HomeMy WebLinkAboutChange Order No 4 - Historic Leeper Park Improvements – Project No. 118-010A - Ancon Construction Co. Inc.1316 COUNTY -CITY BUILDING PHONE 574/ 235-9251 227 W. JEFFERSON BOULEVARD FAx 574/ 235-9171 SOI)TH BEND. INDIANA 46601-1 930 r �r CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS December 19, 2019 Mr. Sean Welty Ancon Construction Co., Inc. 237 N. Michigan St., Suite D South Bend, IN 46601 RE: Change Order No. 4 — Historic Leeper Park Improvements — Project No. 118- 010A Dear Mr. Welty: The Board of Public Works, at its meeting held on December 19, 2019, approved the above referenced Change Order for an increase of $12,165.50, bringing the current contract amount to $1,384,979.86. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: The original contract sum 11 /21 /2019 118-010A Historic Leeper Park Improvements 4/23/2019 PCR #4-Water meter 8, Handrail Install Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time CONTRACTOR Cont for Signatur Printed Name and Title Company Name Address City, State, Zip $ 1,308,129.03 $ 64,685.33 $ 1,372,814.36 FX Increased Decreased $ 12„165.50 $ 1,384,979.86 0.89 % 5.87 % 11/1/2019 19 days 0 days 1 °1 /20/20111 Rg!gQMMENDF.Q EOR AEP69VAL U CONSTR N MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WOS Approved Date: w Gary A. 09ot, President Genevi ve E. Miller, Member Elizabeth A. Maradik, Member ANCON CONSTRUCTION CO., INC. October 28, 2019 Project: Leeper Park Improvements Job No: 173041 PCO No. 08 Reference: Historic Handrails Date: 10/28/2019 Description: Provide and install 3 sets of handrails Includes: 1. handrails made from solid steel bars 3.4" x 1-1/2" 2. Steel bars are hammered and will follow the slope and curve of radiused cheek walls 3. all material will be gloss black powder coat 4. handrails will be cored and crouted into historic step cheek walls. Excludes: Change Order Amount: $ 10,377.00 Should you need any additional supportive documentation and/or breakdown, please call us at your convenience. Thank you for your prompt review and cooperation. Sincerely, `i- vj� Sean Welty Project Manager Ancon Construction Approval: Authorized Signature: Date of Approval: ANCON CONSTRUCTION CO., INC. October 22, 2019 Project: Leeper Park Improvements Job No: 173041 PCO No. 06 Reference: fountain meter Date: 10/22/2019 Description: Change backflow device and install owner provided meter Includes: provide and install additional new 3/4" RPZ, and water meter provided by City Excludes: water meter provided by others. Change Order Amount: $ 1,788.50 Should you need any additional supportive documentation and/or breakdown, please call us at your convenience. Thank you for your prompt review and cooperation. Sincerely, Sean Welty Project Manager Ancon Construction Approval: Authorized Signature: Date of Approval: 1:'urn4'N4 N Ids. A 0 :y DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING Project Number: 118-010A Project Name: Historic Leeper Park Improvements Change Order #: 4 MMM� DATE INITIATED: 11/21/2019 BPW DATE: Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). Install water meter & RPZ valve- per Water Works' directive ($1,788.50) Install handrails for "Historic Steps" ($10,377.00) Attachments: (List documents support change — required) Contractor quotes Amount of Blncrease / ❑Decrease: $ 12,165.50 Categories (Pick One): Previously approved Change Order(s): $ 64,685.33 B Scope of Work El Differing Site Conditions, Changed Conditions Current Percent of Change: 0'89 ❑ Conflicted Specifications and Drawings El Failed Materials New Total Amount: $ 1,384,979.86 — ❑ Error El Omission Total Percent of Change: 5.87 ❑ Final Quantity Adjustment Funding Secured From: __ „ 0 (filled out by PM) RECOMMENDED BY: Greg McGowan �.�..�^ 12/16/19 Project Inspector (Print Name) (Signature) (Date) REVIEWED BY: dl+144-7-19 Construction Ma ger (Print Name) (Signature) (Date) APPROVED BY: Engineering Project Manager (Print Name) (Signat) (Date) APPROVED BY: CityEnineer(rinn ) (Signatc ) (Dat ) BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 12/16/19 Name Kle Silveus Department Enineer�in �__.�... ..... BPW Date 12/19/19 Phone Extension 9083 wwm ummm omomum �ru Prior to Subrnitfal to Board Legal ❑ Attorney Name Clara McDaniel Controller Controller review is required for all Contracts $5,000.00 or more anc greater than one year in length per the City Purchasing Policy Purchasing ❑ Michael Schmidt _ Check the [� Agreement �...e El Professional Services Bid Opening El Quote Opening Change Order No. 4 Ease/Encroach. 7 Other: Contract ❑ Resolution Bid Award El Quote Award C/O & PCA No. EI Traffic Control Proposal ❑ Req. to Advertise Re uiir i Information ❑ PCA Addendum ❑ Title Sheet Company or Vendor Name Ancon Construction Company, Inc.. New Vendor ❑ Yes El No El If Yes, Approved by Purchasing MBE/WBE Contractor ❑ MBE F-] WBE MBE/WBE Contractor Requested ❑ No ❑ Yes Name of Company Project Name Historic Leeper Park Improvements - Bid Package 1 _. _m......_ Project Number 118-010A Funding Source RW TIF Bond Account No. 452-1101-452-31.02 Amount —. ..�-_ .__......_.. Terms of Contract Purpose/Description In Required Contractor's Certification ation Form Attached Water RPZ va (Non - Collusion Non Discnmmation„ Non Debarment, E Verify Iran, etc Amount of Increase $ 12,16550 ❑ Decrease $ �.mm_� Previous Amount $ 1,372,814.36 Current Percent of Change: ..0..� g 89% New Amount $1 384 979.86 Total Percent of Change: 5.87% Dispersal After Approval Copy Original ® Kyle Silveus ® El.Pa..tri__ .. a c.. erm..�.a..n..�..�..�,� - �......... �. � . _ _.....�........ —_. ........ ___ ... _..� ............_,