Loading...
HomeMy WebLinkAboutOpening of Quotes - Muessel Grove Public Restroom Plumbing Work Proj No. 118-099A - D. A. Dodd, LLC. Nbz!33-!3131 Uijsuz.Uisff!Uipvtboe-!Fjhiu!Ivoesfe!Epmmbst 44-911/11 44-911/11 CORPORATE OFFICE 14 E. Michigan Street 1251 Paw Paw Avenue 3416 Rascal Drive 2516 N. Home Street P.O. Box 430 Benton Harbor, MI 49022Lafayette, IN 47909Mishawaka, IN 46545 Rolling Prairie, IN 46371 Phone (269) 926-7873 Phone (765) 448-3405 Phone (574) 968-0589 Phone (219) 778-4302 FAX (269) 926-7871 FAX (765) 448-7955 FAX (574) 968-0590 FAX (219) 778-2981 May26, 2020 City of South Bend Board of Public Works 227 W. Jefferson Blvd., Suite 1316 South Bend, Indiana 46601 Attention: Ms. Alicia Czarnecki, CDT, Project Engineer and MS4 Coordinator RE: Mussel Grove restroom Renovation - Plumbing Modifications (#118-099A) Quote Number: NIS20-394 Dear Sir(s): D.A. DODD, LLC proposes to provide labor and material necessary to complete the above project as indicated on P000, P100, P400, and P800 with the following clarifications: 1. Disconnect existing plumbing fixtures and prepare piping for selective demolition. 2. Furnish and install new underground sanitary piping (PVC) connect to existing as available. 3. Furnish excavation for new underground sanitary piping. 4. Furnish and install new aboveground sanitary waste and vent piping (PVC) connect to existing venting as available. Exclude insulation if required for open plenum HVAC returns. 5. Furnish and install new domestic water piping (copper with sweat fittings) connect to new incoming water line complete with new backflow preventor. 6. Furnish and install new fixtures as indicated on P800. 7. Insulation included for new water piping only. 8. Permits. Total submitted price of $ 33,800.00 (Thirty-Three Thousand, Eight Hundred Dollars) Proposal Excludes: Premium time; Taxes; Bond; Electrical; Ductwork, HVAC, or ventilation system; Test and balance; Temperature controls; Temporary conditions; Fire suppression; Asbestos; Re-rough; Cabinet modifications; Floor, ceiling, wall, roof cutting and patching (removing/reinstalling ceiling tile); Final clean; Paint; Dumpster; Site utilities Addendum:None Indicated NOTE: Concrete cut and patch NOT included as this appears to be part of the general trades package. We have been directed to price the plumbing ONLY. Mussel Grove RR Renovation Scope (NIS20-394) May 26, 2020 NOTE: There is NO water heater scheduled or any hot water piping indicated on the drawings; therefore, we have NOT included any water heater or hot water piping in our scope or price. Work to be performed between the hours of 7:00 AM and 3:30 PM Easterntime andto be invoiced in full upon job completion. If our proposal is acceptable, sign and date one copy and return to D.A. DODD, LLC. If you have any questions, please contact meat 574-968-0589. ACCEPTANCE OF PROPOSAL Accepted by _________________________________________________ Date ________________________________________________________ Purchase Order Number _______________________________________ Proposal valid for 60 days from quoted date. GENERAL PAYMENT TERMS: D. A. Dodd would require 50% down to securethe material order and subcontractor pricing with the balance due upon completion of the project. Net 30 days. All accounts over 30 days are subject to 1½% per month finance charge. APR 18%. All accounts over 60 days are subject to mechanic’slien. Sincerely, Douglas E. Bourne Service Estimator D.A. Dodd, LLC. Mishawaka, Indiana Phone (574) 968-0589 Cell (765) 461-8204 Fax (574) 968-0590 dougbourne@dadodd.com Mussel Grove RR Renovation Scope (NIS20-394) May 26, 2020 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 05/18/2020 Department Engineering/VPA Name Alicia Czarnecki/Patrick Sherman BPW Date 05/26/2020 Phone Extension 5903 Required Prior to Submittal to Board BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name TBD Yes If Yes, Approved by Purchasing New Vendor No MBE Yes MBE/WBE Contractor Completed E-Verify Form Attached WBE No Project Name Muessel Grove Public Restroom Plumbing Work Project Number 118-099A Funding Source Account No. Amount Terms of Contract Purpose/Description _Provide and install all plumbing items for Public Restroom renovation at Muessel Grove Park.______________ For Change Orders Only $ Increase Amount of Decrease ($ ) Previous Amount $ % Increase Decrease ( %) Current Percent of Change: New Amount $ % Increase Decrease ( %) Total Percent of Change: Time Extension Amount: New Completion Date: