Loading...
HomeMy WebLinkAboutOpening of Bids - Eagle Way Sewer Extension Proj No. 119-095 - Ritschard Bros., Inc.CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name Eagle Way Sewer Extension Project No. 119-095 For Bids Due March 10, 2020 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X Certification of use of United States Steel Products or Foundry Products. Proof of MWBE Utilization Plan [MWBE-1.0]. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MWBE Contacted Form X [MWBE-2.1]. X Acknowledge Receipt of 2 Addendum(s) included with the bid. X All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either X printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use documentation; however, it does not include all relieve the bidder of the need to read and comr t Bidder: Ritsch rd r 1 .nc. By Authorized R prese94V Signature: assuring compliance with required �cifications requirements and does not the specif" ons. Print Name & Title: Donald Ritschard Jr r Vice t resident Version 01/29/2020 Contractor's Bid for Public Works - 1 3/10/2020 2. Abandon Existing 8" Eagle Way Sanitary Sewer will be paid for under the lump sum item and price as set forth in the Proposal. XL. PAVEMENT MARKINGS A. Prevailing Specifications: 2020, INDOT Standard Specification Section 808 B. Additions 1. Work to be performed shall include furnishing all labor, services, materials, insurance and equipment to apply pavement markings as shown in the plans. 2. All longitudinal pavement markings on concrete pavement shall be epoxy paint. All pavement message markings on concrete pavement shall be preformed plastic. All pavement markings shall be in accordance with INDOT Standard Specifications Section 808. 3. All curing compound shall be removed or grinded prior to application of epoxy paint. 4. The material shall be warranted to retain its color and adherence to the pavement for 180 days from substantial completion. 5. All pavement markings shall be in accordance with the Indiana MUTCD.. 6. Pavement marking lines will be measured by the linear foot of thermoplastic markings. Each will be paid at the contract unit price. Version 1/30/2020 Special Provisions - 18 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name Eagle Way Sewer Extension Project No. 119-095 For Bids Due March 10, 2020 PART I (Must be completed for all bids. Please type or print) Date: 3/10/2020 Bidder (Firm): Ritschard Bros. Inc. Address: 1204 W. Sample Street City/State/Zip: South Bend IN 46 19 Telephone Number: _ Agent of Bidder (if Applicable): wwwwWWwwWW.www .......... Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Eagle Way Sewer Extenstion - Project No. 119-095 the City of South Bend, Indiana, in accordance with plans and specifications prepared by: Abonmarche Consultants. Inc. and dated 212012020 for the sum of (enter the Total Bid as shown on the Proposal) h Hundred edEi ht one Th sand 281,819.00 '`-____------ - ---------- r.s (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included,in the ntrac are nArt t cost of Uri must be the same as that shown in the original contract if accepts y e i f S If th d i to be awarded on a unit basis, the itemization of the units shall b sho a ep Chime The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member Jordan Gathers, Member Donald Ritschard, Jr. (Printed Name c ACCEPTANCE day of Vice President Person Sio,ninp) Joseph R. Molnar, Member Therese J. Dorau, Member Attest: Linda M. Martin, Clerk Version 01/29/2020 Contractor's Bid for Public Works - 2 20 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 01/29/2020 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana ) ) SS St. Joseph COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. Version 01/29/2020 Contractor's Bid for Public Works - 4 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an-MWBE; however, they may not unlawfully discriminate against said MBE/WBE. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. 1, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. Version 01/29/2020 Contractor's Bid for Public Works - 5 I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this loth day of March , 20 20 Subscribed and swornto before me this loth My Commission Expires 2/2J24 County of Residence Signature of Contractor/Bidder 4r Its Agent Donald Ritschard, Jr., Vice President Printed Name and Title y of March—, 20 20 v Rotary Public������ St. Josefsh■"` v M r . y OB LAB Version 01/29/2020 Contractor's Bid for Public Works - 6 Project Name: Project Number: For Bids Due: Contractor Name: BASE BID i BID/PROPOSALS CITY OF SOUTH BEND f Eagle Way Sewer Extension r0 119-095 March 10, 2020 Ritschard Bros.. Inc,. Item Description Quantity Unit Unit Price Total Amount No. 1 Maintenance of Traffic 1 LS 4,260.00 4,260,00 2 Mobilization and Demobilization 1 LS 2,500.00 2,500.00 3 Construction Engineering 1 LS 7,395.00 7,395.00 4 Clearing of Right of Way LS 7,780.00 7, 780.00 5 Temporary Erosion Control E64 LS 1 000.00 1,000.00 6 Concrete Pavement, Remove SYD 42.00 2,688.00 7 Compacted Aggregate for Base, No. 53 TON 50.00 1,250.00 8 PCCP, 12" 64 SYD 210.DQ 1 9 Concrete Curb, 6" 16 LFT 219.00 3,504.00 10 Standard Sanitary Sewer Manhole, 48 IN. 9 EA 3,430.00 30, 870.00 11 Sanitary Sewer Pipe, PVC SDR 26, Circular, 15 IN. 1,722 LFT 83.50 143 787.00 12 Connection to Existing Sewer - Nimtz Parkway 1 LS 5,260.00 5,26Q.QQ 13 Lonewolf Lift Station Abandonment 1 LS 16, 380.00 16 380.00 14 Abandon Existing 8" Eagle Way Sanitary Sewer 1 LS 22500.00 2,500.00 15 Line, Epoxy Paint, Solid Yellow, 4" 32 LFT 10.00 320.00 16 Line, Epoxy Paint, Broken Yellow, 4" 20 LFT 10.00 200.00 17 Common Excavation 3,600 CYD 5.00 18 000.00 BASE BID TOTAL $261,134.00 ALTERNATE BID Item Description Quantity Unit Unit Price Total Amount No. 18 Borrow 2,100 1 CYD 9.85 20, 685.00 ALTERNATE BID TOTAL $20, 685.00 Bidder (Firm): Ritschard Bros., Inc. Address: 1204 W. Sam le Street City/State/Zip: South Bend IN 46619 Telephone N#Qr/,`0-4 aJ7 7 7 By (Signature) Donald Ritschard, Jr., 'Vice President (Printed Name of Person Signing) ADDENDUM NO.2 Version 01/29/2020 Contractor's Bid for Public Works - 7 �? CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN• FORM MWBE-1.0 MWBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MWBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the MWBE qualifications. Project Number: 119-095 Project Name: Eagle Way Sewer Extension Bidder: Rit:schard Bros., Inc. Total Bid Amount: $281, 819. 00 MWBE Goal: 21. 12% Page 1 of 1 Name &Address of MWBE Primary Contact Person Scope of Work to be Performed Dollar Amount of MWBE Porconta0e Name/Tele hone ( p ) (Attach scope/schedule if you need additional space) Component of TotalBiid�IPro satl Ritschard Bros.., Inc. Rachelle L. 1204 W. Samph. St. Dolniak Sanitary Sewer Installation Y $233,684.00 90% South Bend, IN 46619 1574-288-4777 Submitted by: Donald Ritsthard Jr Print Name Version 01/29/2020 Contractor's Bid for Public Works - B Date CITY OF SOUTH BEND^ r� MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: Project Name: Bidder: Contact Person: Address: City: Email: 119-095 Ea le Wav Sewer Extension State: Date: Telephone: Zip: To determine whether a bidder has demonstrated good faith efforts to reach the MWBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MWBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non certified) found at: htt 2 :LiLl t. 'o'v/idoa/. GOOD FAITH EFFORTS TO OBTAIN MWBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MWBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website ht't ://www.kn. 'ekd/IdCBa . I affirm that I have made good faith efforts to select portions of the contract work to be performed by MWBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate MWBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all MWBEs in the scopes of work of the contract. I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform MWBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MWBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MWBEs of subcontracting opportunities and allowed sufficient time for MWBEs to participate effectively. I affirm that I followed up on initial solicitations with interested MWBEs. I affirm that l negotiated with interested MWBEs in good faith, including providing such MWBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested MWBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 01/29/2020 Contractor's Bid for Public Works - 9 �y�quaa �Ci, CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MWBE-2.0' F EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good faith efforts to assist interested M BEs in obtaining necessary equipment, supplies„ materials, or related assistances or services, where appropriate. 'tased on a thorour.h investigationof their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MWBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 01/29/2020 Contractor's Bid for Public Works - 10 CITY OF SOUTH BEND' MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MWBE-2.1 a MWBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MWBEs. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the MWBE qualifications. Attach additional pages if necessary. PAGE OF Project Number: 119-095 MWBE Participation Goal Project Name: __Eagle Way Sewer Extension Bidder: By: (Signature) (Title) (Date) MWBE Firm Owner or Contact at MWBE Firm Telephone: Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MWBE FIRM: MWBE Firm Owner or Contact at MWBE Firm Telephone: Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MWBE FIRM: Email: Email: Version 01/29/2020 Contractor's Bid for Public Works - 11 BROS., RITSCHARD EXCAVATING AND DEMOLITION March 10, 2020 Section I Experience Questionnaire 1. Completed Projects: Contract Amount Class of Work Completion Project Name Date and Owner $ 421,088.00 Demolition 04/18 City of South Bend, IN $ 387,500.00 Earthwork/Utilities 05/19 Elk. Cnty Juvenile Center —Elkhart County IN $ 182,627.00 Earthwork/Utilities 06/19 Fire Station #9 - City of South Bend, IN $ 51,423.50 Site Utilities 06/19 Three Twenty at the Cascade $ 319,758.00 Demolition 10/19 City of South Bend, IN 2. Public Works Projects in Process: Contract Amount Class of Work $ 125,825.00 $ 49,380.00 3. None Demolition Drive Relocation 4. References: Gibson -Lewis, LLC / Robert Lingenfelter The Robert Henry Corporation / Stephen Henry Walsh & Kelly, Inc. / Doug Kesler Ziolkowski Construction, Inc. / Bill Favors Project Name and Owner City of South Bend, IN City of South Bend, IN 1204 West Sample Street • South Bend, Indiana 46619 • PHONE (574) 288-4777 • FAX (574) 288-5438 • E-MAIL: ritl204@datacruz.com BROS INC. - ----------- - RITSCHA,RD EXCAVATING AND DEMOLITION March 10, 2020 Eagle Way Sewer Extension Project No. 119-095 Section II Plan and Equipment Questionnaire 1. We will demolish pavements, install and backfill sanitary sewer, decommission the lift station and repair surface. 2. Hydro-Tek Seeding, Inc. Seeding Rieth-Riley Construction Co., Inc.. Asphalt and Concrete Pavement 3. Walsh & Kelly, Inc. Paving 4. See Enclosed Schedule of Owned Equipment. 5. Yes. 1204 West Sample Street • South Bend, Indiana 46619 • PHONE (574) 288-4777 • FAX (574) 288-5438 • E-MAIL: ritl204@datacruz.com RITISCHARD MO.,, INC., EXCAVATING AND DEMOLITION FORM 96 (Revised 2005) SECTION II Plan and Equipment Questionnaire ITEM 3 — LIST OF OWNED EQUIPMENT 3 — Vibratory Compactors 3 — 650J John Deere Bulldozers 2 — 750C John Deere Bulldozers 1 — 450G John Deere Bulldozer Long Track 1 — 450H John Deere Long Track Dozer 1 — 416C Caterpillar Loader/Backhoe Combinations 1 — 420D Caterpillar Loader/Backhoe Combination 2 — TS 14 Terex Earthmovers 1— 120G Caterpillar Grader 1 — 30B Bucyrus Erie Crawler Crane — 1 yd 1 — L60 Volvo Loader - 2 3/4 yd 1 — L70 Volvo Loader - 3 yd 4 — L90 Volvo Loaders - 3 1/4 yd 1 — L120 Volvo Loader - 3 %Z yd 2 — Gehl Skid Steer Track Loaders 2 — Takeuchi TL8 Skid Steer Track Loaders 1 — 595D John Deere Excavator 1 — Gehl GE383Z Mini Excavator 1 -Takeuchi TB 180FR Excavator 1 — Takeuchi TB260CR Excavator 1 — Takeuchi TB290CR Excavator 1 — ZX160LC-5 Hitachi Excavator 1 — ZX350LC-5 Hitachi Excavator 1 — EC210BLC Volvo Excavator 1 — EC240CLC Volvo Excavator 2 — Tri Axle Dump Trucks 1204 West Sample Street • South Bend, Indiana 46619 • PHONE (574) 288-4777 • FAX (574) 288-5438 • E-MAIL: ritl204@datacruz.com 4 c RITSCHARD BROS., INC. South Bend, Indiana BALANCE SHEETS November 30, 2019 and 2018 ASSETS CURRENT ASSETS 2019 2018, Cash and cash equivalents 39 39 Accounts receivable 1,557,512 2,301,570 Costs and estimated earnings in excess of billings on contracts in progress 627,871 154,104 Prepaid expenses 34,175 25,937 Total Current Assets 2.219,597 2,481.650 PROPERTY AND EQUIPMENT Original cost 5,201,336 4,861,485 Less accumulated depreciation 4,092,425 3,876,323 Net Pro e and Equipment 1,108,911 995,162 OTHER ASSETS Cash surrender value of life insurance 115,229 102,888 Federal tax deposit 8,372 7,039 Land held for investment, at cost 117,980 117,980 Total Other Assets 241,581 227,907 TOTAL ASSETS 3 570,089 3,694,719 LIABILITIES AND SHAREHOLDERS' EQUITY CURRENT LIABILITIES Checks written not yet presented for payment 259,639 291,599 Note payable - bank 152,563 273,875 Accounts payable 397,158 323,828 Current portion of long-term debt 185,310 151,015 Billings in excess of costs and estimated earnings on contracts in progress 52,669 238,846 Accrued expenses 239,603 263 914 Total Current Liabilities 1,286,942 1,543,077 LONG-TERM DEBT 377,942 321,613 TOTAL LIABILITIES 1.664.884 1.864.690 SHAREHOLDERS'EQUITY Common stock - no par value; 3,500 shares authorized; 1,201 shares issued and outstanding Retained earnings 6,005 6,005 1.899.200 1.824.024 Total Shareholders' Equity 1,905,205 1,830,029 TOTAL LIABILITIES AND SHAREHOLDERS' E UITY 3,570,089 3,694,719 The Notes to Financial Statements are an integral part of this statement. -2- RITSCHARD BROS., INC. South Bend, Indiana STATEMENTS OF RETAINED EARNINGS For the Years Ended November 30, 2019 and 2018 2019 2018 RETAINED EARNINGS, BEGINNING OF YEAR 1,824,024 1,818,465 Net income for the year 128,311 105,591 Distributions to shareholders (53,135) (100,032) RETAINED EARNINGS, END OF YEAR 1,899,200 1824 024 The Notes to Financial Statements are an integral part of this statement. -4- RITSCk .:RD BROS., INC. South Bend, Indiana NOTES TO FINANCIAL STATEMENTS November 30, 2019 and 2018 NOTE 11- BUY - SELL AGREEMENT The Company and the shareholders have entered into a buy -sell agreement. In the event of death or withdrawal from active employment with the Company, the shareholder must sell and the Company must redeem all of the withdrawing shareholder's stock based on the value established by the agreement. If the Company is unable to purchase any of the shares, then the non -selling shareholders will be obligated to purchase the selling shareholder's shares at a value agreed to by the shareholders. The value is determined by a formula based on book value. -12- rMS-1 CONTRACTOR: (Name, legal status and address) Ritschard Bros., Inc. 1204 W. Sample Street South Bend, IN 46619 V/A SURETY: Western Surety Company: South Dakota Corporation (Name, legal status and principal place of business) 151 N. Franklin Street 17th Floor Chicago, IL 60606 OWNER: (Name, legal status and address) City of South Bend, Indiana Board of Public Works County -City Building, Room 1316 227 W. Jefferson Blvd. South Bend, IN 46601 BOND AMOUNT: Five percent (5%) of accompanying bid This document has important legal consequences, Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable, PROJECT: (Name, location or address, and Project number, if any) Eagle Way Sewer Extension Project No. 119-095 Eagle Way, South Bend The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflig' ig with said statutory or legal. requirement shall be deemed deleted herefrom and "' I provisions conforming to sil f s A itory or (.)the], , gal requirement shall be deemed incorporated herein. When so i's and shall �:, con trued as a statutory bond and not as a common law bond. ftivdi5ilid, the intent 7711 day op(, March ........ .. . . . ... ... ... ... 2020 Ritschard Bros.. Inc. (Witness) (Tvitn<1 -Connie J. Mes - Printed in cooperation with the American Institute of Architects (A IA). The language in this document conforms to the language used in AIA DocumentA310 - Bid Bond - 2010 Edition. Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY -IN -FACT Know All Men By These Presents, That WESTERN SURETY COMPANY, a South Dakota corporation, is a duly organized and existing corporation having its principal office in the City of Sioux Falls, and State of South Dakota, and that it does by virtue of the signature and seal herein affixed hereby make, constitute and appoint Thomas J McGovern, Harold E Everett, Elaine K Miller, Thomas J Van Dyck, Jada M Karst, Melinda S Jagger, Tracie M McBride, Connie J Messer, Laura L Diver, Individually of Fort Wayne, IN, its true and lawful Attorney(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on its behalf bonds, undertakings and other obligatory instruments of similar nature Unlimited is - and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said Attorney, pursuant to the authority hereby given, are hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the By -Law printed on the reverse hereof, duly adopted, as indicated, by the shareholders of the corporation. In Witness Whereof, WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate seal to be hereto affixed on this 27th day of February, 2020. �yaery � WESTERN SURETY COMPANY "* "akul T. Bruflat, Vice President State of South Dakota I s, County of Minnehaha On this 271h day of February, 2020, before me personally came Paul T. Bruflat, to me known, who, being by me duly sworn, did depose and say: that he resides in the City of Sioux Falls, State of South Dakota; that he is the Vice President of WESTERN SURETY COMPANY described in and which executed the above instrument; that he knows the seal of said corporation; that the seal affixed to the said instrument is such corporate seal; that it was so affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said corporation. My commission expires J. MOHR mrar a su June 23, 2021 A� J. Mohr, Notary Public 1, L. Nelson, Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in force, and further certify that the By -Law of the corporatiei! printed on the reverse hereof is still in force. In testimony whereof I have hereunto subscribed my name and affixed the seal of the said corporation this 10 _day of __ M Y C}t 2 wram», " WESTERN SURETY COMPANY L. Nelson, Assistant Secretary Form F4280-7-2012 Go to www.cnasgrgly.com > Owner / Obligee Services > Validate Bond Coverage, if you want to verify bond authenticity. Authorizing By -Law ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY This Power of Attorney is made and executed pursuant to and by authority of the following By -Law duly adopted by the shareholders of the Company. Section 7. All bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation shall be executed in the corporate name of the Company by the President, Secretary, and Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile. U 13 1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/235-9251 FAX 574/235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND TAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS Date: February 27, 2020 To: All Bidders From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: 1 Project Name: Eagle Way Sanitary Extension Project Number: 119-095 ACKNOWLEDGEMENT OF :RECEIPT OF ADDENDUM Date Received: 310512020 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171. A copy :MUST also be included with your bid package upon submittal. THIS ADDENDUM MANY AFFECT YOUR BID. Note: The attached documents are hereby Add to the Specifications and Contract Documents and become a part of herein. Company:. Authorized Signature: Date: 3/05/2020 al�'ltt w 1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 Date: To: From Subject PHONE 574/235-9251 FAX 574/235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND .TAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS March 5, 2020 All Bidders Linda M. Martin, Clerk, Board of Public Works Addendum Number: 2 Project Name: Eagle Way Sanitary Extension Project Number: 119-095 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 3 /05 / 2020 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171. A copy 'MUSTalso be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Note: The attached documents are hereby Add to the Specifications and Contract Documents and become a part of herein. Company: Riscrd Bros., Inc.. Authorized Signature: Date: 3 05 2.020 DEPARTMENT OF ADMINISTRATION w STATE Off" IND'IA A Division of Supplier Diversity Eric J. Holcomb, Governor Indiana Government Center South 402 West Washington Street, Room W469 Indianapolis, IN 46204 (317) 232 - 3061 April 11, 2018 Rachelle Dolniak Ritschard Bros., Inc. 1204 W Sample St South Bend, IN 46619 Subject: Application for WBE Certification Dear Ms. Dolniak, Congratulations! The Indiana Department of Administration, Division of Supplier Diversity is pleased to inform you that Ritschard Bros., Inc. is hereby certified as a Women's Business Enterprise (WBE). Your company provides a commercially useful function in the areas listed,below. Only work performed in these areas will be counted towards Women's Business Enterprise participation: UNSPSC CODE(S) Code Descri tion 83101500 Water and Sewer Utilities 72153900 Building site preparation services 72141510 Demolition services 72141511 Digging services 72141500 Land preparation services On September 13, 2010, the Governor's Commission on Minority and Women's Business Enterprises approved the department's effort to streamline its recertification process. Instead of conducting an onsite visit to each company seeking recertification, the department now has the discretion to waive the visit after a thorough review of the company's file and recertification documents. We have approved your recertification and it is valid through April 30, 2021. Please note that IDOA continues to reserve the right to conduct a site visit or phone interview at any time to certified companies. Although your certification is valid for a three-year period, you are required to submit an annual Affidavit of Continued Eligibility (ACE) form, located at www.in.. ovlidoa/mwbeJfiles`ACEFarm.pdf. Please remember you must notify us immediately if any changes occur. Failure to notify us of changes or to provide an ACE form annually will result in revocation of your certification. Changes include, but are not limited to, changes in location, contact information, ownership and control. We encourage you to visit IDOA's procurement website, www.in.gov/idoa/2464.htrn, and update your Business Registration Profile. It is important that you review and update your profile regularly, because state purchasing agents and prime contractors may use this information to contact you for business opportunities. For questions regarding your registration profile, you may contact our office at 317-232- 306:1. Reference: Ritschard Bros., Inc. While this letter serves as notification of certification, it does not serve to prove continued eligibility. Please visit www.in.sov/idoa/mwbe/2743.1attn to verify certification status. Please contact our office at (317) 232- 3061 if you have any other questions. We ask that you please contact Amy L. Wolf, Deputy Director of Certification, at (317) 232-3061 or awolfe.idoadn.gov if you have any questions or concerns about your letter. Sincerely, Amy L. Wolf, Deputy Director of Certification Indiana Department of Administration Division of Supplier Diversity ALW:yJ Bidder Registration No. 0000023294 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Eagle Way Sewer Extension Project No. 119-095 For Bids Due March 10, 2020 Contractor Name: Ritschard Bros, Inc. The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 315' for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 01/29/2020 General Conditions - 6 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 01/29/2020 General Conditions - 7 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) X By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) X Indiana Secretary of State's on-line records (i.e. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). x Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. _1_ List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) _2L For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. Version 01/29/2020 General Conditions - 8 PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) _ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) _ By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: (i) _ Indiana Secretary of State's on-line records (i.e. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) List identifying all former business names. (iii) Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) _ Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 01/29/2020 General Conditions - 9 (ix) Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) List of projects of similar size and scope of work performed in all areas, including the State f Indiana, wi ree (3) years prior to the date on which the bid is due. Date: tt 1 2 (Sign Here)", -- Donald Ritschard, Jr., Vice President (Print Name Here) Ritschard Bros., Inc. (Name of Company) 1204 W. Sant le Street (Address of Company) South Bend (City) Indiana 46619 (State) 574-288-4777 (Telephone Number) Version 01/29/2020 General Conditions - 10 DEPARTMENT OF PUBLIC WORKS CITY OF SOUTH BEND, INDIANA SPECIAL PROVISIONS Eagle Way Sewer Extension Project No. 119-095 I. PROJECT DESCRIPTION Work to be performed shall include furnishing all labor, services, materials, insurance and equipment to provide and install 15-inch sanitary sewer improvements according to the intent of the plans and specifications at Eagle Way. II. PREVAILING SPECIFICATIONS AND DESIGN & CONSTRUCTION STANDARDS The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and DESIGN & CONSTRUCTION STANDARDS, most recent version, are to be used on this project. Each Bid provider is specifically instructed to become completely familiar with the most recent version of the PREVAILING SPECIFICATIONS and the DESIGN & CONSTRUCTION STANDARDS prior to submitting a Bid. Wherever the PREVAILING SPECIFICATIONS refer to "State Specifications," it shall mean the 2020 INDOT Standard Specifications for the letting effective after September 1, 2019. These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING SPECIFICATIONS and are to be used only in conjunction with the PREVAILING SPECIFICATIONS. In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING SPECIFICATIONS, the SPECIAL PROVISIONS will govern. III. BIDDING RE UIREMEN'T'S A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 102 B. Additions: 1. Each Bid provider shall completely execute and submit the following documents with the Bid: a. City of South Bend Contractor's Bid for Public Work Form b. Bid Bond stating 5% of the total Bid or Certified Check of 5% of the bid c. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investment with Iran, Employment Eligibility Verification, Non -Discrimination Commitment and Certification of use of United States Steel Products or Foundry Products. d. Responsible Bidder Checklist Version 1/30/2020 Special Provisions - 1 1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS November 5, 2019 Ms. Rachelle Dolniak Ritschard Bros., Inc. 1204 W. Sample St. South Bend, IN 46619 RE: Pre -Qualification Verification Dear Ms. Dolniak: PHONE 574/235-9251 FAx 574/ 235-9171 This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you are required to re -submit a complete application for continuation of pre -qualification status prior to December 31 for the upcoming calendar year. A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist and attachments. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, GAL Linda M. Martin, Clerk GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAMA L. O'SULLIVAN THERESE J. DORAU 1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR .BOARD OF PUBLIC WORKS November 5, 2019 Ms. Rachelle Dolniak Ritschard Bros., Inc. 1204 W. Sample St. South Bend, IN 46619 RE: Pre -Qualification Verification Dear Ms. Dolniak: PHONE 574/235-9251 FAx 574/ 235-9171 This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you are required to re -submit a complete application for continuation of pre -qualification status prior to December 31 for the upcoming calendar year. A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist and attachments. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, J Linda M. Martin, Clerk GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU Business Name: RITSCHARD BROS., INC. Entity Type: Domestic For -Profit Corporation Creation Date: 12/06/1961 Principal Office Address: 1204 W SAMPLE ST, SOUTH BEND, IN, 46619, USA Jurisdiction of Formation: Indiana BUSINESS INFORMATION CONNIE LAWSON INDIANA SECRETARY OF STATE 03/09/2020 04:46 PM Business ID: 194333-060 Business Status: Active Inactive Date: Expiration Date: Perpetual Business Entity Report Due 12/31/2021 Date: Years Due: Business Name: RITSCHARD BROS., INC. Entity Type: Domestic For -Profit Corporation Creation Date: 12/06/1961 Principal Office Address: 1204 W SAMPLE ST, SOUTH BEND, IN, 46619, USA Jurisdiction of Formation: Indiana BUSINESS INFORMATION CONNIE LAWSON INDIANA SECRETARY OF STATE 03/09/2020 04:46 PM Business ID: 194333-060 Business Status: Active Inactive Date: Expiration Date: Perpetual Business Entity Report Due 12/31/2021 Date: Years Due: RI'T'SCHARD LIPBROS, . EXCAVATING AND DEMOLITION March 10, 2020 City of South Bend, Indiana Board of Public Works 1316 County -City Building South Bend, IN 46601 RE: Pre -Qualified Bidder Checklist Enclosed please find the following attachments: Secretary of State report showing our existence is attached. We have sufficient manpower on hand to complete this project. We are signatory with the Operating Engineers Local 150, Laborers Union No. 645 and Teamsters Union No. 364. If additional manpower is required, it would be obtained through the corresponding union. Our surety company is Western Surety Company and a copy of their certification is attached. List of similar size and scope of work performed within the last three (3) years. Proof of Compliance with participation in apprenticeship and training programs. Sincerely, RITSCHARD BROS., INC. Donald Ritschard, Jr, Enclosures 1204 West Sample Street • South Bend, Indiana 46619 • PHONE (574) 288-4777 • FAX (574) 288-5438 • E-MAIL: rit1204@datacruz.com RITSCHARD BROS., ING. EXCAVATING AND DEMOLITION March 10, 2020 City of South Bend, Indiana Board of Public Works 1316 County -City Building South Bend, IN 46601 RE: Pre -Qualified Bidder Checklist Enclosed please find the following attachments: Secretary of State report showing our existence is attached. We have sufficient manpower on hand to complete this project. We are signatory with the Operating Engineers Local 150, Laborers Union No. 645 and Teamsters Union No. 364. If additional manpower is required, it would be obtained through the corresponding union. Our surety company is Western Surety Company and a copy of their certification is attached. List of similar size and scope of work performed within the last three (3) years. Proof of Compliance with participation in apprenticeship and training programs. Sincerely, RITSCHARD BROS., INC.. Donald Ritschard, Jr.. Enclosures 1204 West Sample Street • South Bend, Indiana 46619 • PHONE (574) 288-4777 • FAX (574) 288-5438 • E-MAIL: ritl204@datacruz.com LIST OF PROJECTS SIMILAR IN SIZE AND SCOPE OF WORK Silver Birch Arco/Murray National Construction Co. Site Utilities $436,426.00 Completed 12/2018 Three Twenty at the Cascade Panzica Building Corp. Site Utilities $735,091.00 Completed 8/2019 Elkhart County Criminal Justice Complex Brown & Brown General Contractors, Inc. Site Utilities $387,500.00 Completed 6/2019 Beacon Granger Hospital Panzica Building Corp. Site Utilities $745,971.00 Completed 12/2019 LIST OF PROJECTS SIMILAR IN SIZE AND SCOPE OF WORK Silver Birch Arco/Murray National Construction Co. Site Utilities $436,426.00 Completed 12/2018 Three Twenty at the Cascade Panzica Building Corp. Site Utilities $735,091.00 Completed 8/2019 Elkhart County Criminal Justice Complex Brown & Brown General Contractors, Inc. Site Utilities $387,500.00 Completed 6/2019 Beacon Granger Hospital Panzica Building Corp. Site Utilities $745,971.00 Completed 12/2019 INTERNATIONAL UNION OF OPERATING ENGINEERS LOCAL UNION NO 150, 150B, 150A, 150C, 150RA, 150D, 150G, 150M AFFILIATED WITH THE A.F.L.C.I.O. AND BUILDING TRADES DEPARTMENT � !a James M Sweeney (708)182-8800 FAX (708) 482-7186 �,' President -Business Managerr� ," 6200 JOLIET ROADCOUNTRYSIDE, IL 60525-3992 November 5, 2019 Chelle Dolniak Ritschard Bros., Inc. 1204 West Sample Street South Bend, IN 46619 Re: Proof of compliance with 30 ILCS 500/30-22(6) Our file No. MI-00321 Dear Ritschard Bros., Inc..: At the request of Chelle Dolniak, I am providing you with evidence of the Company's compliance with the apprenticeship requirements in 30 ILCS 500/30-22(6) of the Illinois Procurement Code. I am submitting this letter along with apprenticeship certificates (Nos. IL012020003 and IL008780173). As a signatory contractor with the International Union of operating Engineers, Local 150, AFL- CIO, Ritschard Bros., Inc. is required by Collective Bargaining Agreement to participate in an applicable apprenticeship and training program approved by a and registered with the United States Department of labor's Bureau of Apprenticeship and Training. The attached certificates are evidence of compliance with eh U. S. Department of labor's apprenticeship requirements. Thank you for your cooperation in this matter. I you have any questions or concerns, please do not hesitate to contact me Very truly yours, IUOE, LOCAL 150, AFL-CIO District 7 dispatch office. Enclosures: INDIANA LABORERS' TRAINING TR UST FUND David A. Frye Secretary -Treasurer Jerry J. Bolk Chris L. Guerrero Ricky Henson, Jr. Ramon Mendoza, Jr, Robert S. Wright P.O. Box 758 - Bedford, Indiana 47421 (812)279-9751 November 5, 2019 To Whom It May Concern: Sean Coakley, Director John P. Brown Chairman Kelly Abel Brad Dreibelbis Michael Ferrara Stan Meyer Jim Wiseman FAX: (812) 279-5545 This letter is to confirm that "R.itschard Brothers., Inc." is a signatory contractof in good standing with the Indiana Laborers' Training Trust Fund. The abovementioned company is a participant in the Joint Apprenticeship and Training Committee through this Union and has been an active participant in good standing for each of the past five plus consecutive years and is currently eligible to use our apprentices on a project. Further, our organization's program is approved by the U.S. Veterans Administration to participate in the GI educational benefits program. A copy of our approval letters are attached along with the collective baxgaining agreement stating the ratios of Journey workers to Apprentices; which is one (1) Apprentice for every four (4) Journey workers and thereafter may not employ more that (1) Apprentice for every (3) Journey workers. Sincerely, Sean Coakley; Director SC:jt www. indianalaborerstraining. org Pd tr� ,s U O F-i U w, Cif] U 41 �EyyOI O O rzA, .r{ q Cd H El ri tH H co M PA4 W td I ro " 4 o w a Ln rn rn r, 00 N Q I N y H A � r DEPARTMENT OF VETERANS AFFAIRS STATE APPROVING AGENCY 402 WEST WASHINGTON STREET ROOM W469 INDIANAPOLIS, INDIANA 46204-2738 Jeremy Brewer Apprenticeship Coordinator Indiana Laborers Training Trust Fund -Apprenticeship 439 Patton Hill Rd. Bedford, IN 47421 Dear Jeremy Brewer, Eric Holcomb, Governor _ James M. Brown, Director January 9, 2019 This will acknowledge receipt of your updated Wage -Scale for the Construction Craft Laborer program offered by Indiana Laborers Training Trust Fund -Apprenticeship. The State Approving Agency has reviewed the document as listed below: Wage Scale: Construction Craft Laborer TACILITY CODE: 30004114 To the best of my knowledge Indiana Laborers Training Trust Fund. -Apprentice p does not utilize erroneous or misleading advertisement, either by actual statement, omission, or )n oration. It is understood by Indiana Laborers Training Trust Fund -Apprenticeship that they will maintain a complete record of all advertising utilized by or on behalf of the- Indiana Laborers Training Trust Rind -Apprenticeship in regards to their training programs during the preceding 12 months. Indiana Laborers Training Trust Fund -Apprenticeship's advertising will be available for review by any and all future supervisory visits by the SAA, or the U.S. Department of Veteran Affairs. Please Review the entire packet for content and accuracy. Approval is granted pursuant to the provisions of Title 38, U.S. Code 3687, with an effective date of April 1, 2018. If you have any questions, please feel free to give me a call at 317-232-3916 or email me at tgriffm@dva.in.gov. Thank you for what you do for our Veterans, and have a great day! Sincerely, Taniqua Griffin Program Director State Approving Agency Cc: VA.RO/ELR `Nbrl A-4 �010 �Gq STATE OF INDIANA DEPARTMENT OF VETERANS AFFAIRS STATE APPROVING AGENCY 402 WEST WASHINGTON STREET ROOM W-469 INDIANAPOLIS, INDIANA 46204-2738 Jeremy Brewer Apprenticeship Coordinator Indiana Laborers Training Trust Fund -Apprenticeship 439 Patton Hill Rd. Bedford, IN 47421 Dear Jeremy Brewer, Eric Holcomb, Governor James M. Brown, Director January 9, 2019 The Indiana State Approving Agency conducted a supervisory visit on 01/8/2019 at Indiana Laborers Training Trust Fund -Apprenticeship. The -purpose of the visit was to provide training to the Certifying Officials and review enrollment certifications, record retention and reporting procedures. The organization demonstrated proper record maintenance and record maintenance and reporting procedures. During the visit, we discussed the importance of reporting hours on a monthly basis, good record keeping techniques, and how to report a leave of absence or completion via VA Form 22-1999b. We also updated the Certifying Officials via VA Form 22-8794, work processes, and wage scale. If you need any assistance or have any questions regarding this technical visit please contact me directly attgrifrm@dv&in.gov or (317) 232-3916. Thank you for the courtesy extended during my visit. The education and training opportunities that your organization continues to provide veterans and their dependents are appreciated. Sincerely, Taniqua Griffin Program Director Phone (317)-234-6062 Toll Free (800)-400-4520 Fax (317)-234-8744 STATE OF INDIANA DEPARTMENT OF VETERANS AFFAIRS STATE APPROVING AGENCY 402 WEST WASHINGTON STREET ROOM W-469 INDIANAPOLIS, INDIANA 46204-2738 Jeremy Brewer Apprenticeship Coordinator Indiana Laborers Training Trust Fund -Apprenticeship 439 Patton ill Rd. Bedford, IN 47421 Dear Jeremy Brewer, Eric Holcomb, Governor James M. Brown, Director January 9, 2019 This will acknowledge receipt of your revised Work Processes for the Construction Craft Laborer program offered at Hoosier Energy, located in Bedford, Indiana. The State Approving Agency has reviewed the document as listed below: TRAINING PRO GI A I LE, GTI1 DOT CODE Construction. Craft Laborer FACILITY CODE: 30004114 4,000-7800 hours 47-2061.00 To the best of my knowledge Indiana Laborers Training Trust Fund -Apprenticeship does not utilize erroneous or misleading advertisement, either by actual statement, omission, or intimation. It is understood by Indiana Laborers Training Trust Fund -Apprenticeship that they will maintain a complete record' of all advertising utilized by or on behalf of the company in regards to their training programs during the preceding 12 months. The company's advertising will be available for review by any and all future supervisory visits by the SAA, or the U.S. Department of Veteran Affairs. This approval is made pursuant to and under the provisions of Title 38, U. S. Code 3687, with an effective date of January 8, 2019. If you have any questions, please contact me at 317-232-3916. Sincerely, ��- Taniqua Griffin Program Director State Approving Agency CC:VARO/ELR Phone (317)-234-6062 Toll Free (800)-400-4520 Pax (317)-234-8744 e y N CV ! N (0 01 ti N ti r 0 B r D C. i c O O O O O O O O O O O O N O N It 47 CO '' O N O "Cr •Q i 04 0 N O O (Lo '� M U (N^ ¢ d� o, M, cv) N- M LI N M O N oo N N ti M � rn rn rn ry 00 ao n rr e- tl~ CD Pww"a a m O O O N O r l 00 � a d . O r M r s- O O O O ClN 00 xcnmenu.�a� ti O r O 0 N (O co O <P ZXWZ U= ==m =Mmmt lr=== f '0 N O � � � � O r � r � m G. a L N r N (O (P O s~- � Q.(Q CO r z q O O N O O O' O O CD O O N ¢a Y-- .w5wm 7 mEras =7.. � N d N 01 OMp (CO N q o ti N NC r ~ O J J, -J .J ..1 J J J w Bo i W 2m, r"T4 N r } � O 04 c i N� �' N N 1W a?-,. ir'rm' Tam 11S ,xAdrvnv..HYS ✓...l:y,,,p5' Y1YJ�Y, i ac7 i' a 0 O a O o 0 0 0 o Cl o r I CO r fh 10 (D I-- CO u) d �1 a. ro M 1.t 114 00 00 a o u� 0)N CO N . M � C> O N r N C9 LO co p ;'..., ram^ cr— I.p com upaxss�a'4,sp'.'.,wrr,;+wr., r,e.^e«nrre��nr .;mr �r�rsaow,.•i�rm'�r�rw�wwr,�rnaaa,'»scrrwti�r.�.+'r-�s'sv., a.�ra ..A::r.�-c..:;rsw:ees., mrew,v'As.e MAX''., AX''.,.7."�^7i d+�"... f.11w«aFu" a?=. ,?i�.A" „....: .'W'�YR"�nu 1. .f�ti.'.rrr�w�v� a. vM'�.:IP e,'�„�..;:�„mu ql x,. ::w,'nnr'�d"f.r FT r N Q [a o a a N o r oo a � orn co N () <p O CV N r o d C7. LIM-11MIMMWRIM 'LldamMr, . r"I'V " 57MMMAY=MV-W V we I4) 't r h � t- r M [7 m (p a N d O °) N 04 d LO m m O 0:.� O O O N O 0 Y O 0 CV) u. n�._..�.�- �-----•_.. __ ...� .._..._... a ....... _.. -.... � .-..�..� � _ ......, _ �,.. _,..'. � r- O °0 O La N � N cn �. ;2" �y a F1 M 00 d (ND 7 ? N E+ a q`1 r r e- - to � O -j ,� .. , �.V, six . „x Q IS Q Z) co J d N W U P Z uU a a- �Z=7T,q=a " ".. LO 0 N M Q N 0 Q 5 7 c� T O N ch N .o E 8 N 0 O y a 0310512020 17:06 TAX)574 288 5438 P.0011001 i Bf 1316 COUNTY -CITY BUILDINo PHONE 574/ 235-9251 227 W, JrFFERSON BOULE•VAIW FAx 5741235-9171 SOUTH Bono, INDIANA 46601-1830 TDD 574/ 235-5567 CITY OF SOUTH BEND .JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS Date: March 5, 2020 F, r To: All Bidders r' From Linda M. Martin, Clerk, Board of Public Works " r, Subject Addendum Number: 2 Project Name: Eagle Way Sanitary Extension Project Number: 119-095 ACKNOWLEDGEMENT OF RE, CEIPT OF ADDENDUM Date Received: 3 0S 2020 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235--9171. A copy MST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR B11). Note: The attached documents are hereby Add to the Specifications and Contract Documents and become a part of herein. Company: Authorized Signature: Date: 05 2020 0310512020 17:05 (FAH)574 288 5438 P.0011001 0AQ � t c 1316 COUNTY -CITY BUILDING PHONE 227 W, WFF-RSON BOULEVARD FAx SOUTH BEND, INDIANA 46601-1830 TDD CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORDS 574/235-9251 574/235-9171 574/ 235-5567 Date: February 27, 2020 '4 To: All Bidders From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: X Project Name: Eagle Way Sanitary Extension Project Number: 119-095 ACKNOWLEDGEMENT OIL RECEIPT OF ADDENDUM Date Received: 3/05/2020 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171. A copy MUST also be included with your bid package upon submittal, TIDS ADDENDUM MAY AFFECT YOUR BID. Note: The attached documents are hereby Add to the Specifications and Contract Documents and become a part of herein. Company: Authorized Signature: Date: 3/05/2020