HomeMy WebLinkAboutOpening of Bids - 2020 Street & Sewer Materials Proj No. 120-005 - Klink Truckingi;.
2020 Street and Sewer Department Materials
March 2020
Prepared for
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
is
Department of Public Works
Division of Engineering
M. K��Si,��/i
CJ
f
• PE 112n0272
STATE OF Z
6910N A L `\`��
Jacob M. Klosinski, P.E.
Registered Professional Engineer
State of Indiana No. PE11200272
City of South Bend, Indiana
Department of Public Works
2020 Street and Sewer Department Materials
Project No. 120-005
Notice to Bidders
General Conditions
Special Provisions
City of South Bend Contractor's Bid for Public Work Form
1 Page
4 Pages
14 Pages
13 Pages
Version 1/11/2017 Table of Contents
NOTICE TO BIDDERS
Notice is hereby given that the City of South Bend, Indiana, Board of Public Works will receive sealed bids
at the Office of the Board of Public Works, County -City Building Room 1316, 227 West Jefferson Blvd,
South Bend, Indiana, 46601 until the hour of 9:30 a.m., Local Time, on April 14, 2020 for the following:
2020 Street and Sewer Department Materials
Project No. 120-005
This project includes the furnishing of materials to be used by the Street Department, Sewer Department,
and other City of South Bend agencies for the year 2020 and the first part of the year 2021. All more
particularly described in plans and specifications prepared by Scott Kreeger, phone 574.235.9245.
The Contract Documents are on file and available for public inspection commencing on the first advertise
date during regular working hours at the Department of Public Works (1316 County -City Building, South
Bend, Indiana), and at MACIAF 3215-A Sugar Maple Court, South Bend, IN 46628. Additionally, the
Contract Documents will be available that same day for inspection or purchase at American Reprographics
Company ("ARC", located at 1303 Northside Blvd., South Bend, Indiana, 46615), www.e-
arc.comllocationlsouth.bendl (574) 287-2944, toll free at (800) 783-7231. There will be a non-refundable
charge for reproduction as set by ARC for every set of documents for all bidders.
Bids must be on the City of South Bend Contractor's Bid for Public Work Form, accompanied by a Certified
Check or Bid Bond in the amount of not less than five percent (5%) of the Divisions, in a sealed envelope
noting the project name, number and your company's information on the front.
Any questions about bidding conditions must be addressed to the Owner in writing no later than 5:00 p.m.,
Local Time, April 7, 2020.
The Board reserves the right to reject any or all bids or to accept a full or partial award of the bid or bids
which, in its judgment, will be to the best interests of the City of South Bend. If the Board elects to award
the divisions, the Board will look at each line item of the cost when determining the lowest, responsive
and responsible bid.
BOARD OF PUBLIC WORKS
Linda M. Martin, Clerk
Publish two (2) times:
March 27, 2020
April 3, 2020
Version 01/29/2020 Notice to Bidders
CITY OF SOUTH BEND
STATEMENT OF POLICY
The Board of Public Works of the City of South Bend has adopted the following policy regarding
the receipt of sealed bids:
All sealed bids submitted to the Board of Public Works must be
received in the Board of Public Works Office, 1316 County -City
Building, South Bend, Indiana, no later than the advertised time on
the advertised date of the bid opening.
It shall be the responsibility of the bidder to see that his/her bid is
received prior to the deadline stipulated in the bid advertisement.
Bids submitted by snail and received after the advertised time
deadline will not be considered by the Board.
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
Linda M. Martin, Clerk
NOTE: Incoming mail does not reach the Board of Public Works until after 9:30 a.m. Local
Time. If you are sending your bid via Federal Express or another overnight source, please
confirm that your package will arrive before the bid opening date and time.
Version 01/29/2020 General Conditions - 1
CITY OF SOUTH BEND
EQUAL EMPLOYMENT OPPORTUNITY CONTRACTING
PROVISIONS DIVERSITY UTILIZATION
It is the policy of the City of South Bend to provide equal employment and business opportunity
for all persons, partnerships, companies, and corporations in accordance with the rules, regulations
and guidelines of the applicable federal, state and local laws. This policy of equal employment and
business opportunity shall apply to every contractor or subcontractor bidding or holding a public
contract with the City of South Bend.
In furtherance of this policy, the following Equal Opportunity Clauses are hereby made a part
of every construction contract entered into by the City of South Bend and all subcontractors
entered into pursuant to any such contract and the bidder hereby certifies that it/he/she will abide
by these provisions.
The contractor will not discriminate against any applicant or employee because of
race, color, religion, sex, national origin, or handicap. The contractor will take
affirmative action to ensure that all applicants or employees are treated fairly and
equitably. Such action shall include but not be limited to the following: hiring, up-
grading, demotion or transfer, recruitment, advertising, lay-offs or termination, rates
of pay or other forms of compensation and selection for training including
apprenticeship programs.
The contractor shall agree to post in conspicuous places available to employees and
applicants, notices to be provided setting forth the provisions of the Non -Discrimination
Clause.
The contractor will, in all solicitations or advertisements for employees placed by or
on behalf of the contractor, state that all qualified applicants will receive
consideration for employment without regard to race, color, religion, sex, or national
origin.
The contractor will send to each labor union or representative of workers with
which it/ he/she has a bargaining agreement or other contract or understanding, a
notice to be provided, advising the labor union or worker's representatives of the
contractor's commitment under this section, and shall post copies of the notices
in conspicuous places available to applicants and employees.
The contractor will comply with all provisions of Executive Order 11246 (as amended
by 11375) and of the rules, regulations and relevant orders of the Department of Labor.
Subpart B -- Contractors' Agreements
Sec. 202. Except in contracts exempted in accordance with Section 204 of this Order, all Government
contracting agencies shall include in every Government contract hereinafter entered into the following
provisions:
"During the performance of this contract, the contractor agrees as follows:"
"(1) The contractor will not discriminate against any employee or applicant for
employment because of race, color, religion, sex, or national origin. The contractor
will take affirmative action to ensure that applicants are employed, and that
employees are treated equally during employment, without regard to their race,
color, religion, sex or national origin. Such action will include, but not be limited to
the following: employment, upgrading, demotion, or transfer; recruitment or
Version 01 /29/2020 General Conditions - 2
recruitment advertising; layoff or termination; rates of pay or other forms of
compensation; and selection for training, including apprenticeship. The contractor
agrees to post in conspicuous places, available to employees and applicants for
employment, notices to be provided by the contracting officer setting forth the
provisions of this nondiscrimination clause."
"(2) The contractor will, in all solicitations or advertisements for employees placed by
or on behalf of the contractor, state that all qualified applicants will receive
consideration for employment without regard to race, color, religion, sex or national
origin."
"(3) The contractor will send to each labor union or representative of workers with
which it/he/she has a collective bargaining agreement or other contract of
understanding, a notice, to be provided by the agency contracting officer, advising
the labor union or workers' representative of the contractor's commitments under
Section 202 of Executive Order No. 11246 of September 24, 1965, and shall post
copies of the notice in conspicuous places available to employees and applicants for
employment."
"(4) The contractor will comply with all provisions of Executive Order No. 11246 of
September 24, 1965, and of the rules and regulations, and relevant orders of the
Secretary of Labor."
"(5) The contractor will furnish all information and reports required by Executive Order
No. 11246 of September 24, 1965, and by the rules, regulations, and orders of
the Secretary of Labor, or pursuant thereto, and will permit access to his books,
records, and accounts by the contracting agency and the Secretary of Labor for
purposes of investigation to ascertain compliance with such rules, regulations, and
orders."
"(6) In the event of the contractor's noncompliance with the nondiscrimination
clauses of this contract or with any of such rules, regulations, or orders, in this
contract may be cancelled, terminated or suspended in whole or in part and the
contractor may be declared ineligible for further Government contracts in accordance
with procedures authorized in Executive Order No. 11246 of September 24, 1965, and
such other sanctions may be imposed and remedies invoked* as provided in
Executive Order No 11246 of September 24, 1965, or by rule, regulations, or order of
the Secretary of Labor, or as otherwise provided by law,"
"(7) The contractor will include the portion of the sentence immediately preceding
paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract
or purchase order unless exempted by rules, regulations, or orders of the Secretary
of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24,
1965, so that such provisions will be binding upon each subcontractor or vendor.
The contractor will take such action with respect to any subcontract or purchase
order as the administering agency may direct as a means of enforcing such
provisions including sanctions for noncompliance: Provided, however, that in the
event a contractor becomes involved in, or is threatened with, litigation with a
subcontractor or vendor as a result of such direction by the administering agency
the contractor may request the United States to enter into such litigation to protect
the interests of the United States."
The applicant further agrees that it will be bound by the above equal opportunity
clause with respect to Its own employment practices when it participates in federally
assisted construction work: Provided, that if the applicant so participating is a State
or local government, the above equal opportunity clause is not applicable to any
agency, instrumentality or subdivision of such government which does not participate
Version 01/29/2020 General Conditions - 3
in work on or underthe contract.
The applicant agrees that it will assist and cooperate actively with the administering
agency and the Secretary of Labor in obtaining the compliance of contractors and
subcontractors with the equal opportunity clause and the rules, regulations, and
relevant orders of the Secretary of Labor, that it will furnish the administering
agency and the Secretary of Labor such information as they may require for the
supervision of such compliance, and that it will otherwise assist the administering
agency in the discharge of the agency's primary responsibility for securing compliance.
The applicant further agrees that it will refrain from entering into any contract or
contract modification subject to Executive Order 11246 of September 24, 1965, with
a contractor debarred from, or who has not demonstrated eligibility for, Government
contracts and federally assisted construction contracts pursuant to the Executive
Order and will cant' out such sanctions and penalties for violation of the equal
opportunity clause as may be imposed upon contractors and subcontractors by the
administering agency or the Secretary of Labor pursuant to Part 11, Subpart D of the
Executive Order. In addition, the applicant agrees that if it fails or refuses to comply
with these undertakings, the administering agency may take any or all of the following
actions: Cancel, terminate, or suspend in whole or in part this grant (contract, loan,
insurance, guarantee); refrain from extending any further assistance to the applicant
under the program with respect to which the failure or refund occurred until satisfactory
assurance of future compliance has been received from such applicant; and refer the
case to the Department of Justice for appropriate legal proceedings.
*Corrected to read "invoked In the original text the word "involved" was printed in error.
Version 01/29/2020 General Conditions - 4
DEPARTMENT OF PUBLIC WORKS
CITY OF SOUTH BEND, INDIANA
SPECIAL PROVISIONS
2020 Street and Sewer Materials
Project No. 120-005
PROJECT DESCRIPTION
This project includes the furnishing of materials to be used by the Street Department, Sewer
Department, and other City of South Bend agencies for the year 2020 and the first part of the
year 2021. All prices will remain in effect until April 30, 2021, This bid will be awarded to the
lowest responsible bidder for each line item or Division, dependent on the needs of the
City of South Bend. Division A and Division C will be awarded in its entirety with the
award to the lowest total responsible bidder. The Contractor does not need to supply unit
prices for all items in each Division to be eligible for award. All items will be awarded per
unit prices and the quantities shown for each item are approximate quantities only. Actual
quantities purchased may be greater or less than the quantities shown on the bid tab.
The contract(s) pursuant to these specifications shall be awarded to the lowest responsible and
responsive vendor.
II. PREVAILING SPECIFICATIONS AND DESIGN & CONSTRUCTION STANDARDS
The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and DESIGN &
CONSTRUCTION STANDARDS, most recent version, are to be used on this project.
Each Bid provider is specifically instructed to become completely familiar with the most recent
version of the PREVAILING SPECIFICATIONS and the DESIGN & CONSTRUCTION
STANDARDS prior to submitting a Bid.
Wherever the PREVAILING SPECIFICATIONS refer to "State Specifications," it shall mean the
2020 INDOT Standard Specifications for the letting effective after September 1, 2019.
These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING
SPECIFICATIONS and are to be used only in conjunction with the PREVAILING
SPECIFICATIONS.
In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING
SPECIFICATIONS, the SPECIAL PROVISIONS will govern.
III. BIDDING REQUIREMENTS
A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 102
B. Additions:
1. Each Bid provider shall completely execute and submit the following documents with the
Bid:
a. City of South Bend Contractor's Bid for Public Work Form
Version 1/30/2020 Special Provisions - 1
b. Bid Bond stating 5% of the total Bid or Certified Check of 5% of the bid.
c. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment and Certification of use of United States Steel Products or Foundry
Products.
d. Responsible Bidder Checklist
IV. TERM "OR EQUAL"
A. Prevailing Specifications: None
B. Additions:
1. Where the term "or equal" is used in these specifications, the Bid provider deviating from
specified item shall file with his/her Bid a letter fully explaining and justifying his/her
proposed article or equal. The City of South Bend shall be the sole judge in determining if
the "or equal" offered meets the specification.
V. TAX EXEMPT
A. Prevailing Specifications: None
B. Additions:
1. Materials and properties purchased under contract with the Owner that becomes a
permanent part of the structure or facilities constructed are not subject to the Indiana Gross
Retail Tax (Sales Tax). The exemption number will be furnished to the Contractor upon
award.
VI. INDEMNIFICATION
A. Prevailing Specifications: None
B. Additions:
1. Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its
agents, officers and employees, from all costs, losses, claims and suits, including court
costs, attorney fees, and other expenses, arising from or out of the negligent performance
of this Contract by Contractor, or because of arising out of any defect in the goods,
materials or equipment supplied by the Bid provider.
VII. AWARD OF CONTRACT
A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 103
B. Additions:
1. All Bids will remain subject to acceptance for sixty (60) calendar days after the day of the
Bid opening, but the City of South Bend may, in its sole discretion, release any Bid and
return the Bid security prior to that date.
2. Successful bidder from award notice will have fourteen (14) calendar days to submit a fully
executed contract, Certificated of Insurance, and other require documents from either the
Version 1/30/2020 Special Provisions - 2
awarded contactor and/or the subcontractors. Failure to comply within the award period
may be cause for the Board of Public Works to rescind the award.
Vill. CONTROL OF WORK
A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 105
B. Additions:
1. The complete responsibility for this project lies with the Director of Public Works of the City
of South Bend, Indiana acting through his authorized representatives.
IX. LEGAL RELATIONS
A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 107
B. Additions:
1. The Owner, where mentioned in these documents, is the City of South Bend. The
Engineer, where mentioned in these documents, is the City of South Bend Department of
Public Works, Division of Engineering.
2. The Contractor shall apply for and obtain any and all required permits for the work from
local, state, and federal agencies and shall comply with permit requirements, including the
St. Joseph County / City of South Bend Building Department.
3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the
Contractor shall provide the Owner with proof that the Contractor is duly licensed, qualified
and registered with the Secretary of State of Indiana to engage in business within the State
of Indiana.
4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The
Owner reserves the right to immediately terminate the public work project awarded should
the Contractor be found to be in violation of any provision of Indiana Code 5-16-13 and
such violation shall result in the forfeiture of Contractor's performance bond to the Owner.
X. DEFAULT AND TERMINATION
A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 108
B. Additions:
1. Events of Default shall include Contractor's failure to perform any of its obligations under
this contract including failure to commence work at the time specified, failure to perform
the work in accordance with these specifications, unauthorized discontinuation of the work,
failure to carry out the work in a manner acceptable to the City, failure to observe Federal,
State, or local laws or regulations, and failure to comply with any other term of this contract.
2. If an Event of Default occurs, the City shall provide Contractor written notice and may
permit Contractor ten (10) calendar days after the date of the notice to cure the default. If
the default is not cured within the ten (10) day cure period, the City may at any time
thereafter terminate this contract in which case the termination shall be final and effective.
