Loading...
HomeMy WebLinkAboutAmendment No 1 to Owner-Engineer Agreement – Additional Work Required by FERC for South Bend Dam 2020 - Christopher B. Burke Engineering, LLC.1316 COUNTY -CITY BUILDING ;a " � � PHONE 574/ 235-9251 227 W. JEFFERSON BOULEVARD 4,�1y � � Fax 574/ 235-9171 SOUTH BEND, INDIANA 46601-1830 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC March 24, 2020 Mr. Jon D. Stolz Christopher B. Burke Engineering, LLC 115 W. Washington St., Suite 1368 South Indianapolis, IN 46204 RE: Amendment No. 1 to Owner -Engineer Agreement Dear Mr. Stolz: The Board of Public Works, at its meeting held on March 24, 2020, approved the above referenced amendment for additional work required by FERC for the South Bend Dam in an amount, not to exceed $32,200. Enclosed please find a copy of the agreement for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT ELIZABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR This is EXHIBIT K, consisting of pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated Decefber 16, 2019. AMENDMENT TO OWNER -ENGINEER AGREEMENT Amendment No. 1 1. Background Data: a. Effective Date of Owner -Engineer Agreement: December 16, 2019 b. Owner: Board of Public Works, City of South Bend, Indiana "Owner" C. Engineer: Christopher B. Burke En ineerin , LLC CBBEL "En ineer" d. Safety Surveillance anMonitoring d Report Protect: South Bend Dam - mDam Saf........ ——- 2. Description of Modifications; a. Engineer shall perform or furnish the following Additional Services: Task 1 — Update DSSMP — In accordance with the request from the Federal Energy Regulatory Commission (FERC), CBBEL will update the Dam Safety Survaillance and Monitoring Plan (DSSMP) for the South Bend Dam. Updates include adding a requirement to obtain a bathymetric survey and underwater inspection following unusual flooding events, adding a requirement to visually monitor the dam and instrumentation during unusual flooding events, general corrections to outdated information, and modifications as needed to make the document consistent with current FERC guidance. The updated DSSMP will be submitted with the 2020 Dam Safety Surveillance and Monitoring Report (DSSMR). Task 2 — Staff Gage Recommendations — FERC requested that the staff gages be replaced so that the height of the gages extends above the water surface elevation of the February 2018 flood and below the lowest historic water suface elevation. CBBEL will review historic high and low water suface elevations at the site and will make a recommendation on the height of the new gages. Task 3 — Bathymetric Survey and Underwater Inspection — FERC requested that a bathymetric survey and underwater inspection be performed to access the potential impacts of the February 2018 flood event on the stability of the dam. CBBEL will retain Lawson -Fisher Associates, P.C. to peform a baythmetric survey of the area immediately downstream of the dam to approximately the downstream end of Island Park. In addition, CBBEL will retain Gus Commercial Divers to perform an underwater inspection of the dam and appurtenant structures. It is expected that both the bathymetric survey and underwater Page 1 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright D 2008 National Society of Professional Engineers for EJCDC. All rights reserved. inspection will be performed during low flow conditions which may require coordinating releases from the Twin Branch Hydroelectric Project. Task 4 — Stakeholder Meeting and Coordination — CBBEL will participate in a meeting with representatives from the City of South Bend, University of Notre Dam, and Lawson -Fisher Associates, P.C. to discuss the project and coordinate the submittal of the requested information to FERC. CBBEL anticipates additional coordination with stakeholders throughout the project. Task 5 — Gate Operation Certification — The Annual Spillway Gate Operation Certificate must be completed each year. CBBEL staff will observe operation of the three East Race gates by City staff and will assist in preparation of the certificate to submit to FERC. It is expected that the certification will be part of the 2020 DSSMR submitted to FERC in 2021. Task 6 — Dam Safety Signage — Dam safety signage is proposed on the upstream side of the Jefferson Boulevard bridge and downstream side of the Colfax Avenue bridge. CBBEL will provide design assistance for mounting and securing the signs. b. The Scope of Services currently authorized to be performed by Engineer in accordance with the Agreement and previous amendments, if any, is modified as follows: N/A. C. The responsibilities of Owner are modified as follows: N/A d. For the Additional Services or the modifications to services set forth above, Owner shall pay Engineer the following additional or modified compensation on a time and material, aggregate not -to -exceed basis in accordance with Engineer's standard charges for professional services: Task 1: $4,000 Task 2: $1,100 Task 3:: 2,2(l0 Task 4: $1,500 Task 5: $800 Task 6 : $2,600 See the attached fee justification and subconsultant proposals. The schedule for rendering services is modified as follows: - Complete final DSSMP and DSSMR by April 1, 2020 Page 2 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright 0 2008 National Society of Professional Engineers For EJCDC. All rights reserved. - Complete bathymetric survey, underwater inspection, staff gage recommendations, and dam safety signage by December 31, 2020 f. Other portions of the Agreement (including previous amendments, if any) are modified as follows: N/A 5. Agreement Summary (Reference only) a. Original Agreement amount: 5,000 b. Net changefor prior amendments: $-............ p 0 c. This amendment amount: $ 32,200 d. Adjusted Agreement amount: $ 37,200 The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in Exhibit C. Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is OWNER: City of South Bend Board of Public Works L6.5 ENGINEER: Christopher B. Burke Engineering, LLC_mm .......... _ ...... By: Jon D. Stolz _._�� DAM Title: Mana ing Vice President Date Signed: March 12, 2020 Page 3 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. 0 t� �9 III III � COST PROPOSAL FOR PROFESSIONAL SERVICES PR(? LC INI°ORMATION Project Name: South Bend Dam DSSMR Amendment Proposal Date: 12-Mar-20 Project Location: South Bend, Indiana Prepared for: City of South Bend, Indiana Contact: Sue 1.len Doudiickc, P 1 i 13oa.cd of Pe.tblic Works 'A.`a 5 74-23.'.'i-5922 office Fax:: FinaH: Prepared by: Christopher B. Burke Engineering, LLC Contact: 3r.mrnn JI I tor„kc, I" III PNC Center, Suite 1368 South Tel: 317-266-8000 115 West Washington Street Fax:.3'fl 7-6,121-9`'306a Indianapolis, Indiana 46204 Email FEE SUMMARY (See following pages for Phase and Task details.) CBBEL Labor Subconsultant Direct Total Phase IIc[wription Fees Fees Costs Cost 1 )SST\M Amendment S 12,765 S 19,475 S S 32,240 2 S S S $ 3 S 5 S $ 4 $ $ S $ 5 S S S $ 6 S S S $ 7 S 5 $ S 8 S S $ $ 9 ; $ $ $ S $ $ Projccl Tolav S 12,765 S 19,475 $ Subconsultant Support Summary Subconsultant Direct Percentage of Total Firm Work Deacriptk)n: Fees Costs Total Fees Cost GUS Undenvater.I_ivcfnspecuon S 4,275,00 S! 133% S 4,275,00 LFA bathyrnetdc Survey $ 15,20000 5 47.1°/ ' .4 15,200,00 $ S $ $ S S $ S S S S S S S S S S $ $ S $ Total Subconsultant Fees S 19,475,00 5 60,41, $`= Included in Project Total Above c an SWIM OZ 'o, 1ri 0 M-ds —.-H .1mg AI isilxnadS A la "dS --d'tla . . . ...... . . . ........ c HEM I a 0 o m4mAk m,95 jjp—(d-x . ...... . . ...... Al—ld--d A--U Md TH —199-R RS M—Mg » ry 7LCIS ­uquF[ 195'ZS FR Al xSVI I �j GUS COMMERCIAL. L.DIVERS 12839 INDUSTRIAL PARK DR P.O. BOX 51 6 GRANGER, IN 46530 Voice: 574-273-9122 Fax: 574-272-9067 b ,. BURKE ENGINEERING. LLC 115 WEST WASHINGTON STREET SUITE 1368 SOUTH INDIANAPOLIS, IN 46204 ESTIMATE Estimate Number: 672 Quote Date: Feb 17, 2020 Page: 1 Customer I:Du..� Good Thru ...... Payment 30 Days .... ...__ ..� .Sales Rep _ ..� ...m BURKE 3/18/20 PAUL A. HUMMEL, PE PIPER C. TITTLE, PE MICHAEL J. GUZIK, PE 9033.27 GREGORY L. HOLDEN, PE February 13, 2020 JON E. RIEMKE, PE Via Email — 2/13/20) L JEFFREY(Sent CHRISTO CHRISTOPHER J. JETER, PE ERJ.McKJE, R, DENNIS A. ZEBELL, PE Mr. Jason Durr, PE DAN G. DELGADO, PE Director, Northern Indiana JARED M.HUSS,PEAARON Christopher B. Burke Engineering, LLC. W. BLANK, PS, PE 220 West Colfax Avenue, Suite 500 BREAGAN P. EICHER, PE KEVIN J. SIEDLECKI, PE South Bend, IN 46601 CHRISTOPHER M. VANHULLE, PE MICHELLE M.G. SLACK, PS RE: Proposal for Consulting Engineering Services MAX WATKINS, PE, SE South Bend Dam — Downstream Bathymetric Survey DMITRI G. ADAMS, PE AMANDA R. BUDREAU, PE JOSEPH D. DUNBAR, PE Dear Mr. Durr: ETHAN L. ZARTMAN, PE Thank you for the opportunity to submit this proposal to provide consulting engineering services for the South Bend Dam — Downstream Bathymetric Survey Project. We appreciate your consideration of LFA and welcome the opportunity to work with Christopher B. Burke Engineering LLC (CBBEL). The following is a Project Description, Scope of Services, Schedule and Fee for the project. i` •;fir, ' "' The Federal Energy Regulatory Commission (FERC) requires that an underwater inspection and a bathymetric survey be performed every ten (10) years at the South Bend Dam. In their December 2019 triennial inspection report, FERC required an additional inspection and survey be performed due to the flood of record that occurred in February 2018 and the history of scour and erosion issues at the dam. Coordinate with American Electric lower ARl' Re a din Water Release from the Twin Branch Hydroelectric Pro/ect In the past AEP has been able to work within their FERC requirements to limit outflow from the Twin Branch project to allow for lower River flows during the underwater inspection and bathymetric survey. While this does not stop flow over the dam, the lower flow does allow for a safer inspection and survey. Coordination with AEP, the FERC and the Indiana Department of Natural Resources (IDNR) is required in order to manipulate the impoundment level upstream of the Twin Branch Dam. LFA will conduct this coordination for the Bathymetric Survey. Depending on timing, it may be advantageous to conduct the underwater dive inspection during the same time period. A♦ Z 0 4W "'I During previous inspections the riverbed downstream of the dam was surveyed to monitor the potential movement of riverbed material. After several surveys it was concluded the riverbed had stabilized and there appeared to be no threat to undermining of the Dam. Despite the most recent 10-year inspection having been performed in 2017, FERC is requiring an additional survey and inspection be performed by December 31, 2020 because of the flood of record that occurred in February of 2018. 525 WEST WASHINGTON AVENUE . SOUTH BEND, INDIANA 46601 . 574-234-3167 . 574-236-1330 (FAX) Mr. Jason Durr, PE February 13, 2020 Page 2 LFA will collect topographic survey data below the water surface in support of the monitoring of the river bottom conditions, just below the South Bend Dam. The bathymetric data shall include: • Mass collection of river bottom grading features typical for creation of a surface model. • Analysis of latest surface model in comparison to the surface models of the same area created in 2002 and 2017. • A letter of findings based on the surface model comparison. • A plan drawing of the surface models for inclusion in CBBEL's Report. • The underwater dive inspection and report is excluded from this scope of services and will be coordinated and performed by others. Schedule: LFA proposes to complete the above scope of services by September 30, 2020. This schedule is dependent on flows in the St. Joseph River being low enough to safely perform the field survey work. Fee: LFA proposes to perform the above Scope of Work on an hourly basis in accordance with Attachment "A". We propose a not -to -exceed fee of $15,200. If this proposal is acceptable to CBBEL, please indicate your acceptance by signing in the space provided below and return one copy to our office. Thank you again for the opportunity to work with CBBEL and the City of South Bend on this project. Please contact us if you have any questions or need any further information. Very truly yours, LAWSON-FISHER ASSOCIATES P.C. ip r C. Tittle, PE Vice President / Water Resources Director Levin J. Siedlecki, PE. Project Manager KJS:PCT/kcb Encls. Mr. Jason Durr, PE February 13, 2020 Page 2 ACCEPTED AND APPROVED this day of 2020 Christopher B. Burke Engineering LLC Jason Durr, PE, Director, Northern Indiana ATTACHMENT "A" LAWSON-FISHER ASSOCIATES P.C. PAYMENTS TO ENGINEER 1. Methods of Payment for Services and Expenses of ENGINEER. OWNER shall pay ENGINEER for professional Services and Expenses as follows: 1.1 Basic Services: 1.1.1 General. For Services rendered an amount equal to ENGINEER's Salary Costs times a factor of 2.37 for all time for Basic Services rendered by principals and employees engaged directly on the Project. 1.1.2 Resident Pro"cet Services. For services of ENGINEER's Resident Project Representative (and assistants) furnished for the project on the basis of Salary Costs times a factor of 2.37 for services rendered by principals and employees assigned to Resident Project representation. 1.1.3 Professional Associates and Consultants. For services and Reimbursable Expenses of independent professional associates and consultants employed by ENGINEER to render Basic Services, the amount billed to ENGINEER therefor times a factor of 1.10. 1.1.4 t erational Phase Services, For Operational Phase services famished, an amount equal to ENGINEER's Salary Costs times a factor of 2.37 for services rendered by principals and employees engaged directly on the Project. 1.2 Additional Services: 1.2.1 General. For Additional Services of Engineer's principals and employees engaged directly on the Project and rendered (except services as witness), on the basis of ENGINEER's Salary Costs times a factor of 2.37. 1.2.2 Professional Associates and Consultants. For services and Reimbursable Expenses of independent professional associates and consultants employed by ENGINEER to render Additional Services, the amount billed to ENGINEER therefor times a factor of 1.10. 1.2.3 Serving has a Witness. For services rendered by ENGINEER's principals and employees as consultants or witnesses in any litigation, arbitration or other legal or administrative proceeding at the rate of 1.35 times the rates in Paragraph 1.2.1. Compensation for ENGINEER's independent professional associates and consultants will be on the basis provided in paragraph 1.2.2. 1.3 Reimbursable Expenses. In addition to payments provided for in paragraphs 1.1 and 1.2, OWNER shall pay ENGINEER the actual costs (except where specifically provided otherwise) of all Reimbursable expenses incurred in connection with all Basic and Additional Services. 1.4 Snecialized Equipment, In addition to payments set out above, a charge may be made for specialized equipment usage as required. 2. Times of Payments,. 2.1 Engineer shall submit invoices covering each calendar month for Basic and Additional Services rendered and for Reimbursable Expenses incurred. OWNER shall pay ENGINEER promptly within thirty (30) calendar days following the ENGINEER's rendering of these invoices to the OWNER. Page 1 of 2 1/16/08 Other Provisions Concerning Pa n eats: 3.1 If OWNER should fail to make any payment due ENGINEER for services and expenses within sixty (60) calendar days after receipt of ENGINEER's statement therefore, the amounts due ENGINEER will be increased at the rate of 1% per month from said sixtieth day, and in addition, ENGINEER may, after giving seven days written notice to OWNER, suspend services under this Agreement until ENGINEER has been paid in full all amounts due for services, expenses and charges. 3.2 In the event of termination by OWNER upon the completion of any phase of the Basic Services, progress payments due ENGINEER for services rendered through such phase shall constitute total payment for such services. In the event of such termination by OWNER during any phase of the Basic Services, ENGINEER also will be reimbursed for the charges of independent professional associates and consultants employed by ENGINEER to render Basic Services, and paid for services rendered during that phase on the basis of ENGINEER's Salary Costs times a factor of 2.37 for services rendered during that phase to date of termination by ENGINEER's principals and employees engaged directly on the Project. In the event of any such termination, ENGINEER will be paid for all unpaid Additional Services and unpaid Reimbursable Expenses, plus all termination expenses. Termination expenses mean additional Reimbursable Expenses directly attributable to termination, which, if termination is at Owner's convenience, shall include an amount computed as a percentage of total compensation for Basic Services earned by ENGINEER to the date of termination, as follows: 20% if termination occurs after commencement of the Preliminary Design Phase but prior to commencement of the Final Design Phase; or 10% if termination occurs after commencement of the Final Design Phase. 3.3 Records of ENGINEER's Salary Costs pertinent to ENGINEER's compensation under this Agreement will be kept in accordance with generally accepted accounting practices. Copies will be made available to OWNER at cost, if requested prior to final payment for ENGINEER's services. 3.4 Whenever a factor is applied to Salary Costs in determining compensation payable to ENGINEER, that factor may be adjusted periodically and equitably to reflect changes in the various elements that comprise such factor. All such adjustments will be in accordance with generally accepted accounting practices as applied on a consistent basis by ENGINEER and consistent with ENGINEER's overall compensation practices and procedures. 4. Definitions: 4.1 The Salary Costs used as a basis for payment mean salaries and wages (basic and incentive) paid to all ENGINEER's personnel engaged directly on the Project, including, but not limited to, engineers, architects, surveyors, designers, draftsmen, specification writers, estimators, other technical and business personnel; plus the cost of customary and statutory benefits including, but not limited to, social security contributions, unemployment, excise and payroll taxes, workers' compensation, health and retirement benefits, sick leave, vacation and holiday pay and other group benefits. The amount of customary and statutory benefits of all personnel of ENGINEER will be considered to be equal to 33% of the salaries and wages, subject to equitable adjustment to reflect changes in ENGINEER's overall compensation procedures and practices. 4.2 Reimbursable Expenses mean the actual expenses incurred by ENGINEER or ENGINEER's independent professional associates or consultants directly or indirectly in connection with the Project, such as expenses for: transportation and subsistence incidental thereto; obtaining the bids or proposals from Contractor(s); providing and maintaining field office facilities including furnishings and utilities; subsistence and transportation of Resident Project Representatives and their assistants; toll telephone calls and telegrams; reproduction of Reports, Drawings, Specifications, Bidding Documents and similar Project -related items in addition to those required under Section l; and if necessary, overtime work required higher than regular rates. Page 2 of 2 1/16/08 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 3/17/2020 Department Name Sue Ellen Doudrick Engineering BPW Date 3/24/2020 Phone Extension 5922 m a Review and Approval Required Prior to Submittal to Board _..._._...._.__.............�..............._.... ........._ _ .. _ _ _ ..._................. Diversity Compliance ❑ Officer Name and Inclusion Officer BPW Attorney ❑ Attorney Name Dept. Attorney F] Attorney Name Purchasing] Check the Appropriate Item 3"° e — Professional Services Agreement Contract F-1 Open Market Contract ® Amendment/Addendum ]' Bid Opening ❑ Bid Award Quote Opening ❑ Quote Award EJ Proposal Opening ❑ C/O & PCA No. Chg. Order, No. ❑ Traffic Control Other: Rpgq i j d Information All Submissions Proposal IH Special Purchase, QPA ❑ Req. to Advertise ❑ Reject Bids/Quotes �] PCA ❑ Resolution Ease./Encroach ❑ Title Sheel Company or Vendor Name Christopher B. Burke Engineering, LLC ............................... ❑ Yes ❑ If Yes, Approved by Purchasing New Vendor ® No MBE MBE/WBE Contractor Completed E-Verify Form Attached ❑ Nos E Project Name South Bend Dam 2020 DSSMR Project Number J .... _._... ............................. 111 2 Funding Source ....19 ....... Stormwater Fund Account No. 667-0621-792-4204 Amount _................._. .......... $32,'�00 Terms of Contract ..............�..w---....�. � ��_.����� � ..............._...... .............w..........�. HNTE Purpose/Description Additional work will include tasks required by FERC: Bathymetric survey, underwater inspection, staff gauge replacement design, dam ahead signage design and coordination, yearly Gate Operation, and development of the .. For Change Orders Only Amount of Increase $ � .. mm_...... ........ ...... El Decrease ($ Previous Amount $ ..._..__.....%... Increase Current Percent of Change: Decrease ( % New Amount $ Increase Total Percent of Change: Decrease Time Extension Amount: New Completion Date: