Loading...
HomeMy WebLinkAbout5B1 Budget Request (Colfax Lift Station Improvements) Redevelopment Commission Agenda Item DATE: 5/28/2020 FROM: Zach Hurst, PE SUBJECT: Budget Request – Colfax Lift Station Improvements Which TIF? (circle one) River West; River East; South Side; Douglas Road; West Washington PURPOSE OF REQUEST: This request is for $550,000 for improvements to the Colfax Lift Station. This is the construction portion of a previous RDC-funded project: the East Bank Sewer Analysis. SPECIFICS: In 2018 the Redevelopment Commission funded a study for the sewer system serving the East Bank area. The equipment in the lift station, located on the south side of Colfax Avenue at the intersection with Sycamore Street, was reaching the end of its life cycle, and development in the area, namely 320 at the Cascade and Commerce Center, warranted an in-depth study of the current and future needs of the area as it expanded. A local consultant performed the work and used the results of the study to produce construction documents which will allow the City to replace the aging infrastructure with more efficient, reliable equipment which will serve the area for the next several decades, ensuring that the East Bank can continue to develop and better serve the needs of area residents. INTERNAL USE ONLY: Project Code: _______________________________________________; Total Amount new/change (inc/dec) in budget: _______________; Break down: Costs: Engineering Amt: ______________________; Other Prof Serv Amt_________________; Acquisition of Land/Bldg (circle one) Amt: ___________; Street Const Amt ________________; Building Imp Amt_________; Sewers Amt_________; Other (specify) Amt: ________________ ___________________________________________. Going to BPW for Contracting? Y/N Is this item ready to encumber now? ____ Existing PO#__________ Inc/Dec $_____________