HomeMy WebLinkAboutTent Permit ApplicationTEMPORARY TENT /TRAILER/ ACCESSORY APPLICATION
CITY OF SOUTH BEND I BUILDING DEPARTMENT
TEMPORARY TENT/TRAILER/ACCESSORY PERMIT CHECKLIST D 1. Completed Application
{IF APPLYING FOR MULTIPLE TENTS/TRAILERS SUBMIT A SEPARATE APPLICATION FOR EACH STRUCTURE) D 2. Site plan showing:D a. ALL property dimensions D b. size and location of ALL existing structures D c. parking spaces AND their dimensions after installation of proposed tent/trailers; D d. parking calculation D e. location of septic system{s) and well{s) {if applicable) D f. size and location of ALL proposed tents/trailers D g. setbacks of all proposed tents/trailers from property lines, existing buildings, well and septic systems; D h. if parcel is under 3 acres, it must be drawn to scale
D 3. Special use/exception and/or variance approvals if applicableD 4. All applicable contractors involved in the project-building, electrical, plumbing, and HVAC. {on application form)□5. Application fee **SEE FEE SCHEDULE FOR APPLICABLE PERMIT FEES
USEFUL LINKS
✓Zoning Map southbendin.gov/ZONING
APPLICANT INFORMATION
PROPERTY
OWNER:
PHONE:
ADDRESS:
APPLICANT:
PHONE:
ADDRESS:
Address
Address
PROPERTY INFORMATION
ADDRESS:
Address
ZONING:
Zoning
Page 11 of 2
IDATE:
EMAIL:
City State
ORG/BUSINESS:
EMAIL:
City State
Zip
Zip
City Zip
VARIANCE, SPECIAL USE/EXCEPTION
APPROVAL {IF APPLICABLE)
Township
Approval Date
TEMPORARY TENT/TRAILER/ACCESSORY APPLICATION CITY OF SOUTH BEND I BUILDING DEPARTMENT
FLOODPLAIN: Yes No WETLANDS: Yes No
PROJECT INFORMATION
PERMIT TYPE RENEWAL 5 START DATE END DATE TOTAL DAYS IN USE
"seasonal retail sales uses shall nat exceed forty-five {45} consecutive days per occurrence nor o total of one-hundred ond twenty {120) days during ony
calendar year"§ 21-03.ll{b}{6)(E}, and§ 154.071{F)(5). In this case each 45 day or part thereof will be charged a separate permit fee.
STRUCTURE TYPE &
PURPOSE
PARKING
TENT TRAILER oTHER
Parking spaces taken by temporary structure Additional parking spaces provided for temporary use
PURPOSE/USE
Parking calculation required on site plan if additional parking is NOT being provided OR spaces for existing uses are being used by temporary structure(s).
Minimum of 3 parking spaces must be dedicated to each temporary structure.
EXISTING
STRUCTURES:
SET BACKS:
CONTRACTORS
Primary Structure (sq/ft) Accessory Buildings (sq/ft) Other (sq/ft)
Front Lot Line (ft) Side Lot line (ft) Side Lot line (ft) Rear lot line (ft)
All contractors must be licensed and/or registered with our department. For more information on this go to
http://www.southbendin.qov/qovernment/content/contractor-licenses-O
BUILDING: ___________ (REQUIRED ON THIS APPLICATION}
•The property owner is allowed to list themselves as the contractor.
ELECTRICAL:
PLUMBING:
HVAC/AC:
OTHER:
___________ (NOT REQUIRED UNTIL APPLICATION FOR ELECTRICAL PERMIT)
___________ (NOT REQUIRED UNTIL APPLICATION FOR PLUMBING PERMIT)
___________ (NOT REQUIRED UNTIL APPLICATION FOR HVAC/AC PERMIT}
____________ (NOT REQUIRED UNTIL APPLICATION FOR APPLICABLE PERMIT)
•Electrical, HVAC ond plumbing work needs to be done by contractors licensed and/or registered with our department.
I certify the above to be a true and accurate to the best of my knowledge.
Page j 2 of 2
Other (ft)
NEW
______________________________
Signature
_______
Date