My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Main Street Culvert Inlet – Project No. 120-016 - Selge Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Main Street Culvert Inlet – Project No. 120-016 - Selge Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:50:21 AM
Creation date
1/15/2020 10:02:29 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT NAME: Main Street Culvert Inlet <br />PROJECT NO. 120-016 <br />QUOTES DUE January 14,m2020, 9:30 a.m., Local Time <br />(Must be completed for all quotes. Please type or print) <br />Date: 1/14/2020 Firm: Selge Construction Co., Inc. <br />2833 S. 11 th Street <br />. .�......_ -.. _ ...._. <br />Address: eet <br />City/State/Zip: Niles, MI 49120 Telephone Number: (269 684-0842 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices <br />of given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public project <br />Main. Street Culvert Inlet <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The Cityof South Bend. of Public Works <br />..._........... <br />and dated January 2020 for the sum of (enter the Total Quote as shown on the Proposal) <br />s ($12, 500.00 <br />(Enter Sum of Total Quote shown on Proposal) <br />Twelve Thousand Five Hundred Dollars & Zero Cent ) <br />(Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />The above quote is accepted this <br />Subject to the following conditions; <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />Therese J. Dorau, Member <br />By . <br />(Signature) <br />tinted game of Person Signing) <br />ACCEPTANCE <br />day of 20 <br />Jordan Gathers, Member <br />Attest: Linda M. Martin, Clerk <br />Version 4/2/2019 Page - 7 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.