Loading...
HomeMy WebLinkAboutOpening of Bids - Six Thousand 6,000, More or Less, Universal Nestable Refuse Containers – Spec B - Otto Environmental Systems North America, Inc.NOTICE TO BIDDERS Notice is hereby given that the City of South Bend, Indiana, will receive sealed bids at the Office of the Board of Public Works, Ste. 1316, County -City Building, 227 West Jefferson Blvd., South Bend, Indiana, until the hour of 9:30 a.m. Local Time, on March 24, 2020 for the following: Spec B — Six Thousand (6,000) More or Less Universal/Nestable Refuse Containers Specifications are available for download by visiting the City of South Bend's web page at wwwsouthberdin. ov: X Click on "I'm Looking For" X Click on "Doing Business in South Bend" X Click on "City Contracts — Invitations to Bid" X Click on the "Required Link" to register your company. You must register to receive addenda and updates to the specific bid you are interested in. Failure to do so could render your bid non -responsive to the specifications. There is no charge for the specifications. The specifications are also available for review only during regular working hours in the Department of Public Works, Ste. 1316, County -City Building, 227 W. Jefferson Blvd., South Bend, Indiana 46601. Bids received after 9:30 a.m. Local Time, on March 24, 2020 will be returned unopened. Bids must be on the City of South Bend Bid/Proposal form provided, which includes a Non -Debarment Affidavit, Non -Discrimination Commitment form, and a Non -Collusion Affidavit Form. Certified Check or Bid Bond in the amount of not less than 10% must be submitted with the bid. A refund of the bid security will be issued upon satisfaction of Bid Award. The Board reserves the right to reject any or all bids or to accept a full or partial award of the bid or bids which, in its judgment, will be to the best interests of the City of South Bend. If the Board elects to award the base bid plus an alternate(s), the Board will look at the totality of the cost when determining the lowest, most responsible bid. The Board may reject any bid that does not conform to these requirements as non -responsive BOARD OF PUBLIC WORKS Linda M. Martin, Clerk Publish two times: February 28, 2020 March 6, 2020 k CITY OF SOUTH BEND. INDIANA SELLER'S BID FOR SALE OR LEASE OF MATERIALS AND NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT AND dtpO NON-DISCRIMINATION COMMITMENT FOR SELLERS BID NAME Sec B — Six Thousand 6,000 More or Less Universal/Nestable Refuse Containers FOR BIDS DUE March 24, 2020 9:30 a.m. Date: Address: 12700 General Drive Bidder (Firm): Otto Environmental Systems North America, Inc. City/State/Zip: Charlotte, NC 28273 Telephone Number: (800 )795-6886 Agent of Bidder (if Applicable): When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF NC ) SS: Merklenhura COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. Oil a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. 4 (To be completed only by ContractorsBidders claiming to be a "local Indiana business" pursuant to I.C. 36-1-12-22) INDIANA LOCAL BUSINESS PREFERENCE CLAIM A "local Indiana business" refers to any of the following: (1) A business whose principal place of business is located in an affected county. (2) A business that pays a majority of its payroll (in dollar volume) to residents of affected counties. (3) A business that employs residents of affected counties as a majority of its employees. (4) A business that makes significant capital investments in the affected counties as defined in rules adopted by the political subdivision. (5) A business that has a substantial positive economic impact on the affected counties as defined by criteria in rules adopted by the political subdivision. An "affected county" refers to St. Joseph County, Indiana, or the following counties located adjacent to St. Joseph County: Elkhart County, Marshall County, Starke County and LaPorte County There are the following price preferences for supplies purchased from a local Indiana business: • 5% for a purchase expected by the purchasing agency to be l %vs than $50, 000 • 3% for a purchase expected by the purchasing agency to beat least $50, 000 but less than $100, 000. • 1 % car the Purchasing a . ency to beat least $100„ 000. Date: Pursuant to I.C. 5-22-15-20.9, preference for Project South Bend, St. Joseph County, Indiana. claims a local Indiana business (Project # ) located within the City of The location of the principal place of business is ; (Address) ❑ St. Joseph County, Indiana ❑ The following county located adjacent to St. Joseph County, Indiana:.. ❑ The majority of the business's payroll for the 12 months prior to the date of this Bid is to residents of St. Joseph County, Indiana or the adjacent county noted above. ❑ The majority of the business's employees for the 12 months prior to the date of this Bid are residents of St. Joseph County, Indiana, or the adjacent county noted above. If the business is deemed to be the apparent lowest, responsible, responsive bidder, then it shall provide supporting documentation for the 12 month period prior to the date of the Bid of (i) the total payroll amount paid to all employees of the business, and (ii) the total payroll amount paid to employees who are residents of St. Joseph County and the adjacent county noted above. WHEN SUPPL YING SUPPORTING PAYROLL RECORDS, BIDDER SHALL R'EDAcTALI SOCIAL SECURIT "NUMBERS. Dated this ..................._._._...... . day of . .�.�... , 20 Contractor/Bidder (Firm) Signature of Contractor/Bidder or Its Agent Printed Name and Title 11 SPECIFICATIONS , 1 C� CITY OF SOUTH BEND Spec B — Six Thousand (6,000) More or Less Universal/Nestable Refuse BID NAME Containers ......... FOR BIDS DUE March 24, 2020 9:30 a.m. Pursuant to notices given, the undersigned offers bid(s) to the City,of South Bend in accordance with the following attachment(s) which specify the class or item number or description, quantity, unit, unit price. SPEC" A — SIX TIJOUSA:N1) 6.000 MODE OR LESS 1M1N(VI� RSAL/ 'ESTALE REFUSE CONTAINERS It is the intent of these specifications to describe 96 gallon refuse containers for the City of South Bend. All containers bid must have been manufactured in the U.S.A. The City of South Bend reserves the right to reject any and all bids or to accept a full or partial award of the bid or bids which, in its judgment, will be in the best interest of the City of South Bend. Vendor to complete bid proposal, and non-discrimination commitment contained in this bid specification and attach to the submitted bid. Vendor shall provide all information requested in specifications to qualify for the bid. Vendor shall indicate YES or NO for each area of the specification. Any variations to the following specifications must be noted on a separate sheet and attached to the bid in order for the bid to be valid. Vendor to complete bid proposal, and non-discrimination commitment contained in this bid specification and attach to the submitted bid. MANUFACTURING PROCESSES AND MATERIALS: Each YESO rollout container shall consist of a body, lid, wheels, axle, and necessary accessories. The plastic resin material and the finished container must meet the minimum specifications herein. PLASTIC MATERIAL: Base plastic resin must be first quality linear low density polyethylene supplied by a national petrochemical producer. Please list supplier: ExxonMobiI..._ Bidder must submit technical data sheet(s) from the resin producer, which verify that the resin to be used in the container body will meet the following minimum property levels: ESCR - > 1000 hrs Elongation - > 1000% Density - 0.937-0.940 RESIN ADDITIVES: The plastic resin must be enhanced with color ' , O pigment and ultraviolet inhibitor, which must be uniformly distributed throughout the finished container. To ensure thorough distribution of these additives, the resin and additives must be mixed in a molted state using a hot -melt compounding process. Bidder must submit a statement certifying that all of the plastic resin and additives will be hot -melt blended. CONTAINER REQUIREMENTS: The rollout containers must be w "I_S ) compatible with standard American semi -automated bar -locking lifters (ANSI type B) as well as automated arm lifters (ANSI type G) and function as follows: ANSI CONFORMANCE: Containers bid herein must meet the requirements of ANSI Z245.30-1999 and ANSI Z245.60-1999 standards for "Type B/G" containers. Bidder must submit independently certified copies of all ANSI test results with bid. Test results must state load (in pounds) under which tests were conducted. The load under which the tests were conducted must be the same as the load rating stated in all literature and specifications. The ANSI Appendix D test for "Loading and Unloading Test for Carts" must clearly state that the required 520 dump cycles under the cart's full rated load were performed on both a Semi -Automated Cart Lifter and a Fully Automated Grabber Arm. LOAD RATING: Containers must be designed to regularly receive YES)"NO and dump the following pounds of waste materials, excluding the weight of the container, without permanent damage or deformation. The load rating must conform with ANSI Standard Z245.30. 96 Gallon — 335 pounds Bidder must submit its normal printed color sales brochure which shows the exact product item bid and the corresponding load rating. Bidder must mark the location of the load rating on the brochure with a bold red arrow so as to aim directly at the load rating. Load rating stated on literature must exactly match all specifications, ANSI certification submitted with bidder's proposal, and the load rating permanently marked on the product. 96 Gallon: STATE LOAD RATING - 335 pounds WEIGHT: The total weight of the fully assembled container shall be as follows:J(YESPNO 96 Gallon — 32 pounds minimum 0 STATE FULLY ASSEMBLED WEIGHT OF EACH SIZE — 96 Gallon - 34.5 pounds CAPACITY: The total capacity of the container body, excluding the YI`S'NO lid, must be 96 U.S. gallons (+/- 2%). Bidder must include an independent test result according to ANSI Z245.30, Appendix A (Volume Test), certified by an accredited professional engineer, showing the exact capacity of the cart body (to the nearest 0.1 U.S. gallon). 96 Gallon: STATE BODY CAPACITY - 95.8 U.S. Gallons DIMENSIONS: The exterior dimensions of the completely YE� / NO assembled containers shall be as follows: 96 Gallon — Height: 43.25" STATE HEIGHT - 41.25 Length: 35.25" STATE LENGTH - 33.88 " Width: 29.75" STATE WIDTH HANDLES: Each container must be equipped with two (2) handles, YES NO each a minimum of 1" diameter. The handles and handle mounts must be an integrally molded part of the container body. The handles shall be designed to afford the user positive control of the loaded cart at all times. The handles must not have the ability to rotate on their own axis at any time. Handles which are molded as part of the lid are unacceptable. Bolted -on handle mounts or bolted -on handles are unacceptable. LID: The lid shall be configured to ensure that it will not warp, YES" NO bend, slump, or distort such an extent that it no longer fits the container properly or becomes otherwise unserviceable. The lid must be crowned in shape and designed to disallow entry of rain when in the closed position. The lid must open from a closed position through a full 270' arc. Living hinges and lid counter weights are unacceptable. Lid latches are unacceptable. The rim must also include a ledge on which the lid rests to create a tight seal between body and lid. BOTTOM: The bottom of the container must have a molded -in wear ES'/NO strip to protect against dragging. Container base must be impact resistant at all points (four corners and the center) of the base for durability. Screw -on, bolt -on, or pop -on wear guards are unacceptable. WHEELS: Wheels shall be 10" diameter and 1.75" wide with YY NO knobby treads. Wheels must be extra high molecular weight polyethylene capable of supporting 200 pounds per wheel. AXLE: The axle must be 5/8" diameter zinc chromate plated solid YES l N( high strength steel fully supported by cart body. Axle must slide through two molded -in plastic journals in the cart bottom and must not be exposed to contents inside of container. Each molded -in axle journal must be at least 1" wide. Axles attached by means of bolts or rivets are unacceptable. 27/32 STABILITY: Each container shall be stable and self -balancing when F, NO in the upright position, either loaded or empty. The container must be designed to withstand winds of up to 25 mph when empty. Containers must be easy for a citizen to tilt to the roll position when fully loaded while keeping both feet on the ground. Any container which is judged as too difficult to tilt when loaded with 335 pounds (96 Gallon) of material will be disqualified. Containers that require a foot fulcrum to assist in tilting the container are unacceptable. LIFT SYSTEM: Each container shall be equipped with attachment Yl"/ NO points which make it compatible with standard American semi - automated bar -locking lifters and fully -automated arm lifters. The upper lift point must be integrally molded into the body of the container. The lower lift bar must be designed to withstand over ten (10) years of lifter attachment, and must be 1" diameter galvanized steel. It must freely rotate a full 360' on its own axis. The lower bar must be mounted in molded -in plastic bearings so that it is not exposed to the contents inside the container. The lower bar must be factory installed and cannot be attached by means of rivets, screws, bolts, fasteners, etc. Containers with bolted on lower bars or plastic lower bars are NOT acceptable. COLOR — The container body color shall be Greenstone, or tan to `i,Sy NO match our existing carts. Bidder must supply sample chips of the colors available with their bid. Surface treatments, spray -on finishes and materials that are not homogenous are not acceptable. Color will be determined at the time of order. Required assembly limited to lids and wheels. YC, / NO MARKINGS: Each container must be permanently marked with Y1'S (:D letters/numbers, as follows: `IT SERIAL NUMBERS: Each container must have a serial number hot stamped in white on the front face of its body. The serial number shall be preceded by a letter or number code which designates the year of manufacture. Serial numbers shall be in sequence beginning with a number designated by the City. The bidder will maintain a file that will identify the date of manufacture by the serial number. RFID tags compatible with Desert Micro Software be included. L;S NO CITY SEAL: The Seal of the City of South Bend shall be hot ( 1 NO stamped onto both sides of the cart body. Street side of containers shall be marked NO PARKING. USER INSTRUCTIONS: Instructions for the safe use of the YES 7, NO container must be molded into each lid. Instructions shall be in both " English and Spanish. LOAD RATING: The load rating of the container must be raised- YES J%O relief molded into the lid. Load rating shall be stated in both pounds and kilograms and in English and Spanish. EXPERIENCE: YINO REFERENCES: Bidder must submit with its bid a reference list of municipalities currently using the bidder's products. The list must include at least ten (10) municipalities who currently have at least 20,000 carts in service. Include the name of the municipality, year of installation, contact person, phone number, and quantity for each reference. Failure to include these references will result in bid disqualification. WARRANTY: Bidder must submit with bid a document which YES //NO clearly states the exact warranty of the bidder. The warranty must be for no less than ten (10) full years and must specifically provide for no -charge replacement of any component parts which fail in materials of workmanship for a period of ten (10) years after installation. The bidders warranty is understood to include, whether stated in bidder's warranty or not, the following coverage: Failure of the lid to prevent rain water from entering the container when in the closed position. Damage to the container body, lid, or any component parts through 'V S NO opening or closing the lid. Failure of the lower lift bar from damage during interface with lifters. YES) NO Failure of the body and lid to maintain their original shape. YES NO Damage or cracking of the container body through normal operating Yl :1 NO conditions. Failure of the wheels to provide continuous, easy mobility, as Y1S, NO originally designed. Failure of any part to conform to minimum standards as specified YI"51O herein. If bidder is owned by another business entity, then the owning entity I Y1n;S)NO must also accept full financial responsibility for the warranty of the bidder. The bidder must submit with their bid a letter from the owning entity which clearly states its obligation and commitment to honor the warranty of the bidder, should the bidder ever be in a position to not do so. Such letter shall be signed by the owning entity's top officer and notarized. Warranty specimen of exact warranty offered must be included with Y ES) NO proposal. LEGAL OR ADMINISTRATIVE SETTLEMENTS: The YES / NO manufacturer of the cart must submit the name, contact name and telephone number for each government or agency with which it has had a legal or administrative settlement of warranty, cart failure claims or contract performance within the last five (5) years including ongoing negotiations of settlement. Include a brief summary of the settlement or indicate if a "gag order" was imposed, and by whom it was ordered. This information must be provided on a separate page entitled "Legal ^�/� or Administrative Settlements." / Y QUANTITY PRICING: Y1 S NO 6,000 more or less 96 gallon or 48 gallon in combination containers over a 24 month period. Vendor to guarantee pricing for a 24 month period from date of bid award. DELIVERY: Max 90 days. Vendor to state approximate delivery , S NO time from bid award. MISCELLANEOUS: Must provide sample within two weeks of bid YES NO opening. w Delivered to: 3113 Riverside Drive, South Bend, IN 46628. Price " -E-S,- / NO to include all freight costs. 10 �p V rrr 14" BID/PROPOSAL CITY OF SOUTH BEND 1865 Spec B — Six Thousand (6,000) More or Less Universal/Nestable Refuse BID NAME Containers FOR BIDS DUE March 24, 2020 9:30 a.m. Description Make/Model Unit Price Item No. Est. Qty. Item Unit Price Total 1 TBD 96 Gallon Universal/Nestable Refuse $42.29 $253,740.00 Container Complete 6 000 Manufacturer: MSD-95 "Millennium" 2 TBD 48 Gallon Universal/Nestable Refuse $ 31.79 $190,740.00 Container Complete 6,000 Manufacturer: MSD-45 "Edge" Bidder (Firm): Otto Environmental Systems North America, Inc. Address: 12ZOO General Drive City/State/Zip: Char1QU"C.,.-2. Telephone Number: 800-795-6886 M BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member Jordan Gathers, Member 11 (Signatu Michael Costello (Printed Name) President and CEO (Title) Therese J. Dorau, Member Joseph Molnar, Member Attest: Linda M. Martin, Clerk r o CITY OF SOUTH BEND INSTRUCTIONS TO BIDDERS`' ddc�M BID FORMS AND EXECUTION A. Bidders are expected to examine the Drawings, Specifications, Proposal and all Instructions. Failure to do so will be at the Bidder's risk. B. Each Bidder shall furnish all information required by the Notice, Instructions to Bidders and Specifications. Bids must be made on the form provided. The Bidder shall sign the Proposal and Non -Collusion Affidavit, which is a part of the provided form, where indicated, provide a notary signature and provide all other information required. C. The Bidder shall sign the Proposal in the following manner: If the Proposal is made by an individual, his/her name and post office address must be shown. If made by a partnership or joint venture, the name and post office address of each member of the partnership or joint venture must be shown. If made by a corporation, the Proposal must be signed by an officer of the corporation or by a representative duly authorized by the corporation to execute the Proposal in its behalf. SEALED BIDS ONLY A. Bids, Proposals, Guaranty, and other required documents must be submitted in a sealed envelope marked on the outside with the general classification of material bids, i.e. "Bid for Computer Equipment," "Bid for Front End Loader," or "Bid for Office Supplies." B. When samples are required, such samples shall be delivered or shipped at the bidder's expense to the address specified in the Invitation to Bid. Samples must be shipped separately from bid documents and labeled clearly with the Bidder's name, address and the commodity or equipment classifications and documents, the item (and item number, if any), and Material Safety Data Sheets (if applicable). All samples must be representative of the commodities or equipment which will be supplied by the successful Bidder. All samples will become the property of the City of South Bend and none will be returned, unless otherwise stated in the Specifications. C. In the event of an inconsistency between provisions of the contract documents, the inconsistency shall be resolved by giving precedence in the following order: ORDER OF PRECEDENCE A. Bid Form attached Proposal B. Amendments to Specifications C. Specifications D. Special Provision E. Instructions to Bidders F. Notice to Bidders 4. DELIVERY OF BIDS A. Bids must be delivered to the Office of the Board of Public Works, 131h Floor, County -City Building, Room 1316, 227 West Jefferson Boulevard, South Bend, Indiana 46601 (574) 235- 9251, by the time specified (local time) in the Notice to Bidders. If not delivered personally, the sealed envelope containing the Bid must be mailed to the following address: City of South Bend Clerk of the Board of Public Works 1316 County -City Building 227 West Jefferson Boulevard South Bend, Indiana 46601 B. The Post Office Department will be considered agent of the Bidder in delivering the bid. The City will not be responsible for deliveries. Any Bids received after the time specified will be returned unopened. 12 C. Bids will be opened and read publicly at the time and place designated in the Notice to Bidders. Bidders, their authorized agents, and the public are invited to be present. D. Bidders may bid on one (1) or more item, provided however, that the bid submitted for each is delivered in a separate, sealed envelope, with the envelope clearly labeled on the outside as to the specific item for which the bid is being submitted. Bidders may submit separate bid bonds for each item being bid upon OR may submit one (1) bid bond equal to 10% of the combined total of all bids submitted. E. The Board may reject any bid based on being non -responsiveness should such bid not conform to these requirements as listed herein or if a bid cannot be delivered in a manner consistent with the needs of the City. 5, ADDENDA — NO VERBAL INTERPRETATIONS A. No inquiries by Bidders relative to interpretation of Plans, Specifications, Special Provisions, or other Bidding Documents will be answered verbally. If any prospective Bidder is unable or unwilling to comply with one or more requirements of the bidding document, such Bidder should so inform the Board of Public Works in writing. Upon receipt of such information, consideration will be given to the advisability of issuing an Addendum which would thereupon become applicable to all Bidders. Any such inquiry must be submitted at least seven (7) days prior to the bid opening date in order to give the Board sufficient time to consider any necessary Addendum. All answers to such inquiries, in the form of Addenda, will be furnished to all prospective Bidders who have registered with the City. All Bidders are required to acknowledge receipt of any Addenda by inserting the Addendum number and the issuing date on executed Proposals. 6. REJECTION OF PROPOSALS CONTAINING ALTERATION ERASURES INCOMPLETE BIDS AND ETC. A. Proposals shall be rejected if they show any alteration of form, additions not called for, conditional or alternate bids (except when and insofar as are invited), incomplete bids, erasures or irregularities of any kinds. B. All blank spaces for bid prices must be filled in, in ink, with the unit price and total price for each item (This does not apply to divisible bids). In case of incorrect totaling of amounts and where the unit price and the extension thereof do not agree, the unit price for each item shall govern, and the City is authorized to correct all erroneous extension and totals for the purpose of comparing bids. 7. TRADE DISCOUNTS, - A. Trade discounts shall not be shown separately, but shall be incorporated in the Bidder's unit price, unless otherwise specified. 8. VEHICLE BIDS A. Bidders may bid on one (1) or more vehicles, provided however, that the bid submitted for each vehicle is delivered in a separate, sealed envelope, by vehicle, with the envelope clearly labeled on Bidders may bid on one (1) or more vehicles, provided however, that the bid submitted for each vehicle is delivered in a separate, sealed envelope, by vehicle, with the envelope clearly labeled on the outside as to the specific vehicle for which the bid is being submitted. Bidders may submit separate bid bonds for each vehicle being bid upon OR may submit one (1) bid bond equal to 10% of the combined total of all vehicle bids submitted. B. If an Option is included within these specifications, please be advised that, optional items placed in the specifications are to determine the best configuration of the item within a budgeted amount and may be included in the award criteria. If the Board elects to award one or more option(s), the base bid price and the option bid price(s) will be totaled and compared for all bidders offering the final configuration. Award will be made based on the lowest responsible/responsive bid prices submitted for the base bid with the selected option(s), if applicable. Failure to submit a bid on an option may result in the entire bid being non -responsive, depending on the final configuration of the product. 13 9. The Board may reject any bid that does not conform to these requirements as non -responsive. 10. TAX EXEMPTIONS A. The City of South Bend is exempt from the payment of federal excise and transportation taxes levied under the provision of the Internal Revenue Code. It is also exempt from the Indiana State Gross Retail Tax (sales tax). The City will furnish the successful Bidder with any certificate of exemption required. 11, WITHDRAWAL OF BIDS A. Withdrawal of bids will be allowed only in those cases in which a written request to withdraw a bid is received by the Board of Public Works prior to the date and hour for receiving and opening bids. In such cases, the same will be returned to Bidder unopened. 12. ESCALATOR OR CONTINGENT CLAUSES A. The use of escalator clauses or other contingent clauses by the Bidder is prohibited, unless requested or permitted by the Invitation to Bid. No Proposal shall contain nor be accompanied by any writing purporting to limit or qualify the City's right to accept such Proposal or purporting to alter such Proposal or any Contract which may be executed pursuant thereto. 11 PRICES MUST BE DELIVERED PRICES A. The bid price shall be a delivered price. All materials shall be shipped F.O.B. destination as specified in the Invitation to Bid. No fuel surcharges accepted. 14, AWARD WAIVER OF TECHNICALITIES A. The Award of Bid, if any award be made, will be made within sixty (60) calendar days after the opening of Proposals to the lowest responsible and responsive Bidder who's Proposal complies with all the requirements prescribed, exclusive of technicalities waived. Until the final award of the Bid, however, the right is reserved by the City to reject any and all Proposals and to waive technical errors. 15, SPLITTING OF AWARDS/DIVISIBLE BIDS A. Bids will be awarded on the basis of the total dollar amount for all items in the Proposal unless the bid is described by the City as a Divisible Bid. The City may award a Divisible Bid to the lowest responsible and responsive Bidder for each item or class of items as indicated in the bid documents. 16. BIDDER QUALIFICATION A. The City may require any Bidder to submit evidence of qualifications, and may consider any evidence of the financial, technical, and other qualifications and abilities of the Bidder. The City will not award a Contract to a Bidder who, in its opinion, is not fully qualified on the basis of financial resources and responsibility, possession of adequate equipment, personnel, experience, and past record of performance to perform the obligations to be undertaken competently and without delay. 17. PURCHASE ORDERS A. A Purchase Order will be issued to the successful Bidder after formal acceptance of the bid is made by the City. 18. NEW MANUFACTURE A. Unless otherwise specified in the Invitation to Bid, the items offered shall all be new and the latest model of manufacture. 19. SOURCE OF SUPPLY A. If the Bidder is not a manufacturer, the source of supply must be shown and all sub- contractors must be identified. 20. PACKAGING A. All items shall be delivered strongly packed and marked according to accepted commercial practice unless otherwise directed in the Specifications. No charge shall be made for containers and the City shall have no obligation to return containers unless otherwise provided by the Specifications or Special Provisions. Any items not received in good condition will be rejected. 14 21. INSPECTION OF GOODS A. The City of South Bend reserves the right to inspect and have any goods tested after delivery for compliance with the specifications. Notice of latent defects, which would make the item unfit for the purposes for which they are required, may be given at any time within one year after discovery of the defects. B. All items rejected must be removed immediately by the Contractor at the expense of the Contractor. If the Contractor fails or refuses to remove the rejected items, they may be sold by the City of South Bend. C. In some cases, at the discretion of the City, inspection of the commodities or equipment will be made at the factory, plant, or other establishment where they are produced before shipment. D. The above provision shall not be construed in limitations of any rights the City may have under any laws including the Uniform Commercial Code. 22, ASSIGNMENTS A. No person to whom a Contract has been awarded may assign his interest in the Contract without the consent, in writing, of the City. 21 CANCELLATION A. The City of South Bend reserves the right to cancel any Contract for failure or refusal of performance, fraud, deceit, misrepresentation, collusion, conspiracy, or any other misconduct on the part of the Contractor. 24. DEDUCTION OF DAMAGES A. If the City cancels the contract for any cause, it shall deduct from whatever is owed the Contractor on the Contract or any other Contract, any amount sufficient to compensate the City for any damages suffered by it because of the Contractor's wrongdoing. 25, METHOD OF INVOICING FOR PAYMENT A. Contractor shall bill the City of South Bend 1. On regular invoice form giving a complete and detailed description of the goods delivered, including purchase order number. 2. If the Contractor allows a discount, the period of time in which the City must make payment to qualify for the discounts shall be computed from the date the City received the invoice (completely filled out), or the date the goods are delivered and accepted, whichever may be later, and shall not be less than twenty (20) days. 3. If more than one shipment is made under the Contract and on the same purchase order, the City will make partial payments on a basis that is agreeable to both parties. 26, OWNERSHIP OF GOODS A. The goods which are the subject of the Contract shall remain property of the Contractor until delivered to and accepted by the City of South Bend. 27. ESTIMATED QUANTITIES A. If the quantity set forth in the Notice to Bidders and Proposal is approximate and represents the estimated requirements of the City for a specified period of time, the unit price and the extended total price thereof shall be used only as a basis for the evaluation of bids. The actual quantities necessary may be more or less than the estimate, but the City shall neither be obligated nor limited to any specific amount. The City will, if at all possible, restrict increases to twenty percent (20%) of the estimated quantity and will, if at all possible, restrict decreases to twenty percent (20%) of the estimated quantity. 