HomeMy WebLinkAbout06/1904 Board of Public Works Minutesim
LJOUNRA
June ,1st. 1904.
The Board met in regular session at 10 A. M. All members present.
Bids were opened and referred to the Engineer for tabulation for the following
Pipe Sewers;- N. Lafayette Street Michigan Avenue, and Keasey Street.
Petition filed for Cement Walks on Jackson street frog: Washington .street to
Linden avenue.
Petition f-i4ed for Grede, Curb & Walk on Pulaski street from Division street
to Ford street.
Contract- signed with C. H. DeFrees on South Bend Avenue Trunk Sewer.
Bond of C. H. DeFrees on South Bend Avenue Trunk Sewer filed and approved.
IMPROVEMENT RESOLUTION NO. 1CO.
Resolved by the Board of Public Works of the City of South Bend, Indiana: That
an improvement be made of the kind, size, location and terminal points as follows:
The Paving of Vistula avenue with brick from the East line of Miami street to the
West line of Leer street saiA Improvement shall be known and designated as "Vistula
A venue Brick" and shall be constructed according to the plans and specifications
prepared by the City Civil Engineer, filed herewith. Notice of this resolution and
proposals for bids for the execution of the above work shall be published on the
3rd day of June and on the 10 th day o" June 1904 in the South Bend Daily Times
and the South Bend Daily Tribune. This Board will give a hearing on this resolution
at its office in'the City Hall on the 21st day o f June 1904, at 7:15 P. M. and
will receive bid4up to 10 A. M. on the 25th day of June 1904.
Adopted this 1st day of June 1904.
BOARD OF PUBLIC WORKS.
IMPROVEMENT RESOLUTION 'd0. 191.
Resolved by the Board of Public Works of the City of South Bend, .Indiana: That
an improvement be made of the kind, size, location and terminal points as follows:
The paving of Ohio street with Brick fron the East line of Michigan street
to the West line of Carroll street. Said improvement shall be' known and designates
as the Ohio S treet Brick and shall be constructed according to the planed and
specifications fr®pgred by the City Civil Engineer, .filed herewith. Notice of this
resolution and proposals for bids for the execution of the above work sha 1 be
published on the 3rd day of June and on the 10 th day of June 1904 in the South
Bend Daily Times and the South Bend Daily Tribune. This Board will give a hearing
on this resolution at its office in the City Hall on the 21 day of June 1904 at
7:15 P. M. and will receive bids up to 10 A. M. , on the 25th day of June, 1904.
Adopted this 1st day of June 1904.
BOARD OF PUBLIC WORKS.
775
The Board met in re gular sess ion at 10 A. M. All membe rs present.
-Bond of Sidman & Staple`s < on Leland Avenue filed and approved.
Contract signed with Sidman & Staples. for Leland Avenue•
Plat of Dinan's 2nd Addition filed and approved.
Contracts were awarded for tbo following Pipe Sewers.
Michigan Avenut to L. H..-Webster.
Keasey street to H. DeVos & Co.
N. Lafayette Street to H. DeVos & Co.
Contractor Bond of L. C. Brown filed and approved.
. Vpt I .
President.
76
ur day .June 4th, 1904.
The Board met in regular session at 10 A. M. All members. present.
Bond filed and, c ontract signed wit h Henri DeVos & Co on Keasey street Pipe Sewer.
Bond filed and contract signed with H. DeVos & Co on Lafayette St. Pipe Sewer.
Bond filed and contract signed with L. H. Webster on Michigan Ave. Pipe Sewer.
Bond of L. H. Webster released on Monroe Street. Pipe Sewer.
Engineer filed specifications for Brick pavement on Vistula avenue and Ohio St.
VACATION RESOLUTION N0.28.
Resolved by the Board of Public Works of the City of South Bend, Indiana: That
it is desirable to vacate the following: That protion of Demler street lying
between the North line of Ewing avenue and the South Line of the first alley North
of Ewing avenue and paralell td'it. To effect the uniformity of adjacent plats.
The following property maybe injuriously or beneficially effectedby such
vacation.
Lot 11 in Demleris Survey.
Lot 12 in Demle r' s Surrey.
Notice of this resolution shall be published on the 8th day of June and on the
15th day of June, 1904s in the South Bend Daily Times.
This Board, at its kffice in the City Hall on the .21st day of June, 1904, at
10 A. M. Will hear and receive remonstrances from all persons interested in or
affected by these proceedings,
Adopted this 4th day of June, 1904.
BOARD OF PUBLIC WORKS.
VACATION RESOLUTION NO. 29.
Resolved by the Board of Public 11orks of the City of South Bend, Indiana: That
it is desirable to vacate the following: Part of an alley running North and South
West of Hill street on Lots 12, 13 and 14 Dinan's Second addition to South Bend to
permit the relocation of said alley on the East side of Lot 11 in said Addition.
The following property maybe injuriously or beneficially effected by such
vacation.
Lot 12 and 13 in Dinan' s Second Addition toSouth Bend.
Notice of this resolution shall be published on the 8th day of June and on the
15th day of June, 1904, in the South Bend Daily Times.
This Board, at its office in the City Hall on the 21st day of June 1904 at 10 AM
will hear and receive remonstrances from all persons interested in or affected by
these proceedings.
Adopted this 4th day of June, 1904.
BOARD 0H PUBLIC WORKS.
v 40Xy!/U
President.
14
777
7t
The board met in re gular session at 10 A. M. Mr. McInerny absent.
Bond approved and contract signed with T. IA. BeLure on N. Michigan street and
Notre Dame street walks.
Petition filed for Grade? Curb & Walk on Sixth street from Washington street
to Linden avenue. Referred to Engineer for specifications.
Petition filed by propertyowners on Michigan avenue between Wilber street and
Olive street as -king that Michigan avenue be retained its full width of 100 feet
between said Olive and Wilber streets.
Engineer filed report re.arding the construction of a culvert at the inter-
section of Fox street and Nitwer street. Same was referred to the Board of
Commissioners of St. Joseph County with request for consideration and action.
SPECIAL SESSION AT 7.15 P. M. _
The Board met in special session at 7:15 P. M. Mr. McInerny absent.
Hearing given on assessment. roll and final estimate for Pipe Sever on Catalpa
avenue and Calvert street from Kemble avenue to Ewing--avenu'e. Under Imp Res. 153.
No remonstrances were filed and no remonstrance appeardZd The Board therefore
find that the property assessed is g�benefN4to the amount of assessr.-ents in
said roll, and the Board. accordingly find that the assessment roll filed May 27th, 1901
and the final estimate allowed June 7th, 1904, should be and the sameis hereby
approved and confirmed.
Friday June loth, 19.04•
The Board met in regular session at 10 A. M. All members present.
In the. matter ,of the Howard street cement wakk under Improvement Resolution
No. 1795 Whereas it appears that there in an irregularity in the printed notices
for the receiving of bids under this `resolution, be it resolved that the bids to
be received at 10 a. m. this day be a 11 rejected and be it further resolved that
this board will re -eive b ids icr this work up to 10 a. m. on the 22nd day of
June 1904, and that noticesof this receiving of said b ids shall be published
in the South Bend Daily Times and the. South Bend Daily Tribune on the 11th day of
June and the 18th day of June 1904.
Petition filed for Pipe Sewer and Asphalt Pavement on Robertson street from
Prairie avenue to Chapin street.
Petition filed byOwners of lots fronting on alley east of Michigan street between
Division street and Mayne street _ for Grade & Brick Pavement. Referred to Engineer
for Specifications.
Contractors Bond of Henri DeVos & Co filed and approved.
Bond of Frederick Schafer as Water Works Superintendent filed and approved.
Engineer reported grade on Milton street. Same was approved.
IMPROVE'ENT RESOLUTION N0. 192.
Resolved by the Board of Public Works of the City of South Bend, Indiana: That
an improvement be made of the kind, size, location and terminal points as follows:
Vassar Avenue from Portage avenue to the alley west of Allen street, by grading
the street the full width of the roadway and construction cement curbing and cement
sidewalks on both sides of the street.. Said. Improvement shall be known and
designated as Vassar Avenue €trade, Curb & Talk and .shall be constructed according
to the plans and specifications prepared by the City Civil Engineer, filed herewith.
Notice of this resolution and proposals forbids for the execution of the above work
shall be published on the 13th day of June and on the 20th day of June, 1904, in
the South Bend Daily Times and the South Bend Daily Tribune. This Board will give
a hearin6 on this resolution at its office in the City Hall on the 28tY day of
June, 1904 at 7:15 P. M. and wi,-11 receive bids up to 10 A. M. on the 29th day of
JUne, 1904.�
Adopted this loth day of June, 1904.
BOARD Or PUBLIC WORKS.
Friday June lOths. lyU4.
IMPROVEMENT .RHiSOLUTION NO* 193•
Resolved by the Board of Public Ft'orks of the: City of terminal lepdintsdian as *. That:
an im rove meat be made of the kind, size, location
andlows
South Bend avenue from Eddy street to a point about 80 feet east of Woodworth
a.vneue where the cut runs out. The Work consists .of Grading the street be*ween curbs
to establish grade. Said improvement shall be known and designated as South Bend
avne ue Grade and shall be constructed according to the plan& and specifications prep-
aredby the City Civil Engin.eer, filed herewith.
Notice of this resolution and pro-
posals for for bids for the execution of the above work shall be published on the
13th day of June and on the 2 0th day o f
June , 1004 in the South Bend Daily Times and
the South Bend Deily Tribune. This Board will give a hearing on this resolution at
its office in the City Hall on the 28th day of June 19042 at 7:15 P. M. and will
receive bids up to 10 A. M. onthe 29th day of June . 1904.
Adopted this 10 th day of June 1904. BOARD OF PUBLIC WORKS.
IMPROVEMENT RESOLUTION NO. 194.
Resolved by the Board of Public Works of the.City of South Bend, Indiana: That
3n improvement be made of the kind, size, location and terminalpointsfollows:
)range street from Sadie. street to the alley east of Adams street
t by g
said
t ree t to the a st ail i she d grade and constructing cement s i dewal ks and curbing where nst
already laid. Said improvement shall be known :-nd designated as Orange street, Grade,
.urh & Walk and still be constructed according to the plans and specifications pre-
par6,d. by the City Civil Engineer, filed herewith. Notice of this resolution and
proposals for bids for the execution of the above work shall be piblished on the 13th
and on the 2 Oth day of June, 1904 in the South Bend Daily Times and the South Bend
Daily Tribune. This Board will give a hearin or_ this resolution at its officein
the City Hall on the 28th day of June, 1904, r.
at 7:15 P. M. and wi 1 receive bids
up to 10 A. M. on the 29t h day of June 1904.
Adopted this loth day of June 1904. BOARD OP PUBLIC 1ORKS.
President
ITYB Board metin re4ular session at 10 A. M. All members present.
Petition filed for Cement Sidewalks and Curbing on St. Francis stmet between
LaSalle avenue and Colfax Avenue. Where not already in. Re Terre d to Engineer for
Spe c i f is ati ons .
President.
The Board met in re gular set s i on at 10 A. M. Mr. McI netny absent.
v
Remonstrance filed against Pipe Sewer, Grade and Asphalt Pavement on Robertson
street from Chapin to Prairie avenue.
Petition filed for uniform grade on College street from Washington
street to Linden avenue.
e
f
Sp�+'CIAL SESSION AT 7:15 P. M-
The Board met in Special Session at 7:15 P. M. Mr. Papczynski absent.
Hearing on assessment roll for Pipe Sewer on Portage avenue under Improvement
Resolution- No. 154. claimin
Remonstrances were filed by B. J. Engledrum and Ormand Kennedy, g
their assessments were more tha n the benefits derived therefrom.
Mr. McManis remonstranted stating that he had been
ass e-Rex St
assessed sdPo the avenue
ewer and had tarped same, p(nd that he received no benefits f
rom
Sewer whatever) therefore should not be assessed at 2.11.
Mr. Oliver Peltier remonstranted saying that he had a sewer through his
lot and has paid for sam a as per contract with the City. also asking for rebate.
The Board t IB n postponed the hearing until June 21st at 7 :15 P. M.
and ordered Engineer Hammond to investigate the matter brought up by the remonstrators.
Pre s i dent .
The Board met in regular session at 10 A. M. All memirers present -
All night lamp ordered in at Cor Tutt street and Prairie avenue.
Petition filed for Grade, Curb & Walk on Notre Dame avenue from So. Bend avenue
to Napoleon street. Referred to Engineer for specifications.
Petition filed for grade, Curb
&
WalkonCarlisle
street
etionom Washington
street to Linden avenue. Referred
to
Engineer
Engineer Hammond filed the following report.
Hon. Board of Public Works,
Gentlemen;--
T desire to submit the following brief report with reference to the
construction of a pipe sewer on Van Buren street Cushings addition.
When the Michigan avenue trunk sewer was constructed to Brick Avenue the
drainage district for said sewer extended north to the City imits which at that
time conformed to the North line of Cushings addition as now laid out.
The pItLt of Cushings addition consisted of some very low ground and when the
street grades were fixed throughout the addition, some of the intersections were
from 7 to 7 1/2 feet below the grade of Michigan avenue.
The grade of the trunk sewer as laid is :moo shallow that allowing for proper
fall of pipe sewer extensions, a' depth of from 4 to 6 feet at Van Buren street could
be obtained, insufficient for p oper and efficient sub -drainage.
This depth is based only o he elevation of the sewer invert, the intention
being to have the inverts of t pipe sewer -and trunk sewer coincide, But if we
allow for the filling up at flood time of the trunk sewer to a depth of 6 feet,
the back water would reach to nearly if not quite the street elevation, nullifying
at such seasons the action of the pipe sewer and backing water into cellars.
To afford temporary relief for the low groung in Cushings addit ion, I have
there for to suggest that a pipe sewer be built on Van Buren street from Cushing
street to Howard avenue and that branch pipe sewers be constructed in the street s
in Cushings addition running from VaInBuren street to a point or points near
Michigan avenue, but that sewers be constructed North from Van Buren street to
connect with this sewer.
The plan is to carry this sewerage through the Van Buren street sewer until
the land north of Cushings addition is developed, when. An.outlet sewer can be
built twords Portage avenue, and then the seers at the vest eA& of Cushings
Addition can be connected with the new outlet and relieve the Van Buren street
sewer which by that time would probably, be overtaxed.
By this plan immediate relief can be given the families living in Cushings
Addition and no future expense need be taxed against them as the sewage can be
diverted to other sewers .which will have to be built as the property id developed
toward Portage Avenue -
I have gone into this: matter in same detail for the purpose of showing the
temporary character of the Van Buren street Sewer at its Western end so far ,.s it
acts as an out fall sewer but it will not at any time lose its character of
efficiency as a local sewer.
At the present time the capicity will be nearly sufficient but with paved
streets and more 1complete development of ruff area, the sewer will be overtaxed
and this feature of the design should not be lost sight of.
Respectfully submitted,
A. J. Hammond City Engineer.
With reference to various petitions for sewers in Cushings addition the Engineer
was instructed to adopt a system of sewage for entire Addition.
r,
Ar e i le tn
The Board met in regular session at 10 A. M. All meirb ers present.
Petition filed for Pipe Sewer on Marietta street from Bronson street to
Sample street. Referredto Engineer for specifications.
Petition filed for Sidewalk on North side of E. Madison street from Eddy street
to Park street. Referred to Engineer for _ specifications.
Pre Sri dent .
hM`911� H
Saturday Jere 18th, 19.04.
The Board met in regular session at �0 A. M. All members present.
Bids were opened and referred to the engineer for tabulation for the painting
of the New Cemetery Fence.
Peter Suzio was given an extension of 90 days time on the Fa.ssnacht avenue
Trunk Sewer.
Petition and specifications iiledby Central Union Telephone Company relative to
revised plan of underground wire system. Approved, as to the alley ways mentioned.
Action deferred as to use of streets shown on plan.
The Board having uiader consideration the matter of certain property fences
obstructing the streets .at the S. W. corner of Wilber street and Michigan avenue
Be It Resolved that the owners. of this property be notified by the Chief of Police
to immediately remove said obstruction.
The Board met in regular session at 10 A. M. All members present.
k on Catalpa avenue from Alley N. of Leon
Peti
tion filed for Grade, Curb &wal
Court to S. S. & S. R. R.
Grand Trunk Ry Co given permission ion to move wat chmans house under the dir ec tion
of the Street Commissioner.
under g round system of same. Referred to �,stem of the' South B endngl' FIe ceteri for
Plans and profiles of the
filed together with petition asking adoption
investigation.
John
having under consideration the cesolution Noo]tlt he �ie� nanimously son
The Board nnemnation R
property for perk purposes under CS-
resolved that
the awards- made by the St - Joseph County Circuit Court b e accepted an
said sum to be paid immediately.
All b ids for the painting of the Cemetery Fence were rejected*
Clerk was inst
ructed to pay judgement against Condemnation of Lot 109
Wiltrout s Svb-Division.
Petition ion filed May 10h, 1904 for Pipe SewerOn B irdsell street from Washington
street to Linden avenue. Referred to Engineer for specifications•
Jane
First hearin; on Vacation resolution No. 28 adopted or_ the 4th daEwing avenue
h of Ewi � avenue and parallel to i t .
1904 vacating a part of Demler street nortg between the north line o1 e °
an�a_ the south line of the first alley �.�
No rem onstrances appeared and no remonstrances were filed. board therefor declare
the above described propertyvacated..
��
t,_� C-u "t, ` ati p f an alley a running
First hearin n Vacation Resol tion No.. 29 13cand TA Dinans Second addition to
north and south, west of Hill street on Lots 122
to ermit the relocation of said aley on the East side of Lot 11 in said
South Bend, p
addition.
No remoxst rances appeared and no remonstrance4filed. The Board her�e ore
declare the ove r o perty vacate d/� ah• '�"'
able Board of lic works. V�`U. p"not approved for the follwoing
Te Honor with return plat of August lne
Gentlemen:-- I here g aralle�
reasons. The plat as filed shown the north while as asouth ines matter ofcfactnthey arenot
lines from Wilber street to Johnson street,
staked so on the ground. id out
the Augustine plat is to
M�information from Mr. Kstrai er htthe
line rfrom Wi berastreet to olive street for . the
the effect that he has run a 6
North
h line of Michigan avenue and has made the line of Michigan avenue in the August -
plat conform to this straight line.to
Previous suzireys along Michigan avenue from own an
le at Johnson street in
Stokes, Whitten, Meighan, and also Keller have sl.t compared to all previous
the line o f Michigan Ban avenue and the present AugustineP
e s shown anrirohment into the avenue of some 12 1/2 feet at Jo' neon street
sufff ,
running to nothing at Wilber street. surveys,various which can be reproduced
I ' have not only the records of the round and elines as laid out for the South
but have had the lines checked on the g
Stokes, Whitten, IvIeighan and Keller check very closely
line of Michigan avenue by
and show the an,�mlar deflection at Johnson street. h the ggestion that it
I believe there Fore that the plat should be returned wit.0
be' made to
conform with the existing defined line of Michigan avenue on the oath
and that the North line be 100 feet therefrom and parallel to said ine.
Rds pe ct fullg submitted, e
A. J.. Hammond City Engineer.
st . 1904.
s
SPECIAL SESSION TUESDAY° EVENING AT 7:15 P. M.
The Board met in special session at 7:15 P. I. All members present.
Dell C. Leer asked to have his name taken off the 44 ft. petition and placed
on the 53 ft. petition on the Vistula avenue Brick Pavement.
Petition and remonstrance filed�reGarding Vistula avenue Brick Pavement and
width of said Vistula avenue.
Hearing on Vistula avenue Brick Pavement under Improvement Hesolution,#190
was held and petition and remonstrance as above mentioned was considered. Hearing
continued until Friday, mornin- at 10,A. Y. June 24th, 1904.
Hearing -on Improvement Resolution.for Brick pavement on Ohio street. from
Vichi an abreet to arroll street under Improvement, Resolution No. 1911.
Engineer filed his estimated cost on the Improvement for Ohio St. Brick5,000.
I
In the above matter no remonstrances appeared and no remonstrances were filed
The Board therefore find that the benefits to the property and to the City of
South Bend are equal to the estimated cost of the improvement and that said
Declaratory resolution iss hereby in all thisngs ratified, confirmed and approved.
Final hearing given on the Assessment Roll for Portage Avenue Pipe Sewer
under` Improvement resolution No 154.
In the matter of the above improvement no remonstrances were filed. Ryell T.
Miller appeared and remonstrated in person stating t1at a tap at --lot No.. 48
was wholly unnecessary and that there wereno bene�fits derived therefrom and that he
should be rebated on same. After due --consideration the Board find that the said
assessment roll should b e amended allowing Ryell T. Miller a rebate of $10.00
The Board find that the property assessed and as shown on said amended
assessment roll in each case respectively is b ene f i t to d in the amount of the
assessment, as shown on said roll and that the assessment roll filed May 31st
and the final estimate allowed June 21st, 1904 shouldbe and the same is hereby
in all things ratifi-id, confirmed and approved.
Presi
787�
sday June 22nd3 1904
The Board met in regular session at 10 A. M. All menb ers present.
Contractor Bond of Tom. M. Bauer Filed and Approved.
Bids were opened and referred to the Engineer for tabulation for the Construction
of Cement sidewalks on Howard Street.
President.
788
01
The Board met in regular session at 10 A. M. All members pre sent.
Petition filed for Brick pavement on East Monroe street from Michigan street
to Vistula avenue.
Petition filed for Pipe Sewer on Osborne street from Vistula avenue ' to the
end of Osborne street. Referred to engineer for specificetions.
M. S. Rogers was awarded the contract for Howard street Walks.
The Board adopted a resolution directing that the plans and specifications
adopted for the improvement of Vistula avenue from Miami street to Leer street k,u 0"1 I
be amended so as to provide for a thirty eight (38) foot roadway, in place of
Thirty five (35) feet. as called for.
Bond .of L. H. Webster on the Portage avenue Pipe Sewer and Bartlett street
Pipe Sewer was)released.
Bond of Defrees & Byrer on Brick pavement in alleys South of Jefferson street
was released.
Clerk instructed to advertise for Bids for sewer and water connections on
Ohio street from Michigan atreet to Carroll street, also sewer and water connections
on Vistula avenue from Miami street to Leer street. Bids to be received up to
10 A. I+I!, on the 8t h day of July;- .1904.
Hearing on the confirmation of the resolution for the brick pavement on
Vistula avenue under improvement resolution +190 postponed from June 21st, 1904,
No additional remonstrances were filed and no remonstrators appear`d. The board
find that the plans and specifications adopted for the improvement of _Vistula avenue
from Miami to Leet street under this resolution should be amended so as to provide
for a 38 feet roadway in place of a 35 foot as called for, and said plant and
specifications are now amended to so provide for a 38 foot roadway. And the Board
further findsthat the benefits to the property affected and to the City of South
Bend is equal to the expense of the said improvement and said resolution is in
all things ratified confirmed and approved.
The Engineer filed his estimated cost of the Improvement as follows; -
Vistula avenue Brick pavement --------------- t11718.00
t,0- X�L President.
The Board met in regular session at 10 A. Y. Mr• :.'Papezyngki absent.
The following communication was received from the South Bend Electric Company
Board of Public Works,
South Bend, Ind.
Gentlemen: --
In compliance with your request, we took up with Yr. Carlton, whom we have
employed as. consulting engineer on our undergroung Work, the question of electrolysis
resulting from our proposed work. We enclose you herewith the reply received from fir.
Carlton this morning. Yours very truly,
SOUTH BEND ELECTRIC CO1SPANY.
By F.A. Bryan Sec' y & Gen' 1 I-gr.
South Bend Electric Companyq
Douth Bend, Ind.
Dear Sirs: -
I underartand that in connection with your proposed underground work, the
City authorities have brought up the possibility of electrolytic action on water pipe3
due to your cables. With the system yoa propose to install there can be no danger
from electrolysis. Practically all damage to water and gas pipes from electric
current is due to, current from street railroads and they use direct current and operat
with a ground return. It is necessary to have these two conditions, direct current
and grounded re turn. that there may be danger t o water and gas pi pe s and even wi t h the-
se conditions if the work is properly done, there should be no danger.
You will use alternating current and will not depend on a ground return, and as
I have already stated there can be no danger from electrolysis.
I have had charge of the underground system of the Chicago Edison Company for the
past three years and have been. in touch with the work for ten years and have yet to
hear of a grater pipe damaged by our lines. We nave installed more than 1,000
miles of cable for both -direct and alternating current work.
Yours truly,
W. E. Carlton,
Asst. to Chief Operating Engineer..
Bids were 'opened for
the Construction
of Brick
pavement on Vistula aveme and
Ohio street Brick. Same
were referred to
Engineer
for tabulation.
Plan of the Central Union Telephone Co's underground conduit system filed and
approved.
Coj�-munication sent to the Indiana. Railway company requesting that the wood trolly
poles in the downtown district to be replaced with Iron Poles.
8th. 1904. _
The Board met in regular session at 10 A. fit?. l>11 members present.
Remonstrance filed a= &inst the ,,proposed construction of a Pipe sewer on Marietta
street froV Sample street, to Bronson street.
Petit ion filed for Pipe sewer on S. Main street from Broadway to Indiana -
avenue. Re ferr-e d to Engineer for Investigation.
A
Pet ition fIlea for Pipe Sewer and Eric k Pavement on Robinson street from
Prairie avenue to Chapin street. Referred to Engineer for Specifications.
i
Application of Charles H. McChord filed for watchman an Leeper Park.
Bond of M. S. Rogers, on Howard streetwalks filed and approved.
Contract signed with M. S. Rogers on Howard street wal ks.
Petition filed by Miss Emma Foegley for a change of the manner of assessment
for the Clavert street Pipe Sewer. Petition granted.
Communication received from the Indiana Railway Company regarding the changing
of wood trolly poles to iron poles.
Petition filed by John A. Hibberd for the vacation of a portion of Poster
street. Referred to the Engineer for proper description.
In the matter of a petition from property owners on E. Monroe street frofta
Michigan street to Vistula a e—nue concerning the width of the roadway on said
Monroe street; the following reolution was unanimously adopted.
Resolved that the plan of Monroe street from Michigan street to Vistula avenue
be changed and amended to provide a roadway width of 40 feet and the ,plan of said
street is hereby established with a roadway of 40 feet and, the City Engineer is
hereby authorized and instructed to place curb on said street in accordance with
this resolution.
Contract awarded to James Nelson for paving of Vistula avenue from Mial1i
street to Leer street with Nelsonville 'Elock pavement.
Contract price for this improvement $9952.78.
Contract awarded to Defrees & Beyrer for paving of Ohio street from Michigan
street to Carroll street with Culver Block pavement.
�,�, President.
F-1
SPECIAL STING TUESDAY EVaNINC AT 7:15 P. T!,
The Board ret in regular session at 7 :15 P. M. All members present.
Hearing given on the following Declaretory Resolutionf for the following
str• et improvements Grade, Curb & Walk. on Vassar avenue Grade on South Bend.
avenue and Grade, Curb & Walk on Orange street all under Improvement resolutions Nos.
192, 193; 194 respectively.
The Engineer filed his estimated cost of the improvements as follows: -
Vassar avenue---------- -----$822.00
South Bend Avenue------------ 342.00
Orange street ---------------- 2755.00
In the above matter no remonstrators appeared and no remonstrances were filed
The Board find in each and every case in the said improvements that the benefits t4
the property and to the City of South Bend are equal to the estimated cost of the
improvements and that said Declaratory resolutions are hereby in 'all t rings ratifd,
confirmed and approved.
Wednesday June 29th, 1904.
The Board met in regular session at 10 A. M. All members present.
The following was ordered of xecoxd:--- - - -
It is the sense of the Board of Public Works that the superintendence and care.
of the City Parks are of such importance as to require they entire time and attention
of the Superintendent of Parks.
ORDERED, that J. G. Barker be and he is hereby releived from office as Superi.z-
tendent of parks and from all duties in connection with the Parks of this City, the
same to take effect July 1st, 1904, at 12 o'clock noon.
ORDERED further, that Herman Beyer be and he is hereby appointed Superintendent
of City Parks, this appointment to be in full force and effect from and after July
11 1904, at 12 o'clock noon, and until revoked by the Board of Puy>lic Works.,
The Superintendent of Parks is hereby directed to report to this Board at its
Trda
office in the City Hall on of each week at 10 o'clock A. X. for
consultation and orders.
4
Adopted:, McInerny and Papczynski voting Aye and Nicar Not voting.
Bids were opened and referred to the Engineer for tabulation for Orange street
Grade, Curb & Walk. Vass ar " avenue Grade, Curb & Walk and South Bend Ave Grade,
Plat of the South Side addition filed and approved.
Petition filed by Hastings & Woodworth and E. H. Rush for the opening of Calvert
street. Referred to the Engineer for proNer description.
Petition filed by Davies Laundry company to temporarily occupy a portion of East
Washington street pending repairs upon therir building. Petition granted.
The Engineer, filed assessment roll and final estimate for Pipe Sewer on Marion
Boulevard and Navarree street. Grade Curb & Walk on Hine street Sidewalk on High
Street Pipe Sewer on Keasey street under improvement resolutions Nos 156, 174,
180, 199 respectively.
Resolved, that notices. as to the amount of assessments be published for six
consecutive days in the South Bend Daily Times and the South Bend Daily Tribune
commencing on the 2nd day of July 1904, stating that this Board will give a bearing
on the ::mount of.such assessments .at .its office in the City Hall on the 12th day of
July 1904 at 7:15 P. M.
Resolved further, that the entire work under the above contract be accepted
and approved and .the final estimate thereon allowed. Notice of. this Resolution shall
be published on the 2nd day of July 1904 in the South Bend .Daily Times and the South
Bend Daily Tribune stating that this Board will give a hearing upon the acceptance
of such work at its office in the City Hall on the 12th day of July 1904 at 7:15 P.M
r