May 12, 2020
Ms. Vicki Priest
Selge Construction Co., Inc.
th
2833 S. 11. St.
Niles, MI 49120
jbutler@selgeconstruction.com; vpriest@selgeconstruction.com
Project No. 120-021
Dear Ms. Priest:
The Board of Public Works, at its meeting held on May 12, 2020, approved the above referenced
Change Order for an increase of $16,856.79, bringing the current contract to a not to exceed
amount of $62,726.79.
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-9251.
Sincerely,
s/Linda M. Martin, Clerk
Enclosure
G ARY A. G ILOT E LIZABETH A. M ARADIK T HERESE J. D ORAU J ORDAN V. G ATHERS J OSEPH R. M OLNAR
City of South Bend Project No. 120-021Change Order No. 105/12/20
OWNER:City of South Bend
ENGINEER:City of South Bend Engineering
Alicia Czarnecki, Project Engineer
CONTRACTOR: Selge Construction Co., Inc.
PROJECT:Hydrant Relocation Quote
Project No. 120-021
SUBJECT:Change OrderGreater than 20%
ISSUE Date:May 05, 2020
The following is a summary and descriptionof Change OrderNo.1:
The original intent of this project was to close existingwater valvesand relocate hydrant
assemblies inanticipation of twoupcomingINDOT projects, Corby/Ironwood/Rockne
Intersection Improvements and Olive Street Reconstruction.Most ofthe work was tobe
completedin the tree lawn area.
On Olive Street, closing the valves became a much more difficult task due tothevalves
being completely paved over, aswell asthe proximityto a proposed inlet for the upcoming
INDOT project which would put the relocated lines directly in conflict with the inlet. To
addressthis,a larger pavement section was removed,andanInserta Valvewas installed
closer to the mainline.This allowed the contractor to install two elbows out of the way of
the proposed structure.
This work was performed ona time and material basis due to the unforeseensite
conditions atthis projectlocation.As a result of the unforeseenwork related to closing the
existing valves, the change order amount is$16,856.79, which is 36.75%. The scope of the
project remained unchanged.
*Please see attached breakdown*
–
Print Name(Signature)(Date)
Print Name(Signature)(Date)
Print Name(Signature)(Date)
Print Name(Signature)(Date)
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 05/04/2020
Department
Name Alicia Czarnecki Engineering
BPW Date 05/12/2020 Phone Extension 5903
Review and Approval Required Prior to Submittal to Board
Diversity Compliance
Officer Name
and Inclusion Officer
BPW Attorney Attorney Name
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. 1 Traffic Control Resolution
Other: Ease./Encroach
Required Information
Company or Vendor Name Selge Construction
Yes If Yes, Approved by Purchasing
New Vendor
No
MBE Yes
MBE/WBE Contractor Completed E-Verify Form Attached
WBE No
Project Name Hydrant Relocation Quote
Project Number 120-021
Funding Source
TIF
Account No. 430-1050-460.31-02
Amount CO #1: $16,856.79, New Total Amount: $62,726.79
Terms of Contract NTE
Purpose/Description _Relocation of existing fire hydrant assemblies in anticipation of roadway
projects in two locations within the City of South Bend, IN. ________
For Change Orders Only
$ 16,856.79
Increase
Amount of
Decrease ($ )
Previous Amount $ 45,870.00
36.75%
Increase
Decrease ( %)
Current Percent of Change:
New Amount $ 16,856.79
36.75%
Increase
Decrease ( %)
Total Percent of Change:
Time Extension Amount:
New Completion Date: