Loading...
HomeMy WebLinkAbout04/1902 Board of Public Works MinutesHearing upon the confirmation of Improvement Resolution Noq 47, 48, and 49 for the grading, graveling and corrstruction,of cement curbing on Niles Avenue, Corby street and St. Peter street, respectively. The Engineer filed the estimated costs as follows: For Niles' Avenue, �4548.72, For Corby street, ' 8033.161 For St Peter street, 1822. 26� A rem:nst ranee was filed against all of these improvements. Petitioners and Remonstrators also appeared before the Board and argued the question as to the advisab- ility of making these improvements. The Board find that the benefits, including the benefits to the City, are equal to the estimated cost of the, above improvements in each case. Improvement Resolutions 4748 and 49 are accordingly confirmed. Hearing upon the confirmation of Improvement Resolutions 55, 56 and 57, for the construction -of Pipe sewers upon Dubail and Indiana Avenues and a trunk sewer upon ° Prairie Avenue respectively. The engineer filed the estimat: d costs as follows: l{'or the Dubail Avenue sewer, $ '1841.95 For the Indiana° Avenue sewer, 1861.95 For the Prairie Avenue sewer, $ 14621.34 No remonstrances were filed and no remonstrators appeared against the execution of any of the above improvements. The Board find that the benefits, including; the benefits to* the City are in each case equal to the estimated cost of the improvement. Improvement Resolutions No. 55, 56, and 57 are accordingly confirmed. Hearing upon the confirmation of Improvement Resolutions No. 50, 51, 52, 53 and 54 for the improvement of Sibley Avenue,- College street, Rush street, Diamond Avenue, and Witwer Avenue respectively. The Engineer filed the estimated costs as follows: Sibley Avenue, A91209.20, College street, $1074.50, Rush street, $1945.30, Diamond Ave- nue, _$563.80, Witwer Avenue, $207.00, No remonstrances were filed and no remonstrators appeared against any of the above improvements. The Board find that the' benefits, in- cluding the benefits to the City are equal to the estimated cost of the above improve- ments in each individual case. Improvement Resolutions 50 to 54 inclusive are' according- ly confirmed. hearing on the confirmation of Improvement Resolution No. 58 for the construe- tion of a pipe sewer on Cushing street and Rex street. remonstrators appeared and prote- sted against the construction of this sewer and a remonstrance was filed. The Engineer filed the estimated Cost, dj-34. S4 The board find that the benefits, including the benefits to the City are equal to the estimated cost of the improvement. Improvement 3� r i 1 1. 19 02. 7 15 P. M. Resolution No. 58 is accordingly confirmed.- The vote ,of the Board was as follows, Messrs Hubbard and Leeper in favor of the confirmation and Mr. Goetz against the same. Hearing on Vacation Resolution No. 11 adopteed Ma_--ch 21st 1902. Remonstrators appeared and remonstrances were filed -against this vacation. August Beyers, John Delusej- John Lue sch, Otto Beyrer s, Frank Mauch, argued the matter to the Board, claiming that the proposed vacation would leave no outlet -from Parry to Eddy street for a gra,gt and un- reasonable distance. The Board find that it is not desirable to vacate this alley at present; accordingly Vacation Resolution No. 11 is hereby rescinded. Hearing on Vacation Resolution No, 10 adopted March 14, 1902. Remonstrators appeared and a remonstrance was filed against this proposed vacation on the ground that such action on the part of the City would injure all surrounding property, especially the closing of any part of Hoke street which it .is claimed should in time be extended north to provide an outlet from Roseland Park. The Board find that thi s proposed-'.vacc tion cannot be carried through without irreparable damage to surrounding property, accordingly Vacation Resolution No. 10 should be and hereby is rescinded. President. April 3, 190a. Continuing bond of George-H. Kirkham approved and filed. Clerk instructed to advertise for bids on the 4th and llth days of April 1902< in the South Bend Daily Tribune and Times for the construction of the Cushing street and Rex street sewer under Improvement Resolution No. 58. President. Contracts signed with Le H. Webster for the construction of the E. Colfax Avenue sewer connections and the South Laurel street sewer connections. Also with James Aslin for the Wayne street eater connections and with James Nelson for the Wayne street sewer connections. Also with William Draper for the E. Colfax Avenue water connections. Contracts provide for completion of the work by April 15th and for the tamping of the trenches from bottom to top. Petition filed for cement walks and curbs on Burroughs street from Michigan Avenue to Marion street, also for grading said Burroughs street if necessary. President. April ?� 1902. Application of, Grerge W. Gastil for Janitor of City Hall filed. Petition filed for cement sidewalks and curbs on Sixth street from Washington street to Linden Avenue. Petition filed asking the City to require the construetton of a: v duet .at WIng AVenUO by the Terre Haute and Logansport R. R. Company. President. AAril 8_'1902.. . Bids. opened for the execution of the improvements provided for under Improvement Resolutions Nos. 47 to 58 inclusive. Engineer requested to have the same tabulated. Messrs Robert, Hoban and Roach requested to make the East Colfax Avenue cement curb returns at the St. Louis street intersection to conform to a roadway of 30 feet on St. Louis street. Clerk instructed to readvertise for bids for City Hall furniture and office and vault fixtures. President. April 102 1902.- Contract for Prairie Avenue. sewer under. Improvement Resolution Not.; 57.E awarded to Robprt, Hoban and Roach. Pipe s.ewe-r to. be,' used froin Indiana. -Avenue to Contrast for Dubai1 Avenue sewer, under Improvement Resolution No. 55, awarded to James Ne 1 s on, Contract for Indiana Avenue sewer, under Improvement Resolution No. 56, awarded to Robert, Hoban and Roach. Contrast for Corby -and Sti, Peter street improvements, under Inprovement Res oluti ons Nos. 48&49., awwarded to Roberti Hoban: and Roach... Contract for Niles Avenue improvement, under Improvement Resolution No. 47, awarded to James Nelson. Contracts for Rush street and Diamond Avenue improvements, under Improvement Resolutions Nos. 52 and 53, awarded to Harry N. Barnes. Contract for College street improvement, under Improvement Resolution No. 51, awarded to Hugh Anderson. Contract for Witwer Avenue improvement, under Improvement Resolution No. 54, awarded to R. Z. Snell. Contract for Sibley Avenue improverent, under Improvement Resolution No. 50, awarded to Harry N. Barnes. Clerk instructed to insert in the cement work contracts a time limit of 90 days; on the Prairie Avenue sewer, until August 15th 1902; on the Indiana and Dubail Avenue sewers, 90 days; on the Niles Avenue., Corby street and St. Peter street improvements, until September lst, 1902. President. April, 11 1902 Contract for the Laurel street water connections awarded to Wm.D canes. Work to. ,be completed-b.,- Apri1. -2.0th and trenches to be tamped from bottom to top. Prices 12.75 on east side and A10.50 on west side. Clerk instructed to readverti.s.e for bids for gas and electric fixtures for the city hall. Bids -to be received on April 28th) 1902 and to be on same condition as bids for city hall furniture Contract signed with Robert, Hoban and Roach for the Prairie Avenue trunk sewer, under improvement Resolution No"'57; also for Corby streets St • Peter street and Indi'wia Avenue improvements, under Improvement Resolutions dos•' �7, 4&,and 60 respectively-- '� . 14Z President. ®pril, 17. 1902• The following contracts fo3: street improvements were signed: Hugh Anderson, under Improvement Resolution No- 51; James Nelsons under Improvement Resolutions No- 55; - and 47; Harry No Barnes; under Improvement Resolutions Nos- 50.52 and 53- Petition received from Mayne street property owners to change the contract for paving said street from concrete and cement to gravel and sand- Referred to engineer to ascertain whether or not every property owner had signed same. Petition filed for grading, curbing and walkk on Linden street from Johnson to Grant streets. Petition filed for cement sidewalks on Johnson street from Washington to Linden streets - Petition of Henry Dean for the removal of a pole of the South Bend Home Tele- phone Co - ,referred to the Street Commissioner for a report. Plat of Swygatt's Second. Addition to South Bend presented for acceptance and referred to the Engineer for advice - AD President. Petition for an electric light at Corner of Perley and S• Michigan streets referred to street, commissioner for a report. Engineer repotted a grade for Van Buren street from A street to E• street - Sane was adopted and filed - Engineer reported drawings and specifications for the E. Bronson street, the S. ;prances street, and the W- Monroe street sewers - IMPROVEMENT RESOLUTION NO • 59 • Resolved by the Board of Public Works of the City of South Bend, ,Indiana: That an improvement be made of the kind, size, location and terminal points as follows: The construction of a pipe serer on East Bronson street from the sewer on St. Joseph street to the alley east of St- Joseph street. Said improvement shall be known and designated as "E• Bronson .Street Sewer" and shall be constructed according to the plans and specifica— tions prepared by the City Civil Engineer, filed herewith- Notice of this resolution and proposals for bids for the execution of the above work shall be published on the 19 day of April and on the 26 day of April 1902, in the South Bend Daily Tribune and in the South Bend Daily Times• This Board will give a hearino, on this resolution at its office in the City Hall on the 29 day of April at 7:15 P• 111. and will receive bids up to 10 A. M• on the 12 day of May 1902 IMPROVE frIENT RESOLUTION NO- 60- Resolved by the Board of Public Works of the City of South Bend, Indiana: That an improvement be made of the kind, size, location and terminal points as follow::: The construction of a pipe sewer on Trances street from Jefferson street to Wayne street- Sa Said improvement- shell be known and 'designated as "Prances Street Sewer" and shall be constructed according to the plans and specifications preparers by the City Civil Engineer, filed herewith- Notice of this resolution and proposals for bids for the execution of t the above work shall be published on the 19 day of April and on the 26 day of April 1902, in the Sou.tT-i Bend Daily Tribune and in the South Bend Daily Times • This Board will give a hearing on this resolution at its office in the City Hall on the 29 day of April 1902, at 7:15 P• 4- and will receive bids up to 10 A. PSI• on the 12 day of May 1902- IMPROVEIENT RESOLUTIONI NO • 61 - Resolved by the Board of Public Works of the City of South Bend, Indiana: That an improvement be made 'of tl�e kind, size, location and terminal points as follows: The construction of a pipe sewer on W • Monroe street from Chapin street to Scott street • Said improvement shall be known and designated as "W • Monroe Street Sewer" and shall be con strutted according to the plans and specifications prepared by the City Civil Engineer, filed herewith- Notice of this resolution and proposals for bids for the execution of the above work shall ice published on the 19 day of April and on the 26 clay or h�):_-is 1902, in the South Bend Dail;; Tribune and in the Sou.ti. Bend Daily Times- Th-s Board will give a hearing on this resolution at its -office in the City Hall on the 29 day of April 1902, at 7:15 P. M- and will receive bids up to 10 A. M- on the 12 day of May 1902• 0 April 18. 1942- Assessment rolls and final estimates filed for the following improvements: Eddy street brick pavement, under Improvement Resolution No. 44; the serer connections on East Colfax Avenue between Sycamore and Eddy streets; the water connections on Eddy street between°Washington street and Colfax Avenue; the sewer and water connections on Wayne street between Michigan and Taylor streets-: ah.d• on Laurel street between Division and Washington streets* Resolved that notices as to amount of assessments be published in the South Bend Daily Times and in the South Bend Daily Tribune for six successive days be ;in— ing on the 21st day of April 19.02, stating that this Board will give a hearing as to the amount of assessments on the 29th day of April 1902 at 7:15 P. M. Resolved further that the entire work under the above -contracts be accepted and approved and the final estimates therefor 'allowed- Notice of this resolution shall be published in the South Bend Daily Tr ibtue and in the -South Bend Daily Times on the 19 day of April 1902 stating that this Board will give a hearing on this ,resolut ion on the 29th day of April 1902 at 7:15 P. M. { Engineer re oprted drawings and specifications for grading south Eddy street from the righ -t of way of the Grand Trunk Western Ry• to 'the east end of the Sample street bridge, also for grading Mishawaka street from Eddy street to a point 500 feet east of the east line of Eddy street. IMPROVEINAT-,NT RESOLUTTON NO • 62 - Resolved by the Board bf Public Works of the City of South Bend, Indiana: That an -improvement be made of the kind, size., location and terminal points as follows: The grading of south Eddy street from the right of way of the Grand Trunk Western Ry• to the east end of the Sample street bridge; also the grading of Mishawaka street from Eddy st,_,c: street to a point 500 feet east of the east line of Eddy street- Said improvement shall be known and designated as"Eddy and Mishawaka Streets"Grading"and shall be constructed according to the plans and. specifications prepared by the City Civil Engineer, filed here- with- Notice of this resolution and proposals for bids for the execution of the above work shall be published on the 19 day of April and on the 26 -day of April 1902� in the South Bend Daily Tribune and in the 'South Bend Daily Times- This Board will give a hear— ing on this resolution at its office in the City Hall on the 13th day of May 1902, at 7:15 P• M• and will receive bids up to 10 A• M• on the 20 day of May 1902• President - Clerk instructed to give Adolph Wuth cemetery deed for Lot 434 Block 1, Range 3 West, upon his surrender of deed to lot 433 Block 1, Range 3 West - Street Comissioner requested to investigate the graveling of West Division street by the Grand Trunk Western Ry • and report on the condition of same - In regard to change in specifications for paving; Wayne street the Engineer reported that the following property owners had not signed the petition: Emma S- Dean, Male t s A • Roe Nettie C • Chandon&is Emma E • Hackney, Robin E • Dunbar • The Board decided to allow one week for petitions to secure the balance of signatures of property owners - Street Commissioner reported that the following change in electric lights should be made: the first lamp south Of Elmira€:street should be put at Milton Avenue and a light should be placed at the intersection of Micnigan and Donald streets - Engineer requested to investigate Sunnyside Avenue and ascertain whether the relocation of the same 50 feet east would correspond to streets north of Sunnys ide - Permission granted to James Oliver to connect Oliver Motel power house with - his residence by underground ducts for carrying steam pipes - Pre s ident • --- 286. April_ '221,. 1-902 Contract for Cushing and Rex streets sewer under Improvement Resolution 11'64 58 awarded to Robert, Hoban and Roach' - Petition for electric damps at corner of Kenwood Ave and 14'remont street and at corner of Linden Ave • and Meade street referred to street conxiissioner for advice- - Aor i 1 25. 19 02 ' Water Works clerk requested to advertise for bids for furnishing coal for the City Water. Works from June lst, 1902 to. June 1st 1903, bids to be received up to 6 P• M- on May 21st, 1902- Representatives of local labor unions granted permission to use Howard Park on Saturday evening April 26th for an open air meeting - Engineer requested to prepare drawings and specifications for pipe sewers on E- LaSalleI Avenue to complete the sewer ing of that Avenue; also for the cutting down of the E. LaSalle Avenue hill at the Frances street intersection; also the grading of Notre Dame street from Madison street to the 1st alley south of LaSalle Avenue • Engineer reported drawings and specifications for the improvement of mellows Dayton street, and Harrison Avenue - street, Van Buren street, In regard to the change of specifications for the°Wayne street brick pavement, the board and the city engineer and a number of interested property owners went over the street and. investigated the condition of the foundation- It was decided by the Board not to interfere with the contract and specifications as originally drawn up- The clerk was requested to notify the contractor to proceed with the contract without further delay. IMPROVEMENT RESOLUTION NO. 63• Resolved by the Board of Public Works of the City Of South Bend, Indiana: That an improvement be made of the kind, size, location and terminal points as follows: The grading of Harrison Avenue and the construction of cement walks and curbs on said avenue from Michigan Avenue to 2uerbringer street • Said improvement shall be known and designat- ed as"Harrison Avenue" and shall be constructed according to the plans and specifications prepared by the City Civil Engineer, filed herewith- Notice of th6s resolution and pro- posals for bids for the execution of the above work shall be published on the 26 day of April and onithe 3 day of May 1902, in the South Bend Daily Trinune and in the South Bend Daily Times- This Board will give a hearing on this resolution at its office in the City Hall on the 13 day of May 1902, at 7:15 P• M- and will receive bids up to 10 A• M- on the 20 day of Vlay 19 02 - 9 '9 Apr i 1 25,, 19112 . ITIPROVEMENT RESOLUTION NO • 64 Resolved by the Board of Public Works of the City of South Bend,.. Indiana.: That an improvement be made of the kind, size, location and terminal points as follows: The grading of Van -Buren street from A street to E street and the construction of cement walks and curbs within said lerminal points- Said improvement shall be known and designated as "Van Buren Street" and shall be constructed according to the plans and"specifications pre- pared by the City Civil Engineer, filed herewith- Notice of this resolution and proposals for bids for the execution of the above work shall be published on the 26 day,of April and on the 3 day of May 1902, in the South Bend Daily Tribune and in the South Bend Daily Times- This Board will give a hearing on this resolution at its office in the City Ball on the 13 day of May 1902, at 7:15 P. M•` and will receive bids up to 10 A. M. on the 20 day of May 1902 - IMPROVEMENT RESOLUTION NO.•.65- Resolved by the Board of Public Works of the City of South Bend, Indiana: That an improvement be made of the kind, size, location and terminal points as follows: The grading of Dayton street and the construction of cement walks and curbs on said street fr from Michian street to Fellows street- Said improvement shall be known and designated as "Dayton street" and shall be constructed according to the plans and specifications prepared by the City Civil Engineer, filed herewith- Notice of this resolution and pro- posals for bids for the execution of the above work shall be published on the 26 day of April and on the 3 day of May 1902, in the South Bend Daily Tribune and in. the South Bend Daily Times- This Board will give a hearing on this resolution at its office in the City Hall on the 13 day of May 1902,` at 7:15 P• M+ and will receive bids up to 10 A• M• on` the 20 day of May 1902 - IMPROVEMENT RESOLUTION NO. 66- Resolved by the Board of Public Works of the City of South Bend, Indiana: That— an improvement be made of the kind, size, location and terminal points as follows: Trae grading of Fellows street and the construction of cement curbs from the Grand Trunk West-- ern tracks to Monroe street- Said improvement shall be known and designated as".,i'ellows Street" and shall be constructed according; to the plans and specifications prepared by the City Civil Engineers filed herewith- Notice of this resolution and proposals for bids for the execution of the above work shall be published on the 26 day of April and on the 3 day of May 1902, in the South Bend Daily Tribune and in the South Bend Daily Times - This Board will give a hearing on this resolution at its office in the City Hall on the 13 day of May 1902, ay 7:15 P• M- and will receive bids up to 10 A• M• on the 20 day of May 1902•. � f `President• _ Contract signed with R. Z. Snell for the witwe-r Avenue improvement, under Improvement Resolution No`• 54 Petition filed for 'prick paving of the lst alley south of Washington street between Michigan and St • Joseph streets' - Bids opened for the gas and electric fixtures for the city hall- Same were as follows : South Bend Electric Company- $1776.00 George Wheelock and . Company • 1775 -00 Electric Construction Company•$1648.00 South Bend Yuel and Gas Co. 1550.00 President- April 29 1902- Petition filed .for the extension of Hoke street from its present terminal north to.Vistula Avenue Referred to Engineer to ascertain what property must be taken for such extension - George Wheekock & Co• awarded the contract for the City Hall gas and electrie- fixtures• Contract price $1775•00 Pre s ident • i1 29. 1902,4 7:15a P• Me Hearing on the Bronson street sewer the li"rances= street sewer and, the Monroe street sewer under Improvement Resolutions Nos- 59, 60 and 61 respectively- No remonstra- tors appeared and no remonstrances were filed against any of these improvements* The engineer filed the estimated costs as follows: For the Bronson strut se;,fer, �r,385•80; for the trances street sewer. 634.54; and for the Monroe street sewer, . 681.75 The Board find that the benefits, including the benefits to the City are equal to the estimated cost of the improvements in each case* Improvement Resolutions Nos- 59, 60 and 61 are accordingly confirmed - 'Contract signed with Robert, Hoban and Roach for the Cushing and Rex streets sewer under Improvement Resolution No • 58 - Hearing on the assessment rolls and final estimates for the following improve - rents: The Eddy street brick pavement, under Improvement Resolution.No• 44, the sewer and water connections on West Wayne street and on South Laurel st re a t. the sewer connec- tions on East Colfax Avenue, and the water connections on Eddy street- No remonstrances were filed and no remonstrators appeared- The assessment rolls for the above improve- ments, filed on April 18th9 19023, and the final estimates, allowed on April 18th) 19022 are accordingly confirmed - Ten year guarentee bond of C• H• Defrees for the Eddy street brick pavement, under Improvement Resolution No- 44 approved and filed- Contract bond on the same imp- rovement released - Street Commissioner requested to examine the cement walk at No- 126 Kendall street and report defects and ascertain if possible cause of same - Pre sident•