Loading...
HomeMy WebLinkAboutChange Order No 1 - Hydrant Relocation Quote Proj No. 120-021 - Selge Construction Co., Inc. P HONE 574/ 235-9251 1316 C OUNTY-C ITY B UILDING F AX 574/ 235-9171 227 W. J EFFERSON B OULEVARD S OUTH B END,I NDIANA 46601-1830 C ITY OF S OUTH B END J AMES M UELLER,M AYOR B OARD OF P UBLIC W ORKS May 12, 2020 Ms. Vicki Priest Selge Construction Co., Inc. th 2833 S. 11. St. Niles, MI 49120 jbutler@selgeconstruction.com; vpriest@selgeconstruction.com Project No. 120-021 Dear Ms. Priest: The Board of Public Works, at its meeting held on May 12, 2020, approved the above referenced Change Order for an increase of $16,856.79, bringing the current contract to a not to exceed amount of $62,726.79. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, s/Linda M. Martin, Clerk Enclosure G ARY A. G ILOT E LIZABETH A. M ARADIK T HERESE J. D ORAU J ORDAN V. G ATHERS J OSEPH R. M OLNAR City of South Bend Project No. 120-021Change Order No. 105/12/20 OWNER:City of South Bend ENGINEER:City of South Bend Engineering Alicia Czarnecki, Project Engineer CONTRACTOR: Selge Construction Co., Inc. PROJECT:Hydrant Relocation Quote Project No. 120-021 SUBJECT:Change OrderGreater than 20% ISSUE Date:May 05, 2020 The following is a summary and descriptionof Change OrderNo.1: The original intent of this project was to close existingwater valvesand relocate hydrant assemblies inanticipation of twoupcomingINDOT projects, Corby/Ironwood/Rockne Intersection Improvements and Olive Street Reconstruction.Most ofthe work was tobe completedin the tree lawn area. On Olive Street, closing the valves became a much more difficult task due tothevalves being completely paved over, aswell asthe proximityto a proposed inlet for the upcoming INDOT project which would put the relocated lines directly in conflict with the inlet. To addressthis,a larger pavement section was removed,andanInserta Valvewas installed closer to the mainline.This allowed the contractor to install two elbows out of the way of the proposed structure. This work was performed ona time and material basis due to the unforeseensite conditions atthis projectlocation.As a result of the unforeseenwork related to closing the existing valves, the change order amount is$16,856.79, which is 36.75%. The scope of the project remained unchanged. *Please see attached breakdown* – Print Name(Signature)(Date) Print Name(Signature)(Date) Print Name(Signature)(Date) Print Name(Signature)(Date) BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 05/04/2020 Department Name Alicia Czarnecki Engineering BPW Date 05/12/2020 Phone Extension 5903 Review and Approval Required Prior to Submittal to Board Diversity Compliance Officer Name and Inclusion Officer BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 1 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Selge Construction Yes If Yes, Approved by Purchasing New Vendor No MBE Yes MBE/WBE Contractor Completed E-Verify Form Attached WBE No Project Name Hydrant Relocation Quote Project Number 120-021 Funding Source TIF Account No. 430-1050-460.31-02 Amount CO #1: $16,856.79, New Total Amount: $62,726.79 Terms of Contract NTE Purpose/Description _Relocation of existing fire hydrant assemblies in anticipation of roadway projects in two locations within the City of South Bend, IN. ________ For Change Orders Only $ 16,856.79 Increase Amount of Decrease ($ ) Previous Amount $ 45,870.00 36.75% Increase Decrease ( %) Current Percent of Change: New Amount $ 16,856.79 36.75% Increase Decrease ( %) Total Percent of Change: Time Extension Amount: New Completion Date: