Loading...
HomeMy WebLinkAboutRM 02-06-76Februz 10:00 Presic 1. SOUTH BEND REDEVELOPMENT COMMISSION REGULAR MEETING ry 6, 1976 A. M. ing Officer: Mr. F. Jay Nimtz, President L CALL 1200 County -City Building 227 W. Jefferson Boulevard South Bend, Indiana 46601 missioners Mr. F. Jay Nimtz, President sent: Mr. Donald A. Wiggins, Vice President Mr. Lloyd E. Robinson, Sr., Member missioners Mr. A. Peter Donaldson, Secretary ent: Mr. Robert J. Cira, Assistant Secretary Le al Counsel: Mr. Kevin J. Butler Mr. George T. Patton N Media: Ms. Mr. Mr. Mr. Mr. Mr. Mr. Others Present: unity to ment f: LPA Staff: Jeanne Derbeck, South Bend Tribune Reporter Lou Tutino, WNDU -TV Reporter James L. Marchelewicz, WNDU -TV Photographer Dan Caesar, WSBT -TV Reporter Frank Vellner, WSBT -TV Photographer Larry Ford, WSJV -TV Reporter Les Howard, WSJV -TV Photographer Mr. Frank J. Alford, Director, Equal Employment Opportunity Mr. Allan C. Bloomquist, First Bank & Trust Company Mr. Ronald Bock, Chamber of Commerce, Inc. Mr. Gene Evans, Executive Secretary, Civic Planning Assn. Mr. Hubert Getzinger, Chairman, Downtown South Bend Council Mr. John R. Kagel, Executive Director, Downtown South Bend Council Mr. Harrison Miller, Interested Citizen Mr. Doug Simpson, Director, River Bend Plaza Office Mr. Keith P. Crighton Mr. James L. Johnson, Jr. Mr. C. Wayne Brownell Ms. Helen S. King - 1 - Mr. Edwin R. Bauer Mr. William J. Parrish 2. APPROVAL OF MINUTES Motion was made by Mr. Wiggins, seconded by Mr. Robinson and MINUTES ca ried, for the approval of the Minutes of the Regular Meeting APPROVED of January 16, 1976, as mailed and /or distributed. 3. APPROVAL OF CLAIMS Motion was made by Mr. Wiggins, seconded by Mr. Robinson and CLAIMS carried, that the claims be approved, as submitted, and they be APPROVED allowed and ordered to be paid -- totalling $56,305.42. The author- ized claims are: PRbJECT EXPENDITURES ACCOUNT R -57 Abstract & Title Corporation $ 52.50 South Bend Exterminating Company 30.00 Total 82.50 PROJECT EXPENDITURES ACCOUNT R -66 Abstract Company of St. Joseph County $ 85.50 Indiana & Michigan Electric Company 7.23 Indiana & Michigan Electric Company 149.12 Nautilus Construction Company, (Colfax /Pier Park Dredging Contract No. 1) 2,050.40 Nautilus Construction Company, (Plaza Park Contract No. 1) 13,507.26 Real Estate Research Corporation 2,610.95 Edward J. White, Inc. 30.00 Total 18,440.46 REDEVELOPMENT REVOLVING FUND Payroll: January 10 through January 23, 1976 $ 6,131.58 C. Wayne Brownell 10.27 Bobbs Merrill Co., Inc. 25.50 Business Systems, Inc. 17.36 City Controller of South Bend 859.45 Credit Bureau of South Bend 5.00 Fisher Bros. Paper Co. 275.00 International Business Machines Corp. 922.51 Jack's Conoco Service 6.00 Makielski Art Shop 18.36 Office Engineers, Inc. 23.12 Postmaster - 500 stamps @ $.13 65.00 Postmaster - January mailing 15.65 Singer General Tire, Inc. 83.68 Total 8,458.48 SOUTHEAST BUREAU OF HOUSING E -7 Area Services, Inc. - Rehabilitation Contract No. 25 $ 4,775.98 Barany Sheet Metal & Heating Co. - Rehabilitation Contract No. 27 5,373.00 Madison Builders, Inc. & Western State Bank - Rehabilitation Contract No. 66 3,316.00 I'AE 3. APIPROVAL OF CLAIMS (Cont'd Madison Builders, Inc. & Western State Bank - Rehab. Contract 66 $ 1,716.00 Madison Builders, Inc. & Western State Bank - Rehab. Contract 65 3,931.00 Madison Builders, Inc. & Western 'State Bank - Rehab. Contract 62 4,682.00 Slatile Roofing & Sheet Metal Co. - Rehab. Contract 64 1,775.00 Slatile Roofing & Sheet Metal Co. - Rehab. Contract 56 3,482.00 Total 29,050.98 DEVELOPMENT DISTRICT CAPITAL FUND A stract Company of St. Joseph County, (Model Neighborhood to City) $ 125.00 E Ciesiolka (rental of appliances), 230 E. Paris 112.00 Total 237.00 OPMENT DISTRICT CAPITAL BONDS OF 1972 Edgard J. White -Plaza Office Office Engineers- Repair heat line 4. CO a. 1 Total GRAND TOTAL ICATIONS $ 20.00 16.00 36.00 $ 56,305.42 HUD Area Office letter dated January 20, 1976: This letter, INDIANA & over the signature of Mr. Stephen J. Havens, Director, Com- MICHIGAN munity Planning and Development Division, acknowledges re- ELECTRIC CO. ceipt of the relocation claim we submitted to the Area Office RELOCATION from Indiana & Michigan Electric Company. CLAIM, R -66 Mr. Havens advised their relocation specialist was ill and they did not know when she would return to work, but that we can anticipate a response to our inquiry within thirty (30) days. Mr. C. Wayne Brownell, Executive Director, Dept. of Redevelop- ment, stated the relocation specialist has returned to work half days and we expect to hear from her. HUD Area Office letter dated January 22, 1976: This letter, over the signature of Mr. Stephen J. Havens, Director, Com- munity Planning and Development Division, advises the Area Office concurs in the amended proposal for audit services with Goodson -Tyler and Associates, IPA. The cost of the audit is an eligible project cost and shall be reflected in the admin- istrative staff expense budget. Until such time as the budget is adjusted to accommodate this expense, payment for the IPA services may be made from project contingency funds. However, the audit fee should not be paid until you have been authorized by this office. Copies of the executed contract were returned for our records. - 3 - AUDIT SERVICES, GOODSON -TYLER AND ASSOCIATES, NDP PROJECT A -10 4. c. M ICATIONS (Cont'd Mr. Dan Caesar, WSBT -TV Reporter, asked various questions: What was the original.. cost? Reason for the amendment? Was this a routine audit? A routine audit required by HUD? Mr. Brownell advised the reason for the amendment is that the firm audited our records through November 30, 1975, and HUD requested the audit be through the balance of the year, which was the month of December, 1975, and that was the amendment. The original audit contract was $1,810 and the amended total was $1,928.00. Commissioner Wiggins added this was a routine and required audit by HUD. It was strictly on a unit cost basis on which they were the low bidders. This firm was composed of people who formerly worked for the Government and did Government auditing. They learned the procedure that way and went into business for them- selves. Because they know this type of auditing and the books so well, they were able to underbid many of the others and they do a very good job. HUD Area Office letter dated January 23, 1976: This letter, PROCLAIMER over the signature of Mr. Stephen J. Havens, Director, Com- CERTIFICATE munity Planning and Development, advises receipt of our Pro- NO. 9, DIS- claimer Certificate No. 9, reuse value on Disposition Parcel POSITION No. 6 -2, Project Indiana R -66, and this information was re- PARCEL 6 -2, corded in their files. R -66 HUD Area Office letter dated January 28, 1976:. This letter, CHANGE over the signature of Mr. Stephen J. Havens, Director, Com- ORDER NO. 1 munity Planning and Development, advises the Area Office TO PHASE II -E concurs in Change Order No. l to Harry H. Verkler, Contractor, R -66 Incorporated for a net increase of $228.76 in contract cost. The original contract was for $14,500.00. With the $228.76 increase, this brings the total contract to $14,728.76. This Change Order No. 1 is to Phase II -E Contract, Project Indiana R-66. Mo ion was made by Mr. Robinson, seconded by Mr. Wiggins and carried, th t the above letters be received and placed on file. 5. 0 a. BUSINESS Lou -Ann Country Mart Litigation, Cause No. F -6489, Project Indiana R -66: Mr. Brownell advised that normally any litiga- tion is discussed in private before Commission action is taken in public. Mr. Dan Caesar asked what that involves -- litigation of land or what? Mr. Brownell advised this involves a lawsuit in which we are being sued for damages in connection with the Columbia Warehouse fire. - 4 - LOU -ANN COUNTRY MART LITIGATION, R -66 5. 04D BUSINESS (Cont'd Mr. Wiggins made the motion to defer this legal business that must be done in private to the end of the meeting, just prior to adjournment, so that we won't have to excuse our guests at this point. Motion was seconded by Mr. Robinson and carried. b. Contract with Legal Counsel for Professional Services: The CONTRACTS Chair advised, under HUD regulations, we need to have a con- WITH LEGAL tract with the Legal Counsel employed. In our Annual Organiza- COUNSEL: tional Meeting of January 2, 1976, the motion was made that Mr. Kevin J. Butler be retained on a temporary basis as Legal 1) KEVIN J. Counsel, and that has been the status to date. The Chair ad- BUTLER vised that he would now like to suggest to the Commission that we enter into a contract with Mr. Butler to be our Legal Counsel 2) GEORGE for negotiations and to attend Commission meetings, and do the PATTON day -to -day and the negotiations and the work such as that; and that the courtroom work, condemnations and anything involving court procedures, be handled by Mr. George Patton. This would be the recommendation of the Chair to the Commission. Mr. Wiggins moved for the above motion, as stated, seconded by Mr. Robinson and carried. Mr. Kevin J. Butler's contract is dated the 6th day of February, 1976, with an effective date of January 1, 1976, and the limita- tion of fees are as noted in the contract, unless amended by mutual agreement of the parties hereto. Mr. Patton will submit his contract for professional services. 6. NEW BUSINESS a. Nautilus Construction Company Contract No. 1, Colfax /Pier Park Dredging Project, Indiana R -66, approval requests for: 1) Contract Change Order No. 1, dated January 22, 1976, for an increase in contract amount of $1,910.00, or total amended contract of: $49,286.00, and 2) Thirty (30) day time extension request per letter dated February 2, 1976, with new completion date to: March 3, 1976. Mr. Brownell read the letters and change order in their en- tirety: One from Mr. Bill Slabaugh, Project Engineer, to Mr. Brownell, dated January 22, 1976, in which Commission ap- proval was recommended, subject to HUD concurrence. He stated the work was discussed during August, 1975, and agreed to by Mr. Dan Lawson, the designer. Attached to the change order is a copy of a segment of plan sheet showing size and location of changes. None of the extras were called for on the plans. 76.25 cu. yds., foundations, in river, @ $15.74 per cu. yd., removal .......................... $1,200.00 Remove clump eight trees and roots ............. 500.00 Remove piling ................................. 210.00 - 5 - $1110.6 CHANGE ORDER NO. 1 TO CONTRACT NO. 1, COLFAX /PIER PARK DREDGING CONTRACT, NAUTILUS CONSTRUCTION CO., APPROVED R -66 6. NEW BUSINESS (Cont'd Also, there is a request from Mr. George W. Batchelder, President, Nautilus Construction Company, to Mr. McMahon, dated February 2, 1976, for an extension of time on the Colfax /Pier Park Contract to complete the items of work enumerated in the punch -list of the pre - final inspection. The persistant ice and snow has not permitted them to work on the gabions and made it almost impossible to finish the grading. Completion and final inspection should be within 30 days and extension is requested to: March 3, 1976. Mr. McMahon's letter dated February 3, 1976, to Mr. Brownell concurs in the time extension. Motion for the approval of Change Order No. l to the Colfax/ Pier Park Dredging Project Contract No. 1, for an increase in contract amount of $1,910.00, or total amended contract of $49,286.00, and a 30- daytime extension approved, with a new completion date of March 3, 1976, was made by Mr. Wiggins, seconded by Mr. Robinson and carried. Approval is subject to HUD concurrence. b. Proclaimer No. 6, Acquisition Parcel No. 22 -5A, Project PROCLAIMER Indiana R -66: Authorization was requested for the Executive NO. 6, Director, Mr. C. Wayne Brownell, to execute Proclaimer No. 6, ACQUISITION per the Schedule A that was attached, for Acquisition Parcel PARCEL 22 -5A, No. 22 -5A, Project Indiana R -66. R -66 Acquisition Parcel 22 -5A has an approximate area square footage of 3,432 feet, with appraisals made by Ralph D. Lauver and Jerome E. Michaels, the avera e of which is: $4.66. The ap- proximate reuse valuation is 16,000.00. Mr. Dan Caesar asked the address of the above parcel. Mr. Bill Parrish, Real Estate Officer, advised it is 26 feet off of In- wood's Parking lot- -the easiest way to describe it - -26 x 132. It is west of Inwood's. Mr. Brownell advised the 26 feet is off the east end of the lot. Commissioner Wiggins advised the purpose of this is to extend that alley or area way to 40 feet - -to widen it and create an access way 40 feet wide. This has been a part of the project everywhere that we could without having to remove buildings to do it, in order to accommodate rear deliveries. Ms. Derbeck asked if that is being done across the whole block, and Mr. Brownell advised the rest is being purchased or negotiated. Mr. Wiggins moved to authorize the Executive Director to exe- cute Proclaimer No. 6, Acquisition Parcel No. 22 -5A, Project Indiana R -66. Motion was seconded by Mr. Robinson and carried. 6. N8W BUSINESS (Cont'd c. Ford Trucks: Authorization was requested to convey title to TWO (2) City of South Bend, Board of Public Works, on two (2) Ford FORD TRUCKS trucks: TITLE CON- VEYED TO 1) Model U15, 1974, Title No. 74135174027, CITY OF SOUTH ID No. U15GLU61962. BEND 2) Model F37, 1974, Title No. 74135174028, ID No. F37BLU69271. Mr. Brownell advised that these are the two (2) Ford trucks that we purchased in connection with the building of the Pedestrian Way, and the title has never been turned over to the City. The Chair added that at one time we had a fleet of automobiles and approximately a year or so ago, we transferred all but three to the City, and asked if we had ever been paid for those and Mr. Brownell said that we have been. There will not be any payment for the above two Ford trucks, Mr. Brownell added, as these were purchased with bond funds, and we purchased these to turn over to the City for the maintenance of the Mall. Tear out and replace the living and dining room ceilings and paint two coats. These ceilings have been damaged by the leaking of the second floor bathroom water closet .... $ 625.00 Replace second floor bathroom water closet, which has deteriorated since initial inspec- tion......................................... 125.00 Replace nine (9) squares of asphalt shingles. 550.00 Total ........ $1,300.00 Motion was made by Mr. Robinson for the approval of Change Order No. l to Rehabilitation Contract No. 28, with Area Service, Inc., for an increase in contract amount of $1,300.00, or an amended contract total of $7,443.32, with contract time unchanged, seconded by Mr. Wiggins and carried. - 7 - Mr. Wiggins moved for the authorization to convey title to the City of South Bend, Board of Public Works, on the above two Ford trucks, seconded by Mr. Robinson and carried. d. Change Order No. 1 to Rehabilitation Contract No. 28, Project CHANGE ORDER E -7: Approval was requested for this Change Order, with NO. 1 TO Area Service, Inc., for an increase in contract amount of REHABILITATION $1,300.00, (Contract: $6,143.32), or an amended contract CONTRACT NO. total of: $7,443.32, for rehabilitation work at: 708 East 28 APPROVED, Broadway Street, in the Southeast Bureau of Housing Project E -7 E -7, per explanation in memorandum dated February 4, 1976, from Chief Inspector, Mr. James L. Johnson. The change order covers the following items which were not included in the original specifications for the referenced contract: Tear out and replace the living and dining room ceilings and paint two coats. These ceilings have been damaged by the leaking of the second floor bathroom water closet .... $ 625.00 Replace second floor bathroom water closet, which has deteriorated since initial inspec- tion......................................... 125.00 Replace nine (9) squares of asphalt shingles. 550.00 Total ........ $1,300.00 Motion was made by Mr. Robinson for the approval of Change Order No. l to Rehabilitation Contract No. 28, with Area Service, Inc., for an increase in contract amount of $1,300.00, or an amended contract total of $7,443.32, with contract time unchanged, seconded by Mr. Wiggins and carried. - 7 - 6. NE4 BUSINESS (Cont'd) e. Change Order No 1 to Rehabilitation Contract No. 44, Project CHANGE ORDER E -7: Approval was requested for this Change Order, with NO. 1 TO Barany Heating & Sheet Metal, for an increase in contract REHABILITATION amount of $1,233.00, (Contract: $6,450.00), or an amended CONTRACT NO. contract total of: $7,683.00, for rehabilitation work at: 44 APPROVED, 236 East Paris Street, in the Southeast Bureau of Housing E -7 Project E -7, per explanation in memorandum dated February 4, 1976, from Chief Inspector, Mr. James L. Johnson. Mr. Brownell read the memorandum and change order items in its entirety. The contractor has submitted a request for the following items which were not included in the specifications for the referenced contract: Replace roof over southwest and southeast rear sections ............................... $ 145.00 Counter flash 30' x 4' ..................... 120.00 First floor bathroom lavatory - Open lava- tory drain, and install P -trap 78.00 Install 160,000 BTU forced air furnace and replace 8' of flue pipe and elbow on water heater ..................................... 945.00 Sub Total 1,288.00 Less credit for duct work repair for furnace 55.00 Total ............... $1,233.00 Commissioner Robinson raised the question on these furnaces, such as the new furnace above, when this has been determined by the inspector and /or the contractor -- whoever it might be -- since the contractor didn't have the opportunity to bid for the item, is he checked before he gives this price for a change order, and the Chair requested Keith Crighton to re- spond to the question. Mr. Crighton advised the cost estima- tor we have on the staff checks all the prices we have on our change order before they are incorporated. The Chair referred to discussions several weeks ago, on companies requesting change orders, and that on today's agenda we have two change orders from Barany Heating and one from Area Service, Inc., and they seem to run in streaks as to the firm asking for the additional work. Commissioner Wiggins agreed and said about everyone runs into problems and that's really to be expected in these old houses. Discussion followed on the size of the furnaces and Mr. Caesar asked if these houses are insulated; if they were they could possibly use smaller furnaces? Mr. Crighton advised that many of these homes are not properly insulated, and that generally if the home is not insulated very well, or insulated at all, 6. NEW BUSINESS (Cont'd insulation is placed in the attic. It fs not blown into the walls as that is rather costly. Most of the heat loss is through the roof, so we would insulate the attic. As to it being cheaper over the long run, Commissioner Wiggins responded that all we can really do is bring the house up to code and the code, at present, does not include insulating the home. Motion was made by Mr. Robinson for the approval of Change Order No. l to Rehabilitation Contract No. 44, with Barany Heating & Sheet Metal, for an increase in contract amount of $1,233.00, or an amended contract total of $7,683.00, with no change °in contract time. Motion was seconded by Mr. Wiggins and carried. f. Change Order No. l to Rehabilitation Contract No. 54, Project E -7: Approval was requested for this Change Order, with Barany Heating & Sheet Metal, for an increase in contract amount of $550.00, (Contract: $5,362.00), or an amended contract total of: $5,912.00, for rehabilitation work at: 628 East Indiana Street, in the Southeast Bureau of Housing Project E -7, per explanation in memorandum dated February 4, 1976, from Chief Inspector, Mr. James L. Johnson. Mr. Brownell read the memorandum and change order items in its entirety. The specifications had called for the installation of a 120,000 BTU gas conversion unit. The contractor suggests that a new furnace would be more adequate for this structure, because of the enormous size of old duct work and the lack of a forced air system. Staff recommends the change order approval. Installation of 160,000 BTU Forced Air Gas Furnance according to South Bend Code....... $ 885.00 Original specifications called for in- stalling 120,000 BTU Gas Conversion unit, deletion..................................... .... 335.00 Total ................ T 550.00 Motion was made by Mr. Wiggins for the approval of Change Order No. l to Rehabilitation Contract No. 54, with Barany Heating & Sheet Metal, for an increase in contract amount of $550.00, or an amended contract total of $5,912.00, with no change in contract time. Motion was seconded by Mr. Robinson and carried. g. Rehabilitation Contracts 1 through 17, Bureau of Housing, HAO Referral Program: The recommendation from Mr. Keith P. Crighton, Director, Bureau of Housing, is that the Redevelop- ment Commission reject the original bid of Slatile Roofing & Sheet Metal, Inc. received totalling $40,166.00, for Re- habilitation Contracts l through 17, for Contract Set l,for the Bureau of Housing, HAO Referral Program, and approve the CHANGE ORDER NO. 1 TO REHABILITATION CONTRACT NO. 54 APPROVED, E -7 REHABILITA- TION CONTRACTS 1 THRU 17, HAO REFERRAL PROGRAM 6. NEW BUSINESS (Cont'd negotiated bid of $38,841.00, subject to Commission Legal Counsel and Common Council approval, as per his memorandum dated February 4, 1976. The Chair asked Mr. Crighton to respond to this item. Mr. Crighton advised we only had one bidder -- Slatile Roofing & Sheet Metal, Inc., for Contract Set 1, Bureau of Housing, HAO Referral Program, even though the contract was properly advertised and copies of the invitation for bids were mailed out to contractors according to stan- dard procedures. - This relates to the HAO elderly and handicapped referral program we have in force under Community Development. We contacted Mr. Butler, and rather than rejecting the bid and going through the re- advertising procedure, we thought we could do a negotiated bid on this and reduce some of the prices that we felt were high. We have followed Mr. Butler's adviee on this and it is now up to the Commissioners whether they want to accept the negotiated bid or not. The Chair asked how many potential bidders were contacted, and Mr. Crighton advised he believed all 53 bidders that we have on our contractors list were contacted and that Slatile Roofing & Sheet Metal was the only contractor who submitted ,a bonafide bid. Four (4) contractors picked up bid documents but only the one (1) submitted a bid. Whether they felt it was outside their bonding limitations, or they didn't have enough manpower to cover the work, they did not state. These houses also are all over the city, so there is a lot of travel time involved with the con- tractor, and it is more costly in that respect also. Mr. Kevin J. Butler, Commission Legal Counsel, advised that basi- cally the staff thought that it would not be to any avail to re- bid this work and it was felt that they could negotiate certain items within the bid down to reasonable levels or levels they thought they could live with, and it is permitted by law- -the Commission has the right to reject any and all bids. Once the Commission has taken that action, they are in position to negoti- ate for an amount lesser than the lowest bid received. The bids received from Slatile Roofing are shown and the negotiated bid amount: - 10 - Negotiated Bid Contract No. Address Bid Received 01 1246 South Bend Ave. $2,115.00 $ 2,165.00 02 150 N. Birdsell St. 11900.00 .2,130.00 03 229 N. Huey Street 2,565.00 2,450.00 04 1317 W. Indiana Ave. 3,090.00 3,360.00 05 1532 Durham Street 2,756.00 2,906.00 06 1803 E. Calvert St. 2,725.00 2,890.00 07 502 Sherman Ave. 3,966.00 4,016.00 08 1043 Portage Ave. 1,235.00 1,350.00 09 421 S. Wellington St. 3,063.00 3,178.00 10 444 S. Wellington St. 170.00 400.00 - 10 - 6. N5W BUSINESS (Cont'd Total..... $38,841.00 $40,166.00 Mr. Wiggins moved for the approval of the recommendation made by Mr. Crighton to reject the original bid of Slatile Roofing & Sheet Metal, Inc. received totalling $40,166.00, for Rehabi:- lation Contracts 1 through 17, for Contract Set l,for the Bureau of Housing, HAO Referral Program, and approve the negotiated bid of $38,841.00 (as noted above), subject to Commission Legal Counsel and Common Council approval. "It is important this get underway and I don't see where anything would be gained by running it through the wringer again; if you didn't get any results the first time, you probably wouldn't the second." Motion was seconded by Mr. Robinson and carried. Ms. Derbeck, South Bend Tribune Reporter, questioned if the above is such an important reduction - -if you objected to $40,166.00, why would you not object to nearly $39,000.00? Commissioner Wiggins responded that the objection that was raised was only on specific items which were negotiated down and which makes up the total final package. Ms. Derbeck then asked, "But this is in order to make homes reach the standards to be on the Housing Allowance Program? Is there any reason that anybody who can qualify for the Housing Allowance can't get this? What is the criteria for picking out certain people to get this ?" Mr. Cri.ghton responded, "Under our Housing Assistance and Community Development, the program was developed and designed to assist the persons that the Council felt needed the assistance most, or at least the person had priority, and these were the elderly persons who have limited income and limited resources to make the repairs to their homes. As you remember, at the Commission meeting before the last one, we presented an amendment to the HAO Program to handicapped and disabled persons of all ages -- provided they are home - owners--to be included in this program, so it has been expanded." Ms. Derbeck's next question was, "It has been for the handicapped and disabled, and the elderly, no other ?" to which Mr. Crighton's reply was, "That is correct." Mr. Dan Caesar asked how many are handicapped on the above contract and Mr. Crighton advised, "None, on this first contract. The amendment was not in force when this contract was drawn." The Chair asked if there are any further questions; there being none, the vote was requested by the Chair, and the "Ayes" were unanimous by all Commissioners present. Motion was carried. - 11 - E Negotiated Bid Contract No. Address Bid Received 11 1115 E. Donald St. $1,440.00 $1,440.00 12 1234 N. Meade St. 335.00 450.00 13 2420 W. Lawton St. 1,235.00 1,400.00 14 1525 Swygart Ave. 4,116.00 3,991.00 15 1228 Elliott St. 170.00 400.00 16 1129 N. Duey St. 2,550.00 2,150.00 17 2818 Horne St. 51,410.00 55490.00 Total..... $38,841.00 $40,166.00 Mr. Wiggins moved for the approval of the recommendation made by Mr. Crighton to reject the original bid of Slatile Roofing & Sheet Metal, Inc. received totalling $40,166.00, for Rehabi:- lation Contracts 1 through 17, for Contract Set l,for the Bureau of Housing, HAO Referral Program, and approve the negotiated bid of $38,841.00 (as noted above), subject to Commission Legal Counsel and Common Council approval. "It is important this get underway and I don't see where anything would be gained by running it through the wringer again; if you didn't get any results the first time, you probably wouldn't the second." Motion was seconded by Mr. Robinson and carried. Ms. Derbeck, South Bend Tribune Reporter, questioned if the above is such an important reduction - -if you objected to $40,166.00, why would you not object to nearly $39,000.00? Commissioner Wiggins responded that the objection that was raised was only on specific items which were negotiated down and which makes up the total final package. Ms. Derbeck then asked, "But this is in order to make homes reach the standards to be on the Housing Allowance Program? Is there any reason that anybody who can qualify for the Housing Allowance can't get this? What is the criteria for picking out certain people to get this ?" Mr. Cri.ghton responded, "Under our Housing Assistance and Community Development, the program was developed and designed to assist the persons that the Council felt needed the assistance most, or at least the person had priority, and these were the elderly persons who have limited income and limited resources to make the repairs to their homes. As you remember, at the Commission meeting before the last one, we presented an amendment to the HAO Program to handicapped and disabled persons of all ages -- provided they are home - owners--to be included in this program, so it has been expanded." Ms. Derbeck's next question was, "It has been for the handicapped and disabled, and the elderly, no other ?" to which Mr. Crighton's reply was, "That is correct." Mr. Dan Caesar asked how many are handicapped on the above contract and Mr. Crighton advised, "None, on this first contract. The amendment was not in force when this contract was drawn." The Chair asked if there are any further questions; there being none, the vote was requested by the Chair, and the "Ayes" were unanimous by all Commissioners present. Motion was carried. - 11 - 7. PROGRESS REPORTS a. Report from Mr. Keith Crighton, Director, Bureau of Housing: REHABILI- TATION The Chair advised we had quite a discussion here at the last REPORT, Commission meeting about bidders on the rehabilitation con- BUREAU OF tracts and on various change orders. Mr. Crighton was not HOUSING present at that meeting as he was tied up in another meeting, and the Chair advised he asked Mr. Crighton to be here at this meeting and report to us so that everybody would know what the procedure is on trying to get contractors to do this type of work. Mr. Crighton apologized to the Commission for not being present at the last Commission meeting, as it would have made things a lot simpler. The six -page typed report, plus two -page contrac- tors' list, was distributed by Mr. Frank J. Alford, as the copies were run a few minutes ago. Mr. Crighton advised because of the importance of several areas in this report, he requested permission to read most of his comments concerning the questions that were raised at the last Commission meeting concerning the nature and quality of the rehabilitation contracts processed by the Bureau of Housing as part of the City's "Housing Rehabilitation Assistance Program." Following are excerpts of the report made by Mr. Crighton: 1. CommiAzionet L.2oyd Robinson a6ked seve aP- quetsfiio" concerning the e44otuts o4 the Housing Bureau sta4j to obtain more eont ac- totus to wo&k in our ptogtams and te.2ated to noti 4 y ing contra.c- totus o4 the avaitabitity o4 wot k thtough our ptwgtcam. Many attempts have been made to s ecune additi,onat eontAaetotus, and the jottow,ing three (3) - -I would tie to think- -are eneompa6z ing attempts o6 doting this: a. We pubticty adveAti�se 4or bids on FAiday eveni,ngA, when we ave eonttac is av e, to both The South Bend Txk une and the T ki- County News, as tequTt_e y State Law. b. In January o� 1975, when I �i ust Atatrted as Bureau o4 Hous- ing Diteetot, we contacted evetcy contAactotc tinted in the yellow pages o4 the South Bend tetephone diAeetoty, and, at that time, we mailed tettetus out to att the eontraetotus, tso t i�sted, noti4ying them of our progtam and the type o4 wo&k we are .invotved ,in, and we were asking them to become invotved. We mailed apptoximatety 143 tettetus. The con - traetotus' response to the tettter generated the preparation o4 the "Conttaetot'ls List" attached to this tepotrt. At that time, the tist eons.usted o4 45 eontnactoks, and we do have a continuous update pro ceduAe whekeb y we add eo ntAactoAz who ate .interested and have exhibited an abi tity to pa4orm in th e/s e pro gAamis . At the ptce/s ent time,, we have 53 eo ntrae- tou who are on the ti.st and to whom we mail the "Invitation 4or B,iA." Any conttractotus who ate .iwtetcested in woAking on - 12 - 7. PROGRESS REPORTS (Cont'd these eonttacts, aU they have to do ,us contact ups and we add their names to the &6t, and they automaticaUy get a copy vJ the "Invitation