May 26, 2020
Mr. Donnie H. Ginn, P.E.
Black & Veatch Corporation
8415 Allison Pointe Blvd., Suite 410
Indianapolis, IN 46250
�_..j H H D v 'j)bv'corn Lj)
............................................ .......
RE: Amendment No. I to Owner -Engineer Agreement
Dear Mr. Ginn:
PHONE 574/ 235-9251
FAx 574/ 235-9171
The Board of Public Works, at its meeting held on May 26, 2020, approved the above
referenced amendment for additional design and construction services for the wastewater
treatment plant electrical improvements in the amount of $55,785, with a new total of
$658,704.
Enclosed please find a copy of the amendment for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
s/Linda M. Martin, Clerk
Enclosure
GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DoRAtj JORDAN V. GATHERS JOSEPH R. MOLNAR
INTER -OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
TO: Board of Public Works Members
FROM: Jacob M. Klosinski, P.E. Assistant City Engineer
SUBJECT: Agenda Request — Amendment No.1 to Prof. Services Agreement
117-132 WWTP Electrical Improvements
DATE: May 5, 2020
The Division of Engineering and Division of Utilities request the Board of Public Works
approval of Amendment No. 1 to a Professional Services Agreement with Black &
Veatch for additional engineering design and construction administration services for
Project No. 117-132 WWTP Electrical Improvements.
Additional services performed are described in Exhibit K, Amendment to Owner -
Engineer Agreement Amendment No. 1, attached.
The additional services result in an overall increase to the Design and Construction
Administration Services Contract.
Original Contract: $602,919.00
Amendment No. 1: $ 55,785.00
New Contract Total: $658,704.00
The funding source for this project is the Division of Utilities, Sewage Works Operations
Account (641-06-605-514-431002).
If there are any questions, please contact Jacob Klosinski (Ext. 9496) at the Division of
Engineering or Al Greek (Ext. 4210) at the Division of Utilities.
This is EXHIBIT K, consisting of 2 pages, referred to in
and part of the Agreement between Owner and Engineer
for Professional Services dated May 26, 2020
AMENDMENT TO OWNER -ENGINEER AGREEMENT
Amendment No.
1. Background Data:
a. Effective Date of Owner -Engineer Agreement:
b. Owner: Board of Public Works, City of South Bend, Indiana
C. Engineer: Black & Veatch Corporation
d. Project: Wastewater Treatment Plant Electrical Improvements Design and
Construction Phase Services
2. Description of Modifications:
a. The Scope of Services currently authorized to be performed by Engineer in
accordance with the Agreement and previous amendments, if any, is modified as
follows:
Task 104 — Design and Contract Document Preparation
Engineer shall prepare Contract Documents for the addition of drainage piping
and grading from the depression south of the Reuse Building to the manhole near
the previous Nitrification Towers.
Task 202 — Construction Administration
As is indicated in Paragraph 7.05 from the General Conditions for the
Construction Contract, Engineer shall be reimbursed for costs associated with
evaluating the Contractor's proposed substitution requests. Engineer reviewed the
below requests submitted by the Contractor:
1. Deviation 2 — Alternative Routing and Installation of Conduits for
SESWGR-1
2. Deviation 3 — Alternative Routing and Installation of Conduits for
NESWGR-5 & 6
3. Value Engineering Ideas for the Generator and Switchgear (nine in
total) submitted via email on April 29, 2019.
Additional responses to Requests for Information (RFIs) submitted by the Owner
or Contractor. The original scope included 30 RFIs. An additional 20 RFIs are
expected to be submitted by the Contractor resulting in a total number of 50 RFIs.
Page 1
(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1)
EJCDC E-500 Agreement Between Owner and Engineer for Professional Services.
Copyright C0 2008 National Society of Professional Engineers for EJCDC. All rights reserved.
Task 204 — Shop Drawing and Submittal Review
As is indicated in Paragraph 7.16 from the General Conditions for the
Construction Contract, Engineer shall be reimbursed for costs associated with
reviewing a fourth or subsequent submittal of a Shop Drawing, sample or oher
item requiring approval. The Engineer reviewed the following shop drawings
submitted by the Contractor:
1. 033053-OO1C and 00113— Cast -in -Place Concrete
2. 263213-OO1C —Engine Generators
3. 262423-002C and 002D — MCC Miscellaneous Buckets
b. For the Additional Services or the modifications to services set forth above,
Owner shall pay Engineer the following additional or modified compensation:
For professional services described under item 2a, Owner agrees to pay Engineer
in accordance with the Agreement for Professional Services on a lump sum basis.
The total compensation for Amendment 1 shall increase the lump sum amount by
$55,785 and shall not be revised without written authorization.
5. Agreement Summary (Reference only)
a. Original Agreement amount: $602,919
b. Net change for prior amendments: $0
c. This amendment amount: $55,785
d. Adjusted Agreement amount: $658,704
The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement,
including those set forth in Exhibit C.
Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this
Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in
effect. The Effective Date of this Amendment is
OWNER:
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
Elizabeth A. Mara dik, Member
� YZ
Joseph R. Molnar, Member
Therese J. Doran, Member
1)-"< _.
Jordan V. Gathers, Member
ATTEST:
Linda M. Martin, Clerk
ENGINEER:
By: Donnie H. Ginn, P.E.
Title: Vice President
Date Signed: May 26, 2020
Page 2
(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1)
EJCDC E-500 Agreement Between Owner and Engineer for Professional Services.
Copyright C0 2008 National Society of Professional Engineers for EJCDC. All rights reserved.
oz,
rn
x
w
Im
ICf
11
rr
rr
Hill
tt
Illy
fly
0�.
Ir
2
N
of
ri
0
w
o
o
IIIVh
�
0
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date May 5, 2020
Department
Name Jacob M. Klosinski En2ineerin2/Utilities
BPW Date May 26, 2020 Phone Extension Ext. 9496
Review and Approval Required Prior to Submittal to Board
Diversity Compliance
and Inclusion Officer ❑ Officer Name Michael Patton
BPW Attorney ❑ Attorney Name Clara McDaniels
Dept. Attorney ❑ Attorney Name Clara McDaniels
Purchasing ❑ Michael Schmidt
Check the Appropriate Item Type — Reuirec or All Submissions
❑ Professional Services Agreement ❑ Contract ❑ Proposal
❑ Open Market Contract ® Amendment/Addendum ❑ Special Purchase, QPA
❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes
❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA
❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution
n Other: n Ease./Encroach
Company or Vendor Name Black & Veatch
New Vendor
MBE/WBE Contractor
Proj ect Name
Project Number
Funding Source
Account No.
Information
❑ Yes[_] If Yes, Approved by Purchasing
® No
❑ WBE Completed E-Verify Form Attached ❑ Yes
No
WWTP Electrical Improvements
119-069
Utilities, Sewage Works Operations
641-06-605-514-431002
Amount Increase Contract by $55,785.00; New Contract Total $658,704
Terms of Contract Lump Sum
Purpose/Description The Division of Engineering and Division of Utilities request the Board of
Public Works approval of Amendment No.1 for the Professional Services
Agreement with Black & Veatch for additional engineering and construction
administration services provided for the subject contract.
For Change Orders Only
Amount of ❑ Increase $
❑ Decrease ($ )
Previous Amount $
Increase %
Current Percent of Change: Decrease ( %)
New Amount $
Increase %
Total Percent of Change: Decrease ( %)
Time Extension Amount:
New Completion Date: