Loading...
HomeMy WebLinkAboutChange Order No 3 - Pulaski Park Improvements Proj No. 118-056 - Larson Danielson Construction Co., Inc. P HONE 574/ 235-9251 1316 C OUNTY-C ITY B UILDING F AX 574/ 235-9171 227 W. J EFFERSON B OULEVARD S OUTH B END,I NDIANA 46601-1830 C ITY OF S OUTH B END J AMES M UELLER,M AYOR B OARD OF P UBLIC W ORKS April 14, 2020 Mr. Darin Meyer Larson-Danielson Construction Co., Inc. 302 Tyler St. LaPorte, IN 46350 dmeyer@ldconstruction.com Dear Mr. Meyer: The Board of Public Works, at its meeting held on April 14, 2020, approved the above referenced Change Order for an increase of $15,556.50, bringing the current amount to $896,526.75. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, s/Linda M. Martin, Clerk Enclosure G ARY A. G ILOT E LIZABETH A. M ARADIK T HERESE J. D ORAU J ORDAN V. G ATHERS J OSEPH R. M OLNAR DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING QvmbtljQbslJnqspwfnfout 229.1674 Project Number: _______________ Project Name: __________________________ Change Order #: ____ 302103131 DATE INITIATED:BPW DATE: Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). 2/Jotubmmifbuubqf0jotvmbujpopoxbufsnbjojouifsftusppn.%3-375/11 3/Sfnpwfdpodsfufcvsjfevoefsqspqptfesfufoujpoqpoe.%2-777/61 4/Izesp.tffebeejujpobm2-255TZT.%21-6::/11 5/Sfmpdbuf4pvudspqqjohcpvmefstgspnqmbzhspvoe.%2-138/11 Attachments: (List documents support changerequired) Dpousbdupsdptuftujnbuft/ QDS$4/ 26-667/61 Amount of Increase / Decrease: $____________________ Categories (Pick One): 3-395/11 ScopeofWork Previously approved Change Order(s): $___________________ DifferingSiteConditions,ChangedConditions 2/88 Current Percent of Change: ____________________ % ConflictedSpecificationsandDrawings FailedMaterials 9:7-637/86 New Total Amount: $____________________ Error Omission 3/14 Total Percent of Change: ____________________ % FinalQuantityAdjustment ______________________ 563.2212.563/42.17 Funding Secured From: __________________________ (filled out by PM) RECOMMENDEDBY: Ejhjubmmz!tjhofe!cz!Hsfh!NdHpxbo! Hsfh!NdHpxbo HsfhNdHpxbo5.3.31 Ebuf;!3131/15/13!24;16;28!.15(11( Project Inspector (Print Name)(Signature)(Date) REVIEWED BY: Ejhjubmmz!tjhofe!cz!Upz!Wjmmb! Upz!Wjmmb UpzWjmmb15013031 Ebuf;!3131/15/13!24;69;26!.15(11( Construction Manager (Print Name)(Signature)(Date) APPROVED BY: Ejhjubmmz!tjhofe!cz!Lzmf!X/!Tjmwfvt! EO;!do>Lzmf!X/!Tjmwfvt-!p>Djuz!pg!Tpvui!Cfoe-!pv-! fnbjm>ltjmwfvtAtpvuicfoejo/hpw-!d>VT! Lzmf!X/!Tjmwfvt LzmfX/Tjmwfvt50703131 Ebuf;!3131/15/17!25;26;42!.15(11( Engineering Project Manager (Print Name)(Signature)(Date) APPROVED BY: Ejhjubmmz!tjhofe!cz!Lbsb!Cpzmft! Lbsb!Cpzmft LbsbCpzmft50703131 Ebuf;!3131/15/17!26;17;62!.15(11( City Engineer (Print Name)(Signature)(Date) main269 327-2322 8132 Merchant Place Portage, MI 49002 pros atwork.com Date: 11/15/2019 Subject: Notice of Change Order Request for additional labor / materials and extension of schedule Change Order: 2 Attachments: 0 Owner: City of South Bend Attention: Jeff Jensen jjensen@ldconstruction.com Mr. Jensen: Please be advised that this is a notification of change and or delay resulting from: Provide and install insulation on water main entering building Larson Danielson Construction Company Inc. agrees to and approves said change for the labor and materials used to install insulation on the water main entering the building to approximately 1 above isolation valve. Pro Services will work with Larson Danielson Construction Company Inc. to help reduce schedule and cost impacts caused by above mentioned. Please see the attached documents. Subcontractor (insulation): $551.00 Total Cost for change to scope $551.00 At this time, the full schedule impact of this change cannot be ascertained. Therefore, Pro Services reserves the right for an extension to our schedule and associate costs. Sincerely, Jeff Jagnecki Project Manager Pro Services Plymouth, IN Branch ΐ ‾ ⁍ Ư 0 ŷźƭ ĭŷğƓŭĻ ƚƩķĻƩ ƩĻƨǒĻƭƷ ŷğƭ ĬĻĻƓ ƦƩĻƦğƩĻķ ĬǤ tƩƚ {ĻƩǝźĭĻƭ ƦƩƚƆĻĭƷ ƒğƓğŭĻƩ WĻŅŅ WğŭƓĻĭƉź͵ ŷźƭ ĭŷğƓŭĻ ƚƩķĻƩ ƩĻƨǒĻƭƷ ƩĻŅƌĻĭƷƭ ķźƭĭƚǝĻƩźĻƭ ƷŷğƷ ŷğǝĻ ĭŷğƓŭĻķ ƚƩ Ǟźƌƌ ĭğǒƭĻ źƒƦğĭƷƭ Ʒƚ ƷŷĻ ƦƩƚƆĻĭƷ ƭĭŷĻķǒƌĻ ğƓķ ƚƩ ĭƚƭƷƭ ğƭƭƚĭźğƷĻķ ǞźƷŷ ĭŷğƓŭĻ͵ tƌĻğƭĻ ƩĻƭƦƚƓķ źƓ ǞƩźƷźƓŭ ǞźƷŷźƓ Ћ ĭğƌĻƓķğƩ ķğǤƭ ƚŅ ƩĻĭĻźǝĻķ ƓƚƷźĭĻ ƚŅ ĭŷğƓŭĻ͵ LƷ Ǟźƌƌ ĬĻ ǒƓķĻƩƭƷƚƚķ ğƭ ğƓ ğĭĭĻƦƷĻķ ĭŷğƓŭĻ ƩĻƨǒĻƭƷ źŅ Ɠƚ ƩĻƭƦƚƓƭĻ źƭ ƩĻĭĻźǝĻķ͵ 9# !60 (.22 5 4-6:5/:7:!tg 5-333/123!tg 274/:29!tg BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date4/6/2020 Department NameKyle SilveusEngineering BPW Date4/14/20Phone Extension9083 Required Prior to Submittal to Board LegalAttorney NameClara McDaniels Controller review is required for all Contracts $5,000.00 or more and Controller greater than one year in length per the City Purchasing Policy PurchasingMichael Schmidt Check the Appropriate Item Type –Required for All Submissions AgreementContractProposalAddendum Professional ServicesResolution Bid OpeningBid AwardReq. to AdvertiseTitle Sheet Quote OpeningQuote Award ChangeOrder No. 3C/O & PCA No. PCA Ease/Encroach.Traffic Control Other: RequiredInformation Company or Vendor Name Larson Danielson Construction Co., Inc._____________ New Vendor YesNoIf Yes, Approved by Purchasing MBE/WBE Contractor MBEWBE MBE/WBE ContractorRequestedNoYes Name of Company Project NamePulaski Park Improvements Project Number 118-056 Funding SourceRW TIFBond Account No.452-1101-452.31-06 Amount$15,556.50 Terms of Contract Purpose/DescriptionMiscellaneous expenses due to unforeseen conditions and scope changes. Required Contractor’s Certification Form Attached(Non- Collusion, Non-Discrimination, Non-Debarment, E-Verify, Iran, etc.) Required For Change Orders Only $$15,556.50 Increase Amount of Decrease$ Previous Amount$880,970.25 Current Percent of Change: 0.26% New Amount$896,526.75 Total Percent of Change:2.03% Dispersal After Approval Copy Original