28.. TERM "OR EQUAL" A. Where the term "OR EQUAL" is used in these Specifications, the Bidder deviating from specified item shall file with his/her bid a letter fully explaining and justifying his/her proposed article or equal. The City of South Bend shall be the sole judge in determining if the "OR EQUAL" offered meets the Specifications. 15 29. INDEMNIFICATION CLAUSE A. The Contractor agrees to indemnify, defend, and hold harmless the City of South Bend, its agents, officers, and employees from all costs, losses, claims and suits, including court costs, attorney fees, and other expenses, arising from or out of the negligent performance of this Contract by the Bidder or because or arising out of any defect in the goods, materials or equipment supplied by the Bidder. NOTE; Incoming mail does not reach the Board of Public Works until after 9:30 a.m. If you are sending your bid via Federal Express or another overnight source, please confirm that your package will arrive before the bid opening time and date. 16 I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this clay of 2(219 �0,%1,4'MwwIMMW►q� OININ 9M Michad sl&o,sidenit and C EQ Printed Name and Title Subscribed and sworn to before me this day QItt, 20,,?' My Commission Expires � Notary Public County of Residence 5 SPEC B -SIX THOUSAND (6000) MORE OR LESS UNIVERSAL/NESTABLE REFUSE CONTAINERS BID DUE: TUESDAY, MARCH 24, 2020 AT 9:30 A.M. Prepared for: Linda M. Martin, Clerk CITY OF SOUTH BEND Prepared by: OTTO ENVIRONMENTAL SYSTEMS NORTH AMERICA, INC. Contact: Sandra Abdow, Municipal Manager 12700 General Drive, Charlotte, NC 28273 Sandra.Abdow@otto-usa.com 980-275-5457 www.otto-usa.com Otto Environmental Systems North America, Inc. 12700 General Drive, Charlotte, North Carolina 28273 March 19, 2020 Linda M. Martin Clerk, Board of Public Works 1316 County — City Building 227 West Jefferson Boulevard South Bend, Indiana 46601 RE: Spec B Six Thousand (6,000) More or Less Universal/Nestable Refuse Containers Bid Opens: March 24, 2020 at 9:30 a.m. Dear Ms. Martin: Otto Environmental Systems North America, Inc. is pleased to respond to the City's referenced bid. Otto has provided high quality containers to municipalities and the waste management industry since 1983. Since then, we have continually invested in both our Charlotte, North Carolina, and Eloy, Arizona, facilities in order to meet production capacity and the needs of our customers. It is estimated that there are currently over 100 million Otto containers in use around the globe. Otto Environmental Systems North America, Inc. appreciates the opportunity to submit our proposal, and we look forward to a long-lasting business partnership with the City of South Bend. We understand you have choices, so we realize that we need to earn your business. With our experienced and qualified engineering and sales teams, our dedicated customer service department and our high -quality products, we feel strongly that our proposal offers a solution that meets or exceeds the bid requirements. Thank you for your interest in Otto, our products and services. Sincerely, Sandra Abdow Municipal Manager Otto Environmental Systems North America, Inc. •800.795.OTTO (6886) •www.otto-usa.com Otto Environmental Systems North America, Inc. 12700 General Drive, Charlotte, North Carolina 28273 CITY OF South Bend, IN Six Thousand (6,000) More or Less Universal/Nestable Refuse Containers Bid Opens: Tuesday, March 24, 2020 at 9:30 a.m. COMMENTS AND EXCEPTIONS The Multi -System Design "MSD" refuse containers manufactured by Otto Environmental Systems North America, Inc. are injection -molded with numerous premium features. The design specifications of the Otto MSD carts will meet virtually all the specifications outlined in this bid request — even exceeding the specifications in some very important areas. Please consider the following exceptions during your evaluation period. DIMENSIONS: Otto's MSD-95 Gallon "Millennium" container exterior dimensions are as follow: Height: 41.25" Length: 33.99" Width: 29.38" AXLE: The Otto MSD-95M machine solid steel Axle has a 27/32" diameter. Otto Environmental Systems North America, Inc. •800.795.OTTO (6886) •www.otto-usa.com In March 19, 2020 Linda M. Martin, Clerk City of South Bend Indiana 1316 County -City Building 227 West Jefferson Boulevard South Bend, Indiana 46601 Otto Industries North America, Inc. 12700 General Drive Charlotte, North Carolina 28273 Re: City of South Bend, Indiana Spec B — 6,000 more or less Universal/Nestable Refuse Containers Dear Ms. Martin: Otto Environmental Systems North America, Inc. ("OESNA") appreciates the opportunity to participate in the City of South Bend Indiana "Spec B — 6,000 more or less Universal/Nestable Refuse Containers." OESNA is committed to ensuring a successful business relationship. Otto Industries North America, Inc. is a privately held company, which is the parent company of OESNA and has made available a line of credit to OESNA such that, barring any unforeseen circumstances, OESNA can meet its warranty commitment under this bid proposal. Mrrnrrnr�� , .' * � is: b n, � Wq A(+a w a r ty hem N N [Notary Acknowledgment Must Be Included] President and Chief Executive Officer Otto Environmental Systems North America, Inc. • 800.227.5885 • www.otto-usa.com Otto Environmental Systems North America, Inc. 12700 General Drive, Charlotte, North Carolina 28273 <4>0 CORPORATE PROFILE Company History With a legacy spanning over 85 years, Otto's original company was founded in Kreutzal, Germany, in 1934. The company entered the waste management industry in 1950. With the introduction of injection molded containers in 1965, Otto pioneered the two -wheeled trash cart in use today. The largest brand of plastic waste containers in the world, Otto has more than 160 million carts servicing communities around the globe. Diversified Portfolio Not only does Otto manufacture a wide range of waste container products, Otto also owns a waste container service group along with a custom and contract molding group. Some of the principal activities of these divisions are: Waste Container Products: Municipalities and Private Haulers Offering waste containers for various types of waste streams in both the residential and commercial categories. These include but are not limited to general waste, recycling, yard waste, organic waste, and e-waste. Container Management Services Providing services such as assembly, distribution and recovery (A&D), logistics, cart repair, inventory management, warranty management, and cart re -branding for deployed waste containers. Waste Container Products: Retail Sector Offering waste container options to retailers that allow consumers to purchase containers for needs beyond their weekly collection service or for those whose collection service requires containers to be purchased by the individual. Operations Overview Otto Environmental Systems North America, Inc. (OESNA) is a wholly owned subsidiary of Otto Industries North America, Inc. which was acquired by Callidus Capital Corporation in June 2017. After entering the United States market in 1983, the company rapidly gained market share by importing containers from its European factories. In 1988, Otto invested $40 million toward its first domestic manufacturing facility located on a 16-acre tract of land in Charlotte, North Carolina. Due to the company's consistent growth, Otto has expanded this facility to accommodate additional machinery, assembly and staging areas, and storage space. The North Carolina facility now houses 177,000 square feet of indoor space, including Otto's North American corporate offices. It is also equipped with an impressive array of modern injection molding equipment. In 2002, Otto opened its second North American facility in Eloy, Arizona. The Eloy facility contains 27,300 square feet of manufacturing space, 400,000 square feet of inventory space, and 4,700 square feet of administrative office space. The plant features several large injection molding machines and various types of manufacturing equipment, which have significantly increased production capacity. Otto: Serving Municipalities and Private Haulers Since 1983, Otto has developed and maintained lasting relationships with many diverse municipalities and private haulers. As a result, Otto's reputation is that of a valued and dependable partner. (references provided upon request.) Otto provides a range of products including a broad array of two -wheeled carts, recycling bins, and related products, along with commercial dumpsters for a variety of waste streams in both residential and commercial sectors. For complex municipal contracts, Otto offers consultation services to guide you through the waste collection process. Whether it is going to council meetings or educating residents, Otto has experts with hands-on experience to help every step of the way. Otto's experienced sales force is the largest in the industry and is uniquely qualified to understand your needs and offer custom, cost-effective solutions. Our dedicated customer support team oversees the order process from order to delivery. Finally, our strategically located facilities, manufacturing partners and distributors help improve product lead time and decrease freight costs. Container Management A division of OESNA, OCM Solutions, LLC (OCMS) is a logistics company that focuses on container management — assembly, distribution and recovery (A&D); container evaluations and maintenance; inventory management; and container re -branding. Originating in Europe, OCMS and its predecessor, Otto Container Management, LLC (OCM), has 40 years of experience in cart maintenance and repair programs with service contracts throughout France, Italy, Britain, Germany, Spain, Mexico, and Brazil. OCMS has taken the best practices from these locations to bring the greatest value to its customers in the United States. OCM began U.S. operations in 2000 and merged into OCMS in 2018. OCMS is headquartered alongside its product manufacturing division in Charlotte, North Carolina. OCMS currently employs 50 full-time team members and has a fleet of 40 service box trucks identifiable with professionally applied graphics and 17 trucks with trailers. The fleet operates under D.O.T. standards, and all trucks are equipped with GPS systems linked to route planning software that provides accurate service verification. OCMS has a growing fleet of locations across the United States, collectively handling about 2.1 million carts. Between 2014-2016, OCIVIS completed over 1.3 million cart actions (approximately 44,000 actions per month) and distributed more than 1.4 million containers to end -user locations via A&D (assembly and distribution) projects. Heightened environmental awareness has led to goals such as becoming 95% emissions free or better by 2018. To accomplish this, OCMS is proud to purchase only zero -emission diesel or CNG trucks for existing and future projects. The fleet currently includes 57 vehicles, 1 of which is a zero -emission vehicle. Otto: Serving the Retail Sector Finding a niche in the consumer waste market, Otto's retail division provides containers to high -volume retailers for business -to -consumer sales. Otto Retail got its start in 2013, quickly gaining traction by landing big accounts such as Walmart and The Home Depot. Otto Retail continues to expand its offerings to suit the needs of consumers. Otto Environmental Systems North America, Inc. •800.795.OTTO (6886) •www.otto-usa.com Expert Engineering Otto strives to provide a breadth of products and services for its customers. Our engineering and product design team has the expertise to provide the best cost-effective solution to meet your needs for quality, durability and longevity. Otto uses a plastic injection molding process using high density polyethylene (HDPE) to produce many of its products, including two -wheel carts, dumpsters, and contracted and custom molded parts. Injection molding provides consistency and durability with design features that are built into the mold to strengthen areas that face unique stress points. Otto containers are engineered with the appropriate balance of stiffness and flexibility to provide flex and conformity for an automated grabber, resulting in fewer stress points. Special features of our two -wheel carts feature a molded -in wear ridge at the bottom of the cart to prolong the container lifespan and patented dimples at four sides to assist with gripping power. Quality Management Otto Environmental Systems North America, Inc. is ISO 9001:2015, and IATF 16969:2016. Otto is regularly audited to maintain these certifications. Every order is inspected to meet specified project requirements. Otto carts are manufactured using high density polyethylene (HDPE). Otto only uses HDPE grades that have longer molecular chains to decrease the melt index and give the material "melt strength." The higher molecular weight also gives the material increased environmental stress crack resistance (ESCR), impact strength, and cold -temperature toughness over a material with a similar density but shorter molecular chains. Each lot of resin is put through extensive testing to verify the melt flow index and check for moisture and contamination to ensure the resin meets Otto's established standards. Advantages of the Otto Injection Molded Container Otto Environmental Systems North America, Inc. refuse containers are manufactured by an injection molding process. The injection molding process is capable of making products with complex designs that would not be possible by other manufacturing processes such as rotational or blow molding. For example: • HDPE (high -density polyethylene) composition is heavy duty and fully recyclable. • The automated manufacturing process yields lower container prices. • Injection molding allows for intricate design features, such as wear strips, support ribs, and assembly slots, where other molding processes create simpler outputs with limited mold design capability. 0 Consistency in wall thickness allows isolation of special features in order to strengthen areas where the container faces special stress, for example: o Lid attachments are cylindrical -shaped and double -ribbed, creating a robust attachment to the container body. o The container base is manufactured with a dual molded -on "wear strip" to take the brunt of the wear and abuse. The flat bottom of the container does not touch the ground. o Molded gussets contribute greater strength to the axle mounting details. High pressure injected resin ensures complete and even coverage throughout the mold, providing overall consistent wall thickness and eliminating thin spots or "windows." An extra deep toehold assists with handling heavy loads. Otto Environmental Systems North America, Inc. •800.795.OTTO (6886) •www.otto-usa.com Other benefits include: • A guaranteed ten-year, non -prorated warranty on carts and a five-year, non -prorated warranty on recycling bins, along with a one-year non -prorated warranty on commercial dumpsters. • A container failure rate of less than 1%. • Standard snap -on wheels that roll easily, quietly and provide greater control of the cart. • A large oversize solid steel axle, which is manufactured from recycled material, to provide exceptional durability. • A cart design that leads the industry in wind stability. • A virtually maintenance -free container, decreasing costly labor for repair. • A durable metal lower "catch" bar. • Industry leading and value-added graphic design services for instructions and container branding. • A selection of seven standard colors and superior hot stamping using the latest heat sink technologies. • An aesthetically pleasing container that complements both inside and outside environments. Innovative Technology Otto is actively investing in cloud -based technologies to change our world for the better. Our investment in "the cloud" aims to reduce our manufacturing footprint and in turn, increase efficiencies that will lead to a cleaner community, less printed paper, more recycled product, and reduced product lead times. All Otto carts can be equipped with RFID tags or permanent barcodes that can link a cart to a specific address. With RFID, a plastic RFID tag is placed inside the handle of the cart during assembly at Otto's manufacturing facility and secured in place once the hinge pins are fastened to the lid. Barcodes are available at the time of manufacture with several application options. ANSI Approved Otto carts meet or exceed A.N.S.I. (American National Standards Institute) Z245 standards for compatibility dimensions to ensure that containers and lifters work together to safely empty and return the container to the ground after collection. These include bib and lift bar dimensional requirements based on the container type. For required markings, Otto carts include a code for the date of manufacture, the maximum payload weight rating, the volumetric capacity, and safety "close lid before moving" instructions. Cart testing is always executed with the maximum load weight of 3.5 pounds per gallon. Additional proprietary tests are also performed and recorded to ensure variables such as different working shifts, raw materials, and equipment are consistent for optimal output. A.N.S.I. tests include: 1. Curb Test: This test determines whether the cart's handles, wheels and axles will withstand the repeated impact forces experienced during a normal 10-year useful life. A maximum loaded cart is pushed off a curb of 5.5 inches and repositioned at the top and repeated for 520 cycles! Otto's steel axles and strong axle ribs ensure a strong base to absorb the impact without breaking. 