HomeMy WebLinkAboutJanuary 1992AGENDA OF THE REGULAR MONTHLY MEETING
OF THE
HISTORIC PRESERVATION COMMISSION
Regular Monthly Meeting County Council Caucus Room, #411
7:30 p.m. County/City'Building
January 20, 1992
I.- Call to Order
II. Roll Call
III. Public Hearing
A. Certificate of Appropriateness
1. 1154 Lincolnway East -- LHD
2. 1071 Riverside Drive -- LHD
IV. Regular Business
A. Approval of Minutes --November 18, 1991,
December 16, 1991
B. Treasurer's Report --December, 1991
C. Correspondence
D. Committee- Reports
1. C of A (Staff Approvals)
a. 1154'Lincolnway East -- LHD
1a. C of A (Enforcement)
a. 805 Arch Avenue --.LHD
b. 1501 E.'Wayne Street -- LHD
c. 1716 E. Wayne Street -- LHD
1b. C of A (Update)
a. 814 Arch Avenue -- LHD
2. Budget & Finance
a. 1991 Annual Treasurer's Report
b. Projected 1992 Staff Budget
3. Legal
4. Historic Districts
5. Historic Landmarks
6. Public Relations & Cannunity Education
7. Personnel
8. Staff Reports
a. 1991 Annual Report
b. 1992 Project Goals
V. Old Business
VI. New Business
A. Appointment of Officers
VII. Hearing of Visitors
VIII. Announcements & Miscellaneous Matters
IX. Adjournment
COMMISSION MEETING VISITOR ROLL
a, i jv-i
If fl
Visitors: Please fill in your name and organization (if
applicable) so your presence can be officially recorded for the
Commission's records. Thank you.
J er
21
2 6/ + '�'� 22
3� v 23
4 �J .1 P .� .l°� 24
5 / 25
6 26
7 27
8 28
9 29
10 30
11 31
12 32
13 33
14 34
15
16
1*1
41
17 37
18 38
19 39
20 40
December 30, 1991
STAFF REPORT
Joseph J. BeI1i_n_a III_____.___
----------ii54- Lincolnway East
South Bend, IN 46601
PROPOSAL
Renovation of rear entry vestibule:
1) Replace wood panel door with single pane glazing (1/2 length)
with metal door of same proportion, simulated paneling detail,
applied muntin grill.
2) Replace fixed sash on west side with 1/1 wood double hung
sash; replace two adjacent fixed sashes on south side with
same double hung sash; remove fixed sash on east side;'
replacement windows to have new wood sills, jambs, and
surrounds.
3) Re -side entire vestibule with in-kind clapboard siding.
STANDARDS
II. Existing Structures
A) Building Materials
1) Required
Existing exterior building materials shall be
retained. The existing or original architectural
detail around windows, porches, doors and eaves
should be retained or replaced by replicas of the
same design and materials when deteriorated beyond
repair.
2) Recommended
Whenever possible, the original building materials
should be restored.
C) Windows and Doors
1) Required
Existing or original windows and doors, including
sash, lintels, sills, shutters, decorative glass,
pediments, hoods and hardware shall be retained or
when deteriorated beyond repair, replaced with
duplicates of the existing or original.
3) Prohibited
Existing or original windows, doors and hardware
shall not be discarded when they can be restored and
reused in place. New windows or door openings that
would alter the scale and proportion of the building
may not be introduced.
RECOMMENDATIONS
The owner began this project without a Certificate of
Appropriateness; it is subsequently not in accordance with
Section 21-117.2 of the Municipal Code of the City of South Bend.
There is.no documentation other than the owner's testimony as to
the nature of the vestibule prior to alteration, i.e. window and
door openings. - --
According to the owner, the previously existing window openings
were not part of the original vestibule: they were make -shift
fixed sashes, fashioned out -of parts from 1/1 double hung wood
sashes. The owner also claims that the previously existing door
to the vestibule was not original, that it fit the opening only
roughly and appeared to be more of an interior door. The owner
also claims that the work to the soffit was begun prior to his
purchase of the home and left incomplete.
The project,.as it exists, is in keeping/not in keeping with the
Lincolnway East Local Historic District standards as follows:
1) Part One is in keeping with standards II.C.(1)(3). The
replacement door is similar in form to that previously existing.
Although somewhat out of. character with -other exterior doors in
the building, it is not contradictory to the Free Classic Queen
10%►Anne style of the house. This type of door is not without
precedent in the district: identical doors were approved in the
summer of 1991 for installation at the rear of 1346 LWE.
-------------- ----
2 - Part --Two is -not -in - keeping -with- standards II.C. (1 )(3) . The
commission should consider, however, that the previously existing
sashes were not historic and were unsympathetic to the style and
form of the entry vestibule and more generally, the building.
Also, the change occurs at the rear of the building and cannot be
seen from the street.
The staff asserts that the replacement sash on the west side is
in accord with the building's historic and aesthetic character,
and therefore should be retained. The window replacement on the
south side, however, should be moved, perhaps to the east 'side;
it currently appears as a misplaced element in the south face of
the entry vestibule..
3) Part three is not in keeping with standards II.A.(1)(2).
The owner claims that the siding is applied directly to the stud
wall. He would like to remove the siding and install building
materials to make the vestibule more weather resistant, and apply
new clapboard to replicate the original.
The original siding, however, appears to be in good condition
The staff recommends that the owner be permitted to install
weather resistant materials and return the original siding in
place.
January 14, 1992
STAFF REPORT
Ann Manion / Stephen Murphy
1071 Riverside Drive
South Bend, IN 46617
PROPOSAL
1. Replace approx. 7 ft. tall wire mesh fence surrounding rear of
yard with custom made wood stockade fence.
2. Install aluminum gutters and downspouts.
3. Replace large wood multi -pane casement pair at rear one story
extension with elliptical window (with wood surrounds and muntin
bars); infill remaining space with wood clapboard to match rest
of clapboard on house.
STANDARDS
I. Environment
A) Building Site and LandscaninR
1) Required
Plants, trees, fencing ... which reflect the
property's history and development shall be
retained.
3) Prohibited
No changes may be made to the appearance of the site
by removing old plants, trees, fencing ... before
( evaluating their importance to the property's
history and development.
II. Existing Structures
B) Roofs and Roofing
2) Recommended
Gutters and downspouts are often a necessary adjunct
in order to prevent deterioration of the structure;
when necessary gutters and downspouts shall be
maintained or replaced with a style comparable and
suitable to the architectural period.
C) Windows and Doors
1) Required
Original windows and doors, 'including sash, lintels,
sills, shutters, decorative glass, pediments, hoods,
and hardware shall be retained or when deteriorated
beyond repair, replaced with units and trim
resembling the original.
2) Recommended
If new sash and doors are used, the existing or
original materials, design, and hardware should be
used.
3) Prohibited
Original windows, doors, and hardware shall not be
discarded when they can be restored and.reused in
place. New windows or door openings that would
alter the scale and proportion of the building may
not be introduced.
RECOMMENDATIONS
The HPC staff was informed by Riverside Drive Historic District
liaison committee members of work being done at 1071 Riverside
Drive without posted permits. A letter was sent to the property
co-owners on 12/30/91 stating C. of A. application requirements
as cited by local ordinance. The HPC staff received
correspondence from the owners at the beginning of the new year,
stating that they were not aware of HPC requirements prior to
receipt of the 12/30/91 correspondence, that a fence surrounding
the backyard was nearly complete, and that "no further exterior
work of any consequence" was being planned. The HPC staff sent a
letter on 1/8/92 reiterating C. of A. application procedures and
requested a completed application and specific documentation of
the newly installed fence. Shortly afterward the HPC staff was
informed by liaison committee members that gutters and downspouts
were being installed. The HPC staff contacted one of the
co-owners on 1/13/92 and restated C. of A. requirements,
including the need to document existing conditions before a
project commences.; The co-owner said she would add the gutters
to the application and submit photographs of both projects. She
mentioned that there were plans to alter a window opening in a
"non -historic porch" which she didn't think would need a C. of A.
The HPC staff stressed that such a project would indeed need a C.
of A. On 1/14/92, the other co-owner submitted the C. of A.
application in person along with the photographs required and an
additional interior photograph of the window opening in the
process of being altered. The HPC staff made a site visit the
same day, documented the changes with photographs and consulted
with the commission's legal council, who advised that contact
with the owners be made, with the request that they stop work on
theprojectand file a C. of A. for the altered window. On
1/15/92, the HPC staff informed the Building Department of the
work being done at the property. Upon discovering that no permit
had been filed with their office, the Building Department issued
a stop work order that same day. The HPC staff had contact with
one of the co-owners the same day and requested that all work
requiring an approved C. of A. be halted, and that the
commission's review of the project may result in a request that
the altered window be returned to its original state.
Project Analysis:
1) Fence: B & C Home Improvement Co. was instructed to replace a
deteriorated metal fence surrounding the backyard with a
stockade -type wood fence, for which no manufacturer's brochure is
available since it was custom built. This portion of the project
is not in keeping with standard I.A(3) as sited above; the HPC
staff was unable to document or determine the historic value of
the previously existing fence.
The commission should consider that the replacement fence is not
without precedent in the neighborhood: an adjacent property, 1069
Riverside Drive, has a similar fence.
2) Gutters and Downsoouts: no gutter system existed previous to
this project. The gutters and downspouts that have been added
appear to be in keeping with standard II.B(2) as sited above.
3) Altered. Window ODeninp,: the rear one story extension was
originally an open porch, according to a member of B and C Home
Improvement Co. The left side was enclosed early on in the
home's history with matching clapboard and a 1/1 double hung
sash; the right side was partially enclosed with matching
clapboard some time during the 1930's and functioned as an entry
vestibule: there was a door at the -right side of the extension,
later removed and covered over with clapboard, and two large,
square casement windows which have been removed as part of the
project currently being reviewed.
The window alteration is not in keeping with any of the standards_
sited above under'Windows and Doors. Furthermore, it introduces
a stylistic element not typical of an early twentieth century
Prairie style residence; the elliptical replacement window is
characteristic of Queen Anne style homes and other ornate styles
of the 1890's.
The large casement windows although arguably unsightly in their
own right, are much more in accord with the style and aesthetic
character of the home than the replacement window, which adds an
eccentric and out of balance element to the exterior composition
of the home. .
The purpose of the alteration in question is part of a scheme to
convert the former entry vestibule into a bathroom. The
previously existing casements are naturally not suited for such a
function; a smaller window opening is more appropriate. Being at
the rear of the property, the alteration would not be seen from
the street.
The staff suggests that the owner be required to remove the
window and propose a more geometric replacement window that would
be in keeping with thenature of the Prairie style.
ANN MANION
20725 Riverlan Road
South Bend, Indiana 46637
-(219) 277-1496
January 20, 1992
Mr. Fred Holycross
Historic'Preservation Commission
County City Building
South Bend, Indiana 46601
Dear Fred,
I am informed by Mr. James Pastor of your office that the
Historic Preservation'Commission has taken exception to a
new window that we have installed at 1071 Riverside Drive.
Mr. Pastor indicated that he was not at liberty to
disclose the details of his report or its recommendation
to the Commission as a whole.
My partner and I purchased this house in October 1991. At
the time we purchased the house, it was in extreme
disrepair. we have been informed by knowledgeable sources
that in another couple of years, this house would be
beyond repair. In addition, the reaction to our
improvements from those living in the neighborhood has
been overwhelmingly positive.
Our intentions were to rehabilitate the house and offer it
for sale as early as possible in 1992. Although we were
not familiar with the requirements of the Historic
Preservation Commission, we had hoped to preserve as much
as possible the original look and feel of the house.
As our work progressed, it became apparent that one window
at the rear of the house (and not visible from the
street), was beyond repair. Because -this window was part
of a later addition (not part of the original structure)
and because the window was not visible from the street, we
opted for a decorative window to enhance the view from the
inside of the house.
When Mr. Pastor called to check in with us, I told him
about the -.window. Although we have unwittingly breached
the procedures of the Historic Preservation Commission by
not asking for permission in advancei, we have operated in
good faith and with.the best of intentions.
Because of the extreme deterioration of the house, we have
already spent over $12,000 on repairs. Unfortunately, we
will have to spend many thousand more. We simply cannot
afford to take this window out and replace it.
I would ask the Historic Preservation Commission to
consider the above factors and the technical points made
on the following pages in reaching their decision tonight.
Sincerely,
�jw n WOXN---
Ann Manion
TECHNICAL REVIEW OF PRESERVATION GUIDELINES
WHAT DO THE PRESERVATION GUIDELINES SAY ABOUT WINDOWS?
The Guidelines state "Original windows and doors,
including sash, lintels, sills, shutters, decorative
glass, pediments, hoods, and hardware shall be retained or
when deteriorated beyond repair, replaced with units and
trim resembling the original."
ARE THE WINDOWS IN QUESTION ORIGINAL?
Clearly not. The windows were put on at the time of a
subsequent enclosure of the original back porch.
There are three factors to consider in determining that
the windows in question are not original. Refer to
attached diagram. First, the basement of the house runs
under all other rooms. A crawl space runs under the front
porch and the former back porch in question.
Secondly, the exterior wall shows a break where the
original structure meets the later wall.
Thirdly, interior walls 1 and 2 (as shown in the attached
diagram) and the ceiling of the former porch are paneled
in the original tongue and groove style. The added walls
3 -and 4 (including the window) were not. In fact, the
walls had no finishing of any kind and the exterior wood
was visible from the inside.
The window in wall 4 was badly deteriorated and probably
never of a very good quality.
We will have pictures available at the Commission meeting
to support the above analysis.
WHAT THEN DO THE PRESERVATION GUIDELINES SAY ABOUT
ADDITIONS?
The Guidelines state "Porches and additions reflecting
later architectural styles, and which are important to the
building's historical integrity shall be retained."
DOES THIS ADDITION REFLECT A LATER ARCHITECTURAL STYLE AND
IS IT IMPORTANT?
Clearly not.
CONCLUSION
The guidelines are silent on the treatment of the window
in question. They are not original. They do not reflect
a later architectural style of importance.
We do not appear to be.in technical violation of
Commission guidelines.
l'1\'O�s Ok VI'r`0)Q kovl
1
��roo,b Ivo
x n M ftl
l��co�b
Iva W,oa �
watt, �ev�lyo QaQ4°
TREASURER'S REPORT: DECEMBER 1981
As can be seen from the computer ledger of our expenses and
receipts under the County General Fund, the staff incurred no
e
unusual expenses in December, 1991, Expenditures claimed total d
$4,712.64. Our unexpended balance was $14,044.26; with ��ob���d
fundo--$10,503.38. r�
MV0576-77 SAINT JOSEPH CVU8TY
FUND: 001 COUNTY GENERA ' . LAST UPDATE: 1�/$1 FUN DATE: 01108/92
^ i[DC[R OFT: 'ALC DETAIL.
� ..
PROCESS TR8N TRAN `
FUN0.ACCT.OBJ.LOC NA/YR DATE TYPE AMOUNT OTHER DATA �
001. 39211.000.034HISTORIC- PRESERVATION COMMISSIONERS
12/91U9/27/90
ENCUMB
61.00
PO
**042474
VENDOR
#007449
SPRING HOUSE INN
12/91
03/04/91
[HCUMB
0,00
FO
#E46312
VENDOR
0008790
HISTORIC LANDMARKS
�
12/81
0/0/91
[NCUMB
8.00
90
#051071
Y[N80R
0007716
C.B.I./GRAPHICS
12/91
1O/U�91
ENCkHD
3.52
PO
#031310
VENDOR
#000 917
INSTY-F8lNT OF SOUTH
' 12/91
\1/14/V1
ENCUMB
645.8J
P0
0051668
VENDOR
10 ' &
PASTOR JAMES
12/91
11/18/91
ENCUMB
15.00
P0
#051713
VENDOR
#001246
NATIONAL TRUST FOR
12/91
11/18191
[NCVM8
50.00
P0
1051715
VENDOR
#001246
NATIONAL TRUST FOR
12/91
12/03/91
[MCUX8
645.83
P0
U051924
VENO08,#804741
PASTOR JAMES
12/91
12/03/01
ENCVK8
28.00
P0
1051947
YEN808
0007716,C,R.I./V8APHlCS
'
12/91
12/03/91
[NCUNB
203,47
P0
#051049
VENDOR
1000553
DILLS CAMERA SHOP ~
12/91
W09/91
APPR0P
94.00
12/$1
12/09/91
ENCU113
645.83
PO
8051995
VENDOR
#0047WFAST0R'JAMES
12/91
12/09/91
[H0MB
629.20
P8
#051996
VENDOR
0007044
BOOKER SUZANNE
.
12/91
12/09/91
ENCUMB
529.20
FO
#051997
VENDOR
0000907
H00GES, SU8HNIT6
\ `' 1.2/91
12/OY/Y1_[NCVMB
24.00
PO
#052015
VENDOR
#001528
SOUTH BEND DRAFTING
12/V1
1� i/91[MCUUB
45.40
P0
8052268-YHmD8.'j0005
`
LL'CAMERA
12
CLAIM
66.00
PO
#051400
VCNDUR.
``--SHO'F�-
---
-' `DAwK
`
� ~
^v,m1
\�/U3/�[
CLAIM
375�8O
P00D5\��Y[NDR`
' '~
'**
o^voxE'x' SUZANNE''08@K-
-O13.6J7"'
7
12191
��/O3/9/
CLAIM
l6.O8
�V
#051451
OOS ��1
YEND0R�
1007716
C.D.I./GRAPHICS
BANK.
402'CHECK
0136385
' 12/91
12/03/9
CLAIM
21.00
P0
#051587
VENDOR
0007716
C.B.I./GRAPHICS
DANK
102
CHECK
0136383
�_-.12/,91-12/03/91,
CLAlN
168.82
P8
I0D0DOO'YERDOR"1000507
COUNTY COMMISSIONERS
BANK
802
CHECK
1136402
12/91
12/03/91
CLAIM
264.60
P0
400667
VENDOR
i000407
xODGES. SVSHHI?A
BANK
102
CHECK
03648
` .12/91
12/03/91
CLAIM
20.84
P0
141051719
VENDOR
1007608
H0LYCR0SS FRED
8kNX
102
CHECK
0136444
13/91
12/03/91
CLAIM
645.83
PV
1000000
Y[00R
#004741
PASTOR JAMES
BANK
#02
CHECK
#136494
12/91
�12/17/91
CLAIM
53.28
P0
0000000
Y[�0R'0OO704�
BVOKEK SUZANNE
BANK
#O2CHECK
#�|�
--12191-12/17/91�
`
�ihlM
1,077.30
R0
��51;26
VENDOH�OO?O6'
�
DO0K5R SUZANNE ` ''
BANK
002�
��CK'��37V2�
` �
'
12/91
'12117/91'CLAIM
61.30
PV
1000000
V[NDOR.4000507
COUNTY COMMISSIONERS.
BANK
102
CHECK
#!37�43-
12/V1
11/17/91
CLAIM
101.44
P0
0051590
|
800553
DILLS CAMERA SHOP
BANK
`
CHECK
#|37i
12/912
�Y1
12/D1Y1
CLAIM
32.02
PO
#051868
VENDOR
#O00553
DILLS CAMERA SHOP
BANK
;02
CHECK
013703 i
12/91
12/17/91
CLAIM
10.00
PO
#051720
VENDOR
8007546
DIVISION OF HISTORIC
BANK
102
CHECK
8137051 |
12/91
12/17/91
CLAIM
1.102.50
PV
#051925
yEH80R
1000907
H8DGES, SUSHMl7A
BANK
002
CHECK
#1V07212/$1
12/17/91
CLAIM
34.50
P0
#O51D�
VENDOR
#000259
INDIANA CONTINUING LEGAL BANK
0O2
CHECK
#137880
�.12/91
12/17/91
CLAIM
645.83
P0
#DO80U0
VENDOR
1004741
PASTOR JAMES
' B6WK'1U2
CHECK
#107117
`12/91
12/17/91
CLAIM
16.38
PO
W000800
VENDOR
#001538
SOUTH BEND TRIBUNE
DANX`'
,2
CHECK
`�-
#137144�
00L3V21L00O.n34'HISTUkIC
PRESERVATION
COMMISSIONERS
--
`
ESTIMATED 8[Y�
'RECEIPTS
UNRECV
REV 0& APPROPRIATION
ENCUMBRANCE
EXPENDITURE UNEXPENDED BAL
UNENCUM8 BAL |
CUR 0.00
0.00
94.00
4.712.64
'
TOT 8.00
0,00
0.00
69,3U.32
3`434.28
55.240.06
14.044.26
10'609.98 �
CORRESPONDENCE
--December issue of Progressive Profile, the economic development newsletter.
--December 16, December 23, December 30, January 6, and January 13 lists of plans
from MACIAF.
--December issue of Solutions, a newsletter from Computerland.
--Fall issue of Common Bond, a preservation newsletter from Middle Tennessee
State University.
--a thank -you note from Debbie Molden for information about the Omniplex building.
--rescheduling notice for an ICLEF conference (now Dec. 12-13)
--a Christmas card from NIHS.
--October issue of Fair Housing Opens Doors, a campaign update from the National
Fair Housing Alliance.
--December issue of Team Tourism from the Indiana Dept. of Commerce.
--Announcement of a February 7 forum on insurance forms and policies.
--a letter from the University of Pennsylvania career planning office, offering
a list of student resumes.
--a notice from Architectural Digest offering gifts and samples.
--a call for papers and an announcement of a Miami conference on' -"Multiculturalism
and Historic Preservation."
--December issue of the Main Street Missive from the Indiana Department of Commerce.
--the Winter 1992 Renovator's Catalogue.
--announcement of a January 29-31 workshop on marketing, graphic and business
design for small businesses, sponsored,by the Indiana Dept. of Commerce.
Jan 15, 1992
HISTORIC PRESERVATION COMMISSION -- STAFF APPROVALS
ST,# STREET NAME CATEGORIES PROJECT DESCRIPTION
------------------------------------------------------------------------
1154 Lincolnway East roofing; roof trim;
chimneys; mortar joints
11
Replace flashing @ top eave,
around widow's walk w/ an
EPDM rubber roof system to
overlap roof lip, supporting
joists, and narrow strip of
roofing material below.
Replace deteriorated wood
crown molding underneath roof
lip w/ similarly milled wood
crown molding to be applied
over EPDM material. Rebuild 4'
brick chimney in-kind as per
LWE LHD standards.
TREASURER'S REPORT: 1991
Grant expenditures for 1991 totaled $32,734.48; grant
reimbursements totaled $28,807.21 --monies deposited into the
County General Fund ($576.00 from COA fees, book sales and plaque
sales was also deposited into the County General Fund). The
differential represents the time lag between the County fiscal
year --January to December --and the State Grant fiscal year --July
to June.
1991 GRANT EXPENDITURES
Survey Records Management Grant: $9,852.95
(1990-91; grant expired, $5,627.05
unspent)
Survey Records Management Grant: $9,231.53
($17,368.47 remaining of $26,600.00,
since July 1, 1991)
Community Development Block Grant: $13,650.00
(grant expired, $0 unspent)
TOTAL 1991 EXPENDITURES: $32,734.48
1991 DEPOSITS TO COUNTY GENERAL FUND
GRANT REIMBURSEMENTS
07-16-91 -$ 7912.00
10-29-91 - 5414.22
11-13-91 - 11890.00
12-11-91 - 1283.33
12-21-91 - 2107.66
$28807.21
COA FEES AND MISC.
02-25-91 - $ 35.00
03-06-91
- 6.00
05-14-91
- 345.00
05-14-91
- 18.00
05-14-91
- 25.00
06-25-91
- 6.00
08-21-91
- 12.00
08-30-91
- 35.00
12-09-91
- 94.00
$576.00
TOTAL 1991 DEPOSITS: $29,382.21
1991 COUNTY EXPENDITURES
As mentioned above, the Historic Preservation Fund
(#001.39211.000.034) at the end of fiscal year 1991 finished with
an unencumbered balance of $10,609.98. These monies, as always,
revert to the County General Fund. The HPC budget under the
County Commissioners in 1992 will total $39,828.00.
Total 1991 expenditures for office supplies, paid by the County,
totaled $4,285.64. These expenditures were other than those
reimbursed by grant monies.
Postage:
$490.50
Travel:
328.78
Mileage:
318.02
Books:
295.04
Conferences:
382.80
Printing:
797.72
Landmarks:
0
Photography:
0
Equipment:
790.50
Legal Services:
0
Technical Services:
0
Legal Notices:
16.38
Office Supplies:
528.90
Dues:
185.00
Subscriptions:
152.00
Total:$4285.64
PROJECTED HPC STAFF BUDGET: 1992
Available grant monies not yet expended from the 1991-1992 Survey
Records Management Grant (the city survey) total $17,368.47. This
money will be expended by June 31, 1992. Application has been
made for a grant to cover the remainder of the year --$12,435.00
(half of grant year 1992 -1993) --which will be used for expenses
related to assembling the South Bend Sites and Structures Summary
Report.
Community Development Block Grant monies will amount to
$13,650.00 for 1-1-92 to 12-31-92 if we receive the same amount
as 1991. The CDBG monies can only be used in 1992 for salaries
directly related to preservation activities in the city of South
Bend.
The county has set aside $39,383.21 as the HPC budget for 1992.
As usual, we will have $4000.00 of this for office expenses; the
remainder will cover other expenses until we are reimbursed by
our various grants.
Grant Income
1991-92 Survey Records Management (State) Grant:
1992-93 Summary Report (State) Grant, 1992 Share:
1992 Community Development Block Grant:
Grant Exoenses
Personnel:
Mileage:
Film/Printing:
Database:
Supplies:
PERSONNEL
$17,368.00
12,435.00
13.650.00
$43,453.47
Administrative Assistant/Survey Manager - $16,249.96
$7749.96 (present salary thru 6-31)
8500.00 (salary thru 12-31)
$16,249.96
Architectural Surveyor - $ 5,733.00
Contract hourly wages from 1-1-92 thru
6-31-92. No Surveyor will be needed
after the end of June.
$34,995.96
1,200.00
3,500.00
500.00
3.257.51
$43,453.47
Research Assistant - $13.013.00
$5733.00 (present hourly wages thru 6-31)
7280.00 (hourly wages thru 12-31-92)
$13013.00
PERSONNEL TOTAL: $34,995.96
As noted above, $13,650.00 of CDBG grant money will go toward
staff salaries. The remaining $21,345.96 will come from the
1991-92 state grant and the projected 1992-93 state grant.
Additional expenses directly related the Survey Records
Management and the Summary Report projects will also be paid by
these grant monies.
COUNTY EXPENSES
These are projected non -grant expenses to come from the $4000.00
allotted to the HPC from the county general fund.
Postage:
$500.00
Travel:
350.00
Mileage:
300.00
Books:
150.00
Conferences:
500.00
Photocopy:
600.00
Landmarks:
50.00
Photography:
300.00
Equipment:
100.00
Legal Services:
50.00
Technical Services: 50.00
Legal Notices:
100.00
Office Supplies:
600.00
Dues:
200.00
Subscriptions:
150.00
TOTAL:
$4000.00
ANNUAL REPORT: 1991
HISTORIC PRESERVATION COMMISSION OF
SOUTH BEND AND ST. JOSEPH COUNTY
HISTORIC PRESERVATION COMMISSION
John Oxian, President
Jed Eide, Vice -President
Jean Dennen, Secretary
Odell Newburn, Treasurer
Martha Choitz
Herb Herendeen
Janeanne Petrass
Joann Sporleder
William Welsheimer. Sr.
Fred M. Holycross
Director
January 21, 1992
i&*114i15 � w W _\M
During 1991 the Historic Preservation Commission of South Bend
and St. Joseph County maintained the commitment to promote
preservation and protect local resources by carrying out the
administration of local districts and landmarks, working toward
the designation of other significant examples of local heritage
and carrying out the responsibilities of a Certified Local
Government. The HPC staff also continued its interaction with
local government and other preservation organizations in the
ongoing effort to be an advocate and agency for local
preservation.
The Historic Preservation Commission provided information to
numerous citizens and groups in 1991. The Commission gave advice
and information concerning: investment tax credits, local
history, the National Register of Historic Places, the Secretary
of the Interior's Standards, restoration and conservation
techniques, funding, facade easements, local landmark and
historic district designation and procedures and the broad range
of preservation issues and concerns found in the community.
As a means of public information and education the HPC hosted the
semi-annual Mayor's Conference on Preservation in May. This
conference, on "growth management," provided a forum for local
residents to hear and interact with preservation experts from
around the state and representatives from the National Trust in
Washington, D.C.. In addition, a brochure, South Bend's Historic
Districts, was produced and distributed throughout the county and
proved to be a popular promotional device for the HPC.
COMMISSION POLICY DECISIONS
In 1991 the HPC adopted a number of new policies and procedures.
Each was designed to further standardize Commission actions and
decisions. The four primary new policies enacted were: 1. new
Certificate of Appropriateness procedures to ensure that the
approval of changes in historic districts and to historic
landmarks is a standard and unambiguous process; 2. Minimum
Maintenance Standards designed to protect district structures and
landmarks from decay by neglect; 3. Certificate of
Appropriateness Architectural Drawing Requirements to standardize
materials presented to the Commission as examples/evidence in the
C.of A. process; and 4. Research Procedures adopted to
standardize research methods for sites and structures to ensure
that each is subjected to similar analysis.
LOCAL LANDMARKS
The following sites and structures were designated as local
historic landmarks in 1991:
609 Portaqe Avenue - Formerly the South Bend Conservatory of
Music; a significant Queen Anne structure built by local firm
Whitcomb and Keller and designed by local architect W.W.
Schneider.
Cleveland Road -Witter Cemetery - A nineteenth-century burial
ground; the resting place for significant pioneer families, Civil
and Spanish-American War veterans and the local German pioneer
community.
Ireland Road -Rohrer Cemetery - A pioneer nineteenth-century
cemetery; burial place for several significant Centre Township
pioneers and families; a fine collection of burial markers and
various decorative elements.
The period has also saw a great deal of work put into several
potential local landmarks: the Southern Hotel at 802 S. Main, one
of the last remaining hotels of its type in the city, built to
serve businessmen during South Bend's heyday of industrial
activity; and 58666 Ireland Trail, a W.P.A.-built caretakers
cottage servicing a water reservoir, unusual as an example of
residential architecture built by local Depression -era government
workers. The HPC was unsuccessful in its attempt to landmark the
W.P.A. structure due to local government resistance, however, the
issue of designating and saving the Southern Hotel from
demolition is still being addressed.
HISTORIC DISTRICTS
The staff worked on two proposed Local Historic Districts in
1991 --potentially to be named Monroe Park LHD and Camp Rose LHD.
The Monroe Park proposal, first introduced at the May HPC
meeting, will have a second reading and public hearing at the
February, 1992 HPC meeting. The staff and the Near Northwest
Neighborhood Association began the various tasks of assembling
data and analyzing the proposed Camp Rose district in December;
historic research and further analysis continue into 1992.
On October 8, Third District Councilman William Soderberg
introduced a bill seeking to amend the boundaries of the
Lincolnway East Historic District. The HPC held a public hearing
on the matter on December 16; as a result of the hearing the
Commission sent an unfavorable recommendation to the South Bend
Common Council. The issue continues in 1992.
The Commission
Appropriateness
properties:
Local Landmarks
618 Leland Ave.
713 Cushing St.
607 Leland Ave.
1028 Wayne St.
reviewed sixty-one (61) Certificate of
applications consisting of the following
(11)
5450 Miami Road
713 Cushing St.
710 Park Ave.
61191 U.S. 31 S.
723 Park Ave.
121 Studebaker
1028 Wayne St.
Edgewater Place LHD (12)
709-11 LWE 810 Arch Ave.
536 River Ave. 740 Bronson St.
805 Arch Ave (2) 805 Bronson St.,
517 Edgewater 814 Arch. Ave. (2)
Lincolnwav East LHD (11)
1224 LWE 1334 LWE 1150 LWE
1154 LWE (7) 1346 LWE
West North Shore Dr. LHD (1)
325 North Shore Dr.
Riverside Drive LHD (5)
808 Golden Ave. 1045 Riverside
1059 Riverside 944 Riverside
East Wayne LHD (21)
1426 Wayne (2) 1209 Wayne(2)
1217 Wayne 1118 Wayne
1521 Wayne 1210 Wayne
302 Sunnyside 1308 Wayne
1501 Wayne 1712 Wayne
519 Edgewater
621 LWE
902 Riverside
1341
Wayne (2)
1121
Wayne
1205
Wayne
1209
Wayne
1716
Wayne
1231
Wayne
1421
Wayne
1121
Jefferson
GRANT PROJECT:
SURVEY RECORDS MANAGEMENT/SOUTH BEND SITES AND STRUCTURES SURVEY
The HPC received two grants from the U.S. Department of the
Interior and one from the Community Block Grant fund. The CDBG
monies were primarily used to pay salaries of staff involved in
various South Bend preservation projects. The other two grants
financed the ongoing update of the Sites and Structures survey.
Update of the Indiana Historic Sites and Structures Inventory in
1991 continued as field work (Phase V) encompassing ten quadrants
due west of the downtown (quadrants 42, 43, 44, 52, 53, 54, 62,
63, 64, and 65). This work began on the first working day of the
new year and continued to the June 30th deadline. Updated maps
and lists of the survey area and survey cards of significant
properties in the area were turned over to the state office at
that time, complete with updated research on significant
properties, a final report describing developmental trends and
other general historic information. The staff also provided
twenty slides of the most significant structures within the city
limits of South Bend to the state office. Research on properties
rated "contributing" continued through December of 1991. 690
sites were identified during Phase V.
Phase VI, the final phase of the city resurvey, began during July
of 1991 with a preliminary windshield survey of quadrants 1-38
and 73-97, which yielded 632 structures. Unlike previous phases,
all sites and structures eligible for inclusion on the Indiana
Historic Sites and Structures Inventory were identified
concretely and assigned a rating during the windshield survey.
Survey forms were then processed for each site using a computer
database.
The actual data gathering for each site began in September of
1991; research of significant properties began in December of
1991. (note: the findings of the windshield survey, 632 sites,
has since decreased somewhat as nearly a dozen buildings have
been vinyl sided in the interim).
The project continues into 1992 with a ending date of June 31.
ENVIRONMENTAL/SECTION 106 REVIEWS
In accordance with federal requirements as a Certified Local
Government, the HPC staff reviewed the agendas of the Area Plan
Commission and the Department of Code Enforcement in order to
identify locally designated or National Register properties that
would be impacted by the agencies' actions.
The staff also reviewed fifty-eight (58) Section 106 and 312
applications during this period. The HPC has maintained its progr
agreement with the SHPO and National Advisory Council to ensure
protection of cultural properties which are listed on or qualify
for the National Register.
NATIONAL REGISTER NOMINATIONS
Lori Dixon worked on an application for an extension to the West
Washington National Register District; the application is still
in process. Due to staff changes, the nomination has temporarily
been put aside. it is the intention of the present Director to
finish this application in the first half of 1992.
The staff assisted local resident, Kevin Smith, with his
reapplication for Union Station in South Bend. The staff also
assisted historian, Glory June Grieff, presently preparing a
National Register application for the central business district
of New Carlisle, Indiana. The HPC received no other National
Register applications during 1991.
1992 HPC STAFF PROJECT GOALS
The primary project goal for the first half of 1992 is to bring
the South Bend Sites and Structures Survey to a successful
conclusion. With the conclusion of the survey --and the successful
receipt of federal grant monies for 1992 -1993 --we will spend the
second half of 1992 on the initial phase of compiling the South
Bend Sites and Structures Summary Report.
Other project goals include:
1. HPC REGULATION MANUAL - Compiling an updated compilation of
HPC rules, regulations, guidelines, procedures and bylaws, a long
overdue project suggested to the staff by our legal counsel. This
project will also include updating informational handouts
provided to homeowners and others.
2. HPC DATA BASE - Continuing the update of HPC computer data
base to make its utilization more efficient. The Survey Records
Management project has provided the initial impetus for
organizing records in this way, however, the staff will be
spending additional time in the coming year further organizing
the data base to allow efficient access to survey records,
district and landmark data and COA histories.
3. ARCHIVAL REORGANIZATION - Negatives and photographs, both from
the survey and other sources, are in dire need of archival
protection. Under the direction of the County Archivist, Jackson
Armstrong -Ingram, the staff will reorganize all materials in an
up-to-date archival manner. This project can be accomplished with
minimal time and money and will insure that these valuable
materials are stored as safely as possible.
4. WEST WASHINGTON NATIONAL REGISTER DISTRICT EXTENSION
This nomination has been temporarily placed on hold due to the
lack of adequate staff time. In 1992 we will commence research
and reorganization of this nomination and plan to have the
application pass technical review and begin to be evaluated by
the state for substantive review by early summer.
5. PIONEER CEMETERY LANDMARKS -
The staff will continue research and analysis of the county's
historic pioneer cemeteries in order to continue proposing their
protection by landmark ordinance to the city and county. Those
targeted will consist of the most endangered by the encroachment
of development.
The staff will also be quite busy this year attending to historic
district issues and developments from 1991. The Lincolnway East
LHD controversy and the two potential new historic districts on
the northwest and south sides --in addition to ongoing HPC staff
responsibilities --insure that 1992 will be a busy, if not hectic,
year of preservation in South Bend and St. Joseph County.
HPC Staff
January 1, 1991- September 8, 1991:
Lori Dixon, Director
James Pastor, Survey Manager
Suzanne Booker, Architectural Surveyor
Elaine Lawson, Architectural Surveyor (through Jan. 1991)
Fred M. Holycross, Research Assistant (Dec. 1990 - Sept. 1991)
Randall Strickler, Research Assistant (July 1991 - Aug. 1991)
Tina Comer, Secretary (April 1991 - August 1991)
Gloria Gaytan, Secretary (February 1991 - March 1991)
September 9, 1991 - December 31, 1991:
Fred M. Holycross, Director
James Pastor, Administrative Assistant/Survey Manager
Suzanne Booker, Architectural Surveyor
Sushmita Hodges, Research Assistant (hired October 1991)
MEETINGS ATTENDED BY HPC MEMBERS AND STAFF
Midwest Regional Trust Conference - 4-91:
J.Pastor
Mayor's Conference on Historic Preservation - 5-1-91:
L.Dixon, J.Pastor, F.Holycross, J.Oxian, R.Strickler, S.Booker
HLFI Quarterly Regional Meeting - 2-20-91:
L.Dixon, J.Pastor
HLFI Quarterly Regional Meeting - 5-91:
J.Pastor, J.Oxian, M.Choitz, J.Petrass, J.Eide
DHPA National Register Workshop - 11-10-91:
F.Holycross, J.Pastor, S.Hodges
HLFI Quarterly Regional Meeting - 11-12-91:
F.Holycross, J.Pastor, J.Petrass
1992 HPC STAFF PROJECT GOALS
The primary project goal for the first half of 1992 is to bring
the South Bend Sites and Structures Survey to a successful
conclusion. We are well on our way to accomplishing this and
expect to have enough time to satisfy the State Preservation
Office's desire that we conclude this long-term project as soon
as possible. With the conclusion of the survey --and the
successful receipt of federal grant monies for 1992 -1993 --we will
spend the second half of 1992 on the initial phase of compiling
the South Bend Sites and Structures Summary Report. (Attached is
a description of that project)
Other project goals include:
1. HPC REGULATION MANUAL - Compiling an updated compilation of
HPC rules, regulations, guidelines, procedures and bylaws, a long
overdue project suggested to the staff by our legal counsel. This
project will also include updating informational handouts
provided to homeowners and others.
2. HPC DATA BASE - Continuing the update of HPC computer data
base to make its utilization more efficient. The Survey Records
Management project has provided the initial impetus for
organizing records in this way, however, the staff will be
spending additional time in the coming year further organizing
the data base to allow efficient access to survey records,
district and landmark data and COA histories.
3. ARCHIVAL REORGANIZATION - Negatives and photographs, both from
the survey and other sources, are in dire need of archival
protection. Under the direction of the County Archivist, Jackson
Armstrong -Ingram, the staff will reorganize all materials in an
up-to=date archival manner. This project can be accomplished with
minimal time and money and will insure that these valuable
materials are stored as safely as possible.
4. WEST WASHINGTON NATIONAL REGISTER DISTRICT EXTENSION -
This nomination has been temporarily placed on hold due to the
lack of adequate staff time. In 1992 we will commence research
and reorganization of this nomination and plan to have the
application pass technical review and begin to be evaluated by
the state for substantive review by early summer.
The staff will also be quite busy this year attending to historic
district issues and developments from 1991. The Lincolnway East
LHD controversy and the two potential new historic districts on
the northwest and south sides --in addition to ongoing HPC staff
responsibilities --insure that 1992 will be a busy, if not hectic,
year of preservation in South Bend and St. Joseph County.
From: Grant proposal submitted to DNR/Div. of Hist. Pres. etc., 1991.
PROJECT DESCRIPTION AND TIMETABLE
SOUTH BEND SUMMARY REPORT PROJECT
The South Bend Historic Sites and Structures Inventory was begun
in 1975 and completed in 1980. A second phase of update and
revision was begun in 1986 and will be completed in June, 1992.
At that time the Survey Records Management Project, Phase VI of
the resurvey, will have revised and updated the survey data,
transferring it onto appropriate state forms with accompanying
photographs, and combined both surveys into a computer data base.
To complete the project, the Historic Preservation Commission of
South Bend and St. Joseph County is requesting funding with which
to compile and publish a Summary Report documenting the results
of the surveys. The project will begin July 1, 1992 and conclude
June 30, 1993. The Commission will employ a Administrative
Assistant and a Research Assistant to work on the project in
conjunction with the Director of the Commission.
The scope of the project will consist of: organizing survey data,
photographs and maps; gathering historic photographs and other
visual materials; conducting necessary research; and writing,
editing and assembling the information into a coherent form. The
data will then be turned over to a graphics and printing firm
with the expertise and equipment to conduct the final printing of
the Summary Report. All Federal regulations regarding proper
bidding procedures will be strictly followed.
The project will be directed and monitored in all its phases by
the Director. The Administrative Assistant will be responsible
for managing the computer data base, ensuring relevant
information is organized for efficient utilization by the
printers, and assisting the Director in other tasks as needed.
The Research Assistant will conduct research as directed and
assist in data entry and other tasks as needed.
The primary goal of this project is to conclude the South Bend
Historic Sites and Structures Inventory project with a concise
published summary of survey and research results. The publication
will be of value to a wide range of audiences including
historical agencies and organizations, governmental agencies and
officials, and local citizens and citizen groups.
Correlative goals include encouraging historic preservation in
the local community; providing individuals and organizations
information with which to determine appropriate properties for
inclusion in the National Register of Historic Places; providing
a source of historical data for local planning and redevelopment
purposes; and providing a catalyst for stimulating a greater
awareness of preservation in the local community and beyond.
The Summary Report as published will Iconsist of: a table of
contents; an introduction; a section explaining methodology; a
section describing the city's history, architecture and important
architects; a guide to historic resources in the city; the
catalog of sites and structures; a conclusion; a bibliography;
and an index.
The introduction will give a brief description of the Indiana
Sites and Structures Inventory project as a whole and the survey
as undertaken in this city. It will also describe the various
uses for the document. The methodology section will provide a
brief account of the procedures used in the survey, explaining
such things as the rating system, mapping and numbering, and the
criteria used to evaluate historic properties.
In the following two sections, South Bend's architecture will be
placed in context with the dominant historical themes of the
city --principally industry, commerce and ethnic heritage.
Important architects and their designs will also be summarized. A
discussion of the city's historic resources will then provide a
description of the area's dominant architectural traditions and
styles --explaining both high -style and the vernacular forms found
here.
The catalog itself will be the bulk of the publication. It will
list the sites and structures and include a brief description of
each. Maps will be provided for geographical orientation. The
majority of the city will be organized by the mile square
quadrants used to orient the survey. Separate sections will also
be included for local historic and National Register districts
with brief histories of each. The entire volume will contain both
historic and survey photographs. Photographs will enhance the
graphic quality of the volume and provide examples of the local
historic built environment.
The conclusion will provide information concerning local
preservation and sources for further information. The
bibliography and index will make the volume easier to access and
provide both historical source information as well as sources for
further study.
The projected schedule for the project will be divided into three
periods:
1. Research, organizing survey data and maps, and data
entry.
2. Gathering, choosing and organizing survey and historic
photographs, concluding necessary research, writing and editing
the text of the volume, and finalizing data entry of information
to be utilized by the printers.
3. Final editing of the volume and working with the
graphics/printing firm in the design and lay -out of the volume.
Jan
10, 1992
CERTIFICATES
OF APPROPRIATENESS ISSUED
IN
1991
'.
EAST WAYNE LOCAL HISTORIC
DISTRICT
-----------------------------------------------------------------------------
DECISION
APPROVED
ST.#
STREET
NAME
CASE#
DECISION
DATE
BY
----
=4126
-----------------------
Wayne
Street
(E)
-----------
1990-1221
----------
Approved
------------
Jan
21,
1991
----------
commission
in
modified
form
1217
Wayne
Street
North
(E)
1991-0221
Approved
Feb
21,
1991
staff
1521
Wayne
Street
(E)
1991-0402
Approved
Apr
15,
1991
commission
1426
Wayne
Street
(E)
1991-0403-2
Approved
Apr
15,
1991
commission
1209
Wayne
Street
North
(E)
1991-0404-1
Approved
Apr
22,
1991
committee
w/
suggestion
1118
Wayne
Street
(E)
1991-0416
Approved
Apr
22,
1991
committee
1210
Wayne
Street
South
(E)
1991-0422-2
Approved
Apr
22,
1991
staff
302
Sunnyside
Avenue
(S)
1991-0505
Approved
Jun
5,
1991
staff
1341
Wayne
North
Street
(E)
1991-0626
Approved
Jul
9,
1991
staff
1313
Wayne
Street
South
(E)
1991-0715
Approved
Jul
15,
1991
commission
Wayne
Street
(E)
1991-0730-1
Approved
Aug
19,
1991
committee;
x-112
commission
1341
Wayne
Street
North
(E)
1991-0806
Approved
Aug
26,
1991
committee
in
-
modified
form
1205
Wayne
North
Street
(E)
1991-0808-2
Approved
Aug
8,
1991
staff
1716
Wayne
Street
(E)
1991-0814
Approved
Oct
21,
1991
commission
in
modified
form
1308
Wayne
Street
South
(E)
1991-0828-1
Approved
Aug
29,
1991
staff
1121
Wayne
Street
(E)
1991-0828-2
Approved
Aug
30,
1991
staff
1209
Wayne
Street
North
(E)
1991-0918
Approved
Sep
19,
1991
staff
with
suggestion
1231
Wayne
Steet
South
(E)
1991-1016
tabled
Oct
21,
1991
421
Wayne
Street
(E)
1991-1021
approved
Nov
18,
1991
commission
20
Jefferson
Boulevard (E)
1991-1112
Approved
Nov
14,
1991
staff
1501
Wayne
Street
(E)
1991-llxx
Jan 13,
1992 CERTIFICATES OF APPROPRIATENESS
ISSUED IN 1991
-----------------------------------------------------------------------------
LOCAL LANDMARKS,
CITY AND
COUNTY
DECISION
APPROVED
ST.#
-----
STREET NAME
----------------
CASE#
-----------
DECISION
----------
DATE
BY
8
Leland Avenue
1990-1018
Approved
------------
Apr
15,
1991
----------
commission
13
Cushing Street
1991-0307
Approved
Mar
7,
1991
staff
607
Leland Avenue
1991-0327
Approved
Mar
27,
1991
staff
1028
Wayne Street (E)
1991-0403-1
Approved
Apr
22,
1991
commission
in
modified
form
5450
Miami Road
1991-0424
Approved
Apr
30,
1991
staff
713
Cushing Street
1991-0508
Approved
May
8,
1991
staff
710
Park Avenue
1991-0607
Approved
Jun
7,
1991
staff
61191
U.S. 31 South
1991-0801
Approved
Aug
19,
1991
committee;
commissio
723
Park Avenue
1991-1017
Approved
Oct
17,
1991
staff
121
Studebaker (N)
1991-1107
Approved
Nov
7,
1991
staff
1028
Wayne Street (E)
1991-1121
Approved
Nov
21,
1991
staff
Jan 10,
1992 CERTIFICATES
OF APPROPRIATENESS ISSUED IN
1991
`
------------------------------------------------------------------------------
EDGEWATER
PLACE
HISTORIC DISTRICT
-----------------------------------------------------------------------------
DECISION
APPROVED
ST.#
STREET NAME
CASE#
-----------
DECISION
----------
------------
DATE
BY
----------
-------
=9-711
------------------
Lincolnway East
1991-0411
Approved
Apr
11,
1991
staff
805
Arch Avenue
1991-0510
Approved
staff
536
River Avenue
1991-0514
Approved
May
14,
1991
staff
805
Arch Avenue
1991-0523
Approved
May
23,
1991
staff
517
Edgewater Place
1991-0524
Approved
May
24,
1991
staff
810
Arch Avenue
1991-0815-1
Approved
Aug
15,
1991
staff
740
Bronson Street (E)
1991-0820-1
Approved
Aug
20,
1991
staff
805
Bronson Street (E)
1991-0820-2
Approved
Aug
20,
1991
staff
814
Arch Avenue
1991-1114-1
Partial
Nov
14,
1991
staff
Approval
814
Arch Avenue
1991-1119
denied
Dec
16,
1991
commission
519
Edgewater Drive
1991-1202-2
Approved
Dec
16,
1991
commission
621
Lincolnway East
1991-1204
approved
Dec
16,
1991
commission
Jan
10, 1992
CERTIFICATES OF APPROPRIATENESS
ISSUED
IN 1991
LINCOLNWAY EAST
LOCAL HISTORIC
DISTRICT
DECISION
APPROVED
ST.#
STREET NAME
CASE#
-----------
DECISION
----------
------------
DATE
BY
----------
----
24
---------------
Lincolnway
East
1991-0618
Approved
Jun
18,
1991
staff
1 54
Lincolnway
East
1991-0624
Approved
Jun
24,
1991
staff
1154
Lincolnway
East
1991-0701
Approved
Jul
1,
1991
staff
1334
Lincolnway
East
1991-0717
Approved
Jul
17,
1991
staff
1154
Lincolnway
East
1991-0807
Approved
Aug
7,
1991
staff
1346
Lincolnway
East
1991-0808-1
Approved
Aug
19,
1991
committee;
in
commission
modified
form
1150
Lincolnway
East
1991-0815-2
Approved
Aug
15,
1991
staff
1154
Lincolnway
East
1991-1114-2
Approved
Nov
14,
1991
staff
1154
Lincolnway
East
1991-1118
approved
Dec
16,
1991
commission
1154
Lincolnway
East
1991-1217
1154
Lincolnway
East
1991-1218
approved
Dec
18,
1991
staff
Jan 10, 1992 CERTIFICATES OF APPROPRIATENESS ISSUED IN 1991
WEST NORTH SHORE DRIVE LOCAL HISTORIC DISTRICT
DECISION APPROVED
ST.# STREET NAME CASE# DECISION DATE BY
--------------------------------------------------------------------
425 North Shore Drive (W) 1991-1202-1 approved Dec 16, 1991 commission
Jan
10, 1992
CERTIFICATES OF APPROPRIATENESS
ISSUED IN 1991
RIVERSIDE DRIVE
LOCAL HISTORIC
DISTRICT
-----------------------------------------------------------------------------
DECISION
APPROVED
ST.#
----
STREET
---------------
NAME
CASE#
-----------
DECISION
DATE
BY
=8
Golden Avenue
1991-0404-2
----------
Approved
------------
Apr
4, 1991
----------
staff
1059
Riverside
Drive
1991-0405
Approved
Apr
25, 1991
staff
1045
Riverside
Drive
1991-0422-1
Approved
Apr
22, 1991
committee
944
Riverside
Drive
1991-0718
Approved
Jul
18, 1991
staff
902
Riverside
Drive
1991-0730-2
Approved
Aug
1, 1991
staff