Jot Bids" in the mait-- geneAaP,ey the same day that it .cis adve&ti6 ed in the pape&. e. Atzo, in Deeembett of 1973, both the Modet Cities Rehab,itita- tion Ptojeet and the E -7 Southeast Revenue Shax.ing Pxogttam weAe expet.iencing exttceme di46ieuety in obtaining eontAac- totus On many eontAact /sets only one (1) bid w" submitted, and, in some instaneets, no bids were submitted. To xemedy this situation.. we set up a zetri.es o4 con�eAenca with the Home Bui edetr s Azz o cca do n o4 St. Joseph Vatt ey in attempts to inteAe/st member eontAactotus to bid on tehab>i 2itation wo&k. This Association tepxesents apptwximateZy, 147 contnactotus, /suppt i,ejus, and teeated bus.ineszes who have 6tequeney o6 contact with anybody .involved in cowstxuetion ox the te- modett i.ng bws-ine/ss, in attempts to .intehe/st member conttac- mod to bid on AehabZUtati.on wotck. Pte i,man iey, the A•s soei- ation objected to out multi- agency .involvement between HUD, DepaAtment of Labor, Equal Employment Oppotrtunity OJJiee, State o6 Indiana, Common Councit, and the Redevetopment Com- miz,sion. They �ett that this work could be better �aaiti- tated t4 it eoutd be handeed by one agency without ma�s/s,ive co nttAaet documentation that we xequvice in o uA pro gram. The A.S/soeiation beUeved that an "open-end/time and matetta z" contract would most cetr to int y bene6it outs ptogtam. Thxough this type oA eonttaet, unjoxe6een costs eoutd be eazity added without the unneees/sa&y delay caused by submitting change otcdetus requesting apptovat by the Commis6ion. The conttactotus would s.impZy do the wo&k and biU the City, and the City would, in turn, pxoeess the ct im Jot payment. The kssoci.ation abo 6ett that the dottax ti.m,itation shoutd be eliminated because the seveAe condition o6 many o6 these homes wantcanted wotFz that would 6atc exceed the t mica Lion. We were unable to make the changes because a22 our pxo eedutes , at the ptes ent time, arse mandated, and they were at that time a?so, by mute vatrious con - tract agencies. Even though the recommended changes eoutd not take ptaee, sevehat membeA eontttacto,, s did isubmit bids, and they are Asti t on out ma.i Zing tist, but they were quickey dis- eoutaged because theit bids wexe too high, and they weAe not, theAe6oxe, awarded any contracts. omment: Bxie4ty, on this one paint: The majox pnobtem in getting mate contJtactotus " o- G 1) Rehab,c2itation wo&k is vety d A�icu.Pt because it ,us not major temodet2ing. The eontractox must be able to work with and around the occupants. 2) AU contractors object to the m",s,iv e amounts o � documenta- tion .incotpotated in out contracts. - 13 - 7. PROGRESS REPORTS (Cont'd In oxdetr to ,intexest moxe contAactotu .. we aim ist att con - ttractotus in the ptepatat i,o n o4 thew, non -z peei. ie contAact documents. This is the only manner in which we ate allowed to hetp a eontAactox oveteome the "xed- tape." Un�oktunatety, we cute not attowed to use the "open -end time and matetuiaez" conttract 4oxm with public 4unds . It obviousty makes oux fob much tesz dii4.icatt to have move conttractotus woxking in the pxo j ect in that we ate able to get the wank done quickeA. we have made and we w,i 2t continue to make s,inceAe and .intews,ive e4jotuts to intexest mane contxac- totus in wonki.ng on then e contracts. 2. AnotheA question raised was concerned with the quat.ity o4 the/se contracts. The xetativeey new b,id /pe 4vwance bond tequiaement was .incoxpoxated into out con Aact conditionz at Mn. But2eA',s and Comm,i�ssion',s request, I betieve, apptox imatety a yect and a hat4 ago. The bene6 t o J this nequvrement is that it "weeded out" the untret.iabte eontractotus who were 4.inaneia t y unabte to obtain bonding ox submit a bond check. The only drawback was that thtis xequ ument dxasticaZZy tceduced the number o4 biddeus Jot the rehabii ation work. 3. Commizzionet Robinson asked a numbetc o4 impoxtant questiov.6 re- t Ling to qua2i.ty o4 the Buteau',s .inspections and spec 4ications. It is an obviousty di44icu2t situation cons.ideAing the numerous change oxdexs that tune presented 4ox action by the Commission. Many o4 the .inspections were done wet over a year ago by a di44etent sta44 undeA di44erent management. when the ptco j eet came undeA my 1uki6dicti,on, I did not order a totat pro j ect xe- in,speetion because o4 out seAiou3 zhatrtage o4 manpower and time. At that time, we had onty tce- apptoptiation 4otr six months and our money had to be a toeated within that six-month pelui.od, and we only had two .inspeetoxs, Aso it was impozs.ibte 4ox us to xe- ,ins peet evexyth.ing . As 4ax as the ,inspections that we ate doing at the ptce�sent time undeA the Community Devetopment Pxo- gxam, we ate attempting to maintain quality and quantity .6 imut- taneou,sty. Ideatty, the pa4eet ,inspecti.on /,spec 4icati.on .us pnepcted by an eng.i.neet and an architect. Atso, a good deaf o6 time shoutd be attotted 4otc the ptepaxation of each speei4.iea- tion to insure its accuracy. Un�otrtunatety , we ate undetusta� ed by appxoximate2y 40% and we are expected to accomptis h in 12 months what pxev,i.ous pxogxams were expected to comptete in three years. Out inspectou axe geneAaUy petusons with construction baekgtround who cure 4ami2tiar with the BOCA "One and Two - Family awett.ing" Code. The main pxobtem with conttraet spec 4icat%on6 in the past was that no two contAactotus woutd have the same ,intenptretation o4 the te- commended work. Pxesentty, we attempt uni4oxmity o4 .5pec%4.ieation tetm.inotogy in oxdex that each conttactot w.it2 have the same .in- texptetation as the otheu. Because the speci4ications o�4er tie of no. 4reedom 4ox the conttractor to account box the ,indiv,idua2 .idio s ynenac e,s o4 each house, he must now z ubm.it requests 4or change - 14 - 7. PROGRESS REPORTS (Cont'd ordeu to coven un4oreseen of changing situations in each unit. Becau/se o4 the Butceau',s desire to document each expenditutce and account 4otc evexy contract dottoA, change oxdex6 have become an .ine/seapabte aspect o4 tehab-i P,itation work. Because aceounta- bit t y o6 each pubt.ic dottat is necess an y, we wiU continue to ,submit change ordeu as the need art ics e/s . In gene -ewtt, tehab.ittitation pxog.awm ate stow, ptodd.ing pnojeeta wholse eg�eet ,us not immed.iatety 4ett. 14 we ate to do a good, accurate job- -they must tcemain so. We axe gtossty undetustaAjed and working on tl m.ited time. We as o ate &ezttr ieted by dottatc .imitations 4oA each project. The pto1ects ate phit- osophica.tty unpoputat and aetstheticaUy uncertain. Ins the Pubtie getting the i)L dotto lls wotrth? I do not know - -i j you'tce tatk.i.ng about each home',s ma&ket vatue - -I Aeatty can't say, but my answer woutd be an emphatic "yes" i6 you were tatk ing about .imptov.ing tiv.ing Bond t ionz and the .s aJety o4 the un it'/s occupants. In oute C-ity',s deteA oAated neighborhoods, we ate b,%inging homes up to minimum code with the hopes o4 making t i v ing a ti ttt e te/s s digs ieutt, impAov.ing the geneAat condition of the neighbotchood, gene&ati,ng neighborhood .intehest and cohesion, and po�ss,ibty ,saving Lives. The mat(iet vatue o4 the home does not enter the is sue at this stage. In my Jive ptuz yeatcs working with Aehab.i 2itation pxograrm, I can estate that it has neveA been an easy task with immediate Aeatization o4 goats. I do fleet that these progxaw accomptush ,some good. We ate making ti6e somewhat more beakabte and suAv.i- vat (somewhat terns di44icutt Jot petvsons who have to Live in deter.ioxated aneas and who have no means to .improve theitc pro - pert y. We aAe o 4 j etc ing a s otutl o n 6 oA a pro btem to which no atteAnative exists. At the ptes ent time, rehab.i ?.itat.i.on " the best and tea6t expensive way of dealing with uAban bright. The Chair thanked Mr. Crighton and stated that it is a good report. Commissioner Wiggins also complimented Mr. Crighton, and added, I think he has done an excellent job here of presenting the situa- tion and the response to it, and "let's keep this on hand. As memory dims and questions arise, we can bring it out again." Commissioner Robinson directed the following question to Mr. Crighton: "At the last meeting, it was explained to us that through this inspec- tion thing, as an example, one contractor had approximately six projects, that it took thirty days for each project for the inspec- tion, so that it was within a realm of possibility that it could be six months or later from the time of inspection until the time that the actual work was started. Is this going to be improved to cut down this period of time, so that, what the complaint was last month was because of the time lapse between the inspection and the actual work was when all these added costs arose ?" Response by Mr. Crighton, "Right. Under the Community Development Project, we completely changed the Notice to Proceed procedure. Now if the contractor had six homes, we would issue three notices to proceed immediately. At the time Mr. Alford here has - 15 - 7. PROGRESS REPORTS (Cont'd a preconstruction conference, one week later we will issue another notice to proceed; another week another one; and then on the third week, a final one, so we are talking about four (4) weeks in which he would get all six (6) notices to proceed. Commissioner Robinson said that is a vast improvement over what was told us in the last Commission meeting. Mr. Crighton said, "We have had a lot of organizational problems on this and this is why we are constantly trying to change it, and the input from the Commission is very important on this, because we really need to make changes on these programs if we are going to get them going the way they should be going, so any information and any suggestions you make are always very seriously considered." b.l Emergency Repair Program Report: This monthly report for January was submitted as a written report EMERGENCY by Mrs. Nyoka King, in which she advised: REPAIR PROGRAM Emergency repairs are proceeding throughout the City of South Bend. REPORT Contracts 27, 31, 32, 33, 34, 35, 36 and 37 were awarded this month. Work will begin immediately. The total awarded contracts to date is 37. A total of 13 final inspections were made and passed, giving a total of 28 final inspections to date. The Project is progressing well. c.1 Relocation Progress Report: This written report for the month of January was presented by the RELOCATION two relocation staff members: PROGRESS REPORT Southeast NDP A -10: The workload is one (1) individual who has moved into substandard housing and is waiting for a vacancy in LaSalle Park Homes. Model Cities Extended Services: The workload is one (1) individual, who is in the process of securing replacement housing. City -Wide: One (1) second year Rental Assistance Payment remains to be paid. d. I Center City News: This flyer was submitted to our office for distribution by Mr. Doug CENTER Simpson, Director, River Bend Plaza Office. CITY NEWS The flyer was prepared through the auspices of the Downtown South Bend Council giving center city news by Mr. Simpson, upcoming events and conventions; results of holiday shopping package; a report by Dr. George A. Wing, Chairman, Mayor's Committee on Downtown Development, outlining its enunciated goals and effective utilization of a viable downtown; and other informational material. - 16 - 7. PROGRESS REPORTS (Cont'd) Our "Thanks" to the Chamber of Commerce and others for an exceptional report. 8. GUEST INTRODUCED Mr. John R. Kagel, Executive Director, Downtown South Bend Council, GUEST, introduced his guest - -a co- worker at the South Bend- Mishawaka Area MR. RON Chamber of Commerce, Inc., who is a replacement for Mrs. Campbell BOCK wh has been working in Washington, D.C. - -Mr. Ron Bock. Mr. Bock is a graduate of Indiana University at Bloomington and very talented in his area of expertise. Mr. Kagel said he brought Mr. Bock to the Co mission meeting today so that he may better understand the "wheels of government in motion, as this Commission, because his work is basically pounding on the doors of business firms throughout the downtown area and we would like for him to get a little idea of how this works. Mr. Bock will not be attending the meetings after this, unless it would be for a special reason. Mr. Bock's one assignment is the Center City News flyer mentioned above. Mr. Bock advised South Bend did have their first winter carnival anJ the various festivities were advertised in The South Bend Tribune and it was very well covered -- treasure hunts, snow "slopes, ski demonstrations, ice skating demonstrations, dogs -- including some St Bernards. Most of the people who attended the festivities enjoyed it very much, and it was, "I think" an added thing for the downtown ar a. It was festive and very well received by the people there. 9. QT COMMISSION MEETING: Th next Regular Meeting of the Redevelopment Commission will be NEXT at 10:00 a.m., Friday, February 20, 1976, in the Office of the Depart- COMMISSION me t of Redevelopment. MEETING: 2 -20 -76 10. TEMPORARY RECESS: As there were no further comments or questions by the public or the RECESS FOR Pr ss, the Chair requested a recess, to discuss Item 5a, privately, LITIGATION Lo -Ann Country Mart Litigation, Cause No. F -6489, Project Indiana DISCUSSION R-56. By unanimous consent, the meeting recessed at 11:00 a.m. for private litigation discussion. Tha meeting reconvened at 11:45 a.m., for the public session. 11. LITTIGATION In ti mo an An Ro reference to Item 5a, "OLD BUSINESS," Lou -Ann Country Mart Litiga LOU -ANN )n, Cause No. F -6489, Project Indiana R -66, Mr. Wiggins made the COUNTRY :ion for the adoption of the recommendation of the Legal Counsel, MART LITI- J that is to authorize Attorney Kevin J. Butler to settle the Lou- GATION, i Country Mart lawsuit for $1,000.00. Motion was seconded by Mr. R -66 Hinson and carried by all Commissioners present. - 17 - 12. ADJOURNMENT Motion was duly made by Mr. Wiggins for adjournment, at 11:47 a.m., seconded by Mr. Robinson and carried. (SEAL) Executive r � w F. Jay N14ntz, President ADJOURNMENT r'• �^yLteT CA a * * o DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT i INDIANAPOLIS AREA OFFICE WILLOWBROOK 5 BUILDING, 4720 KINGSWAY.DRIVE INDIANAPOLIS, INDIANA 46205 REGION V ern. 300 South Recker Drive Chicago, Illinois 6060 IN REPLY R[F[R TOS FEB 4 1976 5.4DS : JM ,1 ' P Mr. C. Wayne Brownell Executive Director f Department of Redevelopment _, F« 1200 County-City Building I` `' r I�76 r• South Bend, Indiana 46601 `i r i Dear 14r. Brownell: Subject: Project Ind. A -10, R -66 and R -57 The purpose of this letter is to document the conclusions reached in your anuary 20th meeting with Jeanne Meggs and Peggy Hudgens of my staff. Our u derstanding of the status of all activities in projects A -12, R -57 nd R -66 are as follows: oject Ind. A -10 Acquisition: 100% Complete Demolition: 100% Complete Relocation: All completed or paid into escrow. oiect Improvements: None in this project. n -Cash: The financing plan calls for $410,866.00. The ouired amount has been certified. udit: The audit is presently being updated to December 31, 1975. he LPA will receive the audit report by February 9, 1976. This eport will be sent to the Regional Inspector General for audit n Chicago the week of February 16th. The audit report will be ransmitted to the Area Office no later than March 1, 1976. The PA will be requested to respond to the audit findings the week of arch 8, 1976. The audit will be cleared the week of March 15, 1976. �` bhl,'1.` .�,r'µ'J' X'^` aM` 1�N �•1�4'7.�y1 ..�`a+�,'�dAy,.ifm ^Y +^.+T-C� :.'!r°•�t t.. - I�.. �'`T ""''�- !.`.1 �..�` 3 Please to clo The es The out �34. keep in mind that the above figure does not include interest ,e-out and is subject to change. :ablished close -out date for project A -10 is March 31, 1976. Project Ind R -11: Acquisition: Parcel 22 -5A is the only parcel remaining to be acquired. It is estimated that this parcel will be acquired by February 19, 1976. R location: There is one claim remaining to be paid. This is tie claim from the Indiana and Michigan Electric Company. This c aim is presently in our office for review. Site Improvements: All presently under contract. Demolition: There are two buildings remaining to be demolished. It is anticipated that these buildings will be under contract by June 30, 1976. Dn -Cash: The financing plan requires $11,816,387.00 in non -cash. a-date $11,816,387.00 has been certified. isposition: The financing plan calls for $7,684,173.00 in land roceeds. To date $2,036,163.00 has been received udit: The contract for an IPA audit will be approved by the ommission and sent to H.U.D. by March 19th. The award of the ontract will be approved by H.U.D. by April 16th. The audit ill begin May 1st and will be completed by June lst. The audit eport will be transmitted to our office for clearance no later han June 15th. The audit should be cleared by June 30th. ticipated financial status of your project at the time of close - as follows: 0 Progr< Financing Plan tures 24,332,016 Estimated Receipts ( +)Overage and (- )Shortage Requirements 23,882,017 +449,999 Item 11 11,816,387 11,816,387 -0- GrosslProgram Cost 1 36,148,403 Dispo ition Proce ds 7,684,173 2,036,163 - 5,184,173 Net P ogram Cost 28,464,230 Local Share Non-Cash 11,816,387 11,816,387 -0- Cash 1,416,552 834,906 - 581,646 Total Local Share 13,232,939 Capital Grant 15,231,291 w Relocation Grant 2,146,844 1,344,572 +80,227 Rehab Grant -0- -0- -0- Total Excess or Shortage - 5,235,593 Pleas keep in mind that the above figure does not include interest to close out and is subject to change. Becau a of the large shortage of funds in this project, we find it neces ary to request that you submit a plan for financial settlement. This plan can take into consideration the estimated proceeds to be received from the sale of land through Fiscal Year 1979, grants avail- able imder the H. U.D. contract for the project, Community Development funds available, and funds from local sources. It is not necessary that the shortage be provided in one year. The plan may provide for the settlement of the outstanding indebtedness in increments through fiscal year 1979. This plan should be submitted to our office no later than February 20, 1976. p b it t .•:M (y �YYI '� t M �t .� } L i l u. J �y, ,M, 1J �y:y, w �f ,.µ l �1 .,5 v ��.. '�� �.-�., j�X�c�..4y'•! xr.+�r"LFn��.��,������ "b� r kOt" �`t R The . This paid the reti tablished close -out date for project R -66 is August 10, 1976. ate represents the date on which all grants available will be o the project. Any resources available will be used to reduce tstanding indebtedness. Any remaining indebtedness will be d in accordance with the plan which we have 'requested above. The c ose -out papers for this project should be submitted to our offic no later than July 26, 1976. Please refer to Chapter II page -4, in the Draft copy of CPD 7388.1 for instructions on com- pleti n of the close -out papers. We are enclosing the required forms with his letter. oject Ind. R -57: he LPA will submit a status report on the activities in this roject by May 1, 1976. Upon receipt of this report, we will chedule a meeting to discuss the settlement of this project.. If yo have any questions concerning the contents of this letter, or the r quirements for financial settlement, feel free to contact Jeann Meggs at (317) 269 -7194 or Peggy Hudgens at (317) 269 -7011 for assis ance. Since$ely, Sf Eph tf J. Havees Direc or, Community Planning and D velopment Division Ow.R?rj wq� '�i,,t,(� *'l�v+`W`,.`�,`'�,�p� CITY OF SO TH BEND South Bend, Indiana 46601 IIM :iA h Peter J. Nemeth r TO: DATEI: COMMUNITY DEVELOPMENT PROGRAM DEPT. OF REDEVELOPMENT 1200 County -City Bldg., Phone 284 -9371 Redevelopment Commission F. Jay Nimtz President John E. Chenney Vice President Donald A. Wiggins Secretary B. L. Wade Assistant Secretary A. Peter Donaldson Member C. Wayne Brownell Executive Director Sweeney, Butler & Simeri Legal Counsel South Bend Redevelopment Commission C. Wayne Brownell February 20, 1976 DearlCommissioners: Attached, hereto, is the plan for financial settlement which was pre- pared pursuant to the request from HUD in their letter of February'4, 1976. This plan was presented to the Mayor and the City Council in caucus, and as been sent to Mr. Stephen J.- Havens, Director, Community Plan- ning and Development Division, at the Indianapolis Area Office of HUD, as requested. CWB : I Enc. Yours respectfully, C. Wayne Brownell Executive Director r $6,745,.000 + 240,000 $6,985,000 - 240,000 $6,745,000 - 39,060 $6,705,940 - 1,050,000 $5,655,940 - 360,000 $5,295,940 - 5,295,000 $ 940 940 $5,295,000 + 211,800 $5,506,800 - 211,800 $5,295,000 - 338,941 $4,956,059 -2,500,000 $2,456,059 - 2,455,000 $ 1,059 $ 1,059 $2,455,000 + 98,200 $2,553,200 98,200 $2,455,000 - 108,900 $2,346,100 - 500,000 $1,846,100 - 1,845,000 $ 1 '10 1 ,100 FINANCIAL PLAN IND. - R -66 Project Notes due June 11, 1976. Interest due June 11, 1976 Total due June 11, 1976 Payments to be made June 11, 1976 Interest from C.D. Funds budgeted` Sale of land $39,060 May 7, 1976 (from Parcel 6 -1 contract of Sale) Progress payment - ask HUD to request Central office approval for June 1976 payment PAGE 1 Relocation balance - ask HUD to request Central office approval for June 1976 payment (approximately) Proceeds from sale of Project Notes Balance due June 1977 To be paid from Project funds June 11, 1976 Project Notes due June 1977 . Interest due June 1977 (estimated) Total due June 1977 Payments to be made June 1977 Interest from C.D. Funds Budgeted. $ 84,100 Sale of Land - Block 6 $254,841 Sale of Land - Block 6 338,941 Total from Sale of Land Urgent Needs Funds Requested from HUD Proceeds from Sale of Notes due June 1978 Balance To be paid from Project Funds Project Notes due June 1978 Interest due June 1978 (estimated) Total due June 1978 P`y.ments ' to be made June 1978 Interest from C.D. Funds Sale of land Block 6 Estimated,Sale of Land by June 1978 Proceeds from Sale of Notes June 1978 Balance To be paid from Project Funds PAGE 2 FINANCIAL PLAN - IND. - R -66 $1,845,000 Project Notes due June 1979 ' + 73,800 Interest due June 1979 (estimated) $1,918,800 Total due June 1979 - 73,800 Interest from C.D. Funds $1,845,00 - 11000100 Sale of Land by June 1979 $ 845,00 - 845,000 Proceeds from Sale of Notes June 1980 $ 845,000 Project Notes due June 1980 + 33,800 Interest due June 1980. $ 878,800 Total due June 1980 - 33,800 Interest from C.D. Funds $ 845,00 $ 845,000 Sale of Land by June 1980 S� �otert 17100511v ,'Can4cape. Asign aid Contracting, 1 nc. 60648 -Cl.c `Koad So,r(l, f encl, 9ndrawa 46614 gelepl one 219) 291 -6253 Mr. C. Wayne Brownell Department of Redevelopment 1200 County City Building South Bend, Indiana 46601 Dear Mr. Brownell: P r our phone conversation of Feb. 18, 1976, we agree to t e extention of the bid award for the Pedestrian way, P ase #3 (project Ind R. -66) Through June, 15, 1976. 3 I is also understood that the beginning of construction a d the completion dates will also be delayed. Yours very truly Robert 0 Foegley E i. E 33 1,976 e CITY OF SO(ATH BEND South Bend, Indiana 46601 Peter J. Nemeth Mayor William C. Gilkey Direct r, Human Resources and . Economic Development Rede elopment Commission City of South Bend February 18, 1976 COMMUNITY DEVELOPMENT PROGRAM Room 1200, County -City Building 219 284 -9371 Bureau of Housing Bureau of Planning and Management VG' �` LL kail 1200 County -City Bldg. �. 227 Jefferson Blvd. ;. Soutf Bend, Indiana 46601 Dear Newb: 15 & Perfc Cond= obta Sirs: 4 In accordance with the Commission's conditional contract award to 11 Construction Company on January 2, 1976 of Contract Nos. 11,12, 18 in the Southeast Project, this firm has failed to provide the rmance Bonding on Contracts 11, 12 $ 18 as required by General tions for the Rehabilitation of Real Property, Stc 121A (a). This ny was also granted a ten day extension (see Attachment A.) to n bonding on 1/23/76. This extension expired on 2/6/76. Due to this contractor's inability to provide bonding, he must forf't 10% of each bid amount totaling $1,022.40 (see Attachment B.) in acco dance with Section 6, Bid Guaranty Instructions to Bidders, and Document E, Bid Bond:' Newbill Construction would therefore be eligible to receive a refund in the amount of $456.10 as 10% of Contract # 15 for whic performance bond is provided. If you have any questions or have need of further information please contact me at your earliest convenience. Thank you. Si cere y p, eith P. Cri ton Director \1 Bureau of Housing KPC /k c Attac . =2 CITY OF SOUTH BEND Sou h Bend, Indiana 46601 %,x xxAKox Peter J. Nemeth May r will am )X yqa; aM G i 1 k ey Dire tor, Human Resources and Economic Development Newbill Construction Co., Inc. 1219 W. Jefferson Street South Bend, Indiana 46625 ear Sir: COMMUNITY DEVELOPMENT PROGRAM Room 1200, County -City Building 219 284 -9371 Bureau of Housing Bureau of Planning and Management January 23, 1976 In response to your January 22 letter requesting a time extension in securing your required Performance Bonds, you are hereby granted a 10 working day extension for Contracts #11, #12 #15 and #18 in the Southeast Community Development project. I will contact Golden Key Insurance Company regarding receipt of this Bond. If you are not able .to provide this Bond by February 6, 1976 at 4:45 P.M. we will be forced to rescind your contracts and award to the next lowest bidder. If you have any.questions please contact me. Sincerely, Keith P. Crighton Director, Bureau of Housing KPC:ef WTvh n CITY OF SOIJJH BEND South Bend, Indiana 46601 Peter J. Nemeth Mayor William C. Gilkey - Director Human Resources and Economic Development Newb 11 Construction Co. 1231 W. Washington Avenue Sout Bend, Indiana 46628 Dears Si rs : COMMUNITY DEVELOPMENT PROGRAM Room 1200, County -City Building 219 264 -9371 Bureau of Housing Bureau of Planning and Management February 10, 1976 Havi g received your Singul.ar Performance Bond for Contract 15 /S CD, 721 East Broadway, it is.my duty to inform you that your Treasurer's check in the amount of $1,478:50, #34148, is h reby being deposited with the Department of Redevelopment for disbursement. Due to your inability to provide performance bond3 for Contracts 11, 12 and 18 you must forfeit 10% of each bid amount for these contracts totaling $1,022.40, in accord- ance with Section 6 Bid Guaranty of the Instructions to Bidders and Document E Bid Bond. 10% of Contract 15 is therefore refunded to you in the amount of $456.10. Please affix your signature to both copies of the attached claim so that this money may be refunded to you as soon as possible. Please return these claims before Wednesday, Febr ary 18, 1976 for action by the Commission at their next regu ar meeting. If y�u have any questions or have -need of further information, plea e contact me at your earliest convenience. KPC: sf Iq -t -+Iqa h n . Sin erely, .O�Q.CG Keith P. 'Cri ghto Director , Bureau of Housing 6. NSW BUSINESS (Cont'd Other questions followed which Mr. Crighton answered, and the answers are summarized for the record: Two contractors bid on the house in question. One of the stipulations for this rehabi- lation program is that the tenant of the house must be the owner; he must have insurance before he can be helped. As to whether a land contract can be considered ownership; it is only when they have added an amendment to the contract. The amendment is an aspect to be used under the LaSalle Park Program, the Redevelop- ment Code Enforcement Programs, and in essence becomes the fore- closure period in the form of 30 days to 90 days, and it also states that the seller has the title to that property. In other words, we are not dealing with someone who is buying the house on land contract, or someone who is also buying other houses on land contracts. We cannot help tenants under this Program- -that would come under the Substandard Building Department. Under the Southeast Community Development Program, the owner must be living in the house. Mr. Caesar asked if the house can be rented after it is rehabilitated, and Mr. Criahton answered in the affirmative. Brownell advised Newbill Construction Company was the low bidder on each of the above four contracts. The bid tabula- tion was included in the packets. Motion aras made by Mr. Wiggins, seconded by Mr. Donaldson and carried, to award the above contracts as noted. Mr. Crighton requested the motion to contain additional wording to show that it is a "conditional award." The Newbill Construc- tion Company is a new contractor bidding on this type of work, and the motion should contain that if the Newbill Construction Company cannot comply with the contract regulations that the contract award should go to the next lowest bidder on the contract. We have Newbill's bid bond. When the contract is awarded, then the contractor files for a performance bond. The - 12 - Mr. Wiggins again made the motion that we accept the recommenda- tions of the Advisory Committee. Mr. Donaldson seconded the mo- tion and it was carried. e.' Rehabilitation Contract Nos. ll /SECD, 12 /SECD, 15 /SECD and REHABILI- 18 /SECD, in the Southeast Community Development Program: Per TATION recommendations of the Southeast Advisory Committee, Commission CONTRACT approval was requested to conditionally award the following con- NOS. tracts to Newbill Construction Company, subject to Commission.. ll /SECD, Legal Counsel approval: 12 /SECD, 15 /SECD, & Contract No. Address Amount 18 /SECD A14ARDED CON - ll /SECD 213 E. Calvert St. $1,993.00 TIONALLY, 12 /SECD 1816 S. Carroll St. 3,347.00 E -7 15 /SECD 721 E. Broadway St. 4,561.00 18 /SECD 506 E. Broadway St. 4,88.4.00 Brownell advised Newbill Construction Company was the low bidder on each of the above four contracts. The bid tabula- tion was included in the packets. Motion aras made by Mr. Wiggins, seconded by Mr. Donaldson and carried, to award the above contracts as noted. Mr. Crighton requested the motion to contain additional wording to show that it is a "conditional award." The Newbill Construc- tion Company is a new contractor bidding on this type of work, and the motion should contain that if the Newbill Construction Company cannot comply with the contract regulations that the contract award should go to the next lowest bidder on the contract. We have Newbill's bid bond. When the contract is awarded, then the contractor files for a performance bond. The - 12 - 6. NSW BUSINESS (Cont'd performance bond is hard to secure and small contractors have this problem to hassle. If we do not have the "conditional award" then we would have to come back to the Commission and ask for a rejection to the previous award, go back to the Common Council, and then have to go through the whole process for approval again, which would be a delay cif at least six (6) weeks. The "conditional award" request is as noted in the letter dated December 31, 1975, to Mr. Brownell from Mr. Crighton, and included in the packet, which states: Since Newbill Construction Co. is a new contractor under the Community Development Program, we are requesting a conditional award subject to that company fulfilling all contract requirements. In the event that this firm is unable to comply with these requirements, we are requesting that these contracts be awarded to the following contractors listed as the next lowest bidders: #11 /SECD* $2,271.38 Combs Decorating #12 /SECD* 3,366.20 Combs Decorating #15 /SECD* 4,727.28 Combs Decorating #18 /SECD ** 5,500.00 Madison Builders, Y, Construction & Construction & Construction Inc. ( *) Subject to approval by Legal Counsel only. ( * *) Subject to Common Council and Legal Counsel approval. At the consent of the Commissioners, the prior motion was rescinded, and the motion is amended to read, that the above contracts, (Nos. 11 /SECD, 12 /SECD, 15 /SECD and 18 /SECD)be awarded to Nevibill Construc- tion Co.,in the bid amounts as noted above by Newbill, as a "condi- tional award" subject to that Company fulfilling all contract re- quirements; in the event the firm is unable to comply with these requirements, the contracts are to be awarded to the next lowest bidders, as are noted above in the indented quote, [Contract #18 in this case would require Common Council approval also.] All are subject to Legal Counsel approval, and the President.and Secre- authorized to execute said Contracts. The amended motion was made by Mr. Wiggins, seconded by Mr. Donaldson and carried. f. Change Order No. 1 to Rehabilitation Contract No 65, Southeast Project E -7: Commission approval was requested of Change Order No. 1 to Rehabilitation Contract No. 65, with Madison Builder's, Inc., for an increase in contract amount of $209.00, (Contract: $3,912.00), or an amended contract total of: $4,121.00, for re- habilitation work at: 605 E. Indiana Avenue, Southeast Project E-7. The letter by Mr. James L. Johnson, Jr., Chief Inspector, to Mr. Crighton, advises the specifications called for replacing the front porch tongue and groove floor 330 square feet. When - 13 - CHANGE ORDER NO. 1 TO REHAB. CONTRACT NO. 65 APPROVED, E-7 �t1 F. RICHARD HI R. KENT ROWE CHARLES A. S` JOSEPH V. SIN KEVIN J. BUTL LEWIS C. LADE Janu ZER, ROWE, SWEENEY, BUTLER, SIMERI & LADERER ATTORNEYS AT LAW SUITE 900 ST. JOSEPH BANK BUILDING RJR. TELEPHONE 233-3303 SOUTii BEND, INDIANA 46601 AREA CODE 219 JR. 23, 1976 Mr. C. Wayne Brownell Executive Director Department of Redevelopment 1200 County -City Building Sout4 Bend, IN 46601 Re: Dear Lou -Ann Country Mart vs. St. Joseph Superior Court Cause No. F -6489 Wayne: Columbia Storage Warehouse This is a companion case to the Stanz Cheese case. We had an opportunity to settle this case for the payment of $1,000 and I thought it was well worth it considering the fact that we would spend far in excess of this in attor- ney's fees defending the matter. I have indicated to Attor- ney imothy Walsh of Edward Kalamaros' office, counsel for the laintiff herein, that I would recommend $1,000 in full sett ement of the case. I am passing this along to you so that you might ob- tain authorization for said payment. The settlement pay- ment should be made payable to Lou -Ann Country Mart and their attorneys Edward N. Kalamaros & Associates. If there is anything further that need be done on this I'd ask that you nquire. j Sincerely yours, Charles A. Sweeney, Jr. CITY OF SOOTH BEND South Bend, Indiana 46601 Peter J. Nemeth Mayo William C. Gilkey Direc or, Human Resources and Economic Development Redevelopment Commission City of South Bend 1200 County-City Bldg. 227 W. Jefferson Blvd. South Bend, I Dear Sir$: COMMUNITY DEVELOPMENT PROGRAM Room 1200, County -City Building 219 284 -9371 Bureau of Housing Bureau of Planning and Management February 3, 1976 At the January 16 Commission meeting several questions were asked concerning the nature and quality of the rehabilitation contracts processed by the Bureau of Housi g as part of the City's "Housing Rehabilitation Assistance Program I would 'like to respond to these questions by the following remarks: 1 Commissioner Lloyd Robinson asked several questions concerning the efforts of the Housing Bureau staff related to notifying contractors of the availability of work through our program. Many attempts have been made to secure additional contractors and are listed as follows: a. We publicly advertise for bids on Friday evenings in both the South Bend Tribune and the Tri- County News, as required by State Law. This advertisement consists of the "Invitation For Bids" which specifies where contract documents may be obtained, the work to be awarded and at which time the bids must be returned for opening. If a contractor is interested in working on these contracts, it is his responsibility to read the legal notices every Friday evening. b. In January of 1975 every contractor listed in the Yellow pages of the South Bend telephone directory was mailed a letter no- tifying him of our program and the type of work we are involved in. We mailed about 143 letters. The contractor's response to the letter generated the preparation of the "Contractor's List" attached hereto. At that time the list consisted of 45 contract- ors. Through continuous updating of the list we now have 53 MEA contractors to whom we mail the "Invitation For Bids ". Needless to say, the response to these individual mailings has not been great. Any contractors interested in working on these contracts have the name of their firm added to the list and they receive copies of the Invitations via regular, mail. c.- In December of 1974 both the Model Cities Rehabilitation Project and the E -7 Southeast Revenue Sharing Program were experiencing extreme difficulty in obtaining contractors. On many contract sets only one bid was submitted and, in some instances, no bids were submitted. To remedy this situation, I was asked by Mayor Jerry Miller to set up a series of conferences with the Home Builders Association of St. Joseph Valley. This Association represents approximately 147 contractors, suppliers, etc. I met with the Association's Executive Committee throughout December of 1974 and January /February of 1975 in attempts to interest member contractors to bid on rehabilitation work. I found the executive committee to.be truly concerned with the success of the program and they suggested several changes that they felt would generate more interest in government contracts. Primari- ly, the Association objected to the multi- agency involvement between D /HUD, Dept. of Labor, Equal Employment Opportunity Office, State of Indiana, Common Council and the Redevelopment Commission. Understandably, they felt that this work could be better facilitated Tf it could be handled by-one agency without massive contract documents that are required by the program agen- cies. Essentially, the Association believed that an "open -end/ time & materials" contract would most certainly benefit our program. Through this type of contract unforeseen costs could be easily added without the unnecessary delay caused by submission to the Commission for approval. The contractor would simply do the work and bill the City after completion. The Association also felt that the dollar limitation should be eliminated because the severe condition of many of these homes warranted work that would far exceed the limitation. All of the Association's re- commendations were seriously considered but we were unable to make any changes because all procedures are mandated by the various contract agencies. Even though the recommended changes could not take place, several member contractors did submit bids but were quickly discouraged because their bids were extremely high. Comment: The major problem in getting more contractors is two -fold: One, rehabilitation work is very difficult because it is not major .remodeling. That is, the interior is not gutted and the work started from scratch. These homes are all occupied and the contractor must be able to work with and around the occupants. Many contractors are unwilling or unable to do this. They feel that occupied structures complicates the work flow. Also, many contractors feel restricted by the contract specifications. They prefer to have the freedom that an open -end, time & materia.ls 2. p -3 contract offers. Many contractors feel they should not have to bid on the work. They would rather be hired outright to do the job with no dollar limitation and thus enabling them to do better work. .Second, all contractors object to the massive amounts of documentation incorporated into our contracts. Because these are public funds making us responsible to many agencies and de- partments, every piece of documentation is a necessary and integral part of each contract - no matter how burdensome that contract ap- pears. Contractors also object to being told how much they have to pay their workers and reporting this payroll in the form of Weekly Wage Reports and Monthly Utilization Reports to the EEO Contract Compliance Officer, Mr. Frank Alford. Mr. Alford moni- tors each contract to insure compliance with EEO and Department of.Labor standards. These reports are mandatory. Finally and quite simply, many contractors do not have the staff to keep up with all the required documentation. In order to interest, more contractors, we assist all con- tractors in the preparation of their non - specific contract documents. Mr. Alford also assists them in completing their report forms. This is- the only manner in which we are allowed to help.a contractor overcome the "red- tape ". Unfortunately, we are not allowed to use the "open -end time and materials" contract form.with public funds. All contracts must be publicly offered for bids and awarded in a specific dollar amount. All change orders and requests for additional.funds must be approved by the Local Public Agency. It obviously makes our job much less difficult to have more contractors working in: .the project in that we are able to get the work done quicker rather than spreading it out among 8 or 9 contractors. We have made and we will continue to make sincere and intensive efforts to interest more contractors in working on these contracts. Another question raised was concerned with the quality of these con- tracts. In the past programs monitored by the Commission, you had to deal with sometimes unreliable contractors who were more interested in earning a quick dollar rather than performing well and building a good reputation. To overcome this problem, the relatively new bid /perform- ance bond requirement was incorporated into our contract conditions. The benefit of this requirement is that it "weeded out" the unreliable contractors who were financially unable to obtain bonding or submit a bond check. The only drawback was that this requirement drastically reduced the number of bidders for the rehabilitation work. An example of this can be best illustrated through the bid opening that took place on January 20, 1975 for the Southeast Project. Two weeks pre- vious to the bid opening, a question was raised concerning the bid bond requirement and the possibility of its being discriminatory. This was widely publicized by the media and the following bid opening consisted of bids submitted by 16 contractors of which only seven had submitted bid bonds or bond checks. The remaining contractors thought p -4 that the bond requirement would be eliminated. After very careful consideration the Redevelopment Commission ruled that the bid bond requirement be retained although many small contractors would be unable to participate in the program. The next bid opening was held on February 3, 1975 with only seven contractors submitting bids. The difference that the bonding "requirement has made is apparent. The large, established contractor is at the other end of-:.tbe spectrum. How do we get them interested in bidding on this work? Presumably, the large contractor is considered more equipped to handle rehabili- tation work with relative ease while maintaining quality workmanship. It was discovered that large contractors have just as much difficulty with the contracts as do the smaller firms. They simply do not have the staff necessary to complete the contract documents and the wage report forms. Also, they submit considerably higher bids due to their higher overhead costs. The only alternative we have in attract- ing "larger" contractors is to "bulk bid" ten or fifteen homes as one contract. This would offer a larger margin of profit to the larger firms but, unfortunately, would discriminate against the smaller companies who are unable to obtain bonding in excess of $50,000. We have incorporated this concept into the contract procedure for the HAO Elderly &Handicapped Referrals Program but we have had very poor response from the larger contractors. Also, we have done this with only one program in order that smaller contractors still have the other project in which to participate. We have still not abandoned the "bulk bid" concept and through the staff efforts to interest more large firms, we hope to have a better response from these companies. 3. Commissioner Robinson asked a number of questions related to quality of the Bureau's inspections and specifications. It is an obviously difficult situati.on considering the numerous change orders that are presented for action by the Commission. Many of the inspections were done well over a year ago by a different staff under different management. I do not know what procedures were used and what type of quality control was maintained. When the project came under my jurisdiction I did not order a total project reinspection.because of our serious shortage of manpower and time. As far as the inspections we are doing at the present time under the Community Development. Program, we are attempting to maintain quality and quantity simul- taneously. Ideally, the perfect inspection /specification is prepared by an engineer and an architect. Also, a good deal of time should be allotted for the preparation of each specification to insure its accuracy. Unfortunately, we are understaffed by approximately 40% and we are expected to accomplish in 12 months _what previous programs were expected to complete in three years. Our inspectors are gener- ally persons with construction background who are familiar with the BOCA. "One and Two - Family Dwelling" Code.. The main problem with contract specifications in the past was that no two contractors would have the same interpretation of the recommended work. Presently, we attempt uniformity of specification terminology in order that each contractor will have the same interpretation as the others. We attempt to make our specifications as exact as possible and we require that the contractors bid only on the specified items. Th -is has created a massive increase in the volume of change orders presented for action. Because the specifications offer little or no freedom for the contractor to account for.the individual idiosyncracies of each house, he must now submit requests.for change orders to cover unforeseen or changing situations in each unit. Because of the Bureau's desire to document each expenditure and account for every contract dollar, change orders have become an inescapable aspect of rehabilita- tion work. It would obviously be much easier for the Bureau to prepare vague specifications that would allow a contractor the freedom to do what he wanted rather than what we specify. Also, change orders occur for a number of other reasons; deteriorated items may become further damaged by severe weather or continued use by the homeowner; items may have been concealed at the time of the inspection by rugs, furniture, etc.; the homeowner may make changes in living pattern or cause damage themselves; the specified method of correction may not be sufficient to eliminate the problem. Please keep in mind that these contracts involve occupied structures and the specifications are very different from those used in new construction. It is literally impossible to cover all points under rehabilitation programs. There are too many unforeseen items and situations that occur. Because accountability of each public dollar is necessary, we will continue to submit change orders as the need arises. In general, rehabilitation programs are slow, plodding projects whose effect is not immediately felt. If we are to do a good, accurate job - they must remain so. We are grossly understaffed and working on limited time. We also are restricted by dollar limitations for each project. The projects are philosophically unpopular and aesthetically uncertain. Is the Public getting their do.11ar's worth? I do not know - if you're talking about each home's market value. My answer would be an emphatic "yes" if you were talking about improving living conditions and the safety of the unit's occupants. In our city's deteriorated neighbor- hoods we are bringing homes up to minimum code with the hopes of making living a little less difficult, improving the general condition of the neighborhood, generating neighborhood interest and cohesion, and possibly saving lives. The market value of the home does not enter the issue at this stage. In my five plus years working with rehabilitation programs, I can state that it has never been an easy task with immediate realization of goals. Housing and Urban Development says we are not encouraging smaller con - tractors to participate in our programs - others.say we need larger contractors who are able to do more and better work. The unions say we do not involve them in our rehabilitation work - yet the Department of Labor states that by law we cannot discriminate between union and non - union contractors. The homeowners want more work done on their homes. The general public feels that we are doing too much work. Even though the apparent inequity exists, I do feel that these programs accomplish some good. We are making life somewhat more bearable and survival somewhat less difficult for persons who have to live in deteriorated areas . who have no means to improve their property. We are offering a solution for a problem to which no.alternative exists. At the present time; rehabilitation is the best and least expensive way of dealing with urban blight. Sincerely, Keith P. Cright Director Bureau of Housing KPC:ef M 1. Castlem n Construction Co. 1522 W. Ford Street South B nd, Indiana 46619 Ph. 234-3810 2. Wm. Goi s Construction Co. P.O. Bo 3558 South B nd, Indiana 46619 3. Vic Tri pel Plumbing 545 W. 3rd Street Mishawaka, Indiana 46544 Ph. 259-5224 4. Wright onstruction Co. 2707 Middlebury Street Elkhart Indiana Ph. 293--3587 5. Case Co 6235 Co Flint, Attn. C Ph. (31 6. Wm. Gyo Mi chi an 15219 K Granger Ph. (21 struction Co., Inc. unna Rd. ichigan 48504 ifton Black 732 -2000 i Roofing Co. rlin Dr. Indiana 46530 684 -5793 after 6 P.M. 7. Bond -Bi t Construction Company 0. S. J hnson, Jr. 13800 W Eight Mile Road Oak Par l, Mich. 48237 Off. 561 -8600 Res. 34 -0764 8. Tom Gel ner 1417 E.. Donald South B nd, Indiana Ph. 289-4927 9. Bill Ri 827 E. Mishawa Ph. 259 10. Mi l l i kei 54933 Q South B Ph . 233• ker Remodeling Service th Street a, Indiana 46544 8764 Construction Co. ince Road nd, Indiana 5833 11. C. E. S afford Construction 111 Cherry Street South Q nd, Indiana Ph. 287-9696 12. Palmer 12892 F Mishawa 13. Area Se P. 0. B 502 S. Mishawa Ph. 255 onstruction Co., Inc. ilmore Road a, Indiana 46544 vices, Inc. x 178 Ironwood a, Indiana 46544 6372 CONTRACTORS 14. A.B.C. Plumbing & Heating, Inc. Attn. Mr. Ray Guzman 121 W. Mishawaka Avenue Mishawaka, Indiana 46544 15. Allied Construction Company 1110 Western Avenue South Bend, Indiana 16. Clyde Wardlow 1351 E. Corby South Bend, Indiana 17. Burkholder & Ford Construction 440 Dragoon Trail Mishawaka, Indiana 18. Bell Aluminum Sales Mr. Norman Theobald 3319 W. Sample Street South Bend, Indiana 46619 Ph. 232 -9903 19. Mr. Richard A. Madison Madison Builder's, Inc. 422 S. Kaley Street South Bend, Indiana 46619 Ph. 289 -9072 20. Woodcox Building Contractor 51175 Prescott Avenue South Bend, IN 272 -6905 21. All State Builders 740 E. Bronson Street South Bend, IN Ph. 234 -1603 22. Fred Bennett Construction 61647 Meadowlark Lane South Bend, IN 46614 Ph. 288 -0191 23. Building.Service Company 2111 Gertrude South Bend, IN 287 -5265 24. F & F Home Improvement 22988 W. Ireland Road South Bend, IN Tele. 288 -7580 25. Jack Frost Company 3015 W. Western Avenue South Bend, IN Ph. 289 -2252 26. Earl Schmucker 730 W. Indiana Avenue South Bend, IN Ph. 289 -1470 27. Michiana Construction 700 St. Joseph Bank Building South Bend, IN Ph. 272 -6882 CONTRAC ORS - Page 2 29. Pub is Service Bureau 424 13th St., N.W. Was ington, D. C. 20004 30. Cha les Brown P.O. Box 3050 Sou h Bend, Indiana 46619 31. Ant ony's.Home Improvement- 1154 W. Washington Street South Bend, IN Office: 232 -0600 Hom : 287 -3811 32. Ros land Construction Company 138 Dixieway North Ros land, Indiana Ph. 272 -6288 33. Cir le Lumber Co. 121 S. Walnut Street Sou h Bend, IN Ph. 287 -5971 34. Dav d Rydzins-ki Ame..Home Improvement 139 W. Willow Drive Sou h.Bend, IN 46637 Ph. 233 -5636 35. Jim Swartz Sun asters Awing, Inc. 905 E. Jefferson Street Mishawaka, IN 46544 PH. 259 -2476 36. Robert J. Elwood Great Horizons Development Corp. Box 1750 5185 Broadway Street Gary, IN 46408 37. Roscoe Baily 602 Euclid South Bend, IN 46628 Ph. 233 -8464 38. Harlan Lusk 'Harty W. Verkler Construction Box 3608 645 Wilber Sou h Bend, IN 46628 Ph. 232 -5801 41. Newton Contractors St. Joseph Bank Bldg. South Bend, IN 46601 Ph. 288 -9000 42. Christman Construction 850 Fellows Street South Bend, IN 287-2827 43. Barany Heating & Sheet Metal 1202 E. Jefferson St. Mishawaka, IN 46544 Phone 259 -9771 44. Van Overberghe Builders, Inc. .57440 Peggy Drive South Bend, IN 46619 45. Reinke, Carl J. & Sons, Inc. 721 N. College Street South Bend, IN 46628 46. Slatile Roofing Co. 1703 S. Ironwood Dr. South Bend, IN 46613 Ph. 233 -7485 47. Able Construction Service 1212 S. Walnut St. South Bend, IN 46621 48. Plaia Construction 228 W. Broadway South Bend, Ind. 46618 49. B. L. Guthrie P.O. Box 345 Lakeville, IN 46536 50. Hance Construction 700 W. Front St. New Carlisle, IN 46552 51. Hosea & Son Construction Co. 322 N. Huey St. South Bend, IN 46628 52. LaPlace Electric Co. 702 S. Main St. Mishawaka, IN 46544 Ph. 256 -0256 53. Thomas Scheibelhut Construction 39. Ted Combs Decorating & Construction, Inc. 25665 New Road 801 E. Colfax Avenue North Liberty, IN 46554 South Bend, Indiana 46617 Phone 232 -5138 40. Ray Bennett, General. Contractor 166 6 Brick Road Sou h Bend, IN Ph. 272 -4970