HomeMy WebLinkAboutOpening of Bids - Press Ganey Administration Building Site Improvements Proj No. 119-061 - Majority Builders, Inc.LOM 0
Project Name Press Ganey Administration Building Site Improvements
For Bids Due April 14, 2020
J III I I A , a 1 11 , I , 0 it- 0 :0. a * 6 0 0 1 - - - a - -
IMMIWAIN10101 0 0 0
Proper bid security included. The bidder has the option of providing either a Certified Check
or Bid Bond,
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
executed,
Contractor"s Non-Colluslon and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, NoDiscrimination Commitment, and
Certification of use of United States Steel Products or Foundry Products,
Proof of MBE/WBE Participation Goal Form [MWBE-1 .0]. If miniimum participation goal is not
met, also provide Evidence of Good Faith Efforts Form [MWB01 and MBontacted
Form [MWBE-2.1].
Acknowledge Receipt of -3- Addendum(s) included with the bid.
All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
printed or typed underneath signature.
This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: - -Majority Builder s, Inc. Date: April. 14, 2020
By Authorized Representat.,iv,15 :
Signature: g, '5
Print Name & Title: David J. Piston/Vice President
Version 4/212019 Contractor's Bid for Public Works - I
I A k A
[OKS] Lill NaMIJO agelza 211:14 [SATIT 0
Project Name Press Gainey Administration Building Site Improvements
Project No. 119-0611
For Bids Due April 14, 2020
. ................
PART I
(Must be completed for all bids, Please type or print)
Date: April 14, _2..020 Bidder (Firm): _MaJority Builder,5,,_Inc .
Address: 62900 US 31 South
........... . .
City/State/Zip: South Bend IN 46614 Telephone Number
(574 ) 291-2091
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor an/or mi-feiial necessary to complete the
public works project of:
Press Gan,ey Administration Building Site Improvements
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
Abonmarche Consultants, Inc,
and dated - 3/17/2020 for the sum of (enter the Total Bid as shown on the Proposal)
Eight hundred ninety six thousand, six hundred thirteen ($ 8)6,613.00
(Entersum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified
in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in
accordance with the notice. Any addendurns attached will be specifically referenced at the applicable
page.
If additional units of material included in the contract are needed, the cost of units must be the same as
that shown in the original contract if accepted by the City of South Bend, If the bid is to be awarded on a
unit basis, the itemization of the units shall be shown on a separate attaq! ent.
By
�Signature)
David j,_PA,,,_ton Vice Presi,d&ut-.-
(Printed Name of Person Signing)
F-111610142IF-3211*4
MIL
0 SAY , i 0 . I
Gary A. Gilot, President
Elizabeth A. Maradik, Member
Joseph R, MdInar, Member
Jordan V. Gathers, Member
Therese J. Dorau, Member
Attest: Linda M. Martin, Clerk
NM
Version 41212'O 19 Contractor's Bid for Public Works, - 2
Uointractor's Bid for Public Work - City of South Be
Project No. 119-061 1
UTIMMOME
lei �91 - o K
Project Name: Press Caney Administration Building Site Improvements
V,
7roject Number: 119-061 ADDENDUM No. 003
For Bids Due: 14-Apr-20
Contractor Name: Majority B,uilders, Inc.
..... .. . . .........
Description Description
JM I 191444 4140111
Unit Price
Total Amount
Mww w i" ww w"il
............... . .
115,320.00
. ......... . .. ......
'iConcrete Pavement, Remove
. ...... ....... -
... . ..............
,Concrete Curb and Gutter, Remove
Fine Grading
— - ----- . . . . . .. ..............
6
21,,332,.00
........... ...... . .
Compacted Aggregate Base, No. 53
---- . . ................... . ...
. . . ......................
124,,708.00
A Intermediate, 19.0 mm
149,202.00
Concrete Curb and Gutter
ww
27,399.00 J
Standard Concrete Curb
. . . . ......... .
--
94,366.00
2,549.00
. ...... .... .
7,689.00
Concrete Sidewalk, 4"
-- ----- --- -
0 MIts
Detectable Wa:rn ing Surface
11 r,
16,6�21.00
Seeding and Topsoil
�119,993.00
�Storm Sewer, PVC, 6t'
Total Amount of Base Bid BASEBIDTOTAIL $844,581.00
MOVIN MIMMOM ��of MTOM-01111i 1121�1 0 �,
Contractor's Bid for Pubfic Work - City of South Bend
Project No, 119-061
012NEEM
�Qa a 0 map
Ila �A�
Mrs? ZTOT M. T-1 Rk ro,
Project Name: Press Ganey Administration Building Site Improvements
Project Number: 1119-061 ADDENDUM No. 003
For Bid
Description
MINIMUM
�� -00 .10111
14-Apr-20
MajoritX Builders, Inc.
Add Alternate B: irrigation
ntity Unit I Unit Price I Total Amount
1 'S 1 27,574.001 t(27.574.00)
ALTERNATE A TOTAL($ 2 7, 5 7 4. 0 0)
. . . ....... . ... ,
... . . .............. . .
Description
Unit Price
Total Amount
ALTERNATES TOTAL $38,185. 00
Add Alternate C
... . . ..............
Description
Unit Price
III
Total Amount
7
Dumpster Enclosure
.................
15,025.00
�Flag Pole and Foundation, 1 F I a g
Sign Post, Type 2
ALTERNATECTOTAL $38,175.00
Contractor's Bid for Public Work - City of South Bend
Project No. 119-061
zMaREMO
Project ft
For Bid
5ilAtwitAkir,
M= Wo
A
'119-061 ADDENDUM No. 003
. .. ...... .
Majority Builder ,Inc.
.... ............ ..
................. . .
Diescriptioin
Unit Price
Total Arnount
. . . . . . ........... -
Line, Paint, Solid, Yellow, 4"
Paint, Solid, Bluei, 4"
=�Pavemenit
Message Mrkng, Paint�, ADA Symbol
Total Amount of Base Bid
Total Amount of Add Alternate B
Total Amount of Add Alternate C
Total Amount of Add Alternate D
ALTERNATEDTOTAL $3,246.00
$,844,1581.00
($27,574.00)
$38,175.00
Bidder (Firm): Majority Biii1ders, Inc.
Address: 62900 US 31 South
City/State/Zip: South Bend, IN 4661Telephone Number: 574 291-2091
By
(Signature)
Version 412/2019 Contractor's Bid For Public Works-9
Init.
AI OTM
Al A Document A31 - 20tA
CONTRACTOR:
SURETY:
(Narric, legal status and address)
('Nanne, legal status and principal place
klajoritv Hkjilder'' lira.
ol'business)
62900 1, 1, S� 3 1 S� sut h
I lartford Accidonil and Indemnity Compml\
This document has important legal
South Berid, 11 N 466 11
11 an ford . C I
consequences, Consultation with
OWNER:
an attorney is encouraged with
(Narne, lega I slants and address)
respect to its completion or
City ol'South Bend Board of Public \Vorks
modification.
Counfy-0ty Building Roont 13 16, 227 4Vcsl .1clki-son
kk,d
Any singular referenice to
South Bemi IN 46,601
Contractor, Surety, Owner or
BOND AMOUNT:
other party shall be considered
live Percent of the I otall Bid
(it' I olat Bid
plural where applicable
PROJECT:
(Name, hication or address, and lorogecl nurnber, if any)
Press (Janev Adminisinifion, Building Site Inipi-mernCilts; Pro ecr No, 119-061
T, lie Conti -actor and Surety are bound to the 0wrier in the amount set f'orth above, for the payment of which the
Contractor and Surety bind then'iselves, their heirs, executors, adniinistralors, successors and assigns,jointly and
severally, as provided herein. I -lie conditions ofthis, Bond are Such that ifthe Owner accepts the bid ofthe Contractor
within (lie tinic specified in the bid documents', or within such tinie period as may be agreed to by tile Owner and
Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms ot'such
bid, and gives such bond or bonds as may be specitied in the bidding or Contract Documents, with asurety adi,nitted
in the jurisdiction ol'the 11ro.ject and otherwise acceptable to the Owner, tor the faithful perl"orn'lance of such Contract
and for tile pronipt payment of labor and rinaterial furnished in the prosecution thereof, or (2) pays to the 0Nvner the
clifference, not to exceed I lie arriount of this Bond, between the arnount siv.,cit-jed in said bid and such lamer a niount
fior Which the Owner navy ill good faith contractwilli another party to pertorrin the work covered by said bid, then this
obligation shall be Mill and void, otherwise to rernaki in full force kind effect. The Surety hereby waives any notice of
an agreement! between, the Owner and Contractor to extend the tine in which the 0wner rnay accept the bid. Waiverol"'
notice by the Surety shall not apply, to any extension exceeding, sixty (60) days in the aggregate beyond the time for
acceptance ofbids specified in tile bid documents, and the ()wner kind Contractor shall obtain the Surety's consent for
an extension beyond sixty (60) days.
if this Bond is issued in connection with a subcontractor's bid to as Contractor,
lontractor, the ternContraclor in (his, l3ond shall
be dern eed to be Subcontractor and, the term 0wncr shall be deemedto, be ("ontractor.
When thus Bond has been furnished to comply with as statutory or other legal requiren'lent ill tile location ofthe Project,
any provision in this Bond conflicting with said statutory or legal requirement shall be deenied delete(] herel-rorn and
provisions coritornling to such sunutorN or other legal recluirernent shall be deerned incorporated herein, When sx;
furnished, the intent is that this Bond stuill be ccinstrued as it statutory' bond and not as as common law bond..
Signed, and sea led this d tst day cal` March 2020
Maljorm h1c,
el'Z (Sea 1)
(Witness)
I'hle David J. Paston Vice preqIA611t'
I larilord ;Neeidcilt and Cdeninily Company
Ca'ro (Surely) (Seal)
(Witness)
JQI 11H, r B. KasAlia, A; 71"Inc% in Fact
CAU11014 : You should sWn aKI Dliqkiaf AfA Contract Gric uniient, c n tich flAs text appears, in REM An oflginat assures that
tm'
changes wort not bo oliscuired.
AIA DocumentA310'- 2010. Copyright 0 1963 1970 and 2010 by'ri'm American InstiluteofArchilects, All rights reserved. WAHNWG�ThNAW"'
Mmmerit Is protected by U.S. Copydght Law and hitevinaflwW IrPaUes. Unauli.horizO reprodwIJon or distribuboin of this AJAO" Docuinnenl, Dir
any porhwin of it, may resuft, an sovere CIO and cHmU11M, penafts, and wall Luin, prosecuted to the mxhimurn extent posslWe umber the Gaw,
PUrchasers are poopMed to reproduce ten: (10p copies of this document when compleled To report cripyrigiht viWations of AIA Contract Documents, e-roaii
The American Instotute of Aichiiects'legal Counsel, copynghl@aja ofg 6M 1 ua
Virect 1nqU0esX1ajms to,
THE HARTFORD
BOND, T-12
One Hartford Plaza
Ir"OWEER OF ATTORNEY Hartford, Connecticut 016156
Bond.Claims�n eharff�ordcom�
call: 808-266-3488 or Fax: 860-767-5835
KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name-. GIBSON INSUPJINCE AGENCY, INC
AgencyCode., 36-212563
Hartford Fire Insurance Company, a corporation duly organized tinder the laws of the State of Connecticut
Hartford Casualty insurance Company, a corporation duly organized under the laws of the State of Indiana
Hartford Accident and Indemnity Company, a corporation duly organized under the laws oaf the State of Corinceficut
Hartford Underwriters Insurance Company, a corporation duly organized tinder the laws of the State of Connecticut
Twin City Fire Insurance Company, a corporation duty organized under the laws of the State of Indiana
Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois
Hartford insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana
Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida
having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "'Companies"') do hereby make, constitute and appoint,
ups tothe arnountof Unlimited
Nic ale L. Bicknell, Cheryl E. Alkire, Theresa M. Burris, William J. Cerney III,
Sandra Junk, Jennifer Kagznia, Wesley Mantooth, Barbara E. Pearson, Megan E.
Riesenberg, Jordan Scheiber, Mark E. Wobe of S01YN BEND, Indiana
their true and lawful Attorneys) -in -Fact, each in their separate capacity if more than one is named above, to sign its name as surety(iies) only as
delineated above by 0', and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments, in the
nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and
executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law,
In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 6, 2015 the Companies have
caused these presents to be signed by its Senior Vice president and its corporate seals to be hereto affixed, duty attested by its Assistant
Secretary. Further, pursuant to Resotution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are
and will be bound by any mechanically applied signatures applied to this Power of Attorney,
4' 1 U*S 7 1*07
37� 19 D".
70
It
John Gray, Assistant Secretary M, Ross Fisher, Senior Vice President
'III Ss. Hartford
COUNTY OF HARTFORD
On this 5th day of January, 2018, before me personally came M, Ross Fisher, to me known, who being by me duly sworn, did depose and
say: that he resides in the County of Hartford, State of Connecticut; that he is the Senior Vice President of the Companies, the corporations
described in, and which executed the above instrument, that he knows the seals of the said corporations-, that the seals affixed to the, said
instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his
name thereto by like authority.
Kathleen'r, Maynard
0 Notary Public
CERTIFICATE My Commission Expires July 1, 202
i, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERflFY that the above and foregoing is a true and correct
copy of the Power of Attorney executed by said Companies, which is still in full force effective as of 020 6)-6
Signed and seated at the City of Hartford.
1*97 1 0
19 7
Sv
Kevin ice President
RNMem".
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms
outside your own firm who have performed part of the work) that you have used on public
works projects during the past five (5) years along with a brief description of the work done
by each subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project,
you are under a continuing obligation to immediately notify the City of South Bend in the
event that you subsequently determine that you will use a subcontractor on the proposed
project.
4. Attach a listing of equipment you have available to use for the proposed project.
Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the
bidder's capability for completing the project if awarded.
Version 4/2/2019 Contractor's Bid for Public Works - 3
Section 1 Experience Questionnaire
Response to Question 1
Projects Completed in Past Year
Proiect Name/Owner Amount Date
Allied MRI Imaging 834,884.00 2019
6301 University Commons
South Bend, IN 46635
Carl Bals
574-251-2100
Drive & Shine Projects
South Bend/Mishawaka
Aji Tehrani
574-277-8877
Growing Kids Warsaw
310 East 200 North
Warsaw, IN 46582
Mike Garatoni
574-220-6430
Hibberd Building Reno
321 South Main Street
South Bend, IN 46601
Mark Neal
LaPorte Fed Credit Union
1800 East Lincolnway
LaPorte, IN 46530
Matthew Romary
260-747-3184
Marshall County Life Ctr
2468 Miller Road
Plymouth, IN 46563
Jerry Chavez
574-935-8499
Patel-Ndukwu Physical Therapy
MPM Investments, LLC
320 Jones Court
Chesterton, IN 46304
Minesh Patel
5,784,998.00
2,322,172.00
4,774,322.00
1,339,294.00
1,918,166.00
1,020,000.00
2019
2019
2019
2019
2019
2019
219-677-4579
ThyssenKrupp Ofc Buildout
GLC Portage Prairie II, LLC
112 West Jefferson Blvd.
South Bend, IN 46601
Jeff Smoke
574-251-4400
Ameriplex East
GLC Portage Prairie II, LLC
112 West Jefferson Boulevard
South Bend, IN 46601
Jeff Smoke
574-251-4400
St. James Church Ofc Reno
Cathedral of St. James, Inc.
117 North Lafayette Boulevard
South Bend, IN 46601
Brian Grantz
574-232-4837
St. Pius Classroom Addition
52553 Fir Road
Granger, IN 46530
Bill Schlatterback
Technology Resource
1165 Franklin Street
South Bend, IN 46601
Linda Martin
574-235-9251
Gibson / Key Bank
202 South Michigan Street
South Bend, IN 46601
Ron Turpin
260-739-1993
Semma Aunalytics
400 Stull Street, Suite 400
South Bend, IN 46601
Brad Toothaker
574-237-6000
1,157,510.00
6,905,139.00
705,083.00
3,984,296.00
1,384,273.00
1,062,730.00
550,691.00
2019
2019
2019
2019
2019
2019
2019
Amazon @ Ameriplex 2,245,920.00 2019
5545 Chet Waggoner Drive
South Bend, IN 46628
Jeff Smoke
574-251-4400
NFI @ Ameriplex 12,454,638.00 2020
5020 Dylan Drive
South Bend, IN 46628
Cliff Bruanstein
856-470-2752
Section I Experience Questionnaire
Response to Question #2
Public Works Projects under Construction
Technology Resource Center Buildouts
Ignition Park
South Bend, IN
Main Street/Wayne Street Parking Garage Renovation
South Bend, IN
Bristol Municipal Complex
Bristol, IN
Non -Applicable
Ancilla Domini Sisters, Inc.
9601 Union Road
Donaldson, IN 46513
Susan Black
Elkhart General Hospital
600 East Boulevard
Elkhart, IN 46514
Tom Johnson
Cross Aluminum
Mayflower Road
Niles, Michigan 49120
Jackie Leets
South Bend, Indiana 46614
Section I Experience Questionnaire
Response to Question #3
Section I Experience Questionnaire
Response to Question #4
Private References
Ryan Rans
Great Lakes Capital, LLC
112 West Jefferson Blvd.
South Bend, IN 46601
Steve Garatoni
SGD, LLC
2043 South Bend Avenue
South Bend, IN
LionsHead Specialty Tire & Wheel
827 Lincoln Avneue
Goshen, Indiana 46528
Section II Plan and Equipment Questionnaire
Question #1 Response
Majority Builders, Inc. intends to start work upon receipt of "Notice to Proceed". A Gantt
project schedule will be generated highlighting the sequencing of work, the trades involved,
and benchmark dates. Subcontractors, suppliers as well as Majority Builders' employees will
coordinate under the direction of a fulltime jobsite superintendent and office project manager
to complete construction of the project on time.
Section II Plan and Equipment Questionnaire
Question #2 Response
Name
BC Mechanical, Inc.
882 Anderson Road
Niles, MI 49120
North Central Mechanical, Inc
1721 North Cedar Street
Mishawaka, IN 46545
Ross Masonry, Inc.
2414 Autumn Trails Drive
Mishawaka, IN 46544
Shambaugh & Son, LP
56575 Twin Branch Drive
Mishawaka, IN
Pritchard Mechanical, Inc.
23598 State Road 2
South Bend, IN 46619
Brief Description
Mechanical Contractor
Mechanical Contractor
Masonry Contractor
Fire Protection Contractor
Mechanical Contractor
Section II Plan and Equipment Questionnaire
Question #3 Response
List of project subcontractors will be provided upon request within 48 hours.
Section II Plan and Equipment Questionnaire
Question #4 Response
450 Dozer
9030 Excavator
650 Dozer
821 Loader
850 Dozer
644 J.D. Front End Loader
(2) 1845-c Skid Loader
Moxy Haul Truck
Volvo Artic Dump Truck
(2) Komatsu Artic Truck
(2) 580E Extended Case Backhoe
9050E Excavator
Int. Dump Trucks
Mac Flatbed Truck
(2) Erection Cranes
Forklifts
Compactors
792 Excavator
Grader
Landscape Grader
Semi Storage Trailers
Concrete Wall Forms
Concrete Equipment
(6) Hand Held Compactors
Concrete Breakers for Equipment
Drilling Rig
Semi with Drop Neck Trailers
(4) Tag Trailers
Air Compressors
Air Gun tools for framing Scaffolding and
Scaffolding Wagons
Many types of drills & hand tools
Concrete Saws
Over 15 Company trucks
Misc. Steel Concrete Forms
Trenchers
Transits with digital read outs
Lasers for grading and Acoustical
Wood shapers, table saws, radial
ceilings
saws for woodworking
Landscape Tractor
NOTE: This is by no means a complete list of our Company resources, but it does indicate our
capabilities.
Section II Plan and Equipment Questionnaire
Question #5 Response
We have received material pricing.
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF Indiana )
) SS:
St. Joseph COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
Version 01/29/2020 Contractor's Bid for Public Works - 4
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee
or applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of employment, or any matter directly or indirectly related to employment because
of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual
orientation or disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions will consider the Contractor's good faith efforts to obtain participation by those
subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to aft-MWBE;
however, they may not unlawfully discriminate against said MBE/WBE. A finding of noncompliance or a
discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one
(1) year from the date of such determination, and such determination may also be grounds for terminating
the contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
may result in forfeiture of contractual payments.
Version 01/29/2020 Contractor's Bid for Public Works - 5
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and comet.
Dated this 14th _, day of Ai_, 20 20
, Majority Build,ers, Inc.
Contractor/Bidder (Firm
Signature of Contractor/ Bidder or Its Agent
David Jaston / Vice Predl,dent
Printed Marne and "Fitle
Subscribed and sworn to before me this 14th d2020 ayqf,—,ADri1
lily Commission Expires 07114/2027
(Notary Public
County of Residence •
CATHERINE A PRANGE
NOTARY PUBUC- INDIANA
Commission No. NP0721290
My Dommi5sion Eqikes 071142027
Version 01/29/2020i Contractor's Bid for Pubhc-UJor�s - F,
Mo 17 U =* I'll &-GItyoT5ouD78—era
Project No. 119-061
Project Name: Press Ganiey Administration Building Site ImprovemenA
Project Number- 119-061 ADDENDUM No. O03
�For Bids Due: 14-Apr-20
Contractor Name: MajoritZ Builders, Inc.
David J. Paston/Vice President
(Printed Name of Person Submitting)
Version 4/2/2019 Contractor's Bid For Public Works-`I0
z
0
w u
w
0
U.
I"
0
ec,
46
o
CL
E
08
LLJ
. . .................
22
m
O
CD
EL W
0
0 (D
U)
0
T)
0
0
0
E
E
CL
LU
m
m
06
0
E
m
z
I
m
1316 COUNTY -CITY BUILDING
227 W.JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/235-9251
F.Ax 574/ 235-9171
TDD 574/ 235-5567
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
Date: April 3, 2020
To: All Planholders
From Linda M. Martin, Clerk, Board of Public Works
Subject Addendum Number: 1
Project Name: Press Ganey Administration Building Site Improvements
Project No.: 119-061
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received:
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by fazing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes: Please see attached memo.
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company:
Authorized Si
Z RJERM
U
1316 COUNTY -CITY BUILDING
227 W.JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/235-9251
FAx 574/ 235-9171
TDD 574/ 235-5567
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
Date: April 6, 2020
To: All Planholders
From Linda M. Martin, Clerk, Board of Public Works
Subject Addendum Number: 2
Project Name: Press Ganey Administration Building Site Improvements
Project No.: 119-061
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received:
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by fazing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes: Please see attached memo.
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company:
Authorized Si!
Date: "I I _::f_1 Imo,
PEACK
13 16 CouNn'-Cri Y BUILMNO PHONr 574/ 235-92i 1
2 2 7' \V, J E ITT'RSON BOULF.VARD FAX 4 AX 57/ 235-9171
SOU III BFNI), NIDIAN,A 46601-1830 TDD 574/ 235-5567
CHNOFSOUT11131"ND lAkll",SMI.11?1,1,1,'IZ,MAYoR
130ARD OF PUBLIC WOIMS
Date.- April 9, 2020
To: All Bidders
From Linda M. Martin, Clerk - Board 017 Public
Subject Works Addendum N'Umber. 3
Project Name: Press Ganey Administration Building Site Improvements
Project
NUmber: 119-061
Date Received:
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum by
taxing this sheet to the Board of Public Works at (574) 235-9171. A copy
MUST also be included with your bid package upon submittal.
M
�
9-91MMIMMINI� � I , � � � i I i � � i 1 11 � i I I � , i I
Note:
The attached documents are hereby Add to the Specifications and Contract
Documents and become a part of herein.
Company:
Authorized Signatui-e: /Ie��,
Date: -1. / / c-) /
CITY OF SOUTH BEND
po
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY A
DEVELOPMENT PROGRAM
FORM M'WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBEIWBE participation, It is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration ("I DOA").
Project Number: 119-061 Date: Apr L 14, 2020
Project Name: Press Ganey Administration Building Site Improvements
Bidder- —Maiority uilders Inc
Contact Person: David J. Pastton Telephone: 574z291-209,1
Address*, 62900 US 31 South
City: South Bend State: Indiana zip: 46614
Email: daveft
To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBEIWBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
----- 16/ Owned Business as found on their website (http://www.in,gov/idoa).
ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South
Bend requires that ail perspective bidders complete no less than 2 of the following:
I) Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and
subcontracting opportunities.
Advertise in general circulation and/or trade association publications concerning subcontracting
opportunities, and allow MBENVBEs reasonable time to respond.
Perform any and all necessary steps to provide written notice in a manner reasonably calculated
to inform MBEAA/BEs of subcontracting opportunities and allowed sufficient time for them to
participate effectively.
Utilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in, the recruitment
and placement of MBE/WBE firms.
"Bidder must circle or otherwise notate which of the two (2) required actions were performed.
GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested IMBE/WBEs,
including providing such MIBE/WBE's with adequate information about the plans, specifications and other
requirements of the subcontract and did not reject MBEIWBEs as unqualified without sound business
reasons based on a thorough investigation of their capabilities.
,,,SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by
MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down
contracts into smaller units to facilitate MBE/WBE participation)
CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has
Ord on the subcontracting opportunity:
`111. Name, address, and telephone number;
Z A description of information provided by the bidder or subcontractor; and
B. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE'/BE was unqualifwed to perform the job,
*Prop next to all of the above boxes. Any
omissions y the Board of Public Works. The City of
i SouthG
Version 4/2/2019 Contractor's Bid for Public Works - 9
MBEIWBE
SOLICITATION
INFORMATION
FOR THE
PRESS GANE,Y
ADMINISTRATION
BUILDING
SITE IMPROVEMENTS
PROJECT #119-061
SUBMITTED BY
MAJORITY BUILDERS, INC.
APRIL 14,2020
Prescribed by State Board of Accounts
Governmental Unit
General Form No. 99P (Rev. 2009A)
To.................................................................................... Dr.
MAJORITY BUILDERS South Bend Tribune
506 W. South St., Suite 210
............................................County, Indiana South Bend, Indiana 46601
Tax ID# #83-2810977
PUBLISHER'S CLAIM
LINE COUNT Ad #: 827005
Display Master (Must not exceed two actual lines, neither of which shall total more than four solid lines of type
in which the body of the advertisement is set) -- number of equivalent ...................................
Head --Number of lines
...................................
Body -- Number of lines ....
Body -- Number of lines ....
Total number of lines in notice 24
COMPUTATION OF CHARGES
24 lines, 1 columns wide equals 24 equivalent lines at 1.68 cents per line
Additional charges for notices containing rule or tabular work
(50 per cent of above amount) ....
Charge for extra proofs of publication
($1.00 for each proof in excess of two) $0:00
............. ...................
TOTAL AMOUNT OF CLAIM $80.64
DATA FOR COMPUTING COST
Width of single column in picas 9.4ems Size of 8 point
Number of Insertions 2
Pursuant to the provisions and penalties of IC 5-11-10-1, 1 hereby certify that the foregoing account is just
and correct, that the amount claimed is legally due, after allowing all just credits, and that no part of the same has
been paid.
I also certify that the printed matter attached hereto is a true copy, of the same column width and type size,
which was duly published in said paper 2 time(s). The dates of publication being as follows: S - -
04/01 /20, O4/O2/2O. CHERYL JUNE MOREY
Notary Public - Seal
St Joseph County - State of Indiana
Commission Number 693302
MY Commission Expires Dec 21, 2024
Publisher Che June Morey, Nota ublic
Resident of St. Joseph GUunty
Commission Number: 693302
My Commission expires December 21, 2024
South Bend Tribune
506 W. South St., Ste. 210 South Bend, IN 46601
ON ACCT OF APPROPRIATION FOR
$80.64
Appropriation No. Tax ID# 83-2810977
ALLOWED
IN THE SUM OF $80.64
Attest
That it is duly authenticated as required by law.
That it is based upon statutory authority.
That it is apparently
correct
incorrect
I certify that the within claim is true and correct; that
the services there in itemized and for which charge is
made were ordered by me and were necessary to the
public business
Ad #: 827005
Majority Builders Inc., an EEO
Employer, is encouraging all
qualified MBE / DBE / WBE
subcontractors and suppliers
to submit bids by 3:00 p.m.,
Monday, April 13, 2020 for work
on the following project: Press
Ganey Administration Build-
ing Site Improvements Project
#119-061, South Bend, Indiana.
All bids must be per plans and
specifications which are avail-
able for review. Please contact
our office by Monday, April 6,
2020 if you are interested in
bidding on this project and we
will assist you in putting a cost
together.
Majority Builders, Inc.
62900 U.S. 31 South
South Bend, Indiana 46614
Contact: David Paston
Phone 574-291-2091
Fax 574-291-7472 hspaxlp
BENU)
WN'ro?"ITY A)3`113 WOME.N RU'SfflESS ENTERPIMSE 01"IYER,317"Y
DEVELOPMENT PROGRAM
FORM MWBE-2.1
MBEIWBE CONTACTED
d n Id b led ds and Publ Jke Projects
I h B 'c W�
0 O's on 8 O�B 0 8 a GO a h'8' 0�1" 0 0' So sole msponsibi to verify
T'l 0' P' "pp' wit' 8' t p Oqu 11 conjactod MBE E to obt III od F 1�h Eff'!I) � ljt�111 8 Cth; bidd rs
w Y 11 mill jrjiCJr W I 1 11 1,3u 1�1 fli rt W
r
n d 3 L 1 11 no I �V 01, om n's owaied
athe a at C Y oTa a ass nee a �e a flea 0 8 et"
business.
Project Number 119-061 MBEIWBE ParUcipation Goal
Project Name: Press.,Gan2y Admiiiistration Building Site Improvements
Bidder: R-41A- T--
0
�sident
(Title)
Owner or Contact at MBEANBE Firm
Telephone: V Fax: Email:
-�Aev
TYPE OF WORK SOLICITED FOR THIS PROJECT:
. ... .........
Owner or Contact at IVIBEANBE Firm
Telephone:
TYPE OF WORK SOUaTED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE)VVBE FIRM:
Vemion 44,212019 C011b'800r"15 Bid ft• PUbk)J'Varks --10
ril 14, 2020',
(Date)
C'�'ITYOF WOUTH BEN[)
PfiJN()R,J'TY,Xt4fl() Aft)MEN BILNINESS ENTERPRISE
RN't
DEVELOPMENT PROGRAM
FORM MWBE-2.11
MBEMBE CONTACTED
'This completed form should be supplied with Bids that pertain to City of South, Bend Public Works I Projects
roquiring contactecl MBEIWBE to obtain Good Faith Effort& It Is the bidder'le responsibility to verify
whother any fisted m1norfty or woman bushiess meets the quallficatilons of a Mincrity or Women* owned
business.
Project Number , 119-061 MBEIWBE Participation Goal
Droj
, lect Name: Press Gang Administration Building Site Improvernents
3id.1- - - T- -
A
N
..........
(Signature) (Title)
y. A
Telephone: -121 Fax�:
TYPE OF W*VC
RESULTS OF CONTACT OJITH THE MBUNBE FIRM:
Email:
Version 402,019 Conkrador's Bid for Public Wat 1,,s -10
SENW3
6
11"II Wf,)1WFN BUMNESS ENTERPRISE DfVEqt&] IrY
DEVELOPMEN'TPROGRAM,
VA�
FORM MWA BE-2.1
MBE/WBE CONTACTED
This completed f0ml should be supplied with Bids that pertain W It of South Bond Public Woir—kis7rojecir—,
requiring contectad MBEIWBE to, obtain Good Faith Efforts. It is the bidder's sole responsibility to verity
whether any flated ininority Or WONTIan I'm'siness meets the qualfficattans of a Minority or Women% OWned
husilless. -It �1'
PAGE__,J OF
ZSMWM���
; 71141 IAVYJ 1.11
Project Name: Press GagttAdministration Building Site Improvements
lidder. Vi. 4 --a"V �-, 71.. .2 1 -:� - - -
By:
L 14, 2020,,'
(Signature) (Tftle) (Date)
UT111*1 �0�
ffi-T9Ar*TWZ
zl�l I. � ., ,
ragm =Ml
Telephone: I 4�5 Fax:
M
RESULTONTACT VVITH THE MBE1VVBE FIRM:
�e)
Email: ip, X. �4&-
,
Vemion 412/2019 Contracior'o, Bidfor PUNic VAJorks - 10
,C"IFY OF SOUTIH SEND
F",Ff fANHYMIC MEN BUSIINESS ENTEl"iN ',,ZISE RfWk',"qRS1"(r"f IWIN
DBJELOPMENT PROGRAM
FORM MWBE-2.'l
MBEJ'WBE CON'TACTED
This—compieted �form aijouid be supplied Wth Bids that Pertain to City of S TIT —Bend i Ublic Works Projects
requifing contacpod: MBEfWBE to obtain Good Falth Effods. It Is the bidder's sole responsibility to verffy
'whether arty listed mhorIty or, ipioanmi bushwas Fneate ft qualifications of a Minavity or'�Wotner�ils owned
business.
PAGEL_��PF-'-�Y__
Project Number 119-061
ftiect Name: Press Ganey Administration Building', Site ImMvements
Pidder:
BY'
01 Vice President A ril 14 2020',
'i �"
(Signature) (Title) (Date)
1011 liid
Telephone- Fax�: Ernail:zf
TYPE OF WORK SOLICITED FOR THI�S PROJECT:
zn�A�
ir
e'
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH T1-11E MBUNBE FIRM:
Version 4/212019 C.,oab-actor's Bjbl for PUbfic)N60m - -10
j,�U ilf
�1,d 1"WND
04*41,-.31R,TY A!Kfl�,,3,r WYOME'N, B1,JSINESS
4�
DEVELOPMENT PROGRAM
FORM MWBE-2.1
MBIB E CONTACTED
This completed form should ;7siti-p-i—pliec-1 with Bids that pertain to City of South Send Public Works Projects,
requiring, contacted MBEIWBE to obtain Good Faith Efforts. It Is the bidder's sole responsibility to verify
Whafter any Elated m1nority orwoman business fneets the qualffications of a Mlnodky or Women's awned
business.
PAGk.,2 F.
Project Number: 119-061 IWBE Participation Goal
Project Name: PressgG!aqn9y dministratlon Building Site Improvements
Bidder: -,p mn4-4i-- R-419— T--
0
(Signature), Ple) (Date)
zfflgr�
Owner or Contact at MBE/WBE Firm
Telephone-
N
,v7A
TYPE OF WO141k SOLICITED FOR ... PROJECT:
Owner or Contact E
feleph)one: — — - �Iln � Fax:
TYPE OF WORK SOLICITED FORI THI'S PR6�,JECT.
11 7 a FAMIRM
Emaili: 0
Version 42/2019 Contractor's Sid f0i'PHIAG Works -10
K
VrYOF SOUTI-4 BEND
BIP","MIESS
Ilia
13EVELOPMEN'T MOGRAM
FORM MWBE-2.1
NIBEMBE CONTACTED
This completed fonn should be supplied with Bids that pertain to City outh Bond Public rks Projects
requiring Contacted MBEfYVBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any flotod m1nority or vvofflagll, WZIMSS MOW thous CILMIffications of a Minority or Women' s owned
business. J
PAGE 0 ._4r
Project Number: 119-061 M�BEIVVBE Participation Goal
Project Name* Press Dane y Administration Building Site Improvements
Bidder: -)
By: Vice President April.1 14, 2020""
(Signature) (Title) (Date)
Owner or Contact at MBE/WBE Firm AWAA444z' ZaL
Telephone: Em
TYPE OF WORK SOLICITED FOR THIS PROJECT: I
eill-I
RESULTS PF CONTACT WITH THE IMBE/WBE FIRM:
Version 4/2/2019 Gonkra0k)r's Bid for Public Works - 10
ili,nxnti " ,, o U I � � &4,
HFND
BtASINESS
OLIEVELOPMEN"I'"PROGRAM
FORM MWBE..2.1
MBEIWBE CONTACTED
This completed fomi should be supplied with Bids that pertain to City of South Sond PubI!—cWor—k9'T7roe—ct.;
requiring contacted MSEMBE tz obtain Good' Faith Efforts. It is the bidder's sole responsibility to verify
whet1w any flsibd rainority or wornan bushiess meets the qualfficatione of a Minority or Women's owned
business.
PAGEL-2-9F,
Project Number: 119-061 MBEMBE Participation Goal
Project Name: Press-gAqqy Administration Suflding Site Improvements
Bidder: M.4-,t4V4-, 12-41A--- T- -
1.2
(Signature)
LTATGT--=,
('itle)
MBEANBE Firm
Owner or Contact at MBE/VVBE Firm -2224Vv &,�c
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT-
02301M
Owner or Contact e
1'elephone:
Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT- V,
RESUL-rs OF CONTACT VVITH THE MBE/VVBE FIRM
VemOn 4/2/2019 Bid fi'Y PUblk, Works - 10
DEVELOPMENT PROGRAM
FORM MWBE-2.1
MBEIWBE CONTACTED
This completed forni should be Supplied with: Bids that partahi to City of South and Public Works Projects,
requiring cantacted MBEIWBE to obtain Good Faith Efforts. It Is the bidder's sole responsibility to verify
whether any listed rninority or w(,,wnan bushless Triepsts the qualificaltions of a Mir orlty or 'Nomeri's awnfacl
business.
PAGE_,� ,_PF.,Z
Project Number: 119-061 MBEMBE Participation Goal
Project Name* Press G
Bidder: M� 4 --'44- M.. -; 1 A --- T--
A
Vice Presiden
(Signature) (Date)
111; 3; flyff AM -4 U M,
a#xfz
Owner or Contact at MBENVBE Firm
Telephone: ZZ: 2
Fax:
Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
[111104YZAAMI
Owner or Contact at i
. .. .......... ....... . .... ..... ....
RESULTS OF CONTACT)AII-1-11 THE MBEMBE FIRW
Version J,/2/2019 Covvtnactor'a Bid for Flublic Ofixks -10
4W
B[1J8WE85,,,; E�,,,J'T1 RPRU,941,-z
DEVELOPMENT PWGRAM
FORM MWBE-2.1
1666
MBEWBE CONTACTED
-fif—m—co—mpleted form should be suppiled with Bids that pertain to City of South and PUblic �WorksProjectz
requiring Contacted MBE/WBE to obtain Good Faith it units, it Is the bidder's sole res,pnsibility to verify
whather any Us W minanty or woman bushiess ineetc., the qualifications of a ism aority or'Wonlen's owned
businass.
PAGE_1-01F,�_._
Project Number: 119-061 MBE/WBE Participation Goal
Project Name- Press Ganey Administration Building Site Jimprovements
Bidder: ,? Mn-iW;14-- "Q-41A-, T--
By:
(Signature)
Owner or Contact at
Teleph,one'a�/—� — Fax,
ltl
Email: ,
MBE/WBE Firm
Owner or Contact at MBENVBE Firm
Telephone-a.Fax. Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITI-1 THE MBENIBE FIRM
Version,4020,19 Conb,aciw's UdIm"Public 'Alorks -10
=a
14. 2
T
1"TYN"SOU YH BUH)
YANI)Ml-:,'�N BUSINESS
DEVELOPMEN"r PROGRAM
rr 61;
FORM NIVM,E-2.1
MBENVIBE CONTACTED
This cornplatedfomi, should be supplied with Bids that, pertain to City Of SOUth Bend Public Works Projects
requiring contartwl MBEIWBE to obtain Good Faith Efforts, It Is the bidder's sole responsibility to verify
whether any listed niftiority ov, wacrwn business meets the quallficastlons, of a Minority or lNomens owned
business.
PAGE
Project Number: 119-061 MBE/WBE Palticipation Gol
Project Name: Press Garble y Administration Building Site Improvements
Bidder: '11-41A- T--
BY: ....... Vice Pres,ident April 14 2020-'
(Signature) (ritle) (Date)
--Owner of, Contact at,MBEJWBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
-------- - -
RESULTS OF CONTACT WITH THE MBEANBE FIRM:
AD&WITH]
Omar or Contact at MBEANBE Firm'
Telephone: Fax: Email:
600-IL
'rYPE OF)NORK SOLICITED FOR THIS PROJECT:
RESSULTS OF C ONITACT WITH!,rHE
V,�rq,flon 4020,19 COF1 P'YEICA(01"'�-3 Bid f0f- PUblk) VVCWkG -10
W
84,,N-31N,NESR Ni
E)EVELOPMENT PROGRAM T, R
NAM
FORM MWBE-2.1 r ray
MBE�IWBE CONTACTED
Thils C01"Plated Cann should be supplied with Bid$ that pertain to C" of South Bond Public Works Projects
requiring oantacted MBENVBE, to obtahi Good Faith Effoots. It is the bidder's sole responsibility to verify
whether any listed minoulty or �Nognen business meets the qualffications of a MInority or Women's cYwjjfDd
business.
PAGE4Y
PAG F4w
Project Number: 119-061 MBEIWBE Participation Goal
Project Name- Press Site Improvements
Bidder. -)
By
(Signature)
zm�T M
Telephone: Fax:
979ADTA M10 �
Z,Vkllk 144-
. . . ... ... .. ........... — . . ....
mra =1
MBEANB,E Firm
2
Owner or Contact at 631iE Firm i, �
Telephone:
Fax: Email:
TYPE OF WO A aOUCITIiD'FOE THIS PROJECT:
............
RESULTs OF CONTACTWITI-11 THE i BEAVBE FIRM,
Varsioa 4,12,r201 '�y Contractor's Dd for Pa k)JjG)Alods - '10
iril 142 2020"'
(Date)
SUSINESs
DEVELOPMENT PROGRA ML
FORM MWISE-2.1 TM
MBEIWBE CONTACTEDrrt
This completed fonr n Shol,1111d be supplied with Bids that pertain to City of South and Publie, Works Projects
requiring contacted NIBEMBE, to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minarity or wornarm business meets the qualffications of a Miriority or Waniffli's Owned
business. PAGE
Project Number 119-061 MBE/WBE Participation Goal
Project, Name: Press Ganey Administration Building Site Improvements
Bideder: ,,i U-41-1— T--
By: 6z2- . . . . . . . . . ... .
(Signature)
MBE/WBE Firm ie)�
Owner or Contact at M BEMBE Firm
zM9NMffl=
PJT-ZM
'relephone: Fax:
'rYPE OF WORK SOUCITED FOR THIS PROJECT,
RESULTS OF CONTAGIT VVM-1 THE RABEANBE FIRK
Email:
Version 42/2019 Con 'Pr,.,xAor'a Bid for Pub4c VVbrks - 10
"HIJ fl ENTERPRISF"
DEVELOPMENTPROGRAM
FORM MWBE-2.1
MBEIWBE CONTACTED
This completed forn,i should be supplied with Bids, that pertain to City of South Bend Public Works Projects
requiring contacted MBE,NVBE to obtain Glood Fafth Efforts, It Is the bidder"s solo rpspo,nsibility to varify
whether any Usted minoft ar wiornaon business meets the ClUaIMCGU0118 of a Mlnodrty or Womews, w crvvr
busilless.
PAGE
Project Number 119-061 MBENVBE Participation final
Project Name: Press Dane y Administration
Bidder:
By:
Vice President 20, IkPril 14 20'
A 011 2-- 1 , -
(Signature) (Title) (Date)
I&I'A l MAN=
Owner or Contact at MBENVBE F(M
Telephone:'�,/,
Fax: Email:
),AAX)JA e'IIIJ 19,' . Ve
TYPE OF WORK SOLICITED FOR THIS PROJECT: I .
ams zg���
A Z1112=1
Owner or Contact at MBENVBE Finn
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF C,',OIT, (','I' WITH THE MBE/WBE FIIRM:
VerMorj 402019 Bid for Pubfic))VbrRs- 'I fr,)
P0i*,KAi,'V1"Y X�H03 AK.")MFN BL181"WESS
0 EV EL 0 P'M E NTP ROG RAM
FORM MWBE-2.1
,
MBE' BE CONTACTED
Th"71s -Completed form should be supplIed with Side that paitain to City of Soutt'i Bend Pubfic Works Projects
requiring contacted MBEIWBE ti) obtain Good Faith Efforts. It Is the bidder's sole responsibility to verify
whether any flated m1nority or wonion businems, meets ffie qualificatione, of ai Minority orlNounen'a owned
business. PAGE__Z��DF
9SMMMEMMMNM�
MBEIWBE Participation, Goal
Project Name: Press Gale y Administration Building Site Improvements
Bidder: Un +ni-17 'R-4 1 A.1-. "r—
By:
rVice President April 14, 202Q'
S"riature) (Title) (Date)
Owner or Contact at MBENVBE Firm
Telephone:
ZfflVvT44=
Owner or Contact at
Telephone: R Fax:
"TYPE OF VVORK SOLICITED, FOR THIS PROJECT:
RESULTS OF CONTACT)NITH THE MBE/VVBE FIRM:
Email:
Email:
z C, 00
Verion 412/2019 ( Bid fr PL9,AC -10
6,,,44V 01F 8OkJll�'H ffl,`�,N[)
JR111"Y 1�60"Hfl'OVVC MEN BUSINES, �" EN
IDEVEI-OPMENTPROGRAM
FORM MWBE-2.1
(865
MBEIWBE CONTACTED
T'hi,s complated to should be supplied with Bids that art in to City of $oath Sen l u 11c Works Projprta
requiring contacted MBENIBEW obtain Good Faith Effort . it Is the bidder's, sole msponsibility to verify
whether any Rated in'novitry ar vmvnwi� businese meets the qualifleations of a Minority or �ffi)men's t,)wroeid
busines's.
PAGELJ-':)—QF�
Pmject Number: 119-061 MBE/WBE Participation Goal
Project Name: Press Ganey Administration Building Site Improvements
8�
By. April 14L 2 1 ' / � . . ............ ... - Vice President __.�:02200"'
nature) (Date)
0 0
RESULTS OF CONTACT WITH THE IMBEANBE FIRM:
Owner or Contact at MBEANBE Firm �&&e
Telephone: Fax: Email,
TYPE OF WORK SOLICITED FOR THIS PROJECT: 7
. ......... . . ..... .
RESULTS OF CONTACT VVITI-11 T1--1E MBEIVY'SE FIRM:
vemion 4-1212019 Contractor's BN for Pubfic'Okwks - '10
CITY OF SOUTH BEND 6�
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY 4�
DEVELOPMENT PROGRAM
�4 0
FORM MWBE,-2.1
MBEfWBE CONTACTED
This completed form should besupplied with Bids that pertain to C :Ity of South Bond Public Works Projects
requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business. I
Project Numbec 119-061
Project Name: Press Ganey Administration, Building Site Improvements
Bidder: ,-) Mn4�4tV+-- 7Q-41A— T—
(Signature)
Vice President
(Title)
MBENVBE Firm
4z"
Owner or Contact at MBE E Firm
Telephone:
Fax. Email-,
TYPE OF WORK SOLICITED FOR THIS PROJECT:
. . . . . . . ..........
Version 4/2/2019 Contractor's Bid for Public Works - 10
CiTY OF STH BEND S5,
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY Al
DEVELOPMENT PROGRAM
FORM MWBE-2.1
MBEfWBE CONTACTED 1865
4 , v
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsiblifty to verify
whether any listed minoft or woman business tneets, the qualifications of a Minority or Women's owned
business. PAGE_Z—OF
Project Number 119-061
-851: . 0.
0 1 *Z
Project Name: PressGapeAdministration Building Site Improvements
Bidder , 7 M.4,VVVf-- n-41A--- T--
By:
(Signature)
MBEANBE Firm
Owner or Contact at MBEANBE
President
LW
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
91
TelephonwEmail
TYPE OF WOR66EICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MIBENVBE FIRM:
110X(M
Version 4/2/2019 Contractor's Bid for Public Works - 10
CITY OF sou"m BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY PINK
DEVELOPMENT PROGRAM
AITACP . ....... .
FORM MWBE-2.1
MBEtWBE CONTACTED
0V NT%7194--e-TrRF70
requiring contacted MBEIWBE to obtain Good Falth Efforts. It Is the bidder's sole responsibility to verify
whether any listed minority or woman, business meets the qualifications of a Minority or Women's owned
business. PAGE_,,& OF
Project Number: 119-061
M11 1--azzM=1 � r AW
Project Name: Press Ganey Administration Building Site Improvements
Bidder: 11 M4,-VCV4— 1-41A--- T- -
A,
wq 127-mror- M,
" (Signature) (Title) (Date)
RESULTS, OF CONTACT WITH THE MBE/WBE FIRM:
Owner or Contact at I
Telephone: Fax:
TV= nz: NAInmv oni 101'rEn CrIt" "rl ]in nm
RESULTS OF CONTACT WITH THE MBE FIRM:
Email:
Version 4/2/2019 Contractor's Bid for Public Works -10
KIP8111111
CITY OF SOUTHI BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITYPi
DEVELOPMENT PROGRAM
FORM MWBE-2.1
MBEfWI3E CONTACTED
. ........... ....... —
-This comple d form should be supplied with Bids Mc to City —of South Band Public Works Projects
requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or wornan business, meats the qualifications of a Minority or Wornen's owned
business. '5 PAGiE OF
7�
9MMUNSEMIGEM
lyllagwvygul�-��
Project Name.- Press Ganey Administration Building Site Improvements
Bidder: ,-7 ern !n'VVf-xr IR-41A.— T--
By: . . ..... -v
(Signature)
MERE Firm
Owner or Contact at MBEIWBE Firm
0 =I-
. . . ......... ... ..
Telephone, Fax:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
M. 33r.- MT
I MA[ff Ira
Owner or Contact at I
Telephone:d.--
Far.
(Title)
Email:
Email: FN
/v
Version 412/2019 Contraictor"s Bid for Public Works - 10
CITY OF SOUTH BENDaroaaar
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM{ypPEE Rk
FORM M11y1"BE-2.1
MBEWBE CONTACTED
This completed form should be supplied with Bids that pertain to City of Scuth Bend Public Works Projects
requiring contacted MBEIWBE to obtain Good Faith Efforts, It is the bidder's sole responsibility to verify
whether any listed', minority or woman business meets the qualifications of a Minority or' Women's owned
business.
PAGE——OF,��,,
I-Iroject Number: 119-0611 M'IBENVBE Participation Gc?2.
Project Name: Press�GA,a�nie Administrati
Bidder: -) Mn4 '0.. 4 1 .1 --,. T—
By:
>--� -- Vice President April 14, 2020"'
(Signature) (Title) (Date)
Telephone: Fax
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WTH THE MBE/WBE FIRM:
ZiL
Email: Azca-��
Version 4/2-/2019 Contractor's Bid for Public Works - 10
CITY OF SOUTH BEND ok
4,
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
U,
DEVELOPMENT PROGRAM
FORM MWBE-2.1
MBEfINBE CONTACTED rids
P E AG _A/ 01%4-:�
9ESUBSE301HEM
Project Name: Press Gene y Administration Building Site Improvements
Bidder: , -,, M-v'4-- D-41A--- T--
0
Vice President
(Title)
Owner or Contact at MBE Firm
Telephone- Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
ltl�14iv, Y.!d4401 .4
RESULTS OF CONTACT WITH THE VIBE-,i-01E FI12,11:
Telephone: Fax. Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT-,
(Date)
NIXON
Version 4/2/2019 Contractor's Bid for Public Works - 10
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM
FORM MWBE-2.1
MBEfWBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBEfWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
PAGE_OF
Project Number: 1119-061 MBEJWBE Participation Goal
Project Name: Press Gang Administration Building Site Improvements
T--
By: Vice President Lril 14 2 20210,"
(Signature) (Title) (Date)
181,11
Owner or Contact at I
Telephone: L Fax:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE/WBiE FIRM:
MBEMBE Firm - T—i -,— , , /,,-
Email:
Owner or Contact at MBEAAME Firm
Telephone: Fax: Email:
TYPE OF WORK'SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBEANBE FIRM:
Version 4/2/2019 Contractor's Bid: for Public Works - 10
CITY OF SOUTH BEND �§wOvii, N�1,
MINORITY AND MEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM
FORM MWBE-2.1
MBEfWBE CONTACTED
This com,pleted fen n should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiringi contacted MBEIWBE to obtain Good Faith Efforts, It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
PAGE_,2_OF —
gr,=vmm.��
Project Name: Press Ganey Administration Building Site lq!rt�v rflerwts
Bidder: , -)� M� 4 —Oe4�— V.. 4 1 A --- T--
By: Vice President April 14,, .202(i.,
(Signature) (Title) (Date)
MBEIWBE Firm
Owner or Contact at MBENVBE Firm
Telephone: A -5e Fax: Email: P
TYPE OF WORK SOLICITED FOR THIS PROJECT:
.... . ......
