HomeMy WebLinkAboutSM 05-13-87May 13, 19 7
4:00 p.m.
Presiding f
1. ROLL
SOUTH BEND REDEVELOPMENT COMMISSION
SPECIAL MEETING
ficer: Mr. F. Jay Nimtz
President
Members) Present:
Legal ounsel:
Redeve oDment Staff:
Bureaulof Housing Staff:
News Media:
Others:
2. OLD BUSIINESS
i
1200 County -City Building
227 W. Jefferson Boulevard
South Bend, Indiana 46601
Mr. F. Jay Nimtz, President
Ms. Paula N. Auburn, Vice - President
Mr. Roman J. Piasecki, Secretary
Mr. Michael Donoho, Assistant Secretary
Mr. Sandy Combs, Member
Ms. Eugenia Schwartz
Mr. Jon R. Hunt, Executive Director
Mrs. Ann Kolata, Deputy Executive Director
Mrs. Cheryl Phipps, Office Manager
Ms. Hedy Robinson
Ms. Kathy Baumgartner
Ms. Jeanne Derbeck, South Bend Tribune
Mr. Gary Seiber, WNDU -TV
Mr. Lee Coulson, WSJV -TV
Mr. Joe Pakii, WSJV -TV
Mr. Dick Maginot, WSBT -TV
Ms. Tracie Davis, WAOR
Mr. Charles Clark, Holladay Corporation
Mr. Robert Sowinski, CCA XVI
Mr. Richard Best, CCA XVI
Mr. Don Best, CCA XVI
Mr. Robert Toothaker, CCA XVI
Mr. Frederick Ritschard, CCA XVI
Mr. Carter Wolf, Center City Associates
a. Commission action on bids received for
cels C4 -3 and C4 -30.
Mr. Hunt noted that the Commission and
Redevelopment Staff had conducted several
meetings with the two development groups
over the last several weeks to discuss
the proposed projects. They have
discussed in detail the costs, time
-1-
South Bend iRedevelopment Commission
Special Me ting - May 13, 1987
2. OLD BUSINESS (Cont.)
a. Continued...
schedule, public assistance requirements,
start dates, financing packaging and all
aspects of each bid. He stated that both
development groups have presented good
bids. A representative from each group
is here today to summarize each proposal.
Mr. Clark, representing Washington /St.
Joseph Associates (W /SJA), summarized
their bid for parcels C4 -3 and C4 -30 as
follows: He distributed copies of two
site plans to the Commissioners. He
indicated that the first, part of the
original bid, called for an atrium
connecting Phase I and Phase II which
would block the existing service drive
between parcel C4 -3 and C4 -30. He
indicated that the total square footage
of the two projects (130,000 s.f.) given
in the original bid was a clerical error
and that the cover letter submitted with
the bid was accurate when it stated that
the 150,000 s.f. minimum would be met.
Phase I would cost $7.15 million, Phase
II would cost $9.35 million, totalling
$16.5 million.
The second site plan showed Phase I, a
seven story, 94,000 s.f. structure with
13,500 s.f. of first floor retail, and
Phase II, a seven story, 56,000 s.f.
structure both to be constructed on
parcel C4 -3, leaving the existing service
drive open. Parcel C4 -30 would be used
to supply 87 parking spaces for tenants.
The plan also included 32 parking spaces
south of and 50 spaces below the proposed
building. Mr. Clark noted that Phase I
would require the commitment of 114
parking spaces from the Jefferson Street
parking garage. He indicated that the
additional parking needed upon the
completion of Phase II would require some
type of joint venture between a
government agency or the City, such as a
UDA , since a private developer cannot
sup ort the cost of a commercial office
-2-
South Bend iRedevelopment Commission
Special Meeting - May 13, 1987
2. OLD BUSINESS (Cont.)
a. Continued...
building and a parking structure with the
re is received from both.
Mr. Clark indicated that they would begin
construction on Phase I in approximately
15 months, which would allow time for
their One Michiana Square (OMS) building
to be completely leased. Phase II would
be in 24 months later. For the second
site plan, Phase I would cost $10.4
million, Phase II would cost $6.2
million, totalling $16.5 million.
Mr. Hunt asked if the 15 month start date
was firm or if it was contingent upon the
100% leasing of the OMS building. Mr.
Clark stated that they expected to have
no problem leasing OMS but the 15 months
was also the time necessary to prepare
the plans and take bids on the
con racting.
Ms. Auburn asked if the square footage of
the total project has been amended from
130,000 s.f. to 150,000 s.f. to comply
with the bid specifications. Mr. Clark
stated that in the original bid, the
cov r letter stated that the project
would total 150,000 s.f. but the proposal
its if contained a clerical error stating
130,000 s.f.
Ms. Auburn also asked about the change in
total project cost. Mr. Clark stated
that Mr. Phair gave the original estimate
($9 /s.f.) and that it was on the low
sid . He said a project of this type
cos s $110 /s.f. which would total $16.5
mil ion.
Mr. Hunt again requested clarification on
the project schedule. He asked if the
con truction start date was July 1988 and
com letion approximately July 1989, would
the start date for Phase II be 24 months
fro the completion date of Phase I? Mr.
Cla k stated that it would be 12 months
-3-
South Bend
Special Mee
elopment Commission
- May 13, 1987
2. OLD BUSINESS (Cont.)
a. Continued...
fro the end of Phase I construction: 12
months to build, 12 months to lease, and
then begin Phase II construction.
Mr. Sowinski, representing Combined
Capital Associates XVI (CCA XVI),
explained their bid proposal for parcel
C4 -3. He indicated that they have not
altered their bid since submitting it.
They considered the minimum offering
price of $94,900 for the parcel to be
very fair and had no problem exceeding it
to offer $100,000. Their proposal of a
71,000 s.f. office building would use the
entire parcel and would meet the minimum
height requirements and maintain the
visual corridor from Century Center to
the Court House. He pointed out how
their proposed building met the set -back
from St. Joseph Street requirement and
was in line with the Jefferson Street
gar ge. The total cost of the project
would be $6,727,250, or $94.75/s.f.
Ms. Auburn asked about their intention to
connect to the Jefferson Street parking
garage. Mr. Sowinski indicated that the
building would connect to the garage at
the second floor level.
Ms. Auburn asked if they had prospective
tenants. Mr. Sowinski indicated that
theV have been talking with a lending
institution which is interested in a
drive-in bank at the location.
Mr. Hunt asked about the drawing which
showed two -way traffic in the one -way
service drive. Mr. Sowinski indicated
that it would be no problem to route the
traffic to correspond to the one -way
serivice drive.
Mr. Hunt asked whether they had
con truction financing in place. Mr.
Sowinski explained that they have been
tal ing with three large lending
-4-
South Bend Redevelopment Commission
Special Me ting - May 13, 1987
2. OLD BU INESS (Cont.)
a. Co tinued...
in titutions which are interested, but
wi 1 not commit until CCA XVI is awarded
th bid.
Mr. Piasecki asked about the construction
schedule. Mr. Sowinski indicated that
they would have the financing in place by
October/November/December 1987; final
construction drawings by
No ember /December 1987; construction
bi ding February /March 1988; begin
co struction May 1988; and complete
co struction October 1989.
Mr. Hunt noted that the City Engineer had
indicated that a connection to the garage
was possible and that he was very
sup ortive of it.
Ms. Auburn asked about the qualifications
of CCA XVI. Mr. Sowinski explained that
the Combined Capital Group consists of
five service corporations. They have 75
employees. It has been a quiet,
low profile company; they deal with local
investors; they own and rent the IBM
Building; their management company
manages and is responsible for the
lease-up of St. Joseph Towers; and they
own and manage 1500 to 2000 apartment
units across Indiana. Combined Capital
Ass ciates acquired Crestwood Gardens
whea it was in gross disrepair and has
don substantial rehabilitation and
ref rbished it as Brendenwood Apartments.
It 's a 143 unit apartment complex. They
hav increased its occupancy from 50% to
100 . Combined Capital bought Sandpiper
Squ re in Mishawaka when it had financial
man gement problems and was 60% occupied.
Its occupancy is now 100 %.
Mr. Combs asked if Combined Capital has
been involved in a project of this size
from beginning to end. Mr. Sowinski
responded that they have, and that they
have also been contacted by various
-5-
South Bend Redevelopment Commission
Special Me ting - May 13, 1987
2. OLD BUSINESS (Cont.)
M
tinued...
lenders to finish projects other
developers had not completed. They are
constructing an on -site rental office and
a community building at a 144 unit
apartment complex in Fort Wayne. They
ha e developed free standing commercial
bu'ldings, Osco Drugs, and a 100 unit
ap rtment complex.
Mr. Nimtz noted that the staff and
Co ission have spent considerable time
Stu ying both bid proposals. He asked
for a staff recommendation.
Mr. Hunt read the bid specifications and
design considerations for the two parcels
and summarized the staff report which is
attached to these minutes. He indicated
that the staff recommended awarding the
contract for bid to CCA XVI. He noted
that the W /SJA bid was an all or nothing
bid. He indicated that there was still a
question about the start date of Phase II
of the W /SJA bid. Also, they were
requesting public assistance for the
con truciton of a parking garage and the
staff doesn't feel they can enter into a
bin ing contract for that since the
current formula for awarding UDAGs
exc udes cities such as South Bend.
Mr. Hunt also noted that the minimum
off ring prices for the two parcels
($91,900 for parcel C4 -3 and $115,750 for
par el C4 -30) were not set arbitrarily,
but through two independent appraisers.
He xplained that they were low because
of 11 the restrictions the staff had
pla ed on the property.
Upon a motion by Ms. Auburn, seconded by
Mr. Piasecki and unanimously carried, the
Comiaission awarded the bid for Parcel
C4-B to Combined Capital Associates XVI
and authorized their officers to sign all
nec ssary documents.
COMMISSION AWARDED THE BID FOR
PARCEL C4 -3 TO COMBINED CAPITAL
ASSOCIATES XVI
South Bend I Redevelopment Commission
Special Me ting - May 13, 1987
2. OLD BUSINESS (Cont.)
a. Codtinued...
Mr � Nimtz recognized Mayor Roger 0.
Pa ent.
Mayor Parent noted that this is another
major development in the redevelopment of
do ntown South Bend. We have had lots of
good news recently and we continue to
have good news, especially as the sod is
being laid in the baseball stadium. He
thanked Combined Capital Associates XVI
for their fine bid and noted that all the
City can do is create a climate in which
the private sector is interested in
investing the redevelopment of the
do ntown.
3. PROGRESS REPORTS
There vAere no progress reports.
4. NEXT COMMISSION MEETING
5.
The ne t Regular Meeting of the Redevelopment
Commission will be Friday, May 22, 1987, at
10:00 a.m.
There being no further business to come before
the Commission, Mr. Combs made a motion that
the meeting be adjourned. Mr. Piasecki
seconded the motion and it was unanimously
carried. The meeting was adjourned at 5:05
p.m.
PROGRESS REPORTS
NEXT COMMISSION MEETING
ADJOURNMENT
Z-' - - - (�� J�0- /V �
Pre 'dent J n R. Hunt, Executive Director
-7-