Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Amendment No 2 to Agreement - Construction Services for Morris Theater Emergency Plaster Work - American Structurepoint Inc.
1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS April 14, 2020 Charles Gasser American Structurepoint, Inc. 56 S. LaSalle St. Suite 102 & 103 Aurora, Illinois 60505 CGasser@ Structurepoint.com RE: Amendment No. 2 to Professional Services Agreement Dear Mr. Gasser: PHONE 574/235-9251 FAx 574/ 235-9171 The Board of Public Works, at its meeting held on April 14, 2020, approved the above referenced amendment for construction administration services for Morris Theater emergency plaster work in the amount, not to exceed $9,650, with a new total of $35,100. Enclosed please find a copy of the amendment for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, s/Linda M. Martin, Clerk Enclosure GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR This is EXHIBIT K, consisting of 2 pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated November 27 , 2018. AMENDMENT TO OWNER -ENGINEER AGREEMENT Amendment No. 2 1. Background Data: a. Effective Date of Owner -Engineer Agreement: b. Owner: Board of Public Works. Citv of South Bend, Indiana C. Engineer: American Structurepoint Inc. d. Project: Morris Center of Performing Arts Emergency Plaster Work 2. Description of Modifications: [NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity with respect to the modifications to be made. Use paragraph numbers in this document for ease of reference herein and in future correspondence or amendments. a. Engineer shall perform or furnish the following Additional Services: American Structurepoint will provide the construction administration services required to assist the City of South Bend required to complete the plaster repairs at the Morris Performing Arts Center. b. The Scope of Services currently authorized to be performed by Engineer in accordance with the Agreement and previous amendments, if any, is modified as follows: • Provide one site visit to inspect plaster installation mock-up at plaster contractor's facility with follow-up report of findings. • Provide no more than two inspections of the dome plaster to determine the extent of repairs required. For the purpose of this proposal it is assumed one inspection will occur during scaffold installation to keep on schedule and another inspection once scaffold construction is complete. • Communication and coordination as required with contractors during repairs. • Provide one final inspection of repairs upon completion. e. For the Additional Services or the modifications to services set forth above, Owner shall pay Engineer the following additional or modified compensation: Page 1 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright �) 2008 National Society of Professional Engineers for EJCDC. All rights reserved. 5. Agreement Summary (Reference only) a. Original Agreement amount: $ 8,900.00 b. Net change for prior amendments: $ 16 550.00 c. This amendment amount: $ 9,650.00 (Hrly NTE)_ d. Adjusted Agreement amount: $ 35,100.00 (MAX) The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in Exhibit C. Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is OWNER: Title: Date Signed: April 14, 2020 BOARD OF PUBLIC WORKS % tea_—_—=1 Clnry A C 7 L P—id-t f hribnlh A M..dik. \fmnbar Tho — J. D, r . Member ,tordnn V. (Wh—, Me db fosryhR Mdnar, Me h,r A NTS'I: min,%; crr�;rtix I m& M Marlin C'.I©rk ENGINES3. By: Mr. Charles E. Gasser Title: Illinois Office Director Date Signed: April 3, 2020 Page 2 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright �) 2008 National Society of Professional Engineers for EJCDC. All rights reserved. BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 04/06/2020 Name Alicia Czarnecki Department Engineering BPW Date 04/14/2020 Phone Extension 5903 Required Prior to Submittal to Board BPW Attorney ❑ Attorney Name Dept. Attorney ❑ Attorney Name Purchasing ❑ Check the Appropriate Item Type — Required. for All Submissions ❑ Professional Services Agreement ❑ Contract ❑ Proposal ❑ Open Market Contract ® Amendment/Addendum ❑ Special Purchase, QPA ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes ❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA ❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution n Other: n Ease./Encroach Company or Vendor Name American New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Information Inc. U Yes U If Yes, Approved by Purchasing ® No ❑ WBE Completed E-Verify Form Attached ❑❑ Nos Morris Theater Emergency Plaster Work 118-094 Engineering Professional Services 101-0602-431-31-06 Amendment 2: $9,650.00 New Contract Amount: $35,100.00 NTE Construction administration services required to assist the City of South Bend required to complete the plaster repairs at the Morris Performing Arts Center. For Change Orders Only Amount of ❑ Increase $ ❑ Decrease ($ ) Previous Amount Current Percent of Change: New Amount Increase Decrease Increase Total Percent of Change: Decrease Time Extension Amount: New Completion Date: