HomeMy WebLinkAboutChange Order No 1- Technology Resource Center – Proj No. 118-090 - Majority Builders, Inc.1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, IND[ANA 46601-1830 CITY OF i BEND BOARD OF PUBLIC 1 March 24, 2020 Mr. Eric Kimmel Majority Builders, Inc. 62900 US 31 South South Bend, IN 46614 PHONE 574/235-9251 FAX 574/235-9171 RE: Change Order No. 1 — Technology Resource Center — Project No. 118-090 Dear Mr. Kimmel: The Board of Public Works, at its meeting held on March 24, 2020, approved the above referenced Change Order for an increase of $214,806, bringing the current amount to $1,599,079, and an additional 254 days, bringing the revised completion date to August 7, 2020. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235-9251, Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: The original contract sum 2/25/2020 118-090 Technology Resource Center 4/9/2019 1 PCR #1-Time Extension PCR #2-COR #1 PCR #3-COR #2 PCR #4- COR #3 PCR #5-COR #4 PCR #6-COR #5 PCR #7-Door Access Controls PCR #8-Sweep Linear Chandelier PCR #9-Raise Duct Work PCR #10-Future Tenant Build Out Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time Printed Name and Title Majority Builders, Inc. Company Name 62900 US 31 South Address South Bend, IN 46614 City, State, Zip $ 1,384,273.00 $ 0.00 $ 1,384,273.00 X Increased Decreased $ 214,806.00 $ 1,599,079.00 15.52 % 15.52 % 11 /27/2019 0 da s 254 days 8/7/2020 RECOMMENDED FOR APPROVAL CONSTRUCTION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC 1i"iPORIKS Approved Date: 1-3 � ' 20 Gary A. Gilot, President Jordan Gat , ember Elizabeth A. Maradik, Member Therese J. Dorau, Member Joseph R. Molnar, Member DEPARTMENT OF PUBLIC WORKS E DIVISION OF ENGINEERING PAO Project Number: 1 18-090 Project Name: Technology Resource Center Change Order #: 1 DATE INITIATED: 2-18-20 BPW DATE„ 3-24-20 Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). Initial deduct of scope work plus some added materials including floor outlets and access control panels for doorways. Total deduct-$46,055.00 Added build -out of future tenant space, including time added to overall contract. Total Add $260,861.00 Attachments: (List documents support change — required) See attached price additions. _W Amountof BIncrease/ ❑Decrease: $214,806.00 Categories (Pick One): Previously approved Change Order(s): $ 0.00 8 Scope of Work ---- Current Percent of Change: 15.52 ❑Differing Site Conditions, Changed Conditions ❑ Conflicted Specifications and Drawings .... ......... ... �. El Failed Materials New Total Amount: $ 1,599,079.00 ------ ❑ Error ....... 15.52 El Omission Total Percent of Change: % ❑ Final Quantity Adjustment `i 3 `t 3Z`1 fill -i T(d. Pew ° Funding Secured From: (filled out by PM) RECOMMENDED BY: Dan Jones Project Inspector (Print Name) (Srgnatur4 (Date) REVIEWED BY: Toy Villa 3• I L • Zo Construction Manager (Print Name) (Signature) (Date) APPROVED BY: Zach Hurst Engineering Project Manager (Print Name) (Signature) (Date) APPROVED BY: Kara Boyles I ow City Engineer (Print Name) (at 0 EPOCH A DI V IS 10N OF SIH IVE j AT-rCRY Change Order Recommendation #10 To: City of South Bend Board of Public Works Dan Jones, Project Inspector 227 W Jefferson Blvd South Bend, IN 46628 574-233-7531 Job: Technology Resource Center at Catalyst 2 1165 Franklin Resource, Suite 100 South Bend, IN 46601 February 12, 2020 (Revised) In response to PR #13 we recommend acceptance of the combined additional cost of +$260,861 $261,406 Base Bid (Includes Suite 120 Case work. Plumbing) + $12,480 Suite 120 Acoustic Baffles - 13,025 Densifier Concrete Finish $260,867 wa � Total Change Value Recommended: Addition +$260,861 Sincerely„ Christopher Kidney, RA Project Manager, EPOCH a Division of Shive Hattery 4�j quo-, flpj� Ay' Cc: Dan Buckenmeyer, Director of Economic Res. and Business Dev., City of South Bend Zach Hurst, Project Engineer, City of South Bend Toy Villa, Construction Manager, City of South Bend Dan Jones, Project Inspector, City of South Bend Brian Donoghue, Innovation & Technology, City of South Bend Dave Paston, Vice President, Majority Builders Eric Kimmel, Project Manager, Majority Builders Attachments: PR #13 Technology Resource Center Change Order #1 Breakdown Original Contract Amount: $1,384,273.00 (BPW Awarded) Deduct Amount:-$69,507.00 (Value Engineering deducts) Added Amount: $284,313.00 (Includes $260,861 for New Tenant Build Out; Adds for other items including floor outlets and access controls for doorways) Total Contract Add: $214,806.00 New Contract Amount: $1,599,079.00 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 3/16/2020 Name Zach Hurst Department DPW --------------------- BPW Date 3/24/2020 Phone Extension 3057 mmmmn Review and A _pm (.oval Required Prior to Submittal to Board Diversity Compliance ❑ Officer Name and Inclusion Officer BPW Attorney ❑ Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type--- Required lbr All Submissions Professional Services Agreement E] Contract EJ Open Market Contract ❑ Amendment/Addendum Bid Opening Bid Award Quote Opening Quote Award ❑ Proposal Opening C/O & PCA No. ® Chg. Order, No. 1 Ej Traffic Control Other: Reo u ired. Information Proposal LJ Special Purchase, QPA Req. to Advertise Reject Bids/Quotes ❑ PCA ❑ Resolution Ease./Encroach ❑ Title Sheel Company or Vendor Name MaJority Builders, Inc. .................. ................_� New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor F MBE Completed E-Verify Form Attached Nos Project Name Tech Resource Center Project Number 118-090 Funding Source River West TIF, Studebaker/Olive Grants, Certified Tech Park Fund Account No. 324-1050-460-42.02, 209-327-1001-469.31.06, 439-1050-460-42.01 Amount$214,806 -_____..................................._ ....... Terms of Contract _ Purpose/Description Change order to document valuemen ell as tenant fit-o spaceaddition . _ ....... ...... ..........._............................... For Chang Orders 0���y ...... wwwwww � ....... ... Amount of Increase $ 214,806.00 El Decrease ($ Previous Amount Current Percent of Change New Amount Total Percent of Change: Time Extension Amount: New Completion Date: $ 1,384,273.00 Increase 15.52% Decrease ( % $ 1,599,079.00 _._.......... ................................ Increase 15.52% Decrease ( %