2. Lid Test: Otto cart lids can withstand a load of 80 pounds (comparable to the weight of a small child) without collapsing. 3. Force to Tip Test: Cart testing measures the force required to start container movement or tip a maximum loaded cart to ensure ease of operation. Otto carts are well below the industry standard of not exceeding 120 pounds of force. 4. Center of Balance Position Test: To further ensure ease of operation, Otto carts are tested to ensure that the height of the handle at the center -of -balance position is between 29-40 inches. Otto Environmental Systems North America, Inc. •800.795.OTTO (6886) •www.otto-usa.com 5. Slope Stability Test: This test checks the static stability of an empty and loaded cart on a 5- degree slope. Otto carts stand, without tipping or moving, in three different orientations. 6. Volumetric Loading Capacity Test: To determine the volume of a container, Otto carts are immersed in a tank of water to verify the volume of the cart. 7. Loading and Unloading — Automated (Cycle Test): A loaded cart is engaged by the lifter and emptied. The cart is reloaded and inspections are made every 100 lifts. 8. Loading and Unloading — Semi -Automated (Cycle Test): A loaded cart is engaged by the lifter and emptied. The cart is reloaded and inspections are made every 100 lifts. Corporate Sustainability Otto is committed to corporate sustainability at our manufacturing locations and in our community. Within the manufacturing process, Otto uses the highest possible levels of recycled content without compromising product integrity. Otto has centered its policies and procedures around environmental sustainability — those actions that reduce the impact that the company's manufacturing has on both local and global environments. Our manufacturing operations have increasingly incorporated additional efforts to reduce their carbon footprint. In the past few years, Otto has been able to reduce six -fold its solid waste generation through reclamation, recycling and recapturing efforts. Otto recycles 13 million pounds of plastic annually through both internal and externally sourced operations. Otto Environmental Systems North America, Inc. •800.795.OTTO (6886) •www.otto-usa.com PERRY JOHNSON rrz REGISTRARS, INC. z444z t t" catE t JPVVZ� c u2io12 !J`egLtzazs, —q&a., Ls auclitEci tfie Quality C�ijana9emElzt cst'itl n2 Of Otto Environmental Systems N.A., Inc. 12700 General Drive, Charlotte, NC 28273 United States ( ETEGZa T CRLLEd tiZE LIX'9a12ization) alZd hEsdL .TE4 t4at zm 111111 O'ganization is ilz eonfoancF (vitg: '-As U4QLStTatiol2 is &I TE112ECt to t%LE forYouYing sac/ E: Manufacture and Assembly of Injection ?folded Plastic Parts for the Solid Waste Industry 9�Ii1 G/?F_q L1tzatio)z L1 UO2t-1 iU['F-at to L& s111tFoz TUfF-1 YOULTYZLYIy tl2£ CREyfitLa/t�ion �7F-irTmd to ajL?ouF, CUZd t/ZE (91yaIZLZaJJtion IZETEULI COJVEnalLtl Wit/Z tIE Jr15E1101.£Izt GodU LlJUtEI tO 09IF-TUE a/Zd Co1776?[q (Vid tf. 1a.Ld TULE1. rp li ee, iJiOBW Ut t.. w `erBotsoi ar a y g , President Perry Johnson Registrars, Inc. (PJR) 755 West Big Beaver Road, Suite 1340 Troy, Michigan 48084 (248)358-3388 The use of the UKdS ucc/redilu/tio//n sym/bol is in respeel to lite //uc/Itivilies covered kv the Accreditation Cerliflcale Number 0105 �3LE V( i'litll o! tti, Ce Ttifl^_atE L1 dE#Enflzut LL/1on oiz oina 1LLwELZLancr 11l _tine LN,U: JJ I/ Ctpludi- L�alx: ✓✓ ✓✓ i'ecEi/ieate. u.: November 15, 2019 November 14, 2022 C2019-03110 Cart References City of Charlotte, NC Ellen Price 250,000 carts Deputy Director of Administration 95 gallon Solid Waste Services Department 1105 Otts Street Charlotte, NC 28205 704-353-1183 eprice@ci.charlotte.nc.us City of Oklahoma City, OK James Linn 170,000 Solid Waste Superintendent 18-gallon bins 95-gallon carts 2000 11501 N. Portland, AVE Oklahoma City, OK 73120 405-749-3092 James.linn@okc.gov Green Waste Recovery, Inc. Frank Weigel San Jose, CA President 100,000 carts 1500 Berger Drive 32, 65 and 95 gallon San Jose, CA 95112 (serving the City of San Jose, and Monterey 408-283-4800 County, CA) fweigel@greenwasterecovery.com City of Sacramento, CA Wendall Brown 120,000 carts Integrated Waste General Supervisor 32, 65 and 95 gallon Recycling and Solid Waste Division 918 Del Paso Rd. Building One Sacramento, CA 95834 916-808-4841 wbrown@cityofsacramento.org California Waste Solutions Joel Corona Oakland, CA Chief Operations Officer 180,000 carts 1820 101h Street 32, 65 and 95 gallon Oakland, CA 94607 (serving the City of San Jose, CA and the City of 510-832-8111 Oakland, CA) jcorona@calwaste.com City of Durham, NC Darryl Collins 100,000 carts Senior Assistant Solid Waste Manager 65 and 95 gallon 1833 Camden Ave. Durham, NC 27701 919-560-4186 ext. 32226 darryl.collins@durhamnc.gov Otto Environmental Systems North America, Inc. • 800.227.5885 • www.otto-usa.com Cart References City of Plano, TX Steve Funk 140,000 carts EWS Operations Manager 95 gallon 4120 W. Plano Parkway Plano, TX 75093 972-769-4225 stevef@plano.gov City of Waterbury, CT Bart Startup 37,000 carts Refuse Supervisor 65 and 95 gallon 500 Captain Neville Dr. Waterbury, CT 06705 203-574-8390 bstartup@waterburyct.org City of Minneapolis, MN Richard Schoumaker 50,000 carts Equipment Supervisor 32 gallon Solid Waste & Recycling Division 2710 Pacific Street N. Minneapolis, MN 55411 612-673-5638 Richard.schoumaker@minneapolismn.gov Frederick County, MD Rebecca Culler 5,000 carts Recycling Program Manger 95 gallon Frederick County Dept. of Solid Waste 9031 Reichs Ford Road Frederick, MD 21704 301-600-7406 Reedy Creek Authority Bob Kirkpatrick Lake Buena Vista, FL Service Manager for Solid Waste 50,000 carts P.O. Box 10000 35 and 65 gallon Lake Buena Vista, FL 32830 407-824-4184 City of Chattanooga, TN Justin Holland 20,000 carts Public Works Supervisor 95 gallon 1250 Market Street Chattanooga, TN 37402 423-757-5370 Holland)@chattanooga.gov Otto Environmental Systems North America, Inc. • 800.227.5885 • www.otto-usa.com OTTO Environmental Systems North America Inc. TEN YEAR NON -PRORATED WARRANTY Otto Roll Out Waste Container Warranty For all new residential waste containers, Otto warrants that they will meet applicable specifications and be free from defects in material and workmanship while in normal use for a period of Ten (10) years from the initial date of shipment from Otto's manufacturing facility. Otto extends this warranty only to the first purchaser of the waste container, except when the purchase is made through an authorized Otto distributor, when the warranty will extend to the first purchaser from the distributor and not to the distributor. 2. Exclusions From Warranty Coverage 2.1 Normal wear and tear for serviceable containers 2.2 Negligent and Abusive Use: including improper storage, use and handling, vandalism, and damage from wildlife 23 Damage from incompatible, improperly installed, operated, or damaged lifting mechanisms 2.4 Improper use of container exceeding specifications 2.5 Unauthorized repair or alteration 2.6 Damage caused by natural calamities such as fire, storm, or high winds Types of damages excluded from this warranty will be determined, each on its own merit, by an Otto warranty representative 3. Warranty Administration 3.1 Buyer representative shall notify Otto's applicable Area Sales Manager or Otto Representative in writing before the end of the warranty period for the allegedly defective container(s). 3,2. The Serial Number(s) of the alleged defective container(s) shall be submitted via email on the Otto Damage Submittal Form (F-9400) and must be accompanied by the appropriate warranty code identifying where the failure occurred. To properly evaluate the claim, electronic photos of the failure types should be submitted for 20% of the claim quantity. 3.3 Buyer agrees that Otto or its designated representative shall have the right to inspect and test the allegedly defective container(s) at the customer's site or a predetermined location. 3A At the time a Damage Submittal Form is submitted, the containers become Otto's property. Otto requires the right to collect/reclaim and recycle the container(s). Buyer agrees to empty, disassemble, and stack containers for shipment set up by Otto. 3.5 Otto reserves the right to either repair, replace or grant credit for defective containers. 4. Exclusive Warranty Remedy Upon determination of containers/parts as defective by Otto, said product shall, at Otto's sole option, be repaired, replaced or the first purchaser shall be given a credit for the amount of the original purchase price of the affected product. Any repaired or replaced containers/parts will assume the remainder of the ten (10) —year (or) applicable warranty from the original containers initial shipment date. This warranty is in lieu of any other remedy warranty, express or implied, including any implied warranty of merchantability or fitness for a particular purpose. In no event shall Otto be liable for incidental or consequential damages (including freight charges) or delay in performance resulting from the defect. Products manufactured by a supplier or third party manufacturer, specifically RFID components; distributed products and customers specified items, are not covered by this warranty and may be warranted by the manufacturer's warranty as offered. Credits not used within six (6) months of issue will expire. 12700 General Drive, P.O. Box 410251 Charlotte, NC 28241 Attn: Warranty Dept. Phone: 1(800)-227-5885 Revision August 20, 2015 L o La o L O N r- T" u;fuOa4S Ol!Su01 POU1B40N %OS 04 SAI)i 0 O i m d 4.0 E _7 o � O V N o O O C N J N O Q ms _ K &, O o 0 O m N ai0 La 0 !— L O O LO 00 o c G. o 'c m 45M cV O •r- 0O Q E+ aNi = o� a z Ea— O t 'E ao a. I* M Otto Environmental Systems North America, Inc. 12700 General Drive, Charlotte, North Carolina 28273 MATERIALS (HOT COMPOUNDING) - FULLY IN COMPLIANCE Otto Environmental Systems North America, Inc. certifies that all color concentrate, ultraviolet inhibitor and thermal stabilizer are hot -melt compounded into the virgin high density polyethylene before molding the rollout containers. The very manufacturing process (injection -molding) that Otto employs in the production of the Otto molded products functions utilizing a hot compounding process. Otto Environmental Systems North America, Inc. •800.795.OTTO (6886) •www.otto-usa.com E*(onMobll Chemical xxonMobilTm HDPE HD 6605.70 High Density Polyethylene Copolymer Resin Product Description HD 6605.70 is a narrow molecular weight hexene copolymer designed for a wide range of injection molding applications, offering excellent ESCR with good stiffness -toughness balance. Ideally suited for articles requiring rugged physical performance in cold temperature environments. General Availability t _ Latin America • North America South America Additive Anti -gas fading: Yes Applications Automotive Components • Recreational Vehicle - • Industrial Closures Components • Waste Carts Revision Date March 2013 Resin Properties Typical Value (English) Typical Value (Sf) Test Based On Density 0.948 g/cm' 0.948 glcm- ASTM D4883 MeR Index (190'C/2.16 kg) 5.0 g/10 min 5.0 g110 min ASTM D1238 Thermal Typical Value (English) Typical Value (SI) Test Based On Deflection Temperature Under Load 156 'F 69 'C ASTM D648 (DTUL) at 66psi - Unannealed Deflection Temperature Under Load 108 'F 42 'C ASTM D648B (DTUL) at 264psi - Unannealed Peak Meiling Temperature 266 'F 130 'C ASTM D3418 Molded Properties Typical Value (English) Typical Value (SI) Test Based On Tensile Strength at Yield _ 3400 psi 23 MPa ASTM D638 Elongation at Break 1000 % 1000 % ASTM D638 Flexural Modulus ASTM D790B 1 % Secant 160000 psi 1100 MPa 2% Secant 140000 psi 970 MPa Environmental Stress -Crack Resistance ASTM D1693B 10% Igepal, F50 20 hr 20 hr Impact Typical Value (English) �._._._ .. Typical Value (Sq ...... Test Based On Notched Izod Impact (-40'F (411 1.0 fli 55 J/m ASTM D256 Additional Information • Properties are based on compression molded samples. • Test procedures may be modified to accommodate operating conditions or facility limitations, • Tensile Strength at Yield and Elongation at Break tested using ASTM D638 Type IV, 50 mm/min. Typical properties: these are not to be construed as specifications. 2013 Exiror MobilExatoaaMobll, the Exxonktobil logo the intedocidrig W device and other produol or servkg names used herein are trademark of Exxonmobil„ unless indicated otherwise, This documoril mays not be dnstiibutad, displayed, copied or allered without ExxonMobd°s prior writteo authorization, To the eMent ExXonhtoblf authoriZes dirlribulhag, displaying for copying of Ws decurneri t,Pse user may do so only if the document: isunaltered and complete„ including Nil of, its headers„ looters, disclaimers and other informadfon, You may not copy thts document to or reproduce it in whole or in pert, on a websde, Exxont4obl't does net guaranlae time typ'rcat (or other) values, Any data included heroin is based' upon ,analysis cat repareserniative s m$ilos and not the actual lr-roduct shipped The I foonallon in lots, document relates only to the named, product or materials when net in comblrmabarw with any otwroer product or rr lenals, VW based the intermation on data beheve(I to be reliable on the date cormmpited, but we do not represent„ warrant, or rAlretwise patentee, expresat or ramapliedly, the mercharitab'fitr, fibaass'for a padicular Purpose, froedorn from patent inlrtogement suftablI ty, accuracy, retiabrlity„ or completeness of this inforcnmaf�on Of The tar ucts, materials or pro sses dascribed, The user is sully responsfNe for all de rrniriabons regarding any use ct nraler or product and anp+ pmocoss In says onrotorios W interest, we exp tssly dlsr wrn babidty for any loss„ damage or Injury directly or indiroctly suffered or incurred as a rostAl of or rolaled 4o anyone using or relying on any of the inrormaban in this document. This docnrmortl Is not an eridorsement of any non•lc"mrsronMribil product or process„ and we expressly disdalm an oonlrrmrryy Im basalion, The terms "we,' 'o r,* "ExxonMobil Chemical' and °`ExxxenMobd" are each usod for com nlonco, and may *Judo any me or more of ExxonMo l Chomi at ompany, Ex"n; Mood 0orporation, or any afittale either directly or iinffirecdy stewarded, oow0w4awareaunWWWffl"""r rem wednnd•y,PAWN, zeta.PW,tmz ExxonMobil Chemical ExxonMobilTm HDPE HD 6605.70 High Density Polyethylene Copolymer Resin Legal Statement Contact your ExxonMobil Chemical Customer Service Representative for potential food contact application compliance (e.g. FDA, EU, HPFB). This product is not intended for use in medical applications and should not be used in any such applications. Notes 1 Product may not be available in one or more countries in the identified Availability regions. Please contact your Sales Representative for complete Country Availability. For additional technical, sales and order assistance: Worldwide and the Americas ExxonMobil Chemical Company 13501 Katy Freeway Houston, TX 77079-1398 USA 1-281-870-6050 Asia Pacific ExxonMobil Chemical Asia Pacific 1 HarbourFront Place #06-00 HarbourFront Tower One Singapore 098633 +86-21-24173999 Typical properties: these are not to be construed as specifications. Europe, Middle East and Africa ExxonMobd Chemical Europe Hermeslaan 2 1831 Machelen, Belgium 420-239-016-274 102013 ExxonMobil. ExxonMobil, the ExxonMobil 1090, the interlocking'ld" device'and other product or service names used hemr n are trademarks of ExxonMobil, unless indicated, otherwise. This documant may not be distributed, displayed., copied or Wtered vMhout ExxonMobits prior written autboftallon, To the extent ExxonMobot authorizes distefbuling, displaping andfor copying of this docurnerrt„ the user may do so only 4the document is unahated and complete, including all of its headers, footers, disdlalmers and other InSormmlon. You may not copy this docurnent so or repmdaice rt In wrhota on In peat ors a viabsite, Exxon MOM$ do us not guaraintee the typical (or other) values. Any data Included herein is based upon anatysis 0lrtrpnosantallve Dampses rill not the actual product,hipped. The informaliort In this document relates only ha the reamed product or materials when not in cornblrwnbtua with any author laraaduct or rsualerfals, We basest she information on data believed to be mfiabla on the date con aitiNed, but was do not reptesmil, vrarmnt, on otherwVsaa guarartte-, oxpreassly on Imp9ledCy, the merchafrability. fitness for a particular ,purpose, freedom from patent inlr mement, suitability„ accuracy, regabfl'ity, 0r o0ntpletanass of this in 0rtwaatcora or the products, materials or fsaarecesses described The user is solely responsible for ag doterminatlons regar4ng any use of "atonal or product amid any process in its loiMories of interest. Vie expressly disddaim fiabdiity for any loss, damage or injury otractly or indirectly sutfared or incurr+eoi as a result of or rooted to any0raa uslr g or tallying on any of the Information In this document. This document Is not an endorsement of any n on•ExxonPhobil product or pie es, end war oxpros't y diec}atm soy contnaq l"Vpeatlon. The terms *we,, our, "'ExxonMobil Chena'ical" and 'ExxonMobil" are each used for oorrwtan#eilc0, and may inudo any one on more 0f ExxonMObil Charnrs Company, Exxon MoWI Cotpdratlon„ or any alfil'wate either direcOy or tndimegy sfew rrded, 8a at wowse ,s®Wb Wadneadq, May roe, 2092-Pa90:202 Carl Test Procedures Otto Environmental Systems, LLC manufactures carts that are of the highest quality and durability possible. One way we accomplish this is through a series of tests that simulate the "true to life" abuses to which carts are subjected week after week. Otto's performance testing requirements were designed to simulate the effects of hard use in waste collection field conditions. The severity of some tests was scaled to anticipate an expected 10-year minimum life of the containers. 1. Loaded Cart Drop Test 2. Wheel Durability 3. Axle Strength Test 4. Bottom Wear (Abraision Resistance) 5. Wind Resistance 6. Loading & Unloading Performance Re uirments Five (5) drops with 300 lbs. load from 12 ft. with no damage. 520 drops with no failure of wheels 800 Lbs. without permanent deformation of axle. 100 lbs. load dragged for 9,500 feet without wear -through or leakage. 40 mph for 30 seconds from any direction without blowing over. 520 complete cycles without any failures In addition, ANSI outlines the following test proceedures in the guidelines set down for refuse collection containers (Z245.30-1999): Slope Stability Test (Appendex B) Durability During Pulling (Appendex C) Loading & Unloading (Appendex D) Center of Balance (Appendex E) Force to Tip (Appendex F) Lid Test (Appendex G) Cart is stable on 5 degree slope See # 2 above. See # 6 above. Balance position achieved with handle positioned 29" (min) to 40" (max) from ground. Maximum force to tip of 120 lbs. Lid withstands 80 lbs. force. C urt Test Procedures The tests outlined in this document primarily focus on measurement of the container's ability to withstand the rigors of regular usage in a waste collection system. Additional consideration should be given to the testing described in ANSI Z245.30-1999. These ANSI tests focus to a greater extend on ease of use and safety issues. 1. LOADED CART DROP TEST The subject cart is loaded with 300 pounds of sand or other static ballast. The carts are then lifted to a height of 12 feet and dropped onto a concrete surface . The test is repeated five (5) times. Carts are then carefully inspected for evidence of any failure. The Loaded Cart Drop Test simulates the stresses that carts must endure through years of lift cycles, especially in fully -automated applications. This test provides a very good indication of the overall strength and durability of the cart. 2. WHEEL DURABILITY The test cart is fitted with the subject wheels. The cart is loaded with 336 pounds of static ballast. The cart is then rolled off of a standard curb with a dead drop of at least 6 inches, onto a solid surface. The test is repeated a minimum of 520 times. Wheels are inspected for cracks, flat spots or any deformation. 3. AXLE STRENGTH TEST The subject axle is positioned for testing with support 1" from each end. Weights are added to apply downward force against the center of the axle. Additional weight is added until a permanent deflection in the axle is noted. The amount of force it takes to bend an axle is a measure of how well it will hold up when being rolled while fully loaded. In conjunction with the wheel durability test, the axle strength testing also indicates how well a cart will perform when dropped onto the wheels, being rolled up and down curbs or stairs, or is rolled over rough surfaces. Cart Test Procedures (Page 2 . 4. BOTTOM WEAR Carts are loaded with 100 pounds of water and dragged on a horizontal asphalt surface at a rate not to exceed 5 MPH. When water begins to leak, the test is discontinued and the distance is recorded. 5. WIND RESISTANCE An empty cart is placed in a wind test fixture. Wind velocity is increased to at least 40 MPH against the front, back, and either side. The point at which the cart tips over is noted. Wind on the street can come from not only inclement weather, but also from passing vehicles. This test shows not only how well a cart will stand up in the wind, but also indicates how easily it may be tipped over by dogs or other animals. 6. LOADING AND UNLOADING TEST The test cart is loaded with 336 pounds of static ballast and cycled at least 520 times, or until failure occurs. A cycle is defined as grab, squeeze, lift, dump, replace on ground, and release (re -load after each dump). The cart is visually inspected for cracks, any indication of stress failure, or any other indication of damage. This test is described in greater detail in the ANSI guidelines outlined in Z245.30-1999; Appendex D. The test simulates the approximate one pickup per week for a 10 year period. It is an important indicator of whether or not a cart will last through its intended life. PRODUCT SPE.CI1'ICATION MSD-95M "Millennium" Container The Otto Multi -System Design MSD-95M "Millennium" rollout container consists of injection -molded, high density polyethylene plastic body, hinged lid, two (2) hinge pins, two (2) plastic wheel assemblies, and a solid steel axle. The Otto MSD-95M rollout refuse container is compatible with fully automated arm lifter systems and standard, semi -automated bar lifter systems. This container complies with ANSI Z245.30-2008 and ANSI Z245.60-2008 standards for Container Safety and Compatibility Requirements. VOLUME CAPACITY: The total actual volume of the Otto MSD-95M container is 99.9 gallons (per ANSI Z245.30-1999, Appendix A, Volumetric Loading Capacity). Base: 95.8 gal Lid: 4.1 gal LOAD RATING: Per the ANSI Z245.30-2008 Standard, the Otto MSD-95M rollout refuse container is capable of accommodating a load of 335 lbs. WEIGHT: The completed assembly weight of the Otto MSD-95M container is 34.5lbs. when equipped with Otto's 10" injection molded wheels. Other wheel options are available. DIMENSIONS: Overall Height: 41.25" Loading Height: 39.25" Overall Width: 29.38" Overall Depth: 33.88" Minimum Grip Diameter: 28.2" CONTAINER BODY: The Otto MSD-95M Container Body is injection -molded from High Density Polyethylene (HDPE). The container body has smooth surfaces both on the interior and exterior. The Rl;\' 0112 P,W. �; l uI G .-- V () ITo l,�V'ntu��n;�'r.�I. SI;S'l'l'.�IS NoR ru .\NIERI '.�, INC PRODUCT SPECIFICATION interior is free of crevices and recesses where refuse could become trapped, in order to allow complete emptying. The average wall thickness is 0.155". The high -density polyethylene has a density of 0.945 to 0.954 grams cm3. The Melt Index (MI) of the HDPE is 3.5 to 6.0. The top of the container body is reinforced with a rim around its entire perimeter. This feature adds structure and stability to the container and provides a flat surface for the lid to close on. The top of the rim has a rain lip to prevent water from entering the container with the lid closed. The handles are integrally molded into the container body at the top rim. The underside of the rim on the Otto MSD-95M is reinforced with a total of forty (40) integrally molded -in gussets spaced around the entire circumference of the container. The front of the container has a molded recess that provides for the front "catch," or lower lift bar. The MSD-95M container is offered with a 1" rotating steel catch bar. The clip -style metal lower lift bar is freely rotating, 1" OD (outside diameter) roll -formed steel with formed ends for added strength. The wall thickness of this bar is .050", hot rolled steel with an iron zinc clear chromate top coat shielding for corrosion protection. The clip -style metal catch bar allows for speedy installation of the bar from the outside of the container without requiring the use of any hand tools. Metal spring clips are compressed during installation and spring back once inside the container for a solid stop once installed. The bottom of the container has molded -in wear ridges that extend around its perimeter. The wear ridges provide additional protection against abrasive wear if the container is slid on asphalt or pavement and improve impact resistance of the bottom of the container. There is a recessed area molded above the middle of the axle which allows a person's foot to be placed directly upon the axle to allow the container to be easily tilted, even with a full load. The inside bottom of the container has a spherically shaped energy absorbing detail, approximately 8" in diameter, integrally molded into its floor. This detail has been engineered to protect the floor of an empty container from impact when being loaded with heavy objects. The Otto MSD-95M rollout container has an integrally molded front "pouch" to facilitate semi -automated lifting. This upper pouch is reinforced with a pattern of eight (8) internal ribs. These ribs add strength and structure to the lifting pouch and front of the container. Otto containers are designed for nesting and easy stacking for shipment and storage. Stacking ribs are molded onto the top rim to prevent containers from becoming wedged together during shipment. The weight of the container body is 24.1 lbs. This weight does not include any other components. REV 0112 1'.AGE 2 o1 6 Co> u'ITo 4;NN'lRC)N Nll•;N'C,AL Sl s l'4;N[5 NOR'f'l l .vN/1ERINC PRO 1)UCh SPECIFICATION LID: The Otto MSD-95M container Lid is injection -molded from HDPE and is attached to the container body using two (2) HDPE snap -lock hinge pins. The lid rotates freely about the hinge a full 270 degrees. The lid, when closed, rests on the top rim of the container body, providing a secure tight fit around the entire perimeter between the lid and base. This prevents rain, insects and vermin from entering the container, as well as preventing the escape of most odors when the lid is closed. The lid is molded with a hand -hold lip that extends across the full width of the front of the cart and wraps around both corners. This allows the lid to be easily opened from three sides without contact with refuse or residue. The minimum material thickness in the lid is 0 .120'% The weight of the lid is 4.1 lbs. HINGE PIN: The Otto MSD-95M lid Hinge Pins are injection -molded from HDPE. The hinge pins secure the lid to the integrally molded lid hinge and handle detail. Two (2) hinge pins are used to secure the lid. The hinge pins are installed at the factory using a rubber mallet. At installation, the truncated conical end of the hinge pin compresses and snaps into the pocket detail in the handle detail. This prevents vandalism and securely fastens the lid to the container base. The hinge pins can be removed with a special tool available from Otto. LID HINGE AND HANDLE DETAIL: The Otto MSD-95M Lid Hinge is integrally molded to the container body. The handle's diameter is 1.0" and provides 1.375" clearance for gloved hands. AXLE: The Otto MSD-95M machined solid plated to protect against rust and c container prevents bending which container. The axle will withstand weight of the axle is 3.9 lbs. WHEELS: steel Axle has a 27/32" diameter. The axle is zinc orrosion. The large diameter of the axle allows the can cause wheel rub and supports a fully loaded i 375-lb. load without permanent deformation. The RI-X 0112 PAGF, 3of 6 to ()l"l'O V'(lR'I'll.AMI{KI('.A, INC PRODUCT SPECIFICATION The Otto MSD-95M container may be fitted with various 10" Wheels. PLASTIC SNAP -ON CUSHION- SOLID INJECTION TREAD MOLDED 10" FOLDED MOLDED TIRE _W _... Injection- Injection - ......... molded hub molded hub Injection - HDPE, blow- HDPE, blow- (HDPE) with (HDPE) with molded hub Description molded, molded, rubberized pressed -on (HDPE), separate integrated cushion solid rubber integrated spacers. spacers. tread, tire, separate integrated spacers. spacers. s acers. Wheel 10" diameter 10" diameter 10" diameter 10' diameter 10" diameter Diameter 1.75" width 1.75" width 1.75" width 1.75" width 1.75" width Load Rating 200 lbs. 200 lbs. 200 lbs. 200 lbs. 200 lbs. Zinc -plated Internal Internal Internal Internal Attachment palnut end "snap -lock" "snap -lock" spring -loaded spring -loaded caps. attachment. attachment. steel detent steel detent for snap -on. for snap -on. Weight (per wheel 1.27 lbs. 1.27 lbs. 1.48 lbs. 1.88 lbs., assembly) (10") (10") (10") (10") 1.39 lbs. (10") MARKINGS: All Otto MSD-95M carts are hot stamped with a unique sequence serial number to facilitate distribution and control. The customer's name or logo can be hot stamped on the container's lid or body. The containers are permanently marked with the month and year of production, mold number, material identification, patent number, and manufacture's insignia. WORKMANSHIP: The Otto MSD-95M plastic material — high -density polyethylene — is manufactured from virgin raw materials by major petrochemical companies, (e.g., Exxon, Chevron -Phillips, Quantum) and includes no recycled or regenerated plastic or foreign material. Up to 50% recycled material (PCR) content may be available upon request on particular colors, where suitable feedstock is available. RVX 0112 PAGE I of G ) O'I"1'0 1;A'V'l\OR'1'll�.A\l4;Rl('.A, fV'('. �� PRODUCT SPF, CIFICATION ... COLOR: Otto's standard colors are Dark Blue, Light Blue, Green, Forest Green, Dark Gray, Light Gray, Brown, and Black. Other colors are available to special order. All injection -molded parts are specifically prepared to be colorfast so that the plastic material does not alter appreciably in normal use. Due to the use of UV (ultraviolet) stable pigment and injection molding process, Otto containers have excellent color fastness. UV LIGHT STABILIZATION: The Otto MSD-95M container is stabilized against ultraviolet degradation with not less than 0.3% UV additives. This is a state-of-the-art package that meets or exceeds older systems requiring 0.5% UV additive by weight and provides product viability for a minimum of 10 years of outdoor exposure. RECYCLABILITY: The Otto MSD-95M Gallon Container is produced with a fully recyclable thermoplastic High Density Polyethylene (HDPE) resin. This allows the material to be recycled and reused after the useful life of the container QUALITY ASSURANCE PROCEDURES AND PERFORMANCE TESTING: The Otto MSD-95M Container is designed to withstand the following series of performance tests. The performance test requirements were designed to simulate the type of situations encountered in actual use. The severity of some tests was scaled to anticipate an expected 10-year life. Semi -Automated Lifter Life Cycle Fully -Automated Lifter Life Cycle Drop Test (335 Lb. @ 12 Feet) Wind Test Axle Durability (Bend) Test Durability During Pulling Test Test ReClUirements ANSI Z245.30-2008 ANSI Z245.30-2008 10 Drops without Damage See 31d party wind resistance testing ANSI Z245.30-2008 ANSI Z245.30-2008 1' W E 5 ul G 0 0ITT ENVIRONNI N f,AL SYSTEMS NO RTI I :AMI-]UC'.A. IM PRODUCT SPECIFICATION The following Quality Assurance tests are performed according to ASTM procedures. Material Testing 1. Melt Flow Index Test: To check that the polymer batch matches the supplier certification. This is testing procedure ASTM D1238. 2. Colorant Color Match: Compare lot based color chips to the color chip master to ensure consistency. In -Process Qualitv Tests 1. Drop Test: Cart is raised 12' under load and dropped 4 consecutive times. This provides that there is not a processing issue. a. 95 gallon- 335lbs 2. Bib Pull Test: Bib pulled to failure to evaluate brittleness. Bib should break tensile. 3. Bar Pull Test: Bar pulled to failure. Determines if there is weakness at knit line at center of plastic bar. Bar should break off center. 4. Fit Checks: Mating components (axle, lift bar, lid) installed onto carts after cooled to ensure proper fit, form & function. 5. Weight & Thickness Checks: Evaluates molding process. All designs, specifications, and components are subject to change at the manufacturer's sole discretion at any time without notice. Data published herein is informational in nature and shall not be construed to warranty suitability of the unit for any particular purpose as performance may vary with the conditions encountered. REV UIt2 PAGE 6o16 00 O ITO ENVIRONMENTAL, SYSTEMS \ORTI I ANI[FRICA, INC�� � TESTING REPORT DATE: 26 July 2007 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-95M TEST: WIND TUNNEL TEST DESCRIPTION: This test is a measure of the stability of the cart in a high wind. Although not specifically tied to the basic purpose of the cart, most consumers would object to a cart that often tipped over and spilled the contents. MI10" PERFORMANCE STANDARD: The specification varies from site to site depending upon prevalent wind conditions, etc. Most manufacturers expect the cart to be stable up to at least 30 mph. TEST PROCEDURE: 1. A large wind tunnel with a 54 inch diameter exit opening is used for the test. The wind was supplied by a Gates Super HC drive. 2. Position the cart 48 inches from the end of the exit opening. (Beyond stagnant air zone.) 3. The bottom of the cart is to be level with the exit opening and is to rest on a concrete surface that has a surface texture similar to a roadway. 4. The bottom of the cart is placed against a 6 inch brace (like a curb) to prevent the cart from rolling or sliding. 5. The wind velocity is raised until the cart starts to move. This wind speed is measured using a certified volometer. 6. Measure the air velocity to tip the cart, either free-standing or against the curb if it has rolled or slid. 7. Test cart in three orientations toward the wind tunnel opening — front, side and back. 8. The procedure was performed using a blow -molded wheel and then repeated using an injection molded wheel with rubber tread. TEST RESULTS: Orientation Towards Wind Tunnel Test Front Side Back Wind speed to 47 mph 56 mph 57 mph tip the cart SUMMARY: The cart was stable in moderate to high winds, A.18rork Strong Professor, Manufacturing Engineering Brigham Young University 265 CTB, Provo, UT 84602 Structural Engineering Services, PLLC 3017Clark Street Charlotte NC Phone: 704.507.4014 E-mail: bbarfield@babstruct.com TESTING REPORT DATE: 15 July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-95M TEST: SLOPE STABILITY TEST DESCRIPTION: This test checks the static stability of an empty and loaded cart on a defined slope (5 degrees). MINIMUM PERFORMANCE STANDARD: ANSI Z245.30 requires that the cart must stand, without tipping or moving, in three different orientations on a defined slope. ANSI Z245.60 establishes dimensional requirements for the cart. TEST PROCEDURE (Meets the requirements of ANSI Z245.30): 1. Prepare a ramp with a slope of 5 degrees. The ramp must be of sufficient size that a cart can be moved onto the cart with no portion of the cart overhanging the edges of the ramp. 2. There is to be no wind. 3. Move an empty cart onto the ramp and orient the cart with the front of the cart facing up the ramp. Note any tipping or movement. Turn the cart so that the front of the cart is facing sideways on the ramp. Note any tipping or movement. Turn the cart so that the front of the cart is facing down the ramp. Note any tipping or movement. 4. Repeat step two with the cart loaded to the standard loading as specified in the ANSI standard. The loading material to occupy at least 70% of the capacity of the cart. TEST RESULTS: Empty t dela'wa to Reu Front facing upward Stable Front facing sideways (right) Stable Front facing sideways (left) Stable Front facing downward Stable Filled (loaded Ibs) Front facing upward Stable Front facing sideways (right) Stable Front facing sideways (left) Stable Front facing downward Stable SUMMARY: The cart passed the ANSI Z245.30 and Z245.60 standards since non -movement in three orientations is met. Sincerely, *,S,oA.elPEural Engineering Services, PLLC '�t'' llll rt�rl"��� d �E 035798 " �� ��t1IulY4wt��� 3 . e Structural Engineering Services, PLLC 3017CIark Street Charlotte NC Phone: 704.507,4014 E-mail: bbarfield@babstruct.com TESTING REPORT DATE: 15 July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-95M TEST: LIDTEST TEST DESCRIPTION: To determine if container lid will sustain the weight of an average child (approximately 80 pounds) without collapsing into the container. MINIMUM PERFORMANCE STANDARD: According to ANSI Z245.30, the lid of the cart must withstand a load of 80 pounds without collapsing or allowing the loading weight to fall into the container. ANSI Z-245.60 establishes dimensional requirements for the cart. TEST PROCEDURE (Meets the requirements of ANSI Z245.30): 1. The cart is placed on a smooth, level, horizontal surface. 2. A weight of 80 pounds with a surface area diameter round of 8 inches is placed on the lid of the cart. 3. The test is to be conducted at room temperature. TESTRESULTS: The lid did not collapse or excessively deflect during the test. SUMMARY: The cart passed the test at or above minimum requirements as specified in ANSI Z245.30 and Z245.60. go y �arIII , bob Structural Engineering Services, PLLC wow l l l P l l/ 0,/> C'r SE L 035798 Structural Engineering Services, PLLC 3017Clark Street Charlotte NC Phone: 704.507.4014 E-mail: bbarfield@babstruct.com TESTING REPORT DATE: 15 July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-95M (I0-inchwheels) TEST: DURABILITY DURING PULLING (CURB TEST) TEST DESCRIPTION: This test determines whether the cart's handles, wheels, and axles will withstand the repeated pulling forces experienced during normal 10-year useful life. MINIMUM PERFORMANCE STANDARD: The ANSI standanrL245.30-2008 requires that after testing the handles, wheels, axles, their attachments to the container, and the container itself must remain functional. ANSI 2245.60-2008 establishes dimensional requirements for the cart. TEST PROCEDURE (Meets the requirements of ANSI 2245.30-2008): 1. The cart is loaded with a standard load (according to the ANSI standard) with the volume of material occupying at least 70% of the total capacity of the cart. (The actual weight was 350 pounds.) 2. Using the cart's handles, the loaded cart is pushed off a curb. The curb height was 5.5 inches. The cart is then repositioned at the top of the curb. The test is repeated for 520 cycles (drops). 3. Using the cart's handles, an unloaded (empty) cart is pulled up a curb. The curb height was 5.5 inches. The cart is repositioned at the bottom of the curb. The test is repeated 520 cycles (lifts). 4. The carts are set down onto aconcrete surface. 5. The temperature to be normal room temperature (73 degrees F). TEST RESULTS 11, st Condition. Push off of full cart Pull up of empty cart Result No significant damage No significant damage SUMMARY: The cart passed the ANSI 2245.30-2008 and 2245.60-2008 standards for minimum performance. 'Nt t t I t l III,, Si y ABa Iai e r field, P.E. bab Structural Engineering Services, PLLC :+ SEAL " 035798 ��tt�slrow e Structural Engineering Services, PLLC 3017Clark Street Charlotte NC Phone: 704.507.4014 E-mail: bbarfietd@babstruct.com TESTING REPORT DATE: 15 July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-95M TEST: DURABILITY DURING PULLING (CURB TEST) TEST DESCRIPTION: This test determines whether the can's handles, wheels, and axles will withstand the repeated pulling forces experienced during normal I0-year useful life. MINIMUM PERFORMANCE STANDARD: The ANSI standard Z245.30-2008 requires that after testing the handles, wheels, axles, their attachments to the container, and the container itself must remain functional. ANSI Z245.60-2008 establishes dimensional requirements for the cart. TEST PROCEDURE (Meets the requirements of ANSI Z245.30-2008): 1. The cart is loaded with a standard load (according to the ANSI standard) with the volume of material occupying at least 70% of the total capacity of the cart. (The actual weight was 350 pounds.) 2. Using the cart's handles, the loaded cart is pushed off a curb. The curb height was 5.5 inches. The cart is then repositioned at the top of the curb. The test is repeated for 520 cycles (drops). 3. Using the cart's handles, an unloaded (empty) cart is pulled up a curb. The curb height was 5.5 inches. The cart is repositioned at the bottom of the curb. The test is repeated 520 cycles (lifts). 4. The carts are set down onto a concrete surface. The temperature to be normal room temperature (73 degrees F). TEST RESULTS: st t w d" ion Push off of full cart Pull up of empty cart Result No significant damage. No significant damage SUMMARY: The cart passed the ANSI Z245.30-2008 and Z245.60-2008 standards for minimum ttil1j1 performance. ,y,�"t rr7r S% irk �,Oteld, �P' SEAL bab Structural Engineering 03579 Services, PLLC N 7 ! e Structural Engineering Services, PLLC 3017CIark Street Charlotte NC Phone: 704.507.4014 E-mail: bbarfield@babstruct.com TESTING REPORT DATE: 15 July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-95M TEST: CENTER OF BALANCE POSITION TEST DESCRIPTION: To determine the height of the handle of a two -wheeled container at the center -of - balance position. This height affects the ease of operation of the cart. MINIMUM PERFORMANCE STANDARD: According to the ANSI standard Z245.30, when in the center -of - balance position, the minimum height is to be 29 inches. The maximum height is to be 40 inches when inthe center -of -balance position. ANSI Z245.60 establishes dimensional requirements forthe cart. TEST PROCEDURE (Meets the requirements of ANSI Z245.30): l . The cart is loaded with a standard load (3.5 pounds per gallon of rated capacity with the load occupying at least 70% of the capacity) or with the maximum rated load. 2. The test to be conducted on a hard, flat surface. 3. Block the wheels so that the cart will not roll. 4. Tip the cart slowly, rotating the cart on the wheels, to the center balance position. This position is determined as the position where the can has a tendency to remain in a balanced (neutral) position, not tipping forward or backward. 5. When in the center balance position, place blocks under the container to maintain in balanced position. 6. Measure the distance vertically from the ground plane to the center line of the handle of the cart. The accuracy of measurement is to be ±0.25 inches. 7. Repeat steps 4, 5 and 6 and then average the results for the three determinations. TEST RESULTS: The results are: Average = 34.0 inches SUMMARY: The cart passed the ANSI Z245.30 and Z245.60 standards. 0At1111111�, � Si Y,( p!. air d yield, .... bab Structural 035798 Services, PLLCRl- `. APW it 1114 it Structural Engineering Services, PLLC 3017Clark Street Charlotte NC Phone: 704.507.4014 E-mail: bbarfield@babstruct,com TESTING REPORT DATE: 15 July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-95M TEST: LOADING AND UNLOADING (CYCLE TEST) -SEMI -AUTOMATED TEST DESCRIPTION: The loading and unloading test is designed to approximate the useful life of a cart (10 years) in the actual lifting that is performed when emptying the cart into a semi- automated truck. This test is useful in assessing the overall design (such as the lid fit, handle material and hinge mechanism, wheel assembly strength, etc.) and overall durability. MINIMUM PERFORMANCE STANDARD: ANSI standard Z245.30-2008 requires that after testing the cart should not suffer any damage or permanent deformation such that it cannot be safely used in normal operation. ANSI Z-245.60-2008 establishes dimensional requirements for the cart. TEST PROCEDURE (Meets the requirements of ANSI Z245.30-2008): l . The test is conducted at room temperature. 2. A standard semi -automated lifting mechanism is used. This lifter is compatible with all currently used carts. The lifting mechanism is attached to a stationary frame which allows the cart to be emptied and then reloaded on each cycle. 3. The cycle time is greater than eight seconds, as required in the standard. 4. The cart is loaded with inert material at 3.5 pounds per gallon according to the rated size of the container. The loading material is to occupy at least 70%of the volume of the cart. 5. The cart is positioned in front of the lifting mechanism and is then engaged by the lifter and lifted to empty the cart into a bin. The cart is set down onto a concrete surface and is held stationary as it is reloaded by tipping the bin to allow the weights to re-enter the cart. 6. Inspections are made whenever any change is noticed and after every 100 lifts. 7. Failure isjudged to be cracks, holes or other induced defects or deformations in the cart that would prevent the cart's use as a trash cart and be emptied by the automated method TEST RESULTS: Cycles Comment orot 1'eri"ork atg&ee No 520 significant damage SUMMARY: The cart passed the ANSI Z245.30-2008 and Z245.60-2008 standards for minimum performance. (Includes cavities 3, 4, and 5 plastic and metal bar) Ae,S'ar reld, P.E. bab Structural Engineering Services, PLLC Structural Engineering Services, PLLC 3017CIark Street Charlotte NC Phone: 704.507.4014 E-mail: bbarfield@babstruct.com TESTING REPORT DATE: 15 July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-95M TEST: LOADING AND UNLOADING (CYCLE TEST) -AUTOMATED TEST DESCRIPTION: The loading and unloading test is designed to approximate the useful life of acart (10 years) in the actual lifting that is performed when emptying the cart into a semi- automated truck. This test is useful in assessing the overall design (such as the lid fit, handle material and hinge mechanism, wheel assembly strength, etc.) and overall durability. MINIMUM PERFORMANCE STANDARD: ANSI standard Z245.30-2008 requires that after testing the cart should not suffer any damage or permanent deformation such that it cannot be safely used in nonnal operation. ANSI Z-245.60-2008 establishes dimensional requirements for the cart. TEST PROCEDURE (Meets the requirements of ANSI Z245.30-2008): l . The test is conducted at room temperature. 2. A standard automated lifting mechanism is used. This lifter is compatible with all currently used carts, The lifting mechanism is attached to a stationary frame which allows the cart to be emptied and then reloaded on each cycle. 3. The cycle time is greater than eight seconds, as required in the standard. 4. The cart is loaded with inert material at 3.5 pounds per gallon according to the rated size of the container. The loading material is to occupy at least 70% of the volume of the cart. 5. The cart is positioned in front of the lifting mechanism and is then engaged by the lifter and lifted to empty the cart into a bin. The cart is set down onto aconcrete surface and is held stationary as it is reloaded by tipping the bin to allow the weights to re-enter the cart. 6. Inspections are made whenever any change is noticed and after every 100lifts. 7. Failure is judged to be cracks, holes or other induced defects or deformations in the cart that would prevent the cart's use as a trash cart and be emptied by the automated method. TEST RESULTS: Cvcles Com—mgnts on lIerfo n�an—cc No 520 significant damage SUMMARY: The cart passed the ANSI Z245.30-2008 and Z245.60-2008 standards for minimum performance. 4Siri/BAKO a, i' "" �"" bab Structural Engineering Services, PLLC M- Structural Engineering Services, PLLC 3017Clark Street Charlotte NC Phone: 704.507.4014 E-mail: bbarfield@babstruct.com TESTING REPORT DATE: IS July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-95M TEST: FORCE TO TIP TEST DESCRIPTION: To measure the strength required to start container movement to the balance point and to ensure that the force is not greater than an established limit. This force relates to the ease of operation of the cart. MINIMUM PERFORMANCE STANDARD: According to ANSI Z245.30, the force must not exceed 120pounds force. ANSI Z-245.60 establishes dimensional requirements for the cart. TEST PROCEDURE (Meets the requirements of ANSI Z245.30): I . The cart is to be loaded with a standard load. (3.5 pounds of material per gallon of rated capacity. (The load to occupy at least 70% of the capacity of the cart.) 2. The ground to be level and with a smooth horizontal surface having less than a lE slope. 3. The cart is to be blocked to prevent movement of the wheels. 4. A spring scale or other force -treasuring device is attached to the handle of the cart. (The force - measuring device to have an accuracy of less than ±3%.) The cart is then tipped by pulling on the force - measuring device, until the cart is in the balanced position. The angle of pull, that is, the tipping force direction, is to be horizontal with less than ±2E to all sides. (The position where the cart does not tend to move either forward or backward but remains in a balanced position.) The maximum force during the pull is noted. 5. Repeat step 4 so that three determinations are made. These results are averaged. 6. The test is to be conducted at room temperature. TEST RESULTS: The tipping forces were as follows: Average = 72 pounds. SUMMARY: The cart passed the ANSI Z245.30 and Z245.60 standards at or above the minimum requirements. tt r I I 11111, Silt el bab Structural Engineering Services, PLLC A% �tD , ' . S EAL 035798 -5r f "WA4 Structural Engineering Services, PLLC 3017CIark Street Charlotte NC Phone: 704.507.4014 E-mail: bbarfield@babstruct.com TESTING REPORT DATE: 15 July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-95M TEST: VOLUMETRIC LOADING CAPACITY TEST DESCRIPTION: To determine the volume of a container MINIMUM PERFORMANCE STANDARD: The volumetric loading capacity of the container should be measured according to ANSI Z245.30-2008. ANSI 2245.60-2008 establishes dimensional requirements for the cart. TEST PROCEDURE (Meets the requirements of ANSI Z245.30-2008): 1. The volume ofthe cart is measured using the tank (immersion) method. 2. The empty cart is placed inside a tank with sufficient capacity to receive the container to be tested. The container must be level (that is, not inclined). 3. Simultaneously fill the tank and the container with water at a standard temperature (597). 4, Measure the volume of water inside the container to an accuracy of f2 percent. 5. Repeat the capacity method and determine the volumetric capacity of the lid. TEST RESULTS: The cart had a capacity of 95.8 gallons. The lid had a capacity of 4.1 gallons. SUMMARY: The cart passed the test at or above minintum requirements, as specified in ANSI Z245.30-2008 and Z245.60-2008. S"O % 11� 11"/ Sit r`� �EL ; bab Structural Engineering 0351798 Services, PLLC /J Molded foot access and large handle make maneuvering easier, even with heavy loads in place III ^ �IKI III E C UII MR The Millennium container is available in 8 standard colors, Over 80 custom colors available upon request. 68 - Dark Blue 51 - Light Blue 56 - Green 65 - Forest Green 50 - Darl< Gray 51- Light Gray 63 - Brown 60 - Black Otto Environmental Systems North America, Inc. 12700 General Drive, Charlotte, North Carolina 28273 800-795-6886 • info@otto-uso.com - otto-usa.com Sanitary, easy -open lift lip Lasts longer with uV resistant plastic for long- term exposure to sunlight Corrosion -resistant hardware protects and increases durability Engineered for stability: able to resist tipping and does not blow over - even in 40 mph winds Y(Wil, CAR T W' '. Your cart is your billboard; every trash day passersby see your company name. Take the opportunity to stand out from the rest, At Otto, we work with you to design your carts, so you get the most from your investment. Customize your cart with color logos, lid graphics, or custom color, We can also include serialization, RFIO, barcodes, and more. Make your carts, "l i uly Your, Carts. Contact your Area Sales Manager to explore your options, C i Rill Service, e, Soillutt ci r-� r 0+ {•1 u E � G � Ln ch E E If1 CJ N tn C' CJ c i C3 10, z O w L z w It W p� tim 0 W PRODUCh SPECIFICATION MSD-45E "Edge" Container The Otto Multi -System Design MSD-45E "Edge" rollout container consists of injection - molded, high density polyethylene plastic body, hinged lid, two (2) hinge pins, two (2) plastic wheel assemblies, and a solid steel axle. The MSD-45E rollout refuse container is compatible with fully automated arm lifter systems and standard, semi -automated bar lifter systems. This container complies with ANSI Z245.30-2008 and ANSI Z245.60-2008 standards for Container Safety and Compatibility Requirements. VOLUME CAPACITY: The total actual volume of the Otto MSD-45E container is 47.1 gallons (per ANSI Z245.30-2008, Appendix A, Volumetric Loading Capacity). Base: 44.9 gal Lid: 2.2 gal LOAD RATING: Per the ANSI Z245.30-2008 Standard, the Otto MSD-45E rollout refuse container is capable of accommodating a load of 160 lbs. WEIGHT: The completed assembly weight of the Otto MSD-45E container is 22.2 lbs. when equipped with Otto's 8" blow molded wheels. Other wheel options are also available. DIMENSIONS: Overall Height: 39.2" Loading Height: 36.0" Overall Width: 22.6" Overall Depth: 27.4" Minimum Grip Diameter: 22.0" REV0412 PAGE 1 of G (() 01TO ENVIRONMENTAL SYSTEMS NORT'11 AMERICA,1NC', PRODTJCT SPECIFICATION CONTAINER BODY: The Otto MSD-45E Container Body is injection -molded from High Density Polyethylene (HDPE). The container body has smooth surfaces both on the interior and exterior. The interior is free of crevices and recesses where refuse could become trapped, in order to allow complete emptying. The average wall thickness is 0.15" on the container sidewalls and 0.15" on the bottom section. The high -density polyethylene has a density of 0.945 to 0.954 grams cm3. The Melt Index (MI) of the HDPE is 3.5 to 6.0. The top of the container body is reinforced with a rim around its entire perimeter. This feature adds structure and stability to the Otto MSD-45E container and provides a flat surface for the lid to close on. The top of the rim has a rain lip to prevent water from entering the container with the lid closed. The handles are integrally molded into the container body at the top rim. The underside of the rim is reinforced with a total of twenty-eight (28) integrally molded -in gussets/ribs spaced around the entire circumference of the container. The front of the container has a molded recess that provides for the front "catch," or lower lift, bar. The Otto MSD-45E container is offered with either an integrally molded plastic front catch bar or a 1" rotating steel catch bar. Both the steel bar and plastic bar versions are nestable with this feature fully installed/integrated. The plastic lower catch bar is integrally molded into the container base in the front recess. Plastic bar containers have no openings into the container bodies. The clip -style metal catch bar is freely rotating, 1" OD (outside diameter) roll -formed steel with formed ends for added strength. The wall thickness of this bar is .050", hot rolled steel with an iron zinc clear chromate top coat shielding for corrosion protection. The clip -style metal catch bar allows for speedy installation of the bar from the outside of the container without requiring the use of any hand tools. Metal spring clips are compressed during installation and spring back once inside the container for a solid stop once installed. The bottom of the container has molded -in wear ridges that extend around its perimeter. The wear ridges provide additional protection against abrasive wear if the container is slid on asphalt or pavement and improve impact resistance of the bottom of the container. There is a recessed area molded above the middle of the axle which allows a person's foot to be placed directly upon the axle to allow the container to be easily tilted, even with a full load. The inside bottom of the container has a cylindrical -shaped energy absorbing detail, approximately 4.5" in diameter, integrally molded into its floor. This detail has been engineered to protect the floor of an empty container from impact when being loaded with heavy objects. The Otto MSD-45E rollout container has an integrally molded front "pouch" to facilitate semi -automated lifting. The front wall of the pouch has eleven (11) corrugations in order RLV 0 61 Y 11AG E 2 of 6 C0 0'IT0 ENVIRONMENTAL S] ti FADS NORM I AMERIC1, INC, PRODUCT SPECIFICATION to support the lifting platform under maximum load lifting forces. This upper pouch is reinforced with a pattern of eight (8) internal ribs. These ribs add strength and structure to the lifting pouch and front of the container. Otto containers are designed for nesting and easy stacking for shipment and storage. Stacking ribs are molded onto the exterior of the top rim to prevent containers from becoming wedged together during shipment. The weight of the container body is approximately 16.6 lbs. This weight does not include any other components. LID: The Otto MSD-45E container Lid is injection- molded from HDPE and is attached to the container body using two HDPE snap -lock hinge pins. The lid rotates freely about the hinge a full 270 degrees. The lid, when closed, rests on the top rim of the container body, providing a secure, tight fit around the entire perimeter between the lid and base. This prevents rain, insects and vermin from entering the container, as well as preventing the escape of most odors when the lid is closed. The lid is molded with a hand -hold lip that extends across the full width of the front of the lid, and wraps around both corners. This allows the lid to be easily opened from three sides without contact with refuse or residue. The Otto MSD-45E lid attachments are cylindrical -shaped and double -ribbed, creating an extremely robust attachment to the container body. The locking mechanism for the lid hinge pin, which is inserted into the attachments, is retained beneath a molded -in step feature within the lid. The minimum material thickness in the lid is 0.12". The weight of the lid is approximately 2.7 lbs. HINGE PIN: The Otto MSD-45E lid Hinge Pins are injection -molded from HDPE. The hinge pins secure the lid to the integrally molded lid hinge and handle detail. Two (2) hinge pins are used to secure the lid. The hinge pins are installed at the factory using a rubber mallet. At installation, the truncated conical center portion of the hinge pin compresses and snaps into the open slot in each side of the handle detail. This prevents vandalism and securely fastens the lid to the container base. The hinge pins can be removed with a special tool available from Otto. REV O-112 YAGL 3 o1 G �� C0 O 11'O ENNIMONMENTAI, SYSTEMS i\ VI'l 1 AMERIC A, IN( PROD UC T SPECIFICXF10N LID HINGE AND HANDLE DETAIL: The Otto MSD-45E Lid Hinge is integrally molded to the container body and lid. The handle diameter is 1.2" and provides 1.87" clearance for gloved hands. AXLE: The Otto MSD-45E machined solid steel Axle has a 3/4" diameter. The axle is zinc plated to protect against rust and corrosion. The large diameter of the axle allows the container to be easily rolled on any surface and supports a fully loaded container. The axle will withstand a 185-lb. load without permanent deformation. The weight of the axle is 3.5 lb. WHEELS: The Otto MSD-45E Wheels are slightly recessed into the container body and can be relocated to forward positioned hole setting, to allow for a fully assembled nestable cart. The overall diameter of the blow molded wheel is 8". The wheel assembly is tamper and theft -resistant and takes seconds to install on the axle. This is made possible with the use of a spring -loaded internal steel detent, which snaps into a locking groove in the axle. Yet, the wheel assembly can be easily removed with a special small hand tool available from Otto. The weight of each wheel is 0.89 lbs. MARKINGS - All Otto MSD-45E carts are hot stamped with a unique sequenced serial number to facilitate distribution and control. The customer's name or logo can be hot stamped on the container's body or lid. The containers are permanently marked with the month and year of production, mold number, material identification, patent number, model, and manufacture's insignia. WORKMANSHIP: The Otto MSD-45E plastic material — high -density polyethylene — is manufactured from virgin raw materials by major petrochemical companies, (e.g., Exxon, Chevron - Phillips, Quantum) and includes no recycled or regenerated plastic or foreign material. Up to 50% recycled material (PCR) content may be available upon request on particular colors, where suitable feedstock is available. REV O-11'l PAGF, -4 of n 0110 O [;NVIRON:MI;A I'.AI.SNS"Ft;N1S NORTII ANIERICA, INC, PRODUCT SPFCIFICNIJON COLOR: Otto's standard colors are Dark Blue, Light Blue, Green, Forest Green, Dark Gray, Light Gray, Brown, and Black. Other colors are available to special order. All injection -molded parts are specifically prepared to be colorfast so that the plastic material does not alter appreciably in normal use. Due to the use of UV (ultraviolet) stable pigment and injection molding process, Otto containers have excellent color fastness. UV LIGHT STABILIZATION: The Otto MSD-45E container is stabilized against ultraviolet degradation with not less than 0.3% UV additives. This is a state-of-the-art package that meets or exceeds older systems requiring 0.5% UV additive by weight, and provides product viability for a minimum of 10 years of outdoor exposure. RECYCLABILITY: The Otto MSD-45E container is produced with a fully recyclable thermoplastic High Density Polyethylene (HDPE) resin. This allows the material to be recycled and reused after the useful life of the container. QUALITY ASSURANCE PROCEDURES AND PERFORMANCE TESTING: The Otto MSD-45E Container is designed to withstand the following series of performance tests. The performance test requirements were designed to simulate the type of situations encountered in actual use. The severity of some tests was scaled to anticipate an expected 10-year life. Test Description Semi -Automated Lifter Life Cycle Fully -Automated Lifter Life Cycle Drop Test Wind Test Axle Durability (Bend) Test ANSI Z245.30-2008 ANSI Z245.30-2008 10 Drops without Damage See 3rd party wind resistance testing ANSI Z245.30-2008 REV0112 PAGE 3of- G (0 0TI'0 ENVIRON.MEXI'AL Sl S FATS NORTII .AMENICA. INC PRODUCT SPECIFICATION Durability During Pulling Test ANSI Z245.30-2008 The following Quality Assurance tests are performed according to ASTM procedures. 1. Melt Flow Index Test: To check that the polymer batch matches the supplier certification. This is testing procedure ASTM D1238. 2. Colorant Color Match: Compare lot based color chips to the color chip master to ensure consistency. In -Process Quality Tests 1. Drop Test: Cart is raised 12' under load and dropped 4 consecutive times. This provides that there is not a processing issue. 2. Bib Pull Test: Bib pulled to failure to evaluate brittleness. Bib should break tensile. 3. Bar Pull Test: Bar pulled to failure. Determines if there is weakness at knit line at center of plastic bar. Bar should break off center. 4. Fit Checks: Mating components (axle, lift bar, lid) installed onto carts after cooled to ensure proper fit, form & function. 5. Weight & Thickness Checks: Evaluates molding process. All designs, specifications, and components are subject to change at the manufacturer's sole discretion at any time without notice. Data published herein is informational in nature and shall not be construed to warranty suitability of the unit for any particular purpose as performance may vary with the conditions encountered. REY u_612 PAGE 6 of 6 Or OTFO ENVIRONMENTAL SYSTEIS y01Tf I AMERICA, INC. • Structural Engineering Services, PLLC 3017CIark Street Charlotte NC Phone: 704.507.4014 E-mail: bbarfield@babstruct.com TESTING REPORT DATE: 15 July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-45E TEST: SLOPE STABILITY TEST DESCRIPTION: This test checks the static stability of an empty and loaded cart on a defined slope (5 degrees). MINIMUM PERFORMANCE STANDARD: ANSI Z245.30 requires that the cart must stand, without tipping or moving, in three different orientations on a defined slope. ANSI Z245.60 establishes dimensional requirements for the cart. TEST PROCEDURE (Meets the requirements of ANSI Z245.30): 1. Prepare a ramp with a slope of 5 degrees. The ramp must be of sufficient size that a cart can be moved onto the cart with no portion of the cart overhanging the edges of the ramp. 2. There is to be no wind. 3. Move an empty cart onto the ramp and orient the cart with the front of the cart facing up the ramp. Note any tipping or movement. Turn the cart so that the front of the cart is facing sideways on the ramp. Note any tipping or movement. Turn the cart so that the front of the cart is facing down the ramp. Note any tipping or movement. 4. Repeat step two with the cart loaded to the standard loading as specified in the ANSI standard. The loading material to occupy at least 70% of the capacity of the cart. TEST RESULTS: Empty Orientation Result Front facing upward Stable Front facing sideways (right) Stable Front facing sideways (left) Stable Front facing downward Stable Filled (loaded lbs) Front facing upward Stable Front facing sideways (right) Stable Front facing sideways (left) Stable Front facing downward Stable SUMMARY: The cart passed the ANSI Z245.30 and Z245.60 standards since non -movement in three orientations is met. Sincerely, I31tt` arfield, P.E. "0. wctural . �rreering Services, PLLC ,��ttttttrttr��� 'P SEAL 5$ ttI Structural Engineering Services, PLLC 3017CIark Street Charlotte NC Phone: 704.507.4014 E-mail: bbarfield@babstruct.com TESTING REPORT DATE: 15 July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-45 E TEST: LIDTEST TEST DESCRIPTION: To determine if a container lid will sustain the weight of an average child (approximately 80 pounds) without collapsing into the container. MINIMUM PERFORMANCE STANDARD: According to ANSI Z245.30, the lid of [lie cart must withstand a load of 80 pounds without collapsing or allowing the loading weight to fall into the container. ANSI Z-245.60 establishes dimensional requirements for the cart. TEST PROCEDURE (Meets the requirements of ANSI Z245.30): 1. The cart is placed on a smooth, level, horizontal surface. 2. A weight of 80 pounds with a surface area diameter round of 8 inches is placed on the lid of the cart. 3. The test is to be conducted at room temperature, TESTRESULTS: The lid did not collapse or excessively deflect during the test. SUMMARY: The cart passed the test at or above minimum requirements as specified in ANSI Z245.30 and Z245.60. SI er..,,,. l'00an A. Barfie d�OF bab Structural Engineering Services, PLLC _rM f Structural Engineering Services, PLLC 3017CIark Street Charlotte NC Phone: 704.507.4014 E-mail: bbarfield@babstruct.com TESTING REPORT DATE: 15 July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-45E TEST: LOADING AND UNLOADING (CYCLE TEST) -AUTOMATED TEST DESCRIPTION: The loading and unloading test is designed to approximate the useful life of acart (10 years) in the actual lifting that is performed when emptying the cart into a semi- automated truck. This test is useful in assessing the overall design (such as the lid fit, handle material and hinge mechanism, wheel assembly strength, etc.) and overall durability. MINIMUM PERFORMANCE STANDARD: ANSI standard Z245.30-2008 requires that after testing the cart should not suffer any damage or permanent deformation such that it cannot be safely used in normal operation. ANSI Z-245.60-2008 establishes dimensional requirements for the cart. TEST PROCEDURE (Meets the requirements of ANSI Z245.30-2008): 1. The test is conducted at room temperature. 2. A standard automated lifting mechanism is used. This lifter is compatible with all currently used carts. The lifting mechanism is attached to a stationary frame which allows the cart to be emptied and then reloaded on each cycle. 3. The cycle time is greater than eight seconds, as required in the standard. 4. The cart is loaded with inert material at 3.5 pounds per gallon according to the rated size of the container. The loading material is to occupy at least 70% of the volume of the cart. 5. The cart is positioned in front of the lifting mechanism and is then engaged by the lifter and lifted to empty the cart into a bin. The cart is set down onto aconcrete surface and is held stationary as it is reloaded by tipping the bin to allow the weights to re-enter the cart. 6. Inspections are made whenever any change is noticed and after every 100lifts. 7. Failure isjudged to be cracks, holes or other induced defects or deformations in the cart that would prevent the cart's use as a trash cart and be emptied by the automated method. TEST RESULTS: C cles Comi%gnts on P rforntanee No 520 significant damage SUMMARY: The cart passed the ANSI Z245.30-2008 and Z245.60-2008 standards for minimum performance. Si el" r 10 bab Structural Engineering Services, PLLC 4�,�t�ittNlddllP�� '� �CAR . ". v *` SEAL 035798 , 4r "� t�ttrrrowtwrr Structural Engineering Services, PLLC 3017Clark Street Charlotte NC Phone: 704.507,4014 E-mail: bbarfield@babstruct.com TESTING REPORT DATE: 15 July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-45E TEST: LOADING ANDUNLOADING (CYCLE TEST) -SEMI -AUTOMATED TEST DESCRIPTION: The loading and unloading test is designed to approximate the useful life of a cart (10 years) in the actual lifting that is performed when emptying the cart into a semi- automated truck. This test is useful in assessing the overall design (such as the lid fit, handle material and hinge mechanism, wheel assembly strength, etc.) and overall durability. MINIMUM PERFORMANCE STANDARD: ANSI standard Z245.30-2008 requires that after testing the cart should not suffer any damage or pennanent deformation such that it cannot be safely used in normal operation. ANSI Z-245.60-2008 establishes dimensional requirements for the cart. TEST PROCEDURE (Meets the requirements of ANSI Z245.30-2008): l . The test is conducted at room temperature. 2. A standard semi -automated lifting mechanism is used. This lifter is compatible with all currently used carts. The lifting mechanism is attached to a stationary frame which allows the cart to be emptied and then reloaded on each cycle. 3. The cycle time is greater than eight seconds, as required in the standard. 4. The cart is loaded with inert material at 3.5 pounds per gallon according to the rated size of the container. The loading material is to occupy at least 70% of the volume of the cart. 5. The cart is positioned in front of the lifting mechanism and is then engaged by the lifter and lifted to empty the cart into a bin. The cart is set down onto a concrete surface and is held stationary as it is reloaded by tipping the bin to allow the weights to re-enter the cart. 6. Inspections are made whenever any change is noticed and after every 100lifts. 7. Failure isjudged to be cracks, holes or other induced defects or deformations in the cart that would prevent the cart's use as atrash cart and be emptied by the automated method TEST RESULTS: Cycles Comments _onPcrfbmi4ngLNo, 520 significant damage SUMMARY: The cart passed the ANSI Z245.30-2008 and Z245.60-2008 standards for minimum performance. (includes cavities 3, 4, and 5 plastic and metal bar�t I � I oil, �r Maine 4A.1JaMeld, i .E. bab Structural Engineering 035798 Services, PLLC M . G. Structural Engineering Services, PLLC 3017CIark Street Charlotte NC Phone: 704.507.4014 E-mail: bbarfield@babstruct.com TESTING REPORT DATE: l5 July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-45E TEST: DURABILITY DURING PULLING (CURB TEST) TEST DESCRIPTION: This test determines whether the cart's handles, wheels, and axles will withstand the repeated pulling forces experienced during normal 10-year useful life. MINIMUM PERFORMANCE STANDARD: The ANSI standard Z245.30-2008 requires that after testing the handles, wheels, axles, their attachments to the container, and the container itself must remain functional. ANSI Z245.60-2008 establishes dimensional requirements for the cart. TEST PROCEDURE (Meets the requirements of ANSI Z245.30-2008): 1. The cart is loaded with a standard load (according to the ANSI standard) with the volume of material occupying at least 70% of the total capacity of the cart. (The actual weight was 158 pounds.) 2. Using the cart's handles, the loaded cart is pushed off a curb. The curb height was 5.5 inches. The cart is then repositioned at the top of the curb. The test is repeated for 520 cycles (drops). 3. Using the cart's handles, an unloaded (empty) cart is pulled up a curb. The curb height was 5.5 inches. The cart is repositioned at the bottom of the curb. The test is repeated 520 cycles (lifts). 4. The carts are set down onto a concrete surface. 5. The temperature to be normal room temperature (73 degrees F). TEST RESULTS: Test Condition Push off of full cart Pull up of empty cart Result No significant damage. No significant damage SUMMARY: The cart passed the ANSI Z245.30-2008 and Z245.60-2008 standards for minimum performance. �����ttt tl tt wrrr�tr Oe,i' ,,' � t3 S '1 �fi ld, . �. r y bab Structural Engineering SAL C n: Services, PLLC 1 035798 ' �" -S . e" Structural Engineering Services, PLLC 3017Clark Street Charlotte NC Phone: 704.507.4014 E-mail: bbarfield@babstruct.com TESTING REPORT DATE: 15 July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-45E TEST: CENTER OF BALANCE POSITION TEST DESCRIPTION: To determine the height of the handle of a two -wheeled container at the center -of - balance position. This height affects the ease of operation of the cart. MINIMUM PERFORMANCE STANDARD: According to the ANSI standard Z245.30, when in the center -of - balance position, the minimum height is to be 29 inches. The maximum height is to be 40 inches when in the center -of -balance position. ANSI Z245.60 establishes dimensional requirements for the cart. TEST PROCEDURE (Meets the requirements of ANSI Z245.30): 1. The cart is loaded with a standard load (3.5 pounds per gallon of rated capacity with the load occupying at least 70% of the capacity) or with the maximum rated load. 2. The test to be conducted on a hard, flat surface. 3. Block the wheels so that the cart will not roll. 4. Tip the cart slowly, rotating the cart on the wheels, to the center balance position. This position is determined as the position where the cart has a tendency to remain in a balanced (neutral) position, not tipping forward or backward. 5. When in the center balance position, place blocks under the container to maintain in balanced position. 6. Measure the distance vertically from the ground plane to the center line of the handle of the cart. The accuracy of measurement is to be f0.25 inches. 7. Repeat steps 4, 5 and 6 and then average the results for the three determinations. TEST RESULTS: The results are: Average = 27.4 inches SUMMARY: The cart passed the ANSI Z245.30 and Z245,60 standards.. A. B - eId, IP DE L bab Structural Engineering 035798 Services, PLLC °. %r91 �7110�1 / l 1010�� Structural Engineering Services, PLLC 3017CIark Street Charlotte NC Phone: 704.507.4014 E-mail: bbarfield@babstruct.com TESTING REPORT DATE: 15 July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-45E TEST: FORCE TO TIP TEST DESCRIPTION: To measure the strength required to start container movement to the balance point and to ensure that the force is not greater than an established limit. This force relates to the ease of operation of the cart. MINIMUM PERFORMANCE STANDARD: According to ANSI Z245.30, the force must not exceed 120pounds force. ANSI Z-245.60 establishes dimensional requirements for the cart, TEST PROCEDURE (Meets the requirements of ANSI Z245.30): I . The cart is to be loaded with a standard load. (3.5 pounds of material per gallon of rated capacity. (The load to occupy at least 70% of the capacity of the cart.) 2. The ground to be level and with a smooth horizontal surface having less than a IE slope, 3. The cart is to be blocked to prevent movement of the wheels. 4. A spring scale or other force -measuring device is attached to the handle ofthe cart. (The force - measuring device to have an accuracy of less than +3%.) The cart is then tipped by pulling on the force - measuring device, until the cart is in the balanced position. The angle of pull, that is, the tipping force direction, is to be horizontal with less than t2E to all sides. (The position where the cart does not tend to move either forward or backward but remains in a balanced position.) The maximum force during the pull is noted. 5. Repeat step 4 so that three determinations are made. These results are averaged. 6. The test is to be conducted at room temperature. TEST RESULTS: The tipping forces were as follows: Average = 23.8 pounds. SUMMARY: The cart passed the ANSI Z245.30 and Z245.60 standards at or above the minimum requirements. t t t I t t r t A 4ar�field. bab Structural Engineering Services, PLLC Structural Engineering Services, PLLC 3017Clark Street Charlotte NC Phone: 704,507.4014 E-mail: bbarfield@babstruct.com TESTING REPORT DATE: 15 July 2015 SUBJECT: Trash carts PRODUCT IDENTIFICATION: MSD-45E TEST: VOLUMETRIC LOADING CAPACITY TEST DESCRIPTION: To determine the volume of a container MINIMUM PERFORMANCE STANDARD: The volumetric loading capacity ofthe container should be measured according to ANSI Z245.30-2008. ANSI 2245,60-2008 establishes dimensional requirements for the cart. TEST PROCEDURE (Meets the requirements of ANSI Z245.30-2008): 1. The volume of the cart is measured using the tank (immersion) method. 2. The empty cart is placed inside a tank with sufficient capacity to receive the container to be tested. The container most be level (that is, not inclined). 3. Simultaneously fill the tank and the container with water at a standard temperature (591F). 4. Measure the volume of water inside the container to an accuracy of±2 percent. 5. Repeat the capacity method and determine the volumetric capacity of the lid. TEST RESULTS: The cart had a capacity of 44.9 gallons. The lid had a capacity of 2.2 gallons. SUMMARY: The cart passed the test at or above minimum requirements as specified in ANSI Z245.30-2008 and Z245.60-2008. Si bab Structural Engineering Services, PLLC �1y 1V111ItIII. N " CAS" / 'r rL SEAL 035798 40 �Ia RESIDENTIAL 0 7\ H/O'j 0) U' N N L L Lo'0'0 rnaaz E 0 0 o W ct o a a - - o N C w U) O) C M V p) M m � p o u 2 2 H F- co C) U) U) U) : U Z w F H O : [-7 - C7 H H U - Q m Z Q d d LL_ J `1 H J J U w O w U U) Q Q p Q w Q J F- F- U) 2:sJ Q U) J H H (D N N L L co U) U '0 ol o) N Ql = _ E O O M EL r, a C UJ c�L6 E " r' - - - O : >C : : : 2 o O. CO - O • r Z w o :L6 �� } z U Q w Z U= U D O w U U) Q ao cQ U) < J H 0 U) 2: J Q U) J [D N N L 2 Lo O OI C 7 = � o 0 co r .oaa w u) co CO r; co co X - O a - 0 - 2 - U) : C7 O rj } U Q 00 Z L u J C Y FU U w O W U V7 J Q U) F � SEDGE /-�5EDG SPECIFICATIONS MODEL ............................. Edge 65G LOAD RATING ...................... 230 Pounds ASSEMBLY WEIGHT......., approx. 29.5 Pounds STACKING ............................. 9 High LTL STACKING .......................... 8 High TOTAL QUANTITY (53' Truclq ........ . .......720 SPECIFICATIONS MODEL ............ n. .., LOAD RATING....... 0 ASSEMBLY WEIGHT.., , STACKING .......... LTL STACKING... . s TOTAL QUANTITY (53' SPECIFICATIONS MODEL... „ -.. ....... , ....... Edge 45G LOAD RATING ................. 160 Pounds ASSEMBLY WEIGHT.. , approx. 22.2 Pounds STACKING (Assembled) ............ 8 High STACKING (Unassembled)......... 10 High LTL STACKING (Assembled)......... 8 High LTL STACKING (Unassembled) ..... 10 High TOTAL QTY Assembled (53' Truck) ......672 TOTAL QTY Unassembled (53' Truck)....760 MAN " This Product is ANSI Compliant "