3. Upon an Event of Default, the City may invoke the following remedies in addition to those
remedies provided under separate provisions of this contract, the right of set-off against
Version 1/30/2020 Special Provisions - 3
any payments due or to become due to the Contractor against the retainage, the right to
take over and complete the Work. If the City notifies Contractor that City is invoking its right
to complete the Work, all rights that the Contractor has in order under Contractor's
subcontracts are assigned to the City, subject to the City's right to take assignment of all
or only selected subcontracts at the City's discretion. The sole obligation accepted by the
City under such subcontracts is to pay for Work satisfactorily performed after the date of
the assignment. In the event a conditional assignment has not been executed, the
Contractor shall execute or cause to be executed any assignment, agreement, or other
document that may be necessary in the sole opinion of legal counsel to the City's Board of
Public Works to evidence compliance with this provision. The Contractor shall promptly
deliver such documents upon the City's request. In the case of such assignment, unless
otherwise agreed in writing, The Contractor remains liability to subcontractors for any
payment already involved, and for any claim, suit or cause of action based upon or resulting
from any error, omission, negligence or other breach of contract by the Contractor, its
officers, employees, or agents arising prior to the date of assignment to the City.
4. The obligation to perform under the terms of this Agreement may be terminated by an
official of the Department of Public Works, with approval from the Board of Public Works,
with or without cause, upon fourteen (14) calendar days written notice to the Contractor.
This Agreement may be terminated by Contractor upon fourteen (14) calendar days written
notice to the Department of Public Works in the event of substantial failure of Public Works
employees and agents to perform in accordance with the terms hereof. If an official of the
Public Works Department terminates the Contract for any cause, it shall deduct from
whatever is owed from the Contractor on the Contact or any other contract, any amount
sufficient to compensate the City of South Bend for any damages suffered by it, including
but not limited to, the cost difference in the materials between the primary and secondary
bidder because of the Contractor's wrongdoing.
XI. RETAINAGE AND FINAL PAYMENT
A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 109
B. Additions:
1. Payments will be made every thirty (30) calendar days.
2. There will be NO Retainage.
3. Contractor shall invoice using the same nomenclature as specified in the bid proposal for
all items.
XII. CORRECTIVE ACTION/DAMAGES
A. Prevailing Specifications: None
B. Additions:
1. Failure to deliver concrete or asphalt materials within NINETY (90) minutes time of scheduled
delivery will result in damages charged to the supplier in the amount of time plus expenses
plus overhead charged.
2. Should a supplier of concrete or asphalt become overbooked for deliveries one or more days
of a week that supplier shall notify the City's representative ordering the material at least two
(2) working days in advance.
Version 1/30/2020 Special Provisions - 4
In the event the initial test results indicate a failure, the contractor will immediately contact
the independent testing agency in order to complete the confirmation testing. The receipt of
the test report indicating the failure in the mix will immediately trigger the corrective
action/damages process. The Contractor will be considered placed on notice upon receipt of
the testing report from the independent laboratory. if a back-up sample was not taken nor if
there is not enough of the original sample to complete confirmation testing, the original test
will be binding. There will be no coring of placed materials for confirmation testing. The
contractor is solely responsible for making any and all corrections to the material mix in order
to meet the requirements in the mix design.
4. The corrective action/damages are set forth as follows:
a. The damages will be for all of the specific mix design/material delivered on the day
the sample was taken.
b. Damages are progressive for each specific mix design. The material costs for the
day the sample was taken will be reduced by the following percentages
First test failure — 10% reduction of actual material cost.
ii. Second test failure — 20% reduction of actual material cost.
iii. Third test failure — 30% reduction of actual material cost.
iv. Fourth and all successive test failures — 50% of reduction of actual
material cost.
5. The City of South Bend reserves the right to accelerate the corrective action/damages
procedure or to require the contractor, at his expense, to remove and replace the material in
the event the failure in the material delivered may cause physical or property damage to the
public.
6. The parties recognize that time is of the essence in regard to this Contract and that City will
suffer financial loss if the equipment, supplies, services are not delivered within the times
specified on the Contract.
a. It is agreed between the parties hereto that if Contractor shall not deliver the
equipment, supplies, services and/or other obligations by the date specified in the
Contract, City shall use the bid bond or certified check of bidder as liquidated
damages
b. Should the Contractor fail to provide or perform the equipment, supplies, services
and/or other obligations pursuant to the Contract, and should the City then elect to
bid a new project that will replace the Contract, any bid for the project from
Contractor will be considered only if Contractor can demonstrate the ability to
deliver and perform the equipment, supplies, services and/or other obligations in
a timely fashion.
c. It is agreed between the parties hereto that if Contractor shall not deliver the
equipment, supplies, services and/or other obligations by the time specified in the
Contract, City shall award all or part of the material to the next lowest bidder.
XIII. DELIVERY
A. Prevailing specifications/INDOT Standard Specification Section: None
Version 1/30/2020 Special Provisions - 5
B. Additions:
1. Items shown in the specifications to be delivered shall be delivered to the Bureau of Streets
at 731 South Lafayette or to other sites within the City of South Bend designated by the
City's representative ordering the material. Delivery dates shall include weekends and
holidays as designated by the representative ordering the material.
2. Each load of loose materials must be fully tarped or covered from origin to the point of
delivery to minimize loss from blowing and change of moisture content.
3. Items shown in the Specifications to be picked up by the City shall be picked up by the City
at the successful bidder's plant or warehouse. The plant or warehouse must be within
the South Bend City limits or within five miles of the Public Works Service Center,
and it must be within 15 minutes driving time via approved truck route(s) of the
Public Works Service Center. Loading shall be done by the supplier.
4. Duplicate weight tickets will be provided for each load. Each ticket will bear a serial number,
increasing in number with each load. No ticket number shall ever repeat.
5. The vendor for items in Division A and Division B shall designate a representative and an
alternate that shall be available for at least one (1) hour no later than Thursday of each
week for a coordination conference to discuss the City of South Bend's prospective order
for the upcoming calendar week. The vendor shall guarantee availability of materials of
each type and in such quantity for each day of the following week as agreed to in the
conference. Quantities shall may be less than or greater than 5% of the agreed upon
amounts. If such materials are not available at the time of delivery as agreed, the vendor
shall at its option remedy the situation by one of the following means:
a. Arrange for the City of South Bend to pick up its order within one (1) hour of the agreed
schedule at another location within five (5) miles of the South Bend City limits at no
additional cost to the City of South Bend.
b. Provide a substitute material equal to or greater than the prevailing specifications at a
cost identical to the cost of original unit price. All substitute materials shall be approved
by Engineering prior to delivery.
c. Within three (3) working days of the failure to deliver, with its own forces and equipment
lay the materials into place at the location the Bureau of Streets has prepared and
readied for paving. Such paving shall be done in a workmanlike manner, according to
the Standard Specifications for the type of material being used, at no additional cost to
the City.
6. All items shall be delivered strongly packed and marked according to accepted commercial
practice unless otherwise directed in the Specifications. No charge shall be made for
containers and the City shall have no obligation to return containers unless otherwise
provided by the Specifications or Special Provisions. Any items not received in good
condition will be rejected.
7. All items rejected must be removed immediately by the Contractor at the expense of the
Contractor. If the Contractor fails or refuses to remove the rejected items, they may be sold
by the City of South Bend.
8. In some cases, at the discretion of the City, inspection of the commodities or equipment
will be made at the factory, plant, or other establishment where they are produced before
shipment.
Version 1/30/2020 Special Provisions - 6
The City reserves the right to inspect and have any goods tested after delivery for
compliance with the Specifications. Notice of latent defects, which would make the item
unfit for the purposes for which they are required, may be given at any time within one year
after discovery of defects.
10. The bid proposal shall specify as per unit cost of delivery for all items specified for delivery.
Award may be made to a company forjust delivery and not necessarily for the purchase of
the material.
XIV. DIVISION A: ASPHALT MATERIALS
A. Prevailing specifications/INDOT Standard Specification Section: 402, 403, 405, 406, 407, 902,
904
B. Additions:
Division includes bituminous materials to be provided to the City of South Bend for
placement by the City's own forces.
a. The producer of the materials will be a CERTIFIED HOT MIX ASPHALT PRODUCER,
in accordance with ITM 583; Certified Hot Mix Asphalt Producer Program by the
Indiana Department of Transportation Materials and Tests Division. The producer also
will have a certified operator, laboratory, and bituminous laboratory technician on staff.
b. Upon request, the successful bidder shall provide to the City copies of all material
certifications, laboratory test results, and other quality control documents necessary to
show compliance with Section 402, for any and all deliveries to the City. Records from
other on -going projects shall be acceptable so long as those projects are concurrent
with deliveries to the City. The City reserves the right to request up to 12 plate samples
during the contract period to be obtained by an independent laboratory for analysis and
verification to the specifications. Any plate samples requested past the 12 required by
the specifications will be processed and paid for by the City of South Bend separate of
this contract. Results of the testing will be delivered within 24 hours of the time the
sample was taken. Large enough samples shall be taken in order to perform
confirmation testing in the event of failure. All costs associated with the testing will be
incurred by the supplier/contractor.
2. The Supplier shall submit job mix formula for all mixes to the Manager of the Street's
Division for approval prior to delivery. The job mix formula must be submitted on Form TD-
451 along with Marshall Design Work Sheet Form TD-515.
a. The job mix formula shall be based upon the Marshall Method of Mix Design for the
aggregate source and gradation available in ample quantity to the Contractor. Any
change of aggregate source shall require a new Mix Design and approval.
b. Recycled materials shall not be used in any surface course mixtures. No RAS shall be
used.
c. Binder course materials will have a maximum of 20% Recycled Materials. No RAS
shall be used.
d. Base course materials will have a maximum of 20% Recycled Materials. No RAS shall
be used.
3. All mixes designated with "11 L" shall be #11 crushed limestone.
Version 1/30/2020 Special Provisions - 7
4. All mixes designated with "11 S" shall be #11 crushed blast furnace slag.
5. All HMA Surface mixes shall have PG 64-22 asphalt binder.
6. All HMA Binder mixes shall be crushed limestone or crushed blast furnace slag, either #11
or #8 or 9 as noted, with PG 64-22 asphalt binder, unless otherwise specified.
7. All HMA Base mixes shall be crushed limestone or crushed blast furnace slag, with PG 64-
22 asphalt binder, unless otherwise specified.
8. The requirements for CMA Patch AE-300P are as follows:
a. Asphalt binder shall be AE-300P or an approved equal with approval by Engineering.
b. Materials shall be produced with less than 1 % moisture
c. Binder content shall be 5.2% to 6.0%
d. Aggregate shall be 100% crushed limestone graded as follows:
Sieve Size
Percent Passing
1/2"
100%
3/8"
75-100%
No. 4
20-80%
No. 8
0-35%
No. 30
0-4%
Loss by Decantation #200
0-1.5%
9. The requirements for the High Performance Cold Patch are as follows:
Emulsion Specifications
Limit
ASTM
Flash Point (Tap Open Cup)
200OF Min
ASTM D-1310
Kisematic Viscosity at 140°F
300-4000cst
ASTM D-2170
Water
0.2% Max
ASTM D-96
Aggregate Specification
Percent Passing
#89
#9
3/8"
90-100
100
No.4
20-55
85-100
No.8
5-30
10-440
No.16
0-10
0-10
No.50
0-5
0-5
11. The material shall be High Performance Cold patch or an approved equal.
Version 1/30/2020 Special Provisions - 8
12. Material must be provided in 5-gallon pails or 40 to 50 pound bags. Payment shall be
for each pail of the High Performance Cold patch.
13. All HMA materials shall be available for storage up to 24 hours after the scheduled
date of delivery.
XV. DIVISION B: PCC MATERIALS
B. Prevailing specifications/INDOT Standard Specification Section: 213, 502, 504, 506, 901, 904,
912,913
C. Additions:
1. Non -chloride accelerator shall be added to Class A Concrete or Class A High Early
Concrete at the City's request.
a. Each unit of non -chloride accelerator shall correspond to the quantity of additive
required to obtain the specified composition (0.5%, 1%, or 2%) per cubic yard of
concrete.
b. The payment for adding the non -chloride accelerator will be made for each cubic
yard of concrete with the additive ordered.
2. The requirements for 7 Bag PCC Material are as follows:
a. The fine aggregate shall be at least 35% but not more than 45% of the total weight
of the aggregate in each cubic yard. Proportions will be based upon SSD
aggregates.
b. The CMD shall produce workable concrete mixtures, with the minimum amount of
water, having the following properties:
Minimum Portland cement content
658lbs/cu yd
Maximum water/cement ratio
0.45
Minimum Slump
2 in.
Air Content
6.5% +/- 1.5%
Minimum Flexural Strength, third point loading
300PSI @ 24hr
Minimum Flexural Strength, third point loading
500PSI @ 3 days
3. Delivery cost shall be included in the unit cost for each of the following line items within
this Division: B-1, B-2, B3, B-4, and B-5.
XVI. DIVISION C: AGGREGATE MATERIALS
A. Prevailing specifications/INDOT Standard Specification Section: 301, 302, 303, 621, 904, 914
B. Additions:
1. The requirements for No. 23 Slag Sand Mix are as follows:
Version 1/30/2020 Special Provisions - 9
Sieve Size
Percent Passing
1/ 1
3/8"
100%
No. 4
80-100%
No. 8
60-90%
No. 16
40-65%
No. 30
25-40%
No. 50
10-30%
No. 100
5-20%
No. 200
0-10%
2. Topsoil must be screened and free of foreign debris.
3. Topsoil will be tested for PH level.
4. Delivery cost shall be included in the unit cost for each of the following line items within
this Division: C-1, C-2, C-3, C-4, and C-6.
XVII. DIVISION D: SEWER MATERIALS -CASTINGS
A. Prevailing specifications/INDOT Standard Specification Section: 908, 907, 910
B. Additions:
1. The manhole 1040A cover and frame shall be the following:
a. Cover: East Jordan Iron Works manhole cover 1040A (Neenah R-1642) or approved
equal
(i) Manhole covers must be labeled "City of South Bend" with "Storm" or "Sanitary"
b. Frame: East Jordan Iron Works manhole frame 1045 (Neenah R-1642) or approved
equal.
2. The catch basin cover and frame shall be the following:
a. Cover: East Jordan Iron Works catch basin cover (grate) 1020-M1 (Neenah R-4380-
17-D) or approved equal
b. Frame: East Jordan Iron Works manhole frame 2996 or approved equal
XVIII. DIVISION E: SEWER MATERIALS - RISERS
B. Prevailing specifications/INDOT Standard Specification Section: 908, 907, 910
C. Additions:
1. Manhole risers shall conform to the following:
a. All risers shall include pivoted turnbuckle adjustable riser rings.
Version 1/30/2020 Special Provisions - 10
b. Adjustable turnbuckle must be pivoted on 304 stainless steel roll pins at both ends
which eliminates binding of mechanism when expanding or contracting manhole
riser.
c. The linkage assembly shall not contain tac-welds.
d. The linkage shall pivot inside a solid W thick bar. The linkage shall accommodate
an adjustment to the diameter of the ring of 1/2" in either direction (larger or smaller).
e. The ring must be a single piece assembly, with no loose parts.
f. Riser must expand to obtain full circumferential engagement.
g. The riser shall not obstruct entrance to a manhole. There are no extensions to
hinder men or equipment using the manhole.
h. All moving parts and mating surfaces are zinc plated with dichromate finish or
stainless steel. Skirts are G90 galvanized.
i. Skirt must be welded 85% of the circumference of riser.
j. Manhole riser allows efficient application of the pivoted turnbuckle so that 60 lbs.
force applied 7" from center of turnbuckle exerts 5600# tangential force in the riser
ring. This enables the riser ring to be forced to fit worn out of round manhole lid
seats and still exert a great force on the side walls for holding power.
k. Manhole risers shall be color coded prior to delivery based on the following:
Ring Diameter
Color
20 3/4" D
Silver
21 3/4" D
Blue
22 1/8" D
Red
22 1 /4" D
Yellow
23" D
Green
23 5/8" D
Black
25 1/2" D
Fluorescent Orange
26" D
Orange
26 1/2" D
Gold
XIX. DIVISION F: TRAFFIC MATERIALS
B. Prevailing specifications/INDOT Standard Specification Section: 808, 909, 921
C. Additions:
1. Liquid Thermoplastic Traffic Marking paint:
a. Liquid Thermoplastic Traffic Marking Paint must meet and exceed the chemical
composition and performance requirements of Federal Specification TT-P-1952E.
b. Liquid Thermoplastic Traffic Marking Paint must be environmentally friendly 100%
acrylic emulsion traffic paint containing less than 100 grams per liter volatile organic
content (VOC).
Version 1/30/2020 Special Provisions - 11
C. Liquid Thermoplastic Traffic Marking Paint must meet or exceed TT-P-1952E Type
III when tested in accordance with the following ASTM test methods: D2369, D562,
D2697, D3723, D2805, D711, D1210, D969, D1849, D522, D2243, D1729, D968,
D2486, D1394, D1640, D2244, D3335, D3718, E1347, G154.
d. Coverage is to be 155-180 ft. of 4-inch line per gallon at 30-35 mils wet film
thickness. Precautions: Both surface and ambient application temperatures shall be
a minimum of 50°F. Temperature shall not drop below 50°F within a 24-hour period
following application. The shelf life of the paint shall be a minimum of 18 months.
e. The paint shall dry to a no tracking condition in no more than 6 minutes. The no
tracking condition shall be determined by actual application on the pavement at a
wet film thickness of 30 mils (750 }gym) or greater with white or yellow paint covered
with glass beads at a rate of 7 lb/gal. (0.7 kg/L).
2. Standard Pavement Marking Beads shall be in accordance with INDOT Specification
Section 921.
3. Material must be provided in 55-gallon drums.
XX. DIVISION G: SNOW REMOVAL MATERIALS
B. Prevailing specifications/INDOT Standard Specification Section: None
C. Additions:
1. This specification covers requirements for replaceable cutting -edge blades for motor
graders and underbody truck scrapers.
2. Material:
a. The cutting edges shall be formed from high carbon steel made by the open hearth,
basic oxygen, or electric furnace process and shall have the following composition.
b. The composition of steel shall be as follows:
High Carbon
Heat Treated
Composition
Min %
Max %
Composition
Min °10
Max
Carbon
0.80
1.00
Carbon
0.25
0.35
Manganese
0.50
0.90
Manganese
0.75
1.20
Phosphorous
---
0.05
Phosphorous
---
0.05
Sulfur
---
0.05
Sulfur
---
0.05
Silicon
---
0.35
Silicon
0.10
0.40
Boron
0,0005
0.0085
G. The finished cutting edge shall have a Brinell hardness number, under a 3000
kilogram load, of not less than 250 nor more than 350 for high carbon blades, and
not less than 400 nor more than 520 for heat treated blades. The Brinell hardness
number will be determined by the current Method Test for Brinell Hardness of
Metallic Materials, ASTM Designation E10.
d. A chemical analysis of each melt of steel shall be made available by the
manufacturer to determine the percentages of the elements specified.
Version 1/30/2020 Special Provisions - 12
3. The cutting edges shall be of the length specified on the request for quotation form and
shall be double bevel, curved, 5/8 inch or 3/4-inch-thick, and 6 inch or 8 inch wide after
forming. The bevel shall be 1 inch in length and the cutting edge shall have a radius
curvature of 71/2 inch to 10 inch. The finished blade section will be given a coat of rust
resistant paint and shall be free of warpage and longitudinal deviation. The cutting
edges for 5/8-inch blades and 3/4-inch blades shall be punched with 11/16-inch square
holes with countersink to receive 5/8-inch diameter #3 plow bolt. Hole punching to be
"standard highway punch" (end 2 holes on each end of the blade on 3-inch centers,
and the remaining holes 12-inch spaced center to center across the middle of the
blade) as per the diagram below.
LENGTH (AS SPECIFIED ON REQUEST FOR QUOTATION)
3" . 3"
3" 1 3"
�.... {p....}......................... EF------------------------'fl------------------------- E3......................... a .... 0-----
�
XXI. DIVISION H: ASPHALT MATERIALS — CONT'D
A. Prevailing specifications/INDOT Standard Specification Section: 404, 406, 408
B. Additions:
1. The requirements for AE-T Tack areas follows:
Sa bolt-Furol Viscosity, 25°C, s
Max
100
Residue from Res. By Dist. %
Min
54
Max
62
Portion, from Res. By Dist. ml
Oil per 100 . Emul.,
Min
4.0
Demulsibilit , %
Min
75
Sieve Test %
Max
0.10
Res, By Dist, Float Test
1200
Penetration
50-200
Solubility in Or . Solv., %
Min.
97.5
Ductility, 25°C, mm
Min
400
2. The requirements for RS-2 are as follows:
Sa bolt-Furo) Viscosity, 25°C, s
75-400
Residue from Res. by Dist. %
Min
68
Portion, from Res. by Dist. ml
Oil per 1002. Emul.
Max
4.0
Settlement, 5 days %
Max
5
Demulsibilit , %
Min
50
Sieve Test %
Max
0.10
Penetration
100-200
Solubility in Or . Solv., %
Min
97.5
Ductility, 25DC, mm
Min
400
Version 1/30/2020 Special Provisions - 13
XXII. DIVISION 1: DELIVERY OF HMA MATERIALS BY TRI-AXLE TRUCK
A. Prevailing specifications Section: Bone
B. Additions:
1. The City of South Bend will coordinate hauling operations for all HMA materials
deliveries. Under certain circumstances, City vehicles may not be available to facilitate
HMA materials hauling operations and will require a contractor to supply truck(s) and
driver(s) to assist with hauling and delivery.
2. The City will assign through successful bidding process tri-axle trucks and drivers to
deliver HMA materials as designated to any point in the City.
3. The City will hire the truck(s) with driver(s) for a minimum of eight (8) hours per day.
4. Paving operations may require the use of the truck(s) and driver(s) for a time period
that exceeds an eight (8) hours workday. There will be no premium time paid for work
in excess of eight (8) hours per day. The City will make all attempts to coordinate
trucking needs and schedule working hours with the Contractor in advance of the date
work will be performed but flexibility in working hours shall be expected.
5. Multiple trucks and drivers may be needed to accommodate paving operations.
Contractors submitting a Unit Price for Division I should provide a list of fleet vehicles
available for hauling and the maximum amount of vehicles that would be available
during typical Monday through Friday operations.
6. Payment shall be made at the Unit Price of Per Hours as specified in the proposal.
Version 1/30/2020 Special Provisions - 14
CITY OF SOUTH BEND, INDIANA rays
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name 2020 Street and Sewer Department Materials
Project No. 120-005
For Bids Due April 14, 2020, 9:30 a.m., Local Time
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
X executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
X Certification of use of united States Steel Products or Foundry Products.
X Acknowledge Receipt of 1 Addendum(s) included with the bid.
X All required additional information is included with the bid.
X Proposal statements and other affidavits all signed by the proper party with name either
printed or typed underneath signature.
X This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: Klink Trucking Date: 4/9/2020
By Authorized
Signature:
Print Name & Title: Anthony VV6tfiters, Vice President
Version 01/29/2020 Contractor's Bid for Public Works - 1
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name 2020 Street and Sewer Department Materials
Project No. 120-005
For Bids Due April 14, 2020, 9:30 a.m., Local Time
PART I
(Must be completed for all bids. Please type or print)
Date: 4/9/2020 Bidder (Firm): Klink Trucking
Address: PO Box 428
City/State/Zip: Ashley, IN 46705 Telephone Number: ( 260 ) 587-9113
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
City of South Bend
and dated 4/9/2020 for the sum of (enter the Total Bid as shown on the Proposal)
Two hundren sixteen thousand six hundred twenty five ($ 216,625.00 )
(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a separat chment.
By
(Signature)
Anthony Wint
(Printed Name of Person Signing)
ACCEPTANCE
The above bid is accepted this day of
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
Elizabeth A. Maradik, Member
Joseph R. Molnar, Member
Therese J. Dorau, Member
Jordan V. Gathers, Member Attest: Linda M. Martin, Clerk
20
Version 01/29/2020 Contractor's Bid for Public Works - 2
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version 01/29/2020 Contractor's Bid for Public Works - 3
CONTRACTOR'S BID FOR PUBLIC WORK - FORM 96
State Form 52414 (R212-13)1 Form 96 (Revised 2013)
Prescribed by State Board of Accounts
PART I
(To be completed for all bids. Please type or print)
Date (month, day, year): 4/9/2020
1, Governmental Unit (Owner): City of South Bend
2. County: St Joseph Co
3. Bidder (Firm): Klink Trucking Inc
Address: PO Box 428
City/State/Z1Pcode: Ashley, IN 46705
4. Telephone Number: 260-587-9113
5. Agent of Bidder (if applicable): NIA
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete
the public works project of City of South Bend
(Governmental Unit) in accordance with plans and specifications prepared by Clty of South Bend
and dated 4/9/2020 for the sum of
two hundred sixteen thousand six hundred twenty five $ 216,625.00
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the
notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the
notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as
that shown in the original contract if accepted by the governmental unit. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a separate attachment.
The contractor and his subcontractors, if any, shall not discriminate against or intimidate any employee,
or applicant for employment, to be employed in the performance of this contract, with respect to any matter
directly or indirectly related to employment because of race, religion, color, sex, national origin or ancestry.
Breach of this covenant may be regarded as a material breach of the contract.
CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS
(If applicable)
I, the undersigned bidder or agent as a contractor on a public works project, understand my statutory
obligation to use steel products made in the United States (I.C. 5-16-8-2). 1 hereby certify that I and all
subcontractors employed by me for this project will use U.S. steel products on this project if awarded.
understand that violations hereunder may result in forfeiture of contractual payments.
ACCEPTANCE
The above bid is accepted this day of , subject to the
following conditions:
Contracting Authority Members:
PART 11
(For projects of $150, 000 or more — !C 36-9-12-4)
Governmental Unit: City of South Bend
Bidder (Firm)
Klink Trucking
Date (month, day, year): 4/9/2020
These statements to be submitted under oath by each bidder with and as a part of his bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
What public works projects has your organization completed for the period of one (1) year prior to the
date of the current bid?
Contract Amount
Class of Work
Completion
Date
Name and Address of Owner
338,868.00
Aggregate
2019
Elkhart Co Hwy Dept
253,575.00
Spray Truck
2019
Kalamazoo Co Rd Comm
242,027.00
Aggregate/Cold Mix
2019
St Joe Co Rd Comm
What public works projects are now in process of construction by your organization?
Contract Amount
Class of Work
Expected
Completion
Date
Name and Address of Owner
none until
beginning
of 2020 season
3. Have you ever failed to complete any work awarded to you? no If so, where and why?
4. List references from private firms for which you have performed work.
Rieth-Riley Construction Inc
Steel Dynamics
SECTION 11 PLAN AND EQUIPMENT QUESTIONNAIRE
9. Explain your plan or layout for performing proposed work. (Examples could include a narrative of when
you could begin work, complete the project, number of workers, etc. and any other information which you
believe would enable the governmental unit to consider your bid.)
Orders to be delivered upon request of material.
2. Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm
who have performed part of the work) that you have used on public works projects during the past five (5)
years along with a brief description of the work done by each subcontractor.
No subcontractors used.
If you intend to sublet any portion of the work, state the name and address of each subcontractor,
equipment to be used by the subcontractor, and whether you will require a bond. However, if you are
unable to currently provide a listing, please understand a listing must be provided prior to contract
approval. Until the completion of the proposed project, you are under a continuing obligation to
immediately notify the governmental unit in the event that you subsequently determine that you will use a
subcontractor on the proposed project.
No subletting.
4. What equipment do you have available to use for the proposed project? Any equipment to be used by
subcontractors may also be required to be listed by the governmental unit.
Quad Axle Dump Trucks - 36
Semi Dump Trailers - 30
Have you entered into contracts or received offers for all materials which substantiate the prices used in
preparing your proposal? If not, please explain the rationale used which would corroborate the prices
listed.
Yes. Material pricing for the upcoming season has been established through quotes from vendors.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial
statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to
the governing body awarding the contract must be specific enough in detail so that said governing body can make
a proper determination of the bidder's capability for completing the project if awarded.
SECTION IV CONTRACTOR'S NON -- COLLUSION AFFIDAVIT
The undersigned bidder or agent, being duly sworn on oath, says that he has not, nor has any other
member, representative, or agent of the firm, company, corporation or partnership represented by him, entered
into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such
letting nor to prevent any person from bidding nor to include anyone to refrain from bidding, and that this bid is
made without reference to any other bid and without any agreement, understanding or combination with any other
person in reference to such bidding.
He further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale.
SECTION V OATH AND AFFIRMATION
I HEREBY AFFIRM UNDER THE PENALTIES FOR PERJURY THAT THE FACTS AND INFORMATION
CONTAINED IN THE FOREGOING BID FOR PUBLIC WORKS ARE TRUE AND CORRECT.
Dated at Ashley, Indiana this 9th day of April , 2020
Klink Trucking Inc
r 442rne of Organization)
BYI��
Vice -President
(Title of Person Signing)
ACKNOWLEDGEMENT
STATE OF Indiana
ss
COUNTY OF Steuben
Before me, a Notary Public, personally appeared the above -named Anthony Winters and
swore that the statements contained in the foregoing document are true and correct.
Subscribed and sworn to before me this 9th day of April 2020
My Commission Expires: 11/1/2024
County of Residence: DeKalb
Notary Pubic
film'
Inmbody Smith
Notn i'ublic, � �t � � a 3 i I
County of DeKalb
My Commission Expires: AO
n%
0
U
c
0
00
N
'IT
X
a
m
O
0-
Q
r-
co
et'
Z
A
aD
le"
CO
f
U
W
O
ry
n
Y
0
U_
-j
m
D
e
L
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WIT14 IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF Indiana )
Steuben ) SS:
COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the fine, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -tithe.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
Version 01/29/2020 Contractor's Bid for Public Works - 4
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
S. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee
or applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of employment, or any matter directly or indirectly related to employment because
of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual
orientation or disability that does not affect that person's ability to perform time work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions will consider the Contractor's good faith efforts to obtain participation by those
subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to an•-MWBE;
however, they may not unlawfully discriminate against said MBE/WBE. A finding of noncompliance or a
discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one
(I) year from the date of such determination, and such determination may also be grounds for terminating
the contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor, agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1).1 hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
may result in forfeiture of contractual payments.
Version 01/29/2020 Contractor's Bid for Public Works - 5
I hereby affirm under the penalties of perjury that the facts and infonnation contained in the foregoing bid
for public works are true and correct.
Dated this 9th day of August . 2020
Klink Trucking
Contractor/Bidder (F• n}
Signature of tractor/Bidder or Its Agent
AnthonyWinters, Vice President
Printed Name and Title
Subscribed and sworn to before me this 9th day of AuRust , 20 20
My Commission Expires 11/1/2024 Ae . VIA24 D, A- il —) —
"Nbtary Public mberly Smith
County of Residence Dekalb
K1mborly Smith
Notary Public, State of Indiana
S L(,Ra3[l
County of D@Kaib
My Commission Expires: i 41 a
Version 01/29/2020 Contractor's Bid for Public Works - 6
BID/PROPOSAL
CITY OF SOUTH BEND
BID NAME 202U Street and 5ewer Department Materials
FOR BIDS DUE April 14, 2020, 9:30 a.m., Local Time
UIVINUN A - AbFHAL I MA I tKIALS
Item
No.
Description
Quantity
Unit
Unit Price
Total
A-1
HMA Surface 11L
15000
TON
$
A-2
HMA Surface 11 L MAC HD
5000
TON
$ Ab
A-3
HMA Surface 11S
2000
TON
$
A-4
HMA Binder 8/9
1500
TON
AW
A-5
HMA Binder 11
3000
TON
$
A-B
HMA Binder 11 MAC
1000
TON
$
A-7
HMA Base 5D
1000
TON
10
$
A-8
CMA Patch AE-300P
500
TON
Ab
AV
$
A-g
High Performance Cold
Mix
150
EA
$
DIVISION A TOTAL
$
Version 01/29/2020 Contractor's Bid for Public Works - 7
BIDIPROPOSAL
CITY OF SOUTH BEND
BID NAME 2020 Street and Sewer Department Materials
FOR BIDS DUE April 14, 2020, 9:30 a.m., Local Time
DIVISION B - PCC MATERIALS
Item
No. Description Quantity Unit Unit Price Total
B-1 Class A Concrete 2500 CY $
B-2 Class A High Early 800 CY $
B-3
7 Bag Mix - New City Specs
600
CY
High Early Concrete wl Integral
B_4
Color - Black
350
CY
B-5
Flowable Fill, Removable
350
CY
Non -Chloride Accelerator added to
B 6
concrete — 0.5%
325
EA CY
Non -Chloride Accelerator added to
B-7
concrete — 1 %
1000
EA CY
B 8
Non -Chloride Accelerator added to
2100
EA CY
concrete — 2%
DIVISION B TOTAL_ $
Version 01/29/2020 Contractor's Bid for Public Works - 8
BIDIPROPOSAL
CITY OF SOUTH BEND
BID NAME 2020 Street and Sewer Department Materials
FOR BIDS DUE ADrll 14. 2020. 9:30 a.m.. Local Time
IR71969[i7►[+�ITdti;7xC7�r>i�t5►A�i�:7T1W-9
Item
No.
Description
Quantity
Unit
Unit Price
Total
C-1
No. 23 Sand
5000
TON
$11.25
$ 56,250,00
C-2
No. 53 Gravel
1000
TON
$13.75
$ 13,750.00
C-3
No. 53 Recycled Concrete
7500
TON
$14.75
$ 110,625.00
C-4
No. 53 Slag
1000
TON
$15.50
$ 15,500.00
C-5
Topsoil
150
CY
$15.00
$ 2,250.00
C-6
No. 11 Slag Chip Stone
1000
TON
$18.25
$ $18,250.00
DIVISION C TOTAL
$ 216,625.00
DIVISION D - SEWER MATERIALS - CASTINGS
Item
No. Description Quantity Unit Unit Price Total
Manhole Cover and Frame:
D-1 EJ 1040A or Neenah R-1642 300 EA EL E
(Circle One)
Catch Basin Cover & Frame: N%j "Old
D-2 EJ 1020-M1 or Neenah R- 300 EA $
1642 (Circle One)
DIVISION D TOTAL $
Version 01/29/2020 Contractor's Bid for Public Works - 9
BID NAME
FOR BIDS DUE
BID/PROPOSAL
CITY OF SOUTH BEND
2020 Street and Sewer Department Materials
April 14, 2020, 9:30 a.m., Local Time
DIVISION E - SEWER MATERIALS
Item
No.
Description
Quantity Unit
Unit Price
Total
E-1
MH Riser 20 3/4" D —1"R — 7/8"L
40
EA
$
E-2
MH Riser 20 314" D —1 1/2"R — 7/8"L
40
EA
$
E-3
MH Riser 20 3/4" D — 2"R — 7/8"L
20
EA
$
E-4
MH Riser 20 3/4" D — 2 1/2"R — 718"L
10
EA
$
E-5
MH Riser 21 3/4" D -- 1 "R — 1 3/8"L
20
EA
$
E-6
MH Riser 21 3/4" D — 1 1/2"R — 1
3/8"L
30
EA
$
E-7
MH Riser 21 3/4" D — 2"R — 1 3/8"L
30
EA
$
E-8
MH Riser 22 1/8" D — 2"R — 1 1/4"L
20
EA
$
E-9
MH Riser 22 118" D — 3"R --1 1/4"L
5
EA
AAV
E-10
MH Riser 22 1/4" D — 1 "R — 1 1/2"L
30
EA
$
E 11
MH Riser 22 1/4" D — 1 1/2"R — 1
1 /2' L
30
EA
$
E-12
MH Riser 23" D — 1 "R — 1 3/4"L
30
EA
$
E-13
MH Riser 23" D —1 1/2"R — 1 3/4"L
20
EA
$
Version 01/29/2020 Contractor's Bid for Public Works - 10
BID/PROPOSAL
CITY OF SOUTH BEND
BID NAME 2020 Street and Sewer Department Materials �tf
FOR BIDS DUE April 14, 2020, 9:30 a.m., Local Time
DIVISION E - SEWER MATERIALS CONTINUED
Item
No.
Description
Quantity
Unit
Unit Price
Total
E-14
MH Riser 23" D -. 2"R — 1 3/4"L
40
EA
$
E-15
MH Riser 23 5/8" D — 1 1/2"R — 1
10
EA
$
1/8"L
E-16
MH Riser 23 5/8" D — 2"R —1 1/8"L
10
EA
Aft .6nL
E-17
MH Riser 23 5/8" D — 1 "R — 1 1/2"L
20
EA
E 18
MH Riser 23 5/8" D — 1 1 /2"R — 1
25
EA
C)
$
1/2"L
E-19
MH Riser 23 5/8" D — 2"R — 1 1/2"L
20
EA
$
$
E-20
MH Riser 23 5/8" D — 2 1/2"R — 1
20
EA
1/211L
DIVISION E TOTAL
$
Jl'11+�1�1fL��lirGl.�.i L�1111a\ 1.►i1t1!�
Item
No.
I Description
Quantity
Unit
Unit Price
Total
F 1
Liquid Thermoplastic Traffic
2200
GAL
$
Marking Paint —White
F-2
Liquid Thermoplastic Traffic
2200
GAL1
0
$
Marking Paint — Yellow
16=0 U_
F-3
Pavement Marking Beads,
40000
LBS
$
Standard
DIVISION F TOTAL $
Version 01/29/2020 Contractor's Bid for Public Works - 11
BID NAME
FOR BIDS DUE
BID/PROPOSAL
CITY OF SOUTH BEND
2020 Street and Sewer Department Materials
April 14, 2020, 9:30 a.m., Local Time
DIVISION G - SNOW REMOVAL MATERIALS
Item
No.
Description
Quantity Unit
Unit Price
Total
Curved Double Bevel Carbon
G-1
Steel Underbody Blade 51 x 6"T x
300
EA
$
5/8"Th
Curved Single Bevel Carbon Steel
G-2
Underbody Blade 51 x 6"T x
50
EA
$
314"Th Heat Treated — Hardened
Curved Single Bevel Carbon Steel
G-3
Underbody Blade 61 x 67 x
50
EA
$
314"Th Heat Treated — Hardened
Boss Power V Plow Blade 5 1 " X 6"
G-4
X'/" Part # SAL08858 Passenger
6
EA
$
Side Edge
Boss Power V Plow Blade 51" X 6"
G-5
X'/z' Part # BAL08859 Drivers
6
EA
Side Edge
G-6
8' 6" Western MVP Plus Plow
6
EA
$
Blade Part # 44285-1
AlF
G-7
Western Pro Plus Plow Blades
8
EA
$
90"L x 6"T x 1 /2"Th
DIVISION G TOTAL
$
Version 01/29/2020 Contractor's Bid for Public Works - 12
BID NAME
FOR BIDS DUE
BID/PROPOSAL
CITY OF SOUTH BEND
y_
2020 Street and Sewer Department Materials
April 14, 2020, 9:30 a.m., Local Time
UIVI:iIUN H - ASI'HALI MAI tKIALS UUN I "D
Item
No. Description Quantity Unit Unit Price Total
H-1 AE-T Tack 25,000 GAL
H-2 I RS-2
25,000 1 GAL
DIVISION H TOTAL $
21kri •iIQkq11IM101441 4WA15rl21111atTil7iliTrtz! Z-4"! �
Item
No.
Description
Quantity
Unit
Unit Price
Total
1-1
Driver and Truck
600
PER HR
AvIlk
DIVISION I TOTAL
$
Bidder (Firm): Klink Trucking
Address: PO Box 428
City/State/Zip: Ashley, IN 46705 Telephone Number: ( 260) 587-9113
By
(Signature)
Anthony Winters
(Printed !Name of Person Signing)
Version 01/29/2020 Contractor's Bid for Public Works - 13
U D Fidelity and Deposit Company of Maryland
Home Office: P.O. Box 1227, Baltimore, MD 21203-1227
JA44
KNOW ALL MEN BY THESE PRESENTS:
That we, Klink Trucking, Inc., PO Box 428, Ashley, IN 46705, as Principal, (hereinafter called the "Principal"), and the
FIDELITY AND DEPOSIT COMPANY OF MARYLAND, of Baltimore, Maryland, a corporation duly organized under the
laws of the State of Maryland, as Surety, (hereinafter called the "Surety"), are held and firmly bound unto City of South
Bend, Indiana as Obligee, (hereinafter called the "Obligee"), in the sum of Ten Percent Dollars ($10%), for the payment of
which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors,
administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has submitted a bid for Supply Aggregate.
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a contract with
the Obligee in accordance with the terms of such bid and give such bond or bonds as may be specified in the bidding or
contract documents with good and sufficient surety for the faithful performance of such contract and for the prompt payment
of labor and material furnished in the prosecution thereof, or in the event of the failure of the principal to enter into such
contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof
between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with
another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full
force and effect.
Signed and sealed this 14th day of April A.D. ,2020.
' Witness
_ 1 1 //_-�
C325-150M,
Approved by The American Institute of Architects,
A. LA. Document No. A-310 February 1970 Edition.
Klink Trucking, Inc.
SEAL
Principal
By r=� LL�
Wayne Klink, President, Title
FIDELITY AND DEPOSIT C MPAi q, OF MA:RY.LA.ND
Renada Kelley, Attorn -in-Fact — —
m
ZURICH AMERICAN INSURANCE COMPANY COLONIAL
AMERICAN CASUALTY AND SURETY COMPANY FIDELITY
AND DEPOSIT COMPANY OF MARYLAND
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New
York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY AND
DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert D.
Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on
the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint,
David M. RELUE, Jeffrey PIKEL, Karen WALLACE, Emily KITCHENS, Martha KINAST and Renada Kelley, all of Ft. Wayne,
Indiana, EACH, its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its
act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be
as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the
regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected
officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly
elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper
persons.
The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of
the By -Laws of said Companies, and is now in force.
IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said
ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and
FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 9th day of April, A.D. 2019.
am
0► nt SEAL
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
Robert D. Murray
Vice President
��a.41?L, ��dw 3%_ —
By. Dawn E. Brown
Secretary
State of Maryland
County of Baltimore
On this O day of April, A.D. 2019, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D.
Murray, Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and tvho
executed the preceding instrument, and acknowledged the execution of same, and being by me duly swum, depmeth and saith, that he/she is the said officer of
the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and
the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written.
,� '„nr1rff,'.
� tie;N,J1 F. 6b
�'4, Ptr �ti�yJ 8
Constance A. Dunn, Notary Public
My Commission Expires: July 9, 2019
EXTRACT FROM BY-LAWS OF THE COMPANIES
"Article V, Section 8, Attomevs-in-Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President
may, by written instrument under the attested corporate seal, appoint attorneys -in -fact with authority to execute bonds, policies,
recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such
attorney -in -fact to affix the corporate seal thereto; and may with or without cause modify of revoke any such appointment or authority at any
time."
CERTIFICATE
1, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN
CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the
foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that Article V, Section 8, of
the By -Laws of the Companies is still in force.
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998.
RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary
and the Seal of the Company may be affixed by facsimile on any Power of Attorney —Any such Power or any certificate (hereof bearing such
facsimile signature and seal shall be valid and binding on the Company."
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of
May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a
meeting duly called and held on the 10th day of May, 1990.
RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature
of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a
certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect
as though manually affixed.
IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies,
this +4th day of Aped 2020
w + 7
s$ r low ��
Brian M. Hodges, Vice President
TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMITA COMPLETE DESCRIPTION
OF THE CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND YOUR CONTACT
I N FORM ATION TO:
Zurich Surety Claims
1299 Zurich Way Schaumburg, II.,
60196-1056
www.reportsfclaims@,zurichna.com
800-6264577
1316 COUNTY -CITY BUILDUNIG F i' _ r PHONE $74l 235-925I
227 W. JFI, -RsoN BOULEVARD t�� ^ �• d ,' FAX 5741235-9171
SoUTIF Brtio, 1\DIA\A 46601-1830 F � �s LACC, ��- TDD 574/235-5567
x x
1965
CITY Off' SOUTi-I BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
Date:
To:
From
Subject
Project Name:
Project No.:
Date Received:
April 6, 2020
All Planholders
Linda M. Martin, Clerk, Board of Public Works
Addendum Number: 1
2020 Street and Sewer Department Materials
I20-005
ao
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum by
faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company: J, . 1
Authorized Signature:
Date:
7�u
1316 Cou.wrY-Cuy BUILDING �_ PHONE 5741235-9251
227 W.JEFFERSON BOULEVARD t�[ 0= FAX 5741235-9171
SOUTH BEND, INDIANA 46601-1830 TDD 574/ 235-5567
1865
CITY OF SOUTH BEIv'D PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
2020 Street and Sewer Department Materials
120-005
Addendum No. 1
Date: April 6, 2020
To: All Plan.holders
From: Scott Kreeger, Project Manager
You must acknowledge a receipt of this addendum by signing the first page and returning a
copy with your bid.
The following information is to be changed/added to the contract documents:
SPECIFICATIONS
1. Replace Notice to Bidders page with revised Notice to Bidders (See Attached Document).
ATTACHMENTS
A. Revised Notice to Bidders
END OF ADDENDUM NO. 1
NOTICE TO BIDDERS
Notice is hereby given that the City of South Bend, Indiana, will receive electronic sealed bids at
southbendin.gov/bids, until the hour of 9:30 a.m., Local Time, on April 14, 2020, for the
following:
2020 Street and Sewer Department Materials
Project No. 120-005
The Title of the Bid and Project Number (where applicable) as described above must be included
in the subject line of the email to which you have attached your bid. The name of the
company/vendor, address, contact email address and phone number must be included in the body
of the email. Detailed instructions and information, including the link to the Reserved Mailbox
for electronic bid submittals, is available at southbendin.gov/bids.
Specifications are available for viewing and download by visiting the City of South Bend's web
page at southbendin.gov/bids.
Click on the "Required Link" to register your company. You must register to receive addenda
and updates to the specific bid you are interested in.. Failure to do so could render your bid
non -responsive to the specifications.
Bids received after 9:30 a.m., Local Time, on April 14, 2020, will be returned unopened.
Electronic bids must be on the City of South Bend Bid/Proposal form provided, which includes a
Non -Debarment Affidavit, Non -Discrimination Commitment form, and a Non -Collusion Affidavit
Form. An electronic copy of a Bid Bond or Certified Check in the amount of not less than 10%
must be submitted with the bid. The awarded bidder will be required to send the original check or
bid bond via USPS.
The Board reserves the right to reject any or all bids or to accept a full or partial award of the bid
or bids which, in its judgment, will be to the best interests of the City of South Bend. If the
Board elects to award the base bid plus an alternate(s), the Board will look at the totality of the
cost when determining the lowest, most responsible bid.
The Board may reject any bid that does not conform to these requirements as non -responsive.
BOARD OF PUBLIC WORKS
Linda M. Martin, Clerk
Publish two times:
March 27, 2020
April 3, 2020
0712412018