RESULTS OF CONTACT WITH THE MBEME�E FIRM:
so
MBEIWBE Firm
wamelaywolgjaegliff -1116"2:12"laft
Version 4/2/2019 Contractor's Bid for Pubfic Works - 10
CITY OF SOUTH BEND
MINORITY AND WOMENBUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM
FORM MWBE-2.1
MBEfWBE CONTACTED
This compill—eted f6irri" should —be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBEfWBE to obtain Good Faith Efforts. lit Is the bidder's sole responsibility to verify
whether any listed minority or wornan business meets the qualifications of a Minority or Women's owned
business,
PAGE Z. OF_Q2.j�
Project Number: 119-0,61 MBEIWBE Participation Goal
Project Name. Press Ganey Administration Building 'Site Improvements
Bidder:
By:
I L(s ?i"g
NAB Firm
Owner or Contact at M13E)W6E Firm
Telephone: 4&Z Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
Telepi Fax. � Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Version 4/22/2019 Contractor's Bid for Public Works - 10
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM
FORM MiWBE-2.1
MBE1WBE CONTACTED
186S
This completed! form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business., PAGE,2L_OF_,��,�
Project Number: 119-061'
Project Name: Press _qAnelAdministration Building Site Improvements
Bidder: -7 pan 4.�VTi-- R-41A— T—,
By: ,/ Vice President April 14, 2020,
.. (Signature) (Title) (Date)
Owner or Contact at MI E/WBE Fir/m , -- -,k �,? -, (S f2
Telephone: Fax: Email::
TYPE OF WORK SOLICITED FOR THIS PROJECT:
ZMATT0-Taff Ira
Fax:
I
Version 4/2/2019 Contractor's Bid for Puiblic Works - 10
Cathy Prange
From:
Sent:
To:
Subject:
Attachments:
Tracking:
Cathy Prange <cathyp@majoritybuilders.com>
Monday, March 30, 2020 10:48 AM
'cathyp@majoritybuilders.com' (cathyp@majoritybuilders.com)
FW: INVITATION TO BID - City of South Bend Indiana Project No. 119-061 Press Ganey
Administration Building Site Improvements
119-061 Press Ganey Administration Building - Plans.pdf, 119-061 Press Ganey
Administration Building - Specifications.pdf
Recipient
'cathyp@majoritybuilders.com'
(cathyp@majoritybuilders.com)
'Anhonesthand@outlook.com'
'drussell@bellsom.com'
'Ibott@frontier.com'
'mabusch@etczone.com'
.Icrosier@crconstruction.info'
'reeddonon008@comcast.net'
'CHRISTINE@CHRISTINECONCRETE.COM'
cmclendon@circlecityrebar.com'
aprazeau@context-design.com'
'contact@cornerstone-constructiongroup.com'
'alphacneff@earthlink.net'
'dsalenda@dindydesignconcepts.com'
'edowe11 @msn.com'
'Ishaw@ecrodgers.com'
'clayton@ejconcrete.com'
'btexpress57@gmail.com'
johnt@firstelectricsupply.com'
'g.l.e.m@sbcglobal.net'
'HHConstJanet@aol.com'
'mike.madrid@hss-mmco.com'
'donna@hubingers.com'
'tcardwell@integritycons.com'
'joses_masonry@yahoo.com'
'kenjackson2005@hotmail.com'
'lovelylawnslandscaping2@yahoo.com'
'terrimcmann@mcmannelectric.com'
'carlaamcvea41 @yahoo.com'
'dsarkisian@modernedgellc.com'
'mIm4620@comcast.net'
'ahunt@molinaconcrete.com'
'morganstripe@att.net'
Read
1
Recipient Read
ImyersbuiIders25@yahoo.com'
'amanda@nobiIityenterprises.com'
'ajones@peci.com'
'info@pks-construction.com'
'nprice@price con structiongroup.org'
juanhernandez1133@yahoo.com'
'dawn.tkelectric@gmail.com'
'patricia@sskeller.com'
'sharon@sajconstruction.com'
'chelsea@smootlandscaping.net'
'Sneedconstruction@gmail.com'
'solidfinish@live.com'
'dub164@aol.com'
'tina@tcelectric.us'
jmckee@comcast.net'
'tigerconcrete@tigerconcrete.net'
'topnotchbbs@aol.com'
'terranceartis@yahoo.com'
Adrian Hunt
Read: 3/30/2020 11:01 AM
Tina Eason
Read: 3/30/2020 10:58 AM
Tyrone Cardwell
Read: 3/30/2020 10:57 AM
Linda Shaw
Read: 3/30/2020 11:28 AM
Dexter Salenda
Read: 3/30/2020 6:07 PM
You are invited to submit your proposal for this project to Majority Builders by Monday April 131h at 3:00 PM.
• Sales tax exempt
• Project completion date 10/31/2020, $1,000.00/day liquidated damages clause.
• Please review contract documents and specifications
• XXI. Description of Work (in the specifications) outlines required alternate costs, which should be separated on
your proposal.
• Please contact David Paston, d_ave@maioritybuilders.com if you have questions.
Thank you,
David Paston
Vice President
Majority Builders, Inc.
62900 US 31 South
2
CITY OF SOUTH BEND
po
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY A
DEVELOPMENT PROGRAM
FORM M'WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBEIWBE participation, It is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration ("I DOA").
Project Number: 119-061 Date: Apr L 14, 2020
Project Name: Press Ganey Administration Building Site Improvements
Bidder- —Maiority uilders Inc
Contact Person: David J. Pastton Telephone: 574z291-209,1
Address*, 62900 US 31 South
City: South Bend State: Indiana zip: 46614
Email: daveft
To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBEIWBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
----- 16/ Owned Business as found on their website (http://www.in,gov/idoa).
ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South
Bend requires that ail perspective bidders complete no less than 2 of the following:
I) Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and
subcontracting opportunities.
Advertise in general circulation and/or trade association publications concerning subcontracting
opportunities, and allow MBENVBEs reasonable time to respond.
Perform any and all necessary steps to provide written notice in a manner reasonably calculated
to inform MBEAA/BEs of subcontracting opportunities and allowed sufficient time for them to
participate effectively.
Utilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in, the recruitment
and placement of MBE/WBE firms.
"Bidder must circle or otherwise notate which of the two (2) required actions were performed.
GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested IMBE/WBEs,
including providing such MIBE/WBE's with adequate information about the plans, specifications and other
requirements of the subcontract and did not reject MBEIWBEs as unqualified without sound business
reasons based on a thorough investigation of their capabilities.
,,,SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by
MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down
contracts into smaller units to facilitate MBE/WBE participation)
CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has
Ord on the subcontracting opportunity:
`111. Name, address, and telephone number;
Z A description of information provided by the bidder or subcontractor; and
B. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE'/BE was unqualifwed to perform the job,
*Prop next to all of the above boxes. Any
omissions y the Board of Public Works. The City of
i SouthG
Version 4/2/2019 Contractor's Bid for Public Works - 9
Cathy Prange
From: Adrian Hunt <ahunt@molinaconcrete.com>
Sent: Tuesday, March 31, 2020 7:34 AM
To: Cathy Prange
Subject: RE: INVITATION TO BID - City of South Bend Indiana Project No. 119-061 Press Ganey
Administration Building Site Improvements
David,
Thanks for the consideration, right now were restricting travel outside on Indianapolis, IN. We will not be
bidding. Thanks for the ITB. Good luck on the project.
Respectfully,
ADRIAN HUNT I Director of Construction & Project Management
MAN
1"WLINA
Concrete Construction
o: (704) 860-5763 1 m: (980) 288-6673
ahunt@molinaconcrete.com I www.molinaconcrete.com
IMPORTANT: The content of this email and any attachments are confidential. They are intended for the named
recipient (s) only. If you have received this email by mistake, please notify the send immediately and do not
disclose the contents to anyone or make copies thereof.
From: Cathy Prange <cathyp@majoritybuilders.com>
Sent: Monday, March 30, 2020 10:48 AM
To: cathyp@majoritybuilders.com
Subject: FW: INVITATION TO BID - City of South Bend Indiana Project No. 119-061 Press Ganey Administration Building
Site Improvements
You are invited to submit your proposal for this project to Majority Builders by Monday April 13th at 3:00 PM.
• Sales tax exempt
• Project completion date 10/31/2020, $1,000.00/day liquidated damages clause.
• Please review contract documents and specifications
• XXI. Description of Work (in the specifications) outlines required alternate costs, which should be separated on
your proposal.
• Please contact David Paston, dave@maioritybuilders.com if you have questions.
Thank you,
1
David Paston
Vice President
Majority Builders, Inc.
62900 US 31 South
South Bend, Indiana 46614
Office (574)291-2091 Ext. 213
Direct (574)222-2402
dave@maioritybuilders.com
CONFIDENTIALITY NOTICE: This email and any attachments are for the exclusive
and confidential use of the intended recipient. If you are not the intended
recipient, please do not read, distribute or take action in reliance upon
this message. If you have received this in error, please notify us
immediately by return email and promptly delete this message and its
attachments from your computer system.
L- �r 6-ze4w—
Tina Eason
Phone 317.313.4768
Fax 765.535.5020
tins _tcelectric.us
JE71eect "i
Inc.
"The information contained in this electronic message and any attachments to this message are intended for the exclusive use of the addressee(s) and
may contain confidential or privileged information. If you are not the intended recipient, please notify the sender at TC Electric immediately and destroy
all copies of this message and any attachments
From: Cathy Prange <cathvp@maioritybuilders.com>
Sent: Monday, March 30, 2020 10:48 AM
To: cathvp@maioritybuilders.com
Subject: FW: INVITATION TO BID - City of South Bend Indiana Project No. 119-061 Press Ganey Administration Building
Site Improvements
You are invited to submit your proposal for this project to Majority Builders by Monday April 13th at 3:00 PM.
• Sales tax exempt
• Project completion date 10/31/2020, $1,000.00/day liquidated damages clause.
• Please review contract documents and specifications
• XXI. Description of Work (in the specifications) outlines required alternate costs, which should be separated on
your proposal.
• Please contact David Paston, dave@maioritybuilders.com if you have questions.
Thank you,
David Paston
Vice President
Majority Builders, Inc.
62900 US 31 South
South Bend, Indiana 46614
Office (574)291-2091 Ext. 213
Direct (574)222-2402
dave@maioritybuilders.com
CONFIDENTIALITY NOTICE: This email and any attachments are for the exclusive
and confidential use of the intended recipient. If you are not the intended
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name Press Ganey Administration Building Site Improvements
Project No.
For Bids Due
119-061
April 14, 2020
Contractor Name: Majority Builders, Inc.
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public
works projects by institution of comprehensive submission requirements in compliance with State law.
Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders
meet certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 31 sc for the upcoming calendar year, or within twelve (12) months of obtaining pre -
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility
of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete
application for continuation of "pre -qualified" standing within the time prescribed above shall result in
automatic removal of the designation, effective January 1 of the following year, or immediately following
the twelve (12) months of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 5/16/2019 General Conditions - 5
POST BID SUBMISSIONS:
Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses
the name, address, licensing status, and type of work for any subcontractor from whom the bidder
has accepted a bid and/or intends to hire on any part of the public work project, including
individuals performing work as independent contractors.
2. Each subcontractor, whose portion of the project is estimated to be at least One -Hundred Fifty
Thousand Dollars ($150,000.00), shall be required to adhere to the requirements of Section I of
the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of
work) to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder and all subcontractors on a public works project are required to submit
certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis,
submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall
identify the job title and craft for each employee. Certified payrolls shall be submitted
electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to
utilize all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
Version 5/16/2019 General Conditions - 6
(a) Acknowled ents:
W 71 By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements
within the last twelve (12) months. A copy of my Pre -Qualification verification
letter is attached.
(ii) By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(b) Attachment
(i) Indiana Secretary of State's on-line records (ie. Business verification) dated
within sixty (60) days of the submission of said document showing that business
is in existence, current with the Indiana Secretary of State's Business Entity
Report, and eligible for a certificate of good standing. (Not applicable to
mdividuals, sole proprietors or partnerships).
Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work.
It ouiflines how I intend to meet the staffing needs of the work.
(iii) List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
(iv) For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office
of Apprenticeship, or its successor organization.
Version 5/16/2019 General Conditions - 7
II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) _ By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) _ By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be
furnished upon request.
(iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform
work on the public work project, are properly licensed. Furthermore, I
acknowledge my understanding that it is my responsibility to ensure that all sub-
contractors have the necessary licenses to undertake the work called for in this
bid. If a sub -contractor loses their license at any point, it is the responsibility of
that sub -contractor to notify the City.
(b) Attachments:
(i) _
Indiana Secretary of State's on-line records (ie. Business verification) dated
within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) _
List identifying all former business names.
(iii) _
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or
antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and
Health Act (OSHA), or federal Davis -Bacon and related Acts, within the
preceding five (5) years.
(iv) _
Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v) _
Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
(vi) _
For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office
of Apprenticeship, or its successor organization.
(vii) _
Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(viii) _
Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in
the bid specifications or contract.
Version 5/16/2019 General Conditions - 8
OX) Written statement of any federal, state or local tax liens or tax delinquencies
owed to any federal, state or local taxing body in the preceding three years.
List of projects of similar size and scope of work performed in all areas, iincluding
the State of Indiana, Mthin three (3) years prior to the date on which the bid is
due.
Date: ADril 14. 2020
(Sign Here)
David J. Paston
(Print Name Here)
Maiority Builders, Inc,
(Name of Company)
62900 US 31 South
(Address of Company)
South Bend
(City)
Indians
(State)
574-291-2091
(Telephone Number)
Version 5/1612019 General Conditions - 9
CFT'Y0F Souni BEND JAPE ESMUELLER,MAYOR
DEPARTMENTOF PUBLIC WORKS
I
ERJC'" HORVATH, DIRECTOR
April 8, 2020
Mr, JoeTinervia
Mzkjority Builders
RE. Pre -Qualification Verification
Dear Mr.Tinervia-,
This letter serves as verification of Pre -Qualification status of your company for bidding with the
City of South Bend. This Pre -Qualification status is effective for twelve (12) months from the date
of this letter. Thereafter you are required to re -submit a complete application for continuation of
pre -qualification status prior to December 31 for the upcorning calendar year.
A copy of this Verification Letter must be included with every hid exceeding $150,000 submitted
to the City of South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist
and attachments.
If you have any Further questions regarding this matter, please call this office at (574) 235-9254.
Sincerely,
Liz Horvath, Permit Manager
Business Name: MAJORITY BUILDERS INC
Entity Type: Domestic For -Profit Corporation
Creation Date: 11/01/1973
Principal Office Address: 62900 U.S. 31 S., SOUTH BEND, IN,
46614, USA
Foreign Legal Name:
Jurisdiction of Formation:
BUSINESS INFORMATION
CONNIE LAWSON
INDIANA SECRETARY OF STATE
03/22/2019 03:14 PM
Business ID: 197311-020
Business Status: Active
Inactive Date:
Expiration Date: Perpetual
Business Entity Report Due Date: 11/30/2019
TITLE
Vice President
NAME
Steven C. Slagle
ADDRESS
5902 YORK RD, SOUTH BEND, IN, 46614, USA
TITLE
Secretary
NAME
MARK W. SLAGLE
ADDRESS
60598 CROWNRIDGE DR., SO BEND, IN, 46614, USA
TITLE President
NAME RICK E. SLAGLE
ADDRESS 67590 PINE RD., NORTH LIBERTY, IN, 46554, USA
Type: Individual
Name: STEVEN C. SLAGLE
Address: 5902 YORK RD., SOUTH BEND, IN, 46614 - 0000, USA
Assirminted OvIlders
and Canualaws, Ine,
Eck'
Chapter
Merriorandurn of I IvWerstavliding
We W. M
been a member in good staniding of Associated Buiildiers &
Contractors of Indiana/Kentucky, Inc. since 1998
ABC's Program is certified by the Federal Department of Labor,
Office of Apprenticeship and Training and by the National
C�enter for Constructions Education and Research (NICCER).
ABC of Indiana uses the NCCER curriculum. Majo6ty Builders
currently has 8 (eight) students enrolled in the apprenticeship
training program
Feel free to call me with any questions regarding our
apprenticeship program.
Regards,
Brianne Feeks
2701 Industrial Dr. Ste. 190—Elkhati, Indiana 46'516— 574-218-0340
bi-iaiine@abcij,)diaiiakeiittick,y.org
Classes are held one MERLE
night per week for 4 hours with 3 hours of online study. All prograrns are ap-
proved by the U.S. Department of Labor, Office of Apprenticeship.
Basic Safety
Alternating Current
Load Calculations—
Load Calcula-
Branch & Feeder
tions—Feeders &
Circuits
Services
Intro to Construction
Motors: Theory and
Conductor Selection
Health Care
Math
Application
& Calculations
Facilities
Intro to Hand Tools &
Electric Lighting
Practical Applica-
Standby and
Power Tools
tions, & Lighting
Emergency
Systems
Intro to Construction
Conduit Bending
Hazardous Locations
Basic Electronic
Drawings
Theory
Basic Rigging
Pull & Junction Boxes
Overcurrent
Fire Alarm
Protection
Systems
Basic Communications
Conductor Installations
Distribution
Specialty
EquipmentEquipment
Transformers
Basic Employability
Cable Tray
Transformers
Advanced Controls
Skills
Intro to Materials
Conductor Terminations
Commercial
HVAC Controls
Handling
and Splices
Electrical Services
Orientation to the
Grounding & Bonding
Motor Calculations
Heat Tracing and
Electrical Trade
Freeze Protection
Electrical Safety
Circuit Breakers and
Voice, Data & Video
Motor Operation
Boxes
and Maintenance
Intro to Electrical
Control Systems & Fun- Motor Controls Medlurn-Voltage
Circuits
damental, Concepts Terminations/
Splices
Electrical Theory
Special Locations
Intro to the National
Introductory Skills
Electrical Code
for Crew Leaders
Device Boxes
Hand Bending
Raceways & Fittings
Conductors & Cables
Basic Electrical Con -
Associated Builders &
struction Drawings,
Contractors of
IndianalKentucky
Residential Electrical
5001 N Shadeland Avenue
Services
Indianapolis, IN 46226
Electrical Test
317-596-4950
Equipment
N
instructors of all apprenticeship classes
are NCCER certified and jOUrneyrncm in
their trade,
During the first year of apprentiiceship,
apprentices receive inStRlOon in
OSFIA 10 Maur, CPR first Aid,
Forklift, Rigging and Signal Person.
M
N
N
a
00
h
a
a
A
_1
ro
it
�'
l
O
Q
1�Y
J
M
�y