Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Amendment No 2 to Agreement for Engineering Services for US 20 Water Main Extension to South Bend Chocolate Company Site – A & Z Engineering, LLC.
1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND. INDIANA 46601-1 930 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS February 11, 2020 Mr. Jamal Anabtawi, P.E. A & Z Engineering, LLC. 1220 Ruston Pass Fort Wayne, Indiana 46825 RE: Amendment No. 2 to Agreement Dear Mr. Anabtawi: PHONE 574/235-9251 FAX 574/235-9171 The Board of Public Works, at its meeting held on February 11, 2020, approved the above referenced agreement for engineering services for the US 20 water main extension to South Bend Chocolate Company site in the amount of $20,200 with a new total of $127,600. Enclosed please find a copy of the agreement for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT ELVABETH A. MARADIK THERESE J. DORAU JORDAN V. GATHERS JOSEPH R. MOLNAR This is EXHIBIT K, consisting of 2 pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated 12/21, 2017. AMENDMENT TO OWNER -ENGINEER AGREEMENT Amendment No. 2 1. Background Data. - a. Effective Date of Owner -Engineer Agreement: December 21„ 2017 b. Owner: City of South Bend Engineer: A&Z En aincerin', LLC d. Project: Airport Annexation Area Surve 2. Description of Modifications: EXHIBIT A — Engineer's Services PART 2 — ADDITIONAL SERVICES A2.01 Additonal Services Requiring Owner's Written Authorization A. If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional Services of the type listed below. 27. Watermain alignment cost study, layout and design along US 20 Bus. (Lincoln Hwy) Corridor west of US 31/US 20 Interchange to Pine Road in City of South Bend, IN. See Exhibit No. 1 EXHIBIT B — Owner's Responsibilities S. Complete agency fee and bond waiver forms and pay associated permit fees,. EXHIBIT C ARTICLE 2 — OWNER'S RESPONSIBILITIES C2.01 Compensation for Basic Services (other than Resident Project Representative) - Lump Sum Method of Payment A. Owner shall pay Engineer... Representative, if any, as follows: -a�wwmM- Page 1 (Exhibit K— (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. 1. A Lump Sum amount of 127,600 based on the following estimated distribution of compensation: j. Potholing item was non -performed in Amendment no. 1 and credited towards Amendment no. 2 k. Watermain alignment cost study, layout and design plans Break-up of item k as under, i. Alterrnate cost study of two alignments $2,250 ii. Preliminary Design Phase and City review $10,500 iii.Final Design Phase including Rule5 & Indot Permits and City review $13,900 iv Bidding and Negotiating Phase $3,350 9 800 $30,000 B. Period of Service: The compensation amount stipulated in Compensation Packet BC-1 is conditioned on a period of service not exceeding 6 months. If such period of service is extended, the compensation amount for Engineer's services shall be appropriately adjusted. Agreement Summary a. Original Agreement amount: $53,850 b. Net change for prior amendments: $53,550 c. This amendment amount: $20,200 d. Adjusted Agreement amount: $127,600 The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in Exhibit C. Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is C611d/01ia.�i City of South Bend, IN Board of Public Works ENGINEER: A&Z Engineering, LLC By:�r+ �.n .. rage c (Exhibit K— (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. Q MITER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF UTILITIES TO: Board of Public Works Members FROM: Jacob M. Klosinski, P.E. Assistant City Engineer SUBJECT: Agenda Request — Amendment to Professional Services Agreement A&Z Engineering, LLC DATE: February 3, 2020 M The Division of Engineering and requests the Board of Public Works approval of Amendment No. 2 to a Professional Services Agreement with A&Z Engineering, LLC to provide additional Professional Engineering services for the design of a water main extension to service the South Bend Chocolate Company site on US 20. Background The City of South Bend is engaged in a Water and Sewer Agreement with South Bend Chocolate Company to supply water and sanitary sewer utility extensions to recently annexed land on US 20 between Olive Road and the US 20 / US 31 Interchange. Sanitary sewer was constructed in 2019. A&Z Engineering will provide water main routing alternatives assessment and detailed design plans and specifications. Routing for the water main is being considered underneath US 20 near Olive Road, and alternately, a second route is being considered from Pine Road. The funding source for this contract is being reviewed. Funding is anticipated out of the TIF-River West — Airport (324-1050-460-31-02) or Other Accounts to be determined by the Department of Community Investment and Public Works. If there are any questions, please contact Jacob M. Klosinski (574) 235-9496 at the Division of Engineering. BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date February 4 2020 Department Name Jacob M. Klosinski En inccrin /Utilities BPW Date Februwar l l (! Phone Extension Ext. 9496 Diversity Compliance ® Officer Name and Inclusion Officer BPW Attorney Attorney Name Dept. Attorney Z Attorney Name Purchasing ® Michael Schmidt ❑ Professional Services Agreement ❑ Contract Michael Patton Clara McDaniels Clara McDaniels Open Market Contract ® Amendment/Addendum El Bid Opening ❑ Bid Award Quote Opening ❑ Quote Award Proposal Opening F-1 C/O & PCA No. [] Chg. Order, No. F] Traffic Control n Other: Company or Vendor Name A&Z Engineering, LLC New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Amount of ❑ Previous Amount Current Percent of Change: New Amount Total Percent of Change: Time Extension Amount: LJ Proposal ❑ Special Purchase, QPA ❑ Req. to Advertise ❑ Reject Bids/Quotes E] PCA Resolution Ease./Encroach U Yes U If Yes, Approved by Purchasing PAN ❑ Title Sheel ❑ WBE Completed E-Verify Form Attached Nos US 2.............. .... TBD TII River West A,,zport or Other Accounts (to be determined) 324-1050-460-31-02 or Other Accounts to be determined __.-.................-.-._._____ $20,200.00 (Increases Total Contract to $127,600.00) Lump Sum The Division of Engineering requests the Board of Public Works a rpp oval i the Amendment No. 2 to a Professional Services A reement with A&Z Engineering for additional engineering services to desi n a water main Increase $ Decrease ($ ............. ....._......................................................... .. Increase % C.....................__.__._._______ Decrease _IT%._ Increase % _...._...._._. .................................... Decrease ( /o New Completion Date: