Loading...
HomeMy WebLinkAboutTent Permit ApplicationTEMPORARY TENT /TRAILER/ ACCESSORY APPLICATION CITY OF SOUTH BEND I BUILDING DEPARTMENT TEMPORARY TENT/TRAILER/ACCESSORY PERMIT CHECKLIST D 1. Completed Application {IF APPLYING FOR MULTIPLE TENTS/TRAILERS SUBMIT A SEPARATE APPLICATION FOR EACH STRUCTURE) D 2. Site plan showing:D a. ALL property dimensions D b. size and location of ALL existing structures D c. parking spaces AND their dimensions after installation of proposed tent/trailers; D d. parking calculation D e. location of septic system{s) and well{s) {if applicable) D f. size and location of ALL proposed tents/trailers D g. setbacks of all proposed tents/trailers from property lines, existing buildings, well and septic systems; D h. if parcel is under 3 acres, it must be drawn to scale D 3. Special use/exception and/or variance approvals if applicableD 4. All applicable contractors involved in the project-building, electrical, plumbing, and HVAC. {on application form)□5. Application fee **SEE FEE SCHEDULE FOR APPLICABLE PERMIT FEES USEFUL LINKS ✓Zoning Map southbendin.gov/ZONING APPLICANT INFORMATION PROPERTY OWNER: PHONE: ADDRESS: APPLICANT: PHONE: ADDRESS: Address Address PROPERTY INFORMATION ADDRESS: Address ZONING: Zoning Page 11 of 2 IDATE: EMAIL: City State ORG/BUSINESS: EMAIL: City State Zip Zip City Zip VARIANCE, SPECIAL USE/EXCEPTION APPROVAL {IF APPLICABLE) Township Approval Date TEMPORARY TENT/TRAILER/ACCESSORY APPLICATION CITY OF SOUTH BEND I BUILDING DEPARTMENT FLOODPLAIN: Yes No WETLANDS: Yes No PROJECT INFORMATION PERMIT TYPE RENEWAL 5 START DATE END DATE TOTAL DAYS IN USE "seasonal retail sales uses shall nat exceed forty-five {45} consecutive days per occurrence nor o total of one-hundred ond twenty {120) days during ony calendar year"§ 21-03.ll{b}{6)(E}, and§ 154.071{F)(5). In this case each 45 day or part thereof will be charged a separate permit fee. STRUCTURE TYPE & PURPOSE PARKING TENT TRAILER oTHER Parking spaces taken by temporary structure Additional parking spaces provided for temporary use PURPOSE/USE Parking calculation required on site plan if additional parking is NOT being provided OR spaces for existing uses are being used by temporary structure(s). Minimum of 3 parking spaces must be dedicated to each temporary structure. EXISTING STRUCTURES: SET BACKS: CONTRACTORS Primary Structure (sq/ft) Accessory Buildings (sq/ft) Other (sq/ft) Front Lot Line (ft) Side Lot line (ft) Side Lot line (ft) Rear lot line (ft) All contractors must be licensed and/or registered with our department. For more information on this go to http://www.southbendin.qov/qovernment/content/contractor-licenses-O BUILDING: ___________ (REQUIRED ON THIS APPLICATION} •The property owner is allowed to list themselves as the contractor. ELECTRICAL: PLUMBING: HVAC/AC: OTHER: ___________ (NOT REQUIRED UNTIL APPLICATION FOR ELECTRICAL PERMIT) ___________ (NOT REQUIRED UNTIL APPLICATION FOR PLUMBING PERMIT) ___________ (NOT REQUIRED UNTIL APPLICATION FOR HVAC/AC PERMIT} ____________ (NOT REQUIRED UNTIL APPLICATION FOR APPLICABLE PERMIT) •Electrical, HVAC ond plumbing work needs to be done by contractors licensed and/or registered with our department. I certify the above to be a true and accurate to the best of my knowledge. Page j 2 of 2 Other (ft) NEW ______________________________ Signature _______ Date