park East. 3. The article in the South Bend Tribune which someone wrote about the two street lights on Robin Hood Lane. In reference to the newspaper about Robin Hood Lane, I would like to say that I did receive a phone call from I & M about these two street lights. The person in this article is accusing the commission of not working with I & M to repair these two street lights, even after the person claims the commission supposedly made these two street lights into landmarks. The person claimed that one of the street lights has not been working at all /U and that the other street light supposedly keeps going on and off all the time. This person would like to see the two street lights either repaired or replaced- Even eplacedEven though the commission is not involved with this, I & M has stated that they would be willing to donate the street lights to us or to the city. Chuck Leone did get up in front of the Common Council and oppose me on declaring two street lights on Sunnymede landmarks. The reason he opposed me was because supposedly they were going to work with the commission on what should be done with the older street lights. Well, I don't want to start getting telephone calls from people or have the commission blamed for something in the newspaper that has nothing to do with us. I intend to cover all of these matters with Mr. Gary Geiot in our meeting on October 2"d. KAREN HAMMOND NASH: We received another letter. This is a copy of a letter to Mr. Jim Aranowski from the Riverbend Historic Neighborhood Association seeking Mr. Aranowski's support and by application also seeking our support for replacing historic concrete and cast metal street lights along Riverbend. There is a policy dated August 19, 1990, signed by then Mayor Joe Kernan, a representative at that time of the electric company. Mr. Oxian, on behalf of the commission, set up a number of standards for the type of street lights that are to be used in the historic neighborhoods in the city of South Bend. Mr. Oxian said, among other things, that no new Town. and Country light poles are to be installed effective August 1990. This letter from Michelle and Julia indicates that seven years ago, which is a lot more recent than 1990, their concrete street light poles were taken down and replaced with the Town and Country street light poles. What I have heard from other reporters is that the 1990 policy is no longer in effect because the electric company has been taken over and the new electric company is considering itself bound by legal contracts and by ordinances, but not by gentlemen agreement policies. On the other hand, Carl Littrel seems to be under the impression that this policy is still binding, and that the electric company is still following the policy. Chuck Leone was also under this same impression when he opposed the landmarking of two street lights on Sunnymede at the Common Council meeting. It is the commission's understanding that both Chuck Leone and Carl Littrel believe that this is still a binding agreement among all the parties that are involved I need to know what the commission would like me to do about this matter with the street lights in the Riverbend area. Does the commission take a pro or con position in this matter? Is the commission instructing me to support the neighborhood with their request regarding the street lights in the Riverbend area? JOANN SPORLEDER: I will make a motion that we as the commission support the neighborhood's request to use the same street lights in the historical neighborhood as in Leeper Park. VIRGINIA O'HAIR: Seconds the motion and the motion carries unanimously. 11 JOHN OXIAN: I would also like to make a motion that the older concrete street light poles that come out of historic districts that are not declared landmarks that they be preserved anyway. MARY JANE CHASE: Seconds the motion and the motion carries unanimously. 2. Inspector's Report, Clay Township WAYNE DOOLITTLE: These are all the pictures that we have from three -and a half townships. Right now I think there are about seventeen that do not match from one book to the other that I am still trying to find so that I can finish Clay Township. All of the township pictures are in here with their addresses. For anybody who wants to look at them they will be in the commission office. I got a call from Don Sappington, who lives in the first house, which is a Federal style house, at the top of the hill on Riverside. He stated in his conversation to me that he would like to have another temporary light of some kind installed in front of the Cutter House. He told me that there hasn't been a light in front of the Cutter House for at least two years. He also told me that he would like to have something at least temporary there until something else better comes along. He stated that it has been a long time and that he would like to see a light installed at the top of the hill. We know that he would like to have one of the original street lights installed there, but we have not been able to successfully do that yet. JOHN OXIAN: That was the original cast iron street light pole on Riverside Drive. Riverside Drive originally had cast iron street light poles not concrete street light poles. That was the only cast iron street light pole left. That was the original cast iron street light pole from Cutter. The city was trying to find a way to copy that cast iron street light pole and have another one installed in its place. This is another important matter that I intend to discuss at the October 2"d meeting. IV. OLD BUSINESS A. Oliver School Certificates of Appropriateness; progress of work. KAREN HAMMOND-NASH: I have no progress to report at this time. I did pass out to commission members copies of the permits that have been issued after our August 7a', and our September 3`' meetings. V. ADJOURNMENT GERALD UJDAK: Makes a motion to adjourn the meeting at 9:35. MARY JANE CHASE: Seconds the motion and the meeting is adjourned. /d September 8, 2002 Mr. Jim Aranowski, Councilman Common Council Office County - City Building 227 West Jefferson South Bend, Indiana 46601 RE: Proposal for new streetlights for East Riverside Drive Dear Mr. Aranowski: The River Bend Historical Neighborhood would like to propose the installation of the same light poles and luminaires that have been used at the new parking facility at the island, to be continued down Riverside Drive east. We were adamant about keeping our original concrete poles and cast metal luminaires that were unnecessarily taken down approximately 7 years ago. This was a tremendous disservice to our Historical Neighborhood, as the poles ended up refurbished and in other historical neighborhoods. The installation of the "Town and Country" fiberglass poles infuriated the neighbors as our requests to reinstall the original poles fell on deaf ears. The installation of new poles that match the ones in the park with a soft light would be a win-win situation. It would enhance the park and give it continuity as well as giving back to our River Bend Historical Neighborhood what was taken away. Karen Hammond -Nash is working closely with us to try and make this happen. Any assistance you can give her in this matter would be greatly appreciated. Thank you for your consideration with this proposal. Sincerely, ichele Gelfman River Bend Neighborhood Liaison^ Julia sLauriers River Bend Neighborhood Liaison cc: Karen R. Hammond -Nash, Director, Historic Preservation Commission Gary Gilot, Director of Public Works RyE ��L74 4� Tl� e7?; - - - - - - - - - - - ......... 0110 F,� vi L (Y tgt o MIN Of Donald F. Eldred 1735 Portage Avenue South Bend IN 46616 H-574-233-1609 Cell 612-867-2654 September 12, 2002 To local, state and federal historic officers: Attached are the applications for certification for historic status, and our rehab plans for the Axtell House in South Bend Indiana. We are simultaneously submitting these requests to the local, state, and federal agencies. We purchased the house on July 19, 2002, from the Near Northwest Neighborhood Association, which is working to rehabilitate the neighborhood. The deed for the house is in the name of Sarah Eldred and Jason Jones. Marilou and myself are Sarah's parents, and our names are also on the deed for we have provided the funding for this adventure. The house is across the street from the Federal Chapin Historic District — so in the applications we have not listed it as being in a historic district, even though it virtually is part of the district. The State of Indiana evaluated the house for historical importance in 1987, and ranked it 12 on a scale of 1 to 13. (See Federal — Part 1). The overall description of the property, with photos, historical documents etc are in Federal — Part 1. On the property is the main house, which is for residential use (Sarah and Jason will move in next week), and a carriage house, which is rental property (now currently rented). The rehab plans, with costs and dates are in Federal Part 2. In general the rehab work is to stabilize the property and its houses, including the replacement of most of the mechanical systems. There is little or no change to the historical features of the house, except for plans to make the attic habitable. We have. Worked with Karen Hammond -Nash, Director Historic Preservation Commission of South Bend and St. Joseph County to prepare these documents, and to be our guide in the rehab process. If you have question, please call or write me, or e-mail me at eldred@stonebridgegroup.com ;Npcerely,. Donald Eldred CC: Sarah E. Eldred Jason E. Jones Marilou D